CN204058097U - Pile tube production circulating water system - Google Patents

Pile tube production circulating water system Download PDF

Info

Publication number
CN204058097U
CN204058097U CN201420505685.0U CN201420505685U CN204058097U CN 204058097 U CN204058097 U CN 204058097U CN 201420505685 U CN201420505685 U CN 201420505685U CN 204058097 U CN204058097 U CN 204058097U
Authority
CN
China
Prior art keywords
sewage
boiler house
water
collecting pool
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420505685.0U
Other languages
Chinese (zh)
Inventor
徐建军
杨慧文
李元胜
范玉东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshi Jianhua Building Material Suzhou Co ltd
Original Assignee
SUZHOU TANGSHI JIANHUA CONCRETE PILE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU TANGSHI JIANHUA CONCRETE PILE Co Ltd filed Critical SUZHOU TANGSHI JIANHUA CONCRETE PILE Co Ltd
Priority to CN201420505685.0U priority Critical patent/CN204058097U/en
Application granted granted Critical
Publication of CN204058097U publication Critical patent/CN204058097U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)

Abstract

The utility model discloses a kind of pile tube production circulating water system, it relates to a kind of circulating water system.It comprises boiler house and sinks pond, cigarette ash shallow lake, sewage collecting pool, sewage second-level settling pond, sewage first stage precipitation tank, sewage Hui Jichi, full factory side bilge, boiler house water purifier, boiler house water purifying tank and boiler house soft brush treatment water tank, full factory side bilge, sewage Hui Jichi, sewage first stage precipitation tank, sewage second-level settling pond, sewage collecting pool connect successively, boiler house sinks pond, cigarette ash shallow lake and is also connected with sewage collecting pool, and sewage collecting pool is connected with three workshop batching plant water of productive use, boiler house water purifiers respectively.This embodiment is by the transformation to water route, and the process realizing water reaches the standard of company's water, accomplishes not sewage effluent.

Description

Pile tube production circulating water system
Technical field
The utility model relates to a kind of circulating water system, be specifically related to a kind of pile tube production circulating water system.
Background technology
Current many factories all can produce the pollutents such as a large amount of waste water and gas aborning, and the sewage that current existing manufacturing enterprise produces is all directly be discharged in rivers, this creates very large pollution to environment, also also creates certain impact to neighbouring resident.
Utility model content
For the deficiency that prior art exists, the utility model object is to provide a kind of pile tube production circulating water system, and by the transformation to water route, the process realizing water reaches the standard of company's water, accomplishes not sewage effluent.
To achieve these goals, the utility model realizes by the following technical solutions: pile tube production circulating water system, comprise boiler house and sink pond, cigarette ash shallow lake, sewage collecting pool, sewage second-level settling pond, sewage first stage precipitation tank, sewage Hui Jichi, full factory side bilge, boiler house water purifier, boiler house water purifying tank and boiler house soft brush treatment water tank, full factory side bilge, sewage Hui Jichi, sewage first stage precipitation tank, sewage second-level settling pond, sewage collecting pool connects successively, boiler house sinks pond, cigarette ash shallow lake and is also connected with sewage collecting pool, sewage collecting pool respectively with three workshop batching plant water of productive use, boiler house water purifier is connected.
As preferably, described boiler house water purifier is connected with boiler house soft brush treatment case by boiler house water purifying tank.
As preferably, described boiler house water purifier is also connected with river source by the pipeline being added with liquid medicine.
The beneficial effects of the utility model: by the transformation to water route, the process realizing water reaches the standard of company's water, accomplishes not sewage effluent.
Accompanying drawing explanation
The utility model is described in detail below in conjunction with the drawings and specific embodiments;
Fig. 1 is structural representation of the present utility model.
Embodiment
The technique means realized for making the utility model, creation characteristic, reaching object and effect is easy to understand, below in conjunction with embodiment, setting forth the utility model further.
With reference to Fig. 1, this embodiment is by the following technical solutions: pile tube production circulating water system, comprise boiler house and sink pond, cigarette ash shallow lake, sewage collecting pool, sewage second-level settling pond, sewage first stage precipitation tank, sewage Hui Jichi, full factory side bilge, boiler house water purifier, boiler house water purifying tank and boiler house soft brush treatment water tank, full factory side bilge, sewage Hui Jichi, sewage first stage precipitation tank, sewage second-level settling pond, sewage collecting pool connects successively, boiler house sinks pond, cigarette ash shallow lake and is also connected with sewage collecting pool, sewage collecting pool respectively with three workshop batching plant water of productive use, boiler house water purifier is connected.
It should be noted that described boiler house water purifier is connected with boiler house soft brush treatment case by boiler house water purifying tank.
In addition, described boiler house water purifier is also connected with river source by the pipeline being added with liquid medicine.
The sewage of traditional factory and enterprise has been carried out time collection, precipitation, purifying treatment by this embodiment, makes the water of productive use of factory and enterprise to reach emission standard, also can carry out recycle, be of value to protection of the environment after carrying out purifying treatment.
This embodiment is by the transformation to water route, and the process realizing water reaches the standard of company's water, accomplishes not sewage effluent.
More than show and describe ultimate principle of the present utility model and principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; what describe in above-described embodiment and specification sheets just illustrates principle of the present utility model; under the prerequisite not departing from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.

