CN204030023U - Throw hanging earthing clamp - Google Patents

Throw hanging earthing clamp Download PDF

Info

Publication number
CN204030023U
CN204030023U CN201420367962.6U CN201420367962U CN204030023U CN 204030023 U CN204030023 U CN 204030023U CN 201420367962 U CN201420367962 U CN 201420367962U CN 204030023 U CN204030023 U CN 204030023U
Authority
CN
China
Prior art keywords
intermediate plate
plate
torsion spring
clip
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420367962.6U
Other languages
Chinese (zh)
Inventor
朱涛
高森
张春波
高翔
吕宁
鹿宁
林晓东
高金福
高伟
周奇
于晓川
李传森
刘秉龙
石泷呈
吕昌杰
杨宝霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Maintenance Branch of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Branch of State Grid Shandong Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Maintenance Branch of State Grid Shandong Electric Power Co Ltd
Priority to CN201420367962.6U priority Critical patent/CN204030023U/en
Application granted granted Critical
Publication of CN204030023U publication Critical patent/CN204030023U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

Throw hanging earthing clamp, comprise the first intermediate plate and the second intermediate plate, on the first intermediate plate face relative with the second intermediate plate, all offer the bayonet socket of arc, two bayonet sockets are corresponding, between the first intermediate plate and the second intermediate plate, fixed axis are set, and on the first intermediate plate and the second intermediate plate, a pair of connecting plate are all installed, two pairs of connecting plates are all hinged with fixed axis, between a pair of connecting plate of inner side, torsion spring is set, torsion spring is arranged on fixed axis, and torsion spring is given the first intermediate plate and the outside thrust of the second intermediate plate all the time.The utility model has the advantage of: in the utility model, by the torsion spring between two insulating cords and the intermediate plate at intermediate plate two ends is set, prevent that earthing clamp large because of shaft tower angle and that strain insulator corner causes is greatly difficult for the problem generations such as installation.

Description

抛挂式接地线夹Throwable ground clamp

技术领域 technical field

本实用新型涉及一种接地线夹,具体地说是抛挂式接地线夹。 The utility model relates to a ground wire clip, in particular to a throw-and-hang type ground wire clip.

背景技术 Background technique

装设接地线是保证电力安全和操作人员安全的重要技术措施。目前,装设抛挂式接地线时,工作人员站在杆塔横臂上,在导线上方垂直向下放置接地线夹,使接地线夹夹住导线,从而使导线接地,操作完成后再由工作人员爬上杆塔取下线夹。但是,当杆塔角度大、耐张转角大及挑线与杆塔距离远时,工作人员操作控制距离不够,无法使接地线夹垂直对应导线,使接地线夹安装困难,往往需要工作人员爬上瓷瓶串接地,既费时费力,而且工作人员站在高处抛挂也有一定危险,容易引发安全事故。 The installation of grounding wire is an important technical measure to ensure the safety of electricity and the safety of operators. At present, when installing the throwing grounding wire, the staff stands on the cross arm of the tower, and places the grounding wire clamp vertically downwards above the wire, so that the grounding wire clamp clamps the wire, so that the wire is grounded. Personnel climbed up the tower to remove the clamp. However, when the angle of the pole tower is large, the tension resistance angle is large, and the distance between the pick-up line and the pole tower is far away, the distance between the operator's operation and control is not enough, and the grounding wire clamp cannot be vertically corresponding to the wire, making the installation of the grounding wire clamp difficult, and often requires the staff to climb on the porcelain bottle Series grounding is time-consuming and labor-intensive, and it is dangerous for staff to stand on a high place and throw it, which is likely to cause safety accidents.

实用新型内容 Utility model content

为解决上述问题,本实用新型的目的是提供一种抛挂式接地线夹,使之可以方便快捷的拆装接地线。 In order to solve the above problems, the purpose of this utility model is to provide a throw-and-hang type ground wire clamp, so that the ground wire can be easily and quickly disassembled.

