CN204080633U - A kind of Bridge Pier Construction device - Google Patents

A kind of Bridge Pier Construction device Download PDF

Info

Publication number
CN204080633U
CN204080633U CN201420364849.2U CN201420364849U CN204080633U CN 204080633 U CN204080633 U CN 204080633U CN 201420364849 U CN201420364849 U CN 201420364849U CN 204080633 U CN204080633 U CN 204080633U
Authority
CN
China
Prior art keywords
template
support bar
creeping formwork
bridge pier
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420364849.2U
Other languages
Chinese (zh)
Inventor
梁枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RUIAN DONGNAN MUNICIPAL ENGINEERING CONSTRUCTION CO., LTD.
Original Assignee
Chengdu Jiameijia Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiameijia Science and Technology Co Ltd filed Critical Chengdu Jiameijia Science and Technology Co Ltd
Priority to CN201420364849.2U priority Critical patent/CN204080633U/en
Application granted granted Critical
Publication of CN204080633U publication Critical patent/CN204080633U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of Bridge Pier Construction device, comprise template, and be arranged on the lacing wire in template, and be arranged on the creeping formwork in template; Described creeping formwork is provided with pole-climbing; Described pole-climbing upper end is provided with working platform; Described working platform upper end is provided with jack; Described jack upper end is provided with push rod; Described creeping formwork comprises framed bent; Support bar is connected with between described framed bent; Described support bar is vertically installed with angle mould; Described angle mould is vertically installed with column casing; The utility model gets sliding formwork and the advantage of turning over mould, two kinds of systems are comprehensively integrated, again platform and template are divided into two independently systems, thus the complexity of the continuity overcome required by slding form operation and construction organization and system easily reverse the deficiency causing concrete bodies surface quality difference, the labor strength that the frame again and again solving over-form construction scaffold and platform stands, removes and above turns over and brings is large, and working procedure cycle period is long waits many contradictions.

Description

A kind of Bridge Pier Construction device
Technical field
The utility model belongs to civil construction field, particularly relates to a kind of Bridge Pier Construction device.
Background technology
Generally slding form operation is applied at present in the engineerings such as railway and highway bridge pier, silo, inverted cone water tower.The problem of kerve, hanging and correction is there will be in work progress, and due to bridge pier height degree large, horizontal closing slope rate is delayed, when template system climbs pier shaft top, working platform crossbeam outward outstanding part is oversize, simultaneously the frame again and again of construction scaffolding and the platform labor strength standing, remove and above turn over and bring is large, and many troubles such as the working procedure cycle period brought is long.
Summary of the invention
(1) technical problem that will solve
For solving the problem, the utility model proposes the labor strength that a kind of frame again and again solving over-form construction scaffold and platform stands, removes and above turn over and bring large, the long Bridge Pier Construction device waiting many contradictions of working procedure cycle period.
(2) technical scheme
Bridge Pier Construction device of the present utility model, comprises template, and is arranged on the lacing wire in template, and is arranged on the creeping formwork in template; Described creeping formwork is provided with pole-climbing; Described pole-climbing upper end is provided with working platform; Described working platform upper end is provided with jack; Described jack upper end is provided with push rod; Described creeping formwork comprises framed bent; Support bar is connected with between described framed bent; Described support bar is vertically installed with angle mould; Described angle mould is vertically installed with column casing.
Further, described working platform lower end is provided with joint pin.
Further, described support bar and framed bent adopt buckle to be fastenedly connected.
(3) beneficial effect
The utility model compared with prior art, it has following beneficial effect: Bridge Pier Construction device of the present utility model, get sliding formwork and the advantage of turning over mould, two kinds of systems are comprehensively integrated, again platform and template are divided into two independently systems, thus the complexity of the continuity overcome required by slding form operation and construction organization and system easily reverse the deficiency causing concrete bodies surface quality difference, the frame again and again solving over-form construction scaffold and platform stands, the labor strength of removing and above turn over and bring is large, working procedure cycle period is long waits many contradictions.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model creeping formwork.
1-template; 2-lacing wire; 3-creeping formwork; 4-pole-climbing; 5-working platform; 6-jack; 7-push rod; 8-framed bent; 9-support bar; 10-angle mould; 11-column casing; 12-joint pin.
Detailed description of the invention
A kind of Bridge Pier Construction device as depicted in figs. 1 and 2, comprises template 1, and is arranged on the lacing wire 2 in template 1, and is arranged on the creeping formwork 3 in template 1; Described creeping formwork 3 is provided with pole-climbing 4; Described pole-climbing 4 upper end is provided with working platform 5; Described working platform 5 upper end is provided with jack 6; Described jack 6 upper end is provided with push rod 7; Described creeping formwork 3 comprises framed bent 8; Support bar 9 is connected with between described framed bent 8; Described support bar 9 is vertically installed with angle mould 10; Described angle mould 10 is vertically installed with column casing 11.
Wherein, described working platform 5 lower end is provided with joint pin 12; Described support bar 9 adopts buckle to be fastenedly connected with framed bent 8.
Bridge Pier Construction device of the present utility model, get sliding formwork and the advantage of turning over mould, two kinds of systems are comprehensively integrated, again platform and template are divided into two independently systems, thus the complexity of the continuity overcome required by slding form operation and construction organization and system easily reverse the deficiency causing concrete bodies surface quality difference, the labor strength that the frame again and again solving over-form construction scaffold and platform stands, removes and above turns over and brings is large, and working procedure cycle period is long waits many contradictions.
Embodiment recited above is only be described preferred embodiment of the present utility model, not limits design of the present utility model and scope.Under the prerequisite not departing from the utility model design concept; the various modification that this area ordinary person makes the technical solution of the utility model and improvement; protection domain of the present utility model all should be dropped into; the technology contents of the utility model request protection, all records in detail in the claims.