Claims (3)

1. pile tube production circulating water system, it is characterized in that, comprise boiler house and sink pond, cigarette ash shallow lake, sewage collecting pool, sewage second-level settling pond, sewage first stage precipitation tank, sewage Hui Jichi, full factory side bilge, boiler house water purifier, boiler house water purifying tank and boiler house soft brush treatment water tank, full factory side bilge, sewage Hui Jichi, sewage first stage precipitation tank, sewage second-level settling pond, sewage collecting pool connect successively, boiler house sinks pond, cigarette ash shallow lake and is also connected with sewage collecting pool, and sewage collecting pool is connected with three workshop batching plant water of productive use, boiler house water purifiers respectively.
2. pile tube production circulating water system according to claim 1, is characterized in that, described boiler house water purifier is connected with boiler house soft brush treatment case by boiler house water purifying tank.
3. pile tube production circulating water system according to claim 1, is characterized in that, described boiler house water purifier is also connected with river source by the pipeline being added with liquid medicine.
CN201420505685.0U 2014-09-04 2014-09-04 Pile tube production circulating water system Expired - Lifetime CN204058097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420505685.0U CN204058097U (en) 2014-09-04 2014-09-04 Pile tube production circulating water system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420505685.0U CN204058097U (en) 2014-09-04 2014-09-04 Pile tube production circulating water system

Publications (1)

Publication Number Publication Date
CN204058097U true CN204058097U (en) 2014-12-31

Family

ID=52199651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420505685.0U Expired - Lifetime CN204058097U (en) 2014-09-04 2014-09-04 Pile tube production circulating water system

Country Status (1)

Country Link
CN (1) CN204058097U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105384267A (en) * 2014-09-04 2016-03-09 苏州汤始建华管桩有限公司 Pipe pile production circulation water system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105384267A (en) * 2014-09-04 2016-03-09 苏州汤始建华管桩有限公司 Pipe pile production circulation water system

Similar Documents

Publication Publication Date Title
Loh et al. Zero discharge treatment technology of palm oil mill effluent
CN204319932U (en) A kind of three-stage filtration sewage-treatment plant
CN203999271U (en) Printing and dyeing intermediate water reuse system
CN204661496U (en) A kind of for heat-engine plant desulfurized Wastewater research device
CN203065286U (en) Phosphorus fertilizer acid wastewater treatment device
CN204058097U (en) Pile tube production circulating water system
CN201817347U (en) Gas generating sewage water treatment unit
CN204454833U (en) A kind of water-borne coatings aftertreatment effluent treatment plant
CN204644062U (en) The dirty utilization system of aquaculture excrement
CN202705132U (en) Industrial waste water treatment device
CN204079727U (en) A kind of disposal system of percolate
CN204281504U (en) A kind for the treatment of system for marine culture waste water
CN202968318U (en) Household wastewater treatment system
CN105384267A (en) Pipe pile production circulation water system
CN201620094U (en) Percolate treatment system of household refuse incineration plant
CN202156980U (en) High-efficiency low-consumption yellow starch peeled waste water treatment purifying unit
CN105016566A (en) Waste water treatment method in chemical plant
CN203938569U (en) A kind of wind energy combined type sewage treatment equipment
CN204174015U (en) A kind of diary farm Sewage treatment systems
CN205710060U (en) A kind of wastewater from chemical industry purifying processing device
CN205007652U (en) Novel just heavy pond
CN204401710U (en) Domestic waste water the automatic recovery reutilizing device
CN204474494U (en) A kind of Sewage treatment systems
CN203625111U (en) Efficient biogas slurry treatment equipment with membrane bioreactor
CN204607812U (en) A kind of wastewater treatment equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 215127 No. 2 Xingguo Road, South Wing Tai bridge, Luzhi Town, Suzhou, Jiangsu, Wuzhong District

Patentee after: TANGSHI JIANHUA BUILDING MATERIAL (SUZHOU) CO.,LTD.

Address before: 215000 Suzhou City, Wuzhong District Province, Luzhi Town, the south side of the bridge on the south side of Xingguo Road, No. 2, No.

Patentee before: SUZHOU TANGSHI JIANHUA CONCRETE PILE Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20141231

CX01 Expiry of patent term