本实用新型为实现上述目的,通过以下技术方案实现:抛挂式接地线夹,包括第一夹片和第二夹片,第一夹片和第二夹片相对的面上均开设弧形的卡口,两个卡口相对应,第一夹片和第二夹片之间设置固定轴,第一夹片和第二夹片上均安装一对连接板,两对连接板均与固定轴铰接,内侧的一对连接板之间设置扭簧,扭簧安装在固定轴上,扭簧始终给第一夹片和第二夹片向外的推力;第一夹片和第二夹片后端均安装连接绳,两个连接绳之间连接第一固定片,第一固定片上连接第一绝缘绳,第一夹片上安装连接片和第二固定片,第一夹片上设置第一连接螺栓,第一夹片通过第一连接螺栓与连接片和第二固定片连接,连接片上连接接地线,第二固定片上连接第二绝缘绳。 In order to achieve the above object, the utility model is realized through the following technical solutions: the throwing-type grounding clamp includes a first clip and a second clip, and arc-shaped Bayonet, the two bayonets correspond, a fixed shaft is set between the first clip and the second clip, a pair of connecting plates are installed on the first clip and the second clip, and both pairs of connecting plates are hinged to the fixed shaft , a torsion spring is set between a pair of connecting plates on the inner side, the torsion spring is installed on the fixed shaft, and the torsion spring always pushes the first clip and the second clip outward; the rear ends of the first clip and the second clip Connecting ropes are installed, the first fixing piece is connected between the two connecting ropes, the first insulating rope is connected to the first fixing piece, the connecting piece and the second fixing piece are installed on the first clamping piece, and the first connecting bolt is arranged on the first clamping piece, The first clamping piece is connected with the connecting piece and the second fixing piece through the first connecting bolt, the connecting piece is connected with the ground wire, and the second fixing piece is connected with the second insulating rope.

为进一步实现本实用新型的目的,还可以采用以下技术方案:所述的连接片上还设置第二连接螺栓,连接片通过第二连接螺栓与第一夹片连接;所述的第一夹片中部安装连接轴,连接轴上铰接限位板,第二夹片中部开设连接槽,限位板的自由端伸出连接槽,限位板的自由端一侧开设弧形的卡槽,卡槽与第二夹片配合。 In order to further realize the purpose of the utility model, the following technical solutions can also be adopted: the connecting piece is also provided with a second connecting bolt, and the connecting piece is connected to the first clamping piece through the second connecting bolt; the middle part of the first clamping piece is The connecting shaft is installed, the limiting plate is hinged on the connecting shaft, a connecting groove is provided in the middle of the second clip, the free end of the limiting plate protrudes from the connecting groove, and an arc-shaped card slot is provided on one side of the free end of the limiting plate. The second clip fits.

本实用新型的优点在于:本实用新型中,通过设置位于夹片两端的两根绝缘绳与夹片之间的扭簧,可以使工作人员将一根绝缘绳固定好,在导线一侧手持另一根绝缘绳,将接地线抛过导线另一侧,再通过拉紧另一根绝缘绳将两夹片固定在导线上,避免垂直安装,防止因杆塔角度大和耐张转角大导致的接地线夹不易安装等问题发生。本实用新型还具有结构简洁紧凑、制造成本低廉和使用简便的优点。 The utility model has the advantages that: in the utility model, by setting the torsion spring between the two insulating ropes at both ends of the clip and the clip, the staff can fix one insulating rope and hold the other on one side of the wire. An insulating rope, throw the grounding wire over the other side of the wire, and then tighten the other insulating rope to fix the two clips on the wire, avoid vertical installation, and prevent the grounding wire from being damaged due to the large angle of the tower and the large tension rotation angle. The clip is not easy to install and other problems occur. The utility model also has the advantages of simple and compact structure, low manufacturing cost and easy use.

附图说明 Description of drawings

图1是本实用新型结构示意图;图2是本实用新型另一种状态结构示意图。 Fig. 1 is a schematic structural diagram of the utility model; Fig. 2 is a schematic structural diagram of another state of the utility model.

附图标记:1第一夹片 2第二夹片 3卡口 4固定轴 5连接板 6扭簧 7连接绳 8第一固定片 9第一绝缘绳 10连接片 11第一连接螺栓 12接地线 13第二固定片 14第二绝缘绳 15第二连接螺栓 16连接槽 17连接轴 18限位板 19卡槽。 Reference signs: 1 first clip 2 second clip 3 bayonet 4 fixed shaft 5 connecting plate 6 torsion spring 7 connecting rope 8 first fixing piece 9 first insulating rope 10 connecting piece 11 first connecting bolt 12 grounding wire 13 The second fixed piece 14 The second insulating rope 15 The second connecting bolt 16 The connecting groove 17 The connecting shaft 18 The limit plate 19 The card slot.

