CN204002634U - Well workover team manages device up and down - Google Patents

Well workover team manages device up and down Download PDF

Info

Publication number
CN204002634U
CN204002634U CN201420456730.8U CN201420456730U CN204002634U CN 204002634 U CN204002634 U CN 204002634U CN 201420456730 U CN201420456730 U CN 201420456730U CN 204002634 U CN204002634 U CN 204002634U
Authority
CN
China
Prior art keywords
guide rail
rig floor
telescopic arm
hydraulic telescopic
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420456730.8U
Other languages
Chinese (zh)
Inventor
马伟
阿合买提·依明
王艳辉
李建华
张瑞川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG TALLINN PETROLEUM TECHNOLOGY Co Ltd
Original Assignee
XINJIANG TALLINN PETROLEUM TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG TALLINN PETROLEUM TECHNOLOGY Co Ltd filed Critical XINJIANG TALLINN PETROLEUM TECHNOLOGY Co Ltd
Priority to CN201420456730.8U priority Critical patent/CN204002634U/en
Application granted granted Critical
Publication of CN204002634U publication Critical patent/CN204002634U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of well workover team and manage up and down device, comprise rig floor, the lopsidedness overlap joint of rig floor is setting up a guide rail, between guide rail and ground, form 14 degree angles, the upper end of guide rail is installed with fixed pulley, the lower end of guide rail is installed with positioning base, a twin drum winch is installed on guide rail, wire rope on a reel is walked around fixed pulley and is connected with hoist engine base, wire rope lower end on another reel is installed with lifting handgrip, the bottom of the guide rail auxiliary hook that is being slidably installed, on rig floor, fixedly mounting a robot device, the top of robot device is installed with one and can rotates, the hydraulic telescopic arm of pitching, hydraulic telescopic arm free end is arranging clamping handgrip.The utility model replaces manually putting, carry drilling rod with machinery, and it is time saving and energy saving to use, and labor strength is low.

Description

Well workover team manages device up and down
Technical field
The utility model relates to a kind of well workover team and manages up and down device.
Background technology
At present, in oilfield operation process, for the carrying of drilling rod, the move operation of physical location such as put, general all by manually carrying out.Use crane lifting be also require great effort very much, time-consuming, labor strength is large, affects drilling well operating efficiency.
Summary of the invention
The purpose of this utility model is to provide a kind of well workover team to manage up and down device, with machinery, replaces manually putting, carry drilling rod, and it is time saving and energy saving to use, and labor strength is low.
The purpose of this utility model is to realize like this, a kind of well workover team manages device up and down, comprise rig floor, the lopsidedness overlap joint of rig floor is setting up a guide rail, between guide rail and ground, form 14 degree angles, the upper end of guide rail is installed with fixed pulley, the lower end of guide rail is installed with positioning base, a twin drum winch is installed on guide rail, wire rope on a reel is walked around fixed pulley and is connected with hoist engine base, wire rope lower end on another reel is installed with lifting handgrip, the bottom of the guide rail auxiliary hook that is being slidably installed, on rig floor, fixedly mounting a robot device, the top of robot device is installed with one and can rotates, the hydraulic telescopic arm of pitching, hydraulic telescopic arm free end is arranging clamping handgrip.
When the utility model is used, by the auxiliary lower end that tangles drilling rod, lifting handgrip is embraced the top of drilling rod, a reel rotation of hoist engine, the wire rope drilling rod of slinging that rises, the another reel rotation of hoist engine, makes hoist engine rise along guide rail together with the drilling rod of hanging.When drilling rod one end extends on rig floor, the hydraulic telescopic arm of robot device catches drilling rod, gyroscopic pendulum to be placed on rig floor by clamping handgrip, when needs are transferred drilling rod, by the hydraulic telescopic arm of robot device, by clamping handgrip, catch drilling rod lifting, lift, be convenient to crane lifting.The utility model replaces manually putting, carry drilling rod with machinery, and it is time saving and energy saving to use, and greatly reduces workman's labour intensity, has improved operating efficiency.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is main TV structure schematic diagram of the present utility model.
The specific embodiment
Well workover team manages a device up and down, as shown in Figure 1, comprises rig floor 8, and the lopsidedness overlap joint of rig floor 8 is setting up a guide rail 7, forms 14 degree angles between guide rail 7 and ground, makes drilling rod can steadily lift by crane carrying.The upper end of guide rail is installed with fixed pulley 9, and the lower end of guide rail 7 is installed with positioning base, and guide rail 7 positions are fixed.Wire rope on 4, one reels of a twin drum winch is installed on guide rail 7 and walks around fixed pulley 9 and be connected with hoist engine base, the wire rope lower end on another reel is installed with lifting handgrip 5, the bottom of the guide rail 7 auxiliary hook 6 that is being slidably installed.On rig floor 8, fixedly mounting a robot device, the top of robot device be installed with one can rotate, the hydraulic telescopic arm 3 of pitching, hydraulic telescopic arm 3 free ends are arranging clamping handgrip.Clamping handgrip, under the effect of hydraulic cylinder piston rod, can carry out folding and unfolding campaign.When drilling rod one end extends on rig floor, the hydraulic telescopic arm of robot device catches drilling rod, gyroscopic pendulum to be placed on rig floor by clamping handgrip, when needs are transferred drilling rod, hydraulic telescopic arm 3 by robot device is caught drilling rod lifting, is lifted by clamping handgrip, is convenient to crane 1 and lifts by crane by wire rope 2.

