CN203977456U - A kind of cable tunnel multifunctional examining well - Google Patents

A kind of cable tunnel multifunctional examining well Download PDF

Info

Publication number
CN203977456U
CN203977456U CN201420453099.6U CN201420453099U CN203977456U CN 203977456 U CN203977456 U CN 203977456U CN 201420453099 U CN201420453099 U CN 201420453099U CN 203977456 U CN203977456 U CN 203977456U
Authority
CN
China
Prior art keywords
inspection well
sump
inspection
cable
cable tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420453099.6U
Other languages
Chinese (zh)
Inventor
孟梅
邵明欣
周芹
王统民
刘宝磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZAOZHUANG LIYUAN ELECTRIC POWER DESIGN CO Ltd
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
ZAOZHUANG LIYUAN ELECTRIC POWER DESIGN CO Ltd
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZAOZHUANG LIYUAN ELECTRIC POWER DESIGN CO Ltd, Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical ZAOZHUANG LIYUAN ELECTRIC POWER DESIGN CO Ltd
Priority to CN201420453099.6U priority Critical patent/CN203977456U/en
Application granted granted Critical
Publication of CN203977456U publication Critical patent/CN203977456U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Sewage (AREA)

Abstract

本实用新型公开了一种电缆隧道多功能检查井,所述智能排污控制箱安装在检查井上部屋体墙壁一侧,所述开关门设置在检查井上部屋体的向路面,所述太阳能电池板安装在查井上部屋体的顶部,所属蓄电池安装在查井上部屋体内并与太阳能电池板相连,所述灯具安装在查井上部屋体顶部,所述防雨百叶窗安装在检查井上部屋体的三面安并装有防护网,所述镀锌安全盖板安装在集水坑上部,所述爬梯在检查井下部,所述电缆支架在电缆沟内并延至检查井下部,所述集水坑在检查井下部,所述液位计在集水坑内,所述潜水排污泵在集水坑内,所述柔性防水套管在排水管穿墙处,所述排水管与潜水排污泵连接,所述排水管连接至外部排水检查井。本实用新型安装简易、维护方便、造型美观、节能环保。

The utility model discloses a multifunctional inspection well of a cable tunnel. The intelligent sewage control box is installed on one side of the wall of the upper part of the inspection well, the switch door is arranged on the road surface of the upper part of the inspection well, and the solar battery panel is installed On the top of the upper house of the inspection well, the accumulator is installed in the upper house of the inspection well and connected with the solar panel. There is a protective net, the galvanized safety cover is installed on the upper part of the sump, the ladder is at the lower part of the inspection well, the cable bracket is in the cable trench and extends to the lower part of the inspection well, the sump is at the lower part of the inspection well, The liquid level gauge is in the sump, the submersible sewage pump is in the sump, the flexible waterproof sleeve is at the place where the drainage pipe passes through the wall, the drainage pipe is connected to the submersible sewage pump, and the drainage pipe is connected to the outside Drain inspection well. The utility model has the advantages of simple installation, convenient maintenance, beautiful appearance, energy saving and environmental protection.

Description

一种电缆隧道多功能检查井A cable tunnel multifunctional inspection shaft

技术领域 technical field

本实用新型涉及电缆隧道领域,具体为一种电缆隧道多功能检查井。  The utility model relates to the field of cable tunnels, in particular to a multifunctional inspection well for cable tunnels. the

背景技术 Background technique

现有电缆沟、电缆隧道一般仅设置方便人员检修的检修口或安全孔,工业性厂区或变电所内隧道的安全孔间距不宜大于75m。如未设置有效的通风设施,沟道内空气污浊,影响检修人员生命安全。沟底设排水坡度或导流槽,汇集至集水坑后通过PVC管排至就近排水检查井,由于电缆隧道(电缆沟)的深度加上集水坑的深度,一般比排水管网的深度低,不能有效地自然排水甚至倒灌,造成电缆隧道(电缆沟)内大量积水。电缆沟未设置照明设施,不方便检修。  Existing cable trenches and cable tunnels are generally only equipped with inspection openings or safety holes for personnel maintenance, and the distance between safety holes in tunnels in industrial factories or substations should not be greater than 75m. If effective ventilation facilities are not installed, the air in the ditch will be dirty, which will affect the life safety of maintenance personnel. Drainage slopes or diversion grooves are set at the bottom of the ditch, and after being collected into the sump, they are discharged to the nearest drainage inspection well through PVC pipes. Due to the depth of the cable tunnel (cable trench) plus the depth of the sump, it is generally more than the depth of the drainage pipe network. Low, can not effectively drain naturally or even pour back, resulting in a large amount of water in the cable tunnel (cable trench). There is no lighting facility in the cable trench, which is inconvenient for maintenance. the