具体实施方式 Detailed ways

抛挂式接地线夹,如图1所示,包括第一夹片1和第二夹片2,第一夹片1和第二夹片2相对的面上均开设弧形的卡口3,两个卡口3相对应。第一夹片1和第二夹片2可以通过闭合卡口3夹紧导线。第一夹片1和第二夹片2之间设置固定轴4,第一夹片1和第二夹片2上均安装一对连接板5,两对连接板5均与固定轴4铰接,内侧的一对连接板5之间设置扭簧6,扭簧6安装在固定轴4上,扭簧6始终给第一夹片1和第二夹片2向外的推力。第一夹片1和第二夹片2后端均安装连接绳7,两个连接绳7之间连接第一固定片8,第一固定片8上连接第一绝缘绳9,第一夹片1上安装连接片10和第二固定片13,第一夹片1上设置第一连接螺栓11,第一夹片1通过第一连接螺栓11与连接片10和第二固定片13连接,连接片10上连接接地线12,第二固定片13上连接第二绝缘绳14。这种结构可以使工作人员将一根绝缘绳固定好,在导线一侧手持另一根绝缘绳,将接地线12抛过导线另一侧,再通过拉紧另一根绝缘绳将两夹片固定在导线上,避免垂直安装,防止因杆塔角度大和耐张转角大导致的接地线夹不易安装等问题发生。 The throwing-type grounding clip, as shown in Figure 1, includes a first clip 1 and a second clip 2, and arc-shaped bayonets 3 are provided on the opposite surfaces of the first clip 1 and the second clip 2, The two mounts 3 correspond to each other. The first clip 1 and the second clip 2 can clamp the wire by closing the bayonet 3 . A fixed shaft 4 is arranged between the first clip 1 and the second clip 2, and a pair of connecting plates 5 are installed on the first clip 1 and the second clip 2, and both pairs of connecting plates 5 are hinged with the fixed shaft 4, A torsion spring 6 is arranged between a pair of connecting plates 5 inside, and the torsion spring 6 is installed on the fixed shaft 4, and the torsion spring 6 always pushes the first clip 1 and the second clip 2 outward. Both the first clamp piece 1 and the second clamp piece 2 rear ends are equipped with connecting ropes 7, the first fixed piece 8 is connected between the two connecting ropes 7, the first fixed piece 8 is connected with the first insulating rope 9, and the first clamping piece 1, the connecting piece 10 and the second fixing piece 13 are installed, the first clamping piece 1 is provided with the first connecting bolt 11, the first clamping piece 1 is connected with the connecting piece 10 and the second fixing piece 13 through the first connecting bolt 11, connected The ground wire 12 is connected to the piece 10 , and the second insulating rope 14 is connected to the second fixing piece 13 . This structure allows the staff to fix one insulating rope, hold another insulating rope on one side of the conductor, throw the grounding wire 12 over the other side of the conductor, and then pull the other insulating rope to tighten the two clips. Fix it on the wire, avoid vertical installation, and prevent problems such as the difficulty of installing the grounding clamp due to the large angle of the tower and the large rotation angle of the tension.

安装接地线时,先将第一绝缘绳9固定在地面,工作人员再攀上杆塔,在导线一侧手持第二绝缘绳14,将接地线12抛过导线另一侧,迅速拉紧第二绝缘绳14,使第一夹片1和第二夹片2张开,导线卡在卡口2处,继续拉紧第二绝缘绳14,使第一夹片1和第二夹片2克服扭簧6的推力,第一夹片1和第二夹片2闭合,闭合后的卡口3夹紧导线,从而使接地线12挂在导线上。拆卸时,将第二绝缘绳14固定在地面,拉紧第一绝缘绳9,使第一夹片1和第二夹片2张开,导线脱离卡口2,从而使接地线12脱离导线,此时,第一夹片1和第二夹片2在扭簧6的弹力作用下闭合复位。 When installing the grounding wire, first fix the first insulating rope 9 on the ground, then the staff climbs up the pole tower, holds the second insulating rope 14 on one side of the wire, throws the grounding wire 12 over the other side of the wire, and quickly tightens the second The insulating rope 14 makes the first clamping piece 1 and the second clamping piece 2 open, and the wire is stuck at the bayonet 2, and continues to tighten the second insulating rope 14, so that the first clamping piece 1 and the second clamping piece 2 can overcome the torsion. The thrust of the spring 6 closes the first clip 1 and the second clip 2, and the closed bayonet 3 clamps the wire, so that the grounding wire 12 is hung on the wire. When dismounting, the second insulating rope 14 is fixed on the ground, the first insulating rope 9 is tightened, the first clip 1 and the second clip 2 are opened, and the wire is separated from the bayonet 2, so that the grounding wire 12 is separated from the wire. At this time, the first clamping piece 1 and the second clamping piece 2 are closed and reset under the elastic force of the torsion spring 6 .