Claims (3)

1. a Bridge Pier Construction device, is characterized in that: comprise template, and is arranged on the lacing wire in template, and is arranged on the creeping formwork in template; Described creeping formwork is provided with pole-climbing; Described pole-climbing upper end is provided with working platform; Described working platform upper end is provided with jack; Described jack upper end is provided with push rod; Described creeping formwork comprises framed bent; Support bar is connected with between described framed bent; Described support bar is vertically installed with angle mould; Described angle mould is vertically installed with column casing.
2. Bridge Pier Construction device according to claim 1, is characterized in that: described working platform lower end is provided with joint pin.
3. Bridge Pier Construction device according to claim 1, is characterized in that: described support bar and framed bent adopt buckle to be fastenedly connected.
CN201420364849.2U 2014-07-03 2014-07-03 A kind of Bridge Pier Construction device Expired - Fee Related CN204080633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420364849.2U CN204080633U (en) 2014-07-03 2014-07-03 A kind of Bridge Pier Construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420364849.2U CN204080633U (en) 2014-07-03 2014-07-03 A kind of Bridge Pier Construction device

Publications (1)

Publication Number Publication Date
CN204080633U true CN204080633U (en) 2015-01-07

Family

ID=52173368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420364849.2U Expired - Fee Related CN204080633U (en) 2014-07-03 2014-07-03 A kind of Bridge Pier Construction device

Country Status (1)

Country Link
CN (1) CN204080633U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120653A (en) * 2014-07-03 2014-10-29 成都佳美嘉科技有限公司 Pier constructing device
CN108914780A (en) * 2018-08-03 2018-11-30 中水电第十工程局(郑州)有限公司 A kind of bridge tall pier and thin wall hydraulic sliding mould construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120653A (en) * 2014-07-03 2014-10-29 成都佳美嘉科技有限公司 Pier constructing device
CN108914780A (en) * 2018-08-03 2018-11-30 中水电第十工程局(郑州)有限公司 A kind of bridge tall pier and thin wall hydraulic sliding mould construction method

Similar Documents

Publication Publication Date Title
CN204174935U (en) A kind of outer wall of basement one side formwork supporting and protection structure
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN104695337A (en) Self-lifting sliding and turnover construction system and construction method
CN204080633U (en) A kind of Bridge Pier Construction device
CN204024045U (en) A kind of movable assembled high-supported formwork bracing or strutting arrangement
CN204238570U (en) The spiral adjuster of absolute altitude of frame ball node is installed
CN204081453U (en) Can have enough to meet need use formula scaffold frame shaped steel fixing device that encorbelments
CN204212447U (en) Door and window concrete arch lintel strengthening construction device
CN203129025U (en) Suspension fixing device for hanging basket
CN104120653A (en) Pier constructing device
CN203200719U (en) Hanging type slope pouring template device
CN204753390U (en) Bridge construction support bracket
CN204386139U (en) Detachable structural steel anchor device
CN205223861U (en) Capable system is walked to cast -in -place simple box girder centre form of high -efficient support
CN205152775U (en) Bridge height limiting device
CN207469752U (en) A kind of venthole non-dismantling formwork
CN204212272U (en) A kind of concrete column and stiffened steel structure post steel split heads connected node
CN207209786U (en) The cast-in-place boom support monoblock type automatic disassembling device of falsework
CN208055892U (en) A kind of multifunctional dolly for the installation of bridge drainpipe and guardrail repairing
CN202644407U (en) Demoulding device for bottom plate bracket of capping beam constructed by hoop method
CN204023414U (en) The few fulcrum support entirety of a kind of novel large falls rack device
CN103469734A (en) Negative-bending-moment corrugated pipe duct grouting construction method
CN203175037U (en) Internal formwork bracket for building
CN204174936U (en) A kind of template support structure of outer wall of basement
CN204959612U (en) Detain hanging die block

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Li Rongchao

Inventor before: Liang Feng

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20151130

Address after: 130032 No. 5986, free road, two economic development zone, Changchun, Jilin

Patentee after: Changchun municipal construction (Group) Co., Ltd.

Address before: 610000 Sichuan Province, Qingyang District, Jinyang Road, No. 7, building 6, building 19, No. 112

Patentee before: CHENGDU JIAMEIJIA SCIENCE & TECHNOLOGY CO., LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160928

Address after: 325200 Ruian Dongshan Street Economic Development Zone starting area

Patentee after: RUIAN DONGNAN MUNICIPAL ENGINEERING CONSTRUCTION CO., LTD.

Address before: 130032 No. 5986, free road, two economic development zone, Changchun, Jilin

Patentee before: Changchun municipal construction (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20180703

CF01 Termination of patent right due to non-payment of annual fee