Claims (1)

1. a well workover team manages device up and down, comprise rig floor, it is characterized in that: the lopsidedness overlap joint of rig floor is setting up a guide rail, between guide rail and ground, form 14 degree angles, the upper end of guide rail is installed with fixed pulley, the lower end of guide rail is installed with positioning base, a twin drum winch is installed on guide rail, wire rope on a reel is walked around fixed pulley and is connected with hoist engine base, wire rope lower end on another reel is installed with lifting handgrip, the bottom of the guide rail auxiliary hook that is being slidably installed, on rig floor, fixedly mounting a robot device, the top of robot device is installed with one and can rotates, the hydraulic telescopic arm of pitching, hydraulic telescopic arm free end is arranging clamping handgrip.
CN201420456730.8U 2014-08-14 2014-08-14 Well workover team manages device up and down Expired - Fee Related CN204002634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420456730.8U CN204002634U (en) 2014-08-14 2014-08-14 Well workover team manages device up and down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420456730.8U CN204002634U (en) 2014-08-14 2014-08-14 Well workover team manages device up and down

Publications (1)

Publication Number Publication Date
CN204002634U true CN204002634U (en) 2014-12-10

Family

ID=52042654

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420456730.8U Expired - Fee Related CN204002634U (en) 2014-08-14 2014-08-14 Well workover team manages device up and down

Country Status (1)

Country Link
CN (1) CN204002634U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723394A (en) * 2018-11-27 2019-05-07 中国石油集团川庆钻探工程有限公司 Lower platform long-range control method on a kind of Operating Pressure tubing string
CN112459733A (en) * 2020-11-03 2021-03-09 成都大学 Rod conveying vehicle for assisting installation of drill rod of shaft drilling machine and drill rod installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723394A (en) * 2018-11-27 2019-05-07 中国石油集团川庆钻探工程有限公司 Lower platform long-range control method on a kind of Operating Pressure tubing string
CN112459733A (en) * 2020-11-03 2021-03-09 成都大学 Rod conveying vehicle for assisting installation of drill rod of shaft drilling machine and drill rod installation method

Similar Documents

Publication Publication Date Title
CN207312974U (en) One kind is used for construction boom hoisting
CN204002634U (en) Well workover team manages device up and down
CN205472336U (en) Loop wheel machine that construction was used
CN204827251U (en) Novel suit derrick upright
CN202379648U (en) Portable mobile crane
CN204737703U (en) Multi -functional operation hanging flower basket of railway tunnel
CN202744232U (en) Tower crane long suspension arm lifting steel rope supporting device
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN203476246U (en) Sucker rod lifting system device
CN202017458U (en) Drill rod multiplying device for drilling machine
CN204162319U (en) High strength crane-car
CN207406013U (en) A kind of FRAME ON THE ROOF OF HIGH-RISE BUILDING curtain wall lifting device
CN204529154U (en) Cement brick hoisting machine
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN203269351U (en) Forceps clip used on crane and used for lifting barrel-shaped objects
CN202829361U (en) Small-size hoisting machine
CN211813094U (en) Mechanical carrying and hoisting device for petroleum pipeline installation
CN205346675U (en) Lorry crane with drilling rod device
CN204162320U (en) Facilitate the crane-car of operation at night
CN204470863U (en) A kind of crane arm lower edge frock holding device
CN204677117U (en) A kind of upright movement formula oil-well rig boring tower
CN206203745U (en) Mobile rubbish hangs
CN207450758U (en) A kind of filling lodge
CN205381883U (en) Novel big arm of tower crane segmentation demolish supplementaryly device
CN204265323U (en) Boom structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141210

Termination date: 20150814

EXPY Termination of patent right or utility model