为了避免第一连接螺栓11与第一夹片1连接不紧密,使连接片10和接地线12绕第一连接螺栓11旋转,导致接地线12与导线脱离。所述的连接片10上还设置第二连接螺栓15,连接片10通过第二连接螺栓15与第一夹片1连接。这种结构使连接片10与第一夹片1之间有两个连接点,避免连接片10和接地线12绕第一连接螺栓11旋转。 In order to prevent the first connecting bolt 11 from being tightly connected to the first clip 1 , the connecting piece 10 and the grounding wire 12 are rotated around the first connecting bolt 11 , so that the grounding wire 12 is detached from the wire. The connecting piece 10 is further provided with a second connecting bolt 15 , and the connecting piece 10 is connected with the first clamping piece 1 through the second connecting bolt 15 . This structure enables two connection points between the connecting piece 10 and the first clamping piece 1 , preventing the connecting piece 10 and the ground wire 12 from rotating around the first connecting bolt 11 .

为了避免拉紧绝缘绳的力量过大,使第一夹片1和第二夹片2的开口过大,扭簧6受力过大被压缩变形,从而降低扭簧6的使用寿命。所述的第一夹片1中部安装连接轴17,连接轴17上铰接限位板18,第二夹片2中部开设连接槽16,限位板18的自由端伸出连接槽16,限位板18的自由端一侧开设弧形的卡槽19,卡槽19与第二夹片2配合。这种结构限制了第一夹片1和第二夹片2的开口范围,避免扭簧6受力过大被压缩变形而导致的使用寿命降低。 In order to avoid excessive tension of the insulating rope, the openings of the first clip 1 and the second clip 2 are too large, and the torsion spring 6 is compressed and deformed due to excessive force, thereby reducing the service life of the torsion spring 6 . The connecting shaft 17 is installed in the middle part of the first clip 1, and the stop plate 18 is hinged on the connecting shaft 17. The middle part of the second clip 2 is provided with a connecting groove 16, and the free end of the limiting plate 18 stretches out from the connecting groove 16, and the limit One side of the free end of the plate 18 defines an arc-shaped locking groove 19 , and the locking groove 19 cooperates with the second clip 2 . This structure limits the opening range of the first clamping piece 1 and the second clamping piece 2, so as to avoid the shortened service life of the torsion spring 6 caused by compression deformation caused by excessive force.

    本实用新型的技术方案并不限制于本实用新型所述的实施例的范围内。本实用新型未详尽描述的技术内容均为公知技术。 The technical solution of the utility model is not limited within the scope of the embodiments described in the utility model. The technical contents not described in detail in the utility model are all known technologies.

Claims (3)

1. throw hanging earthing clamp, it is characterized in that: comprise the first intermediate plate (1) and the second intermediate plate (2), on the first intermediate plate (1) face relative with the second intermediate plate (2), all offer the bayonet socket (3) of arc, two bayonet sockets (3) are corresponding, between the first intermediate plate (1) and the second intermediate plate (2), fixed axis (4) is set, on the first intermediate plate (1) and the second intermediate plate (2), a pair of connecting plate (5) is all installed, two pairs of connecting plates (5) are all hinged with fixed axis (4), between a pair of connecting plate (5) of inner side, torsion spring (6) is set, torsion spring (6) is arranged on fixed axis (4), torsion spring (6) is given the first intermediate plate (1) and the outside thrust of the second intermediate plate (2) all the time, connection cord (7) is all installed in the first intermediate plate (1) and the second intermediate plate (2) rear end, between two connection cords (7), connect the first stator (8), upper the first insulating cord (9) that connects of the first stator (8), upper brace (10) and the second stator (13) installed of the first intermediate plate (1), the first connecting bolt (11) is set on the first intermediate plate (1), the first intermediate plate (1) is connected with brace (10) and the second stator (13) by the first connecting bolt (11), the upper earth connection (12) that connects of brace (10), upper the second insulating cord (14) that connects of the second stator (13).
2. the hanging earthing clamp of throwing according to claim 1, is characterized in that: on described brace (10), the second connecting bolt (15) is also set, brace (10) is connected with the first intermediate plate (1) by the second connecting bolt (15).
3. the hanging earthing clamp of throwing according to claim 1 and 2, it is characterized in that: connecting axle (17) is installed at described the first intermediate plate (1) middle part, the upper hinged limiting plate (18) of connecting axle (17), link slot (16) is offered at the second intermediate plate (2) middle part, the free end of limiting plate (18) stretches out link slot (16), free end one side of limiting plate (18) is offered the draw-in groove (19) of arc, and draw-in groove (19) coordinates with the second intermediate plate (2).
CN201420367962.6U 2014-07-04 2014-07-04 Throw hanging earthing clamp Expired - Fee Related CN204030023U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420367962.6U CN204030023U (en) 2014-07-04 2014-07-04 Throw hanging earthing clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420367962.6U CN204030023U (en) 2014-07-04 2014-07-04 Throw hanging earthing clamp

Publications (1)

Publication Number Publication Date
CN204030023U true CN204030023U (en) 2014-12-17

Family

ID=52069854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420367962.6U Expired - Fee Related CN204030023U (en) 2014-07-04 2014-07-04 Throw hanging earthing clamp

Country Status (1)

Country Link
CN (1) CN204030023U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104767050A (en) * 2015-04-08 2015-07-08 国网浙江武义县供电公司 A hook type personal security line
CN107257040A (en) * 2017-05-27 2017-10-17 国网黑龙江省电力有限公司检修公司 Pull back swing arm short circuit earthing clamp and ground connection and method for dismounting
CN107931928A (en) * 2017-12-19 2018-04-20 中船黄埔文冲船舶有限公司 A kind of Portable clamp for aiding in transverse and longitudinal beam welding equipment
CN108376846A (en) * 2018-01-09 2018-08-07 国网山东省电力公司滨州供电公司 A kind of novel power transmission line-to-ground wire clamp
CN109037986A (en) * 2018-08-01 2018-12-18 国网浙江省电力有限公司金华供电公司 Super extra-high voltage self-locking anti-dropout conductor grip

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104767050A (en) * 2015-04-08 2015-07-08 国网浙江武义县供电公司 A hook type personal security line
CN107257040A (en) * 2017-05-27 2017-10-17 国网黑龙江省电力有限公司检修公司 Pull back swing arm short circuit earthing clamp and ground connection and method for dismounting
CN107931928A (en) * 2017-12-19 2018-04-20 中船黄埔文冲船舶有限公司 A kind of Portable clamp for aiding in transverse and longitudinal beam welding equipment
CN107931928B (en) * 2017-12-19 2024-05-24 中船黄埔文冲船舶有限公司 Portable clamp for assisting in welding of transverse and longitudinal beams
CN108376846A (en) * 2018-01-09 2018-08-07 国网山东省电力公司滨州供电公司 A kind of novel power transmission line-to-ground wire clamp
CN109037986A (en) * 2018-08-01 2018-12-18 国网浙江省电力有限公司金华供电公司 Super extra-high voltage self-locking anti-dropout conductor grip

Similar Documents

Publication Publication Date Title
CN204030023U (en) Throw hanging earthing clamp
CN203983842U (en) Repair apparatus hangs eminence grounding wire device
CN103606854A (en) Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode
CN104485530B (en) Mechanical ground wire connecting operation platform
CN201549607U (en) A multi-angle grounding clamp
CN201515026U (en) A vertical ground clamp
CN206727557U (en) High pressure pylon electricity consumption cable stationary fixture
CN105356368B (en) Insulating shield installation tool
CN201623268U (en) Transmission line pole tower grounding wire device and its hooking tool
CN205123131U (en) Insulating guard shield mounting tool
CN202602233U (en) Automatic drop-off composite zinc oxide arrester
CN204382187U (en) A kind of contact net inclined cantilever insulator replacement tool
CN203277304U (en) Built-in high-voltage fuse sleeve installation apparatus
CN104269669B (en) A kind of earth lead
CN201584691U (en) Special tool for 220KV double-circuit common-tower line accessing tension-resistance high-pressure high-electric field
CN106877262A (en) A kind of suspension clamp with weight hitch point
CN105185487B (en) A kind of protection of arrester frame
CN106437279A (en) Double-cross arm structure
CN203205771U (en) Tensioning insulating clamp for live replacement of tension insulator
CN212461272U (en) A kind of strong and tough column type porcelain insulator for high voltage line
CN109731252A (en) A kind of fixation type safety band suspension arrangement for converting station electric power overhaul of the equipments
CN203871501U (en) Horizontal-installation ground wire apparatus for power transmission line
CN210941370U (en) A wall-mounted charging pile based on the new energy field
CN203631773U (en) Side-pull type wire clamp for hanging wires
CN209133709U (en) Hook earthing or grounding means

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141217

Termination date: 20180704