实用新型内容 Utility model content

本实用新型所解决的技术问题在于提供一种电缆隧道多功能检查井,以解决上述问题。  The technical problem solved by the utility model is to provide a cable tunnel multifunctional inspection well to solve the above problems. the

本实用新型所解决的技术问题采用以下技术方案来实现:  The technical problem solved by the utility model adopts the following technical solutions to realize:

一种电缆隧道多功能检查井,包括检查井上部屋体和检查井下部两部分,所述检查井上部屋体和检查井下部,是以水平面为分界线,其中检查井上部屋体包括智能排污控制箱、开关门、蓄电池、太阳能电池板、灯具、防雨百叶窗、防护网,检查井下部包括镀锌安全盖板、集水坑、液位计、潜水排污泵、柔性防水套管、排水管、电缆支架、爬梯,其特征在于:所述智能排污控制箱安装在检查井上部屋体墙壁一侧,所述开关门设置在检查井上部屋体的向路面,所述太阳能电池板安装在检查井上部屋体的顶部,所属蓄电池安装在检查井上部屋体内并与太阳能电池板相连,所述灯具分别安装在检查井上部屋体顶部,所述防雨百叶窗安装在检查井上部屋体的三面并安装有防护网,所述镀锌安全盖板安装在集水坑上部,所述爬梯在检查井下部,所述电缆支架在电缆沟内并延至检查井下部,所述集水坑在检查井下部,所述液位计在集水坑内,所述潜水排污泵在集水坑内,所述柔性防水套管在排水管穿墙处,所述排水管与潜水排污泵连接,所述排水管连接至外部排水检查井。本实用新型安装简易、维护方便、造型美观、节能环保。  A cable tunnel multifunctional inspection well, including two parts: the upper part of the inspection well and the lower part of the inspection well. The upper part of the inspection well and the lower part of the inspection well are separated by the horizontal plane. Opening and closing doors, storage batteries, solar panels, lamps, rain shutters, protective nets, inspection underground including galvanized safety covers, sumps, liquid level gauges, submersible sewage pumps, flexible waterproof casings, drainage pipes, cable brackets . The climbing ladder is characterized in that: the intelligent sewage control box is installed on the side of the upper house of the inspection well, the switch door is arranged on the road surface of the upper house of the inspection well, and the solar battery panel is installed on the top of the upper house of the inspection well. , the battery is installed in the upper house of the inspection well and connected with the solar panel, the lamps are respectively installed on the top of the upper house of the inspection well, the rain-proof shutters are installed on three sides of the upper house of the inspection well and equipped with protective nets, the plated The zinc safety cover is installed at the upper part of the sump, the ladder is at the lower part of the inspection well, the cable bracket is in the cable trench and extends to the lower part of the inspection well, the sump is at the lower part of the inspection well, and the liquid level gauge is at the lower part of the inspection well. In the water pit, the submersible sewage pump is in the sump, the flexible waterproof casing is at the place where the drainage pipe passes through the wall, the drainage pipe is connected to the submersible sewage pump, and the drainage pipe is connected to an external drainage inspection well. The utility model has the advantages of simple installation, convenient maintenance, beautiful appearance, energy saving and environmental protection. the

作为优选,所述灯具为高效节能防水防尘灯具,照明采用24V安全电压,采用太阳能电池板和蓄电池供电,无需外接电源,节能环保。  Preferably, the lamp is a high-efficiency, energy-saving, waterproof and dust-proof lamp. The lighting adopts a 24V safe voltage, powered by solar panels and batteries, and does not require an external power supply, which is energy-saving and environmentally friendly. the

作为优选,所述开关门的上部和下部均设有防雨百叶窗,尽可能地增大通风面积,提高自然通风效率。  Preferably, the upper and lower parts of the switch door are provided with rain-proof louvers to increase the ventilation area as much as possible and improve the natural ventilation efficiency. the

作为优选,检查井上部屋体开关门的门口高于室外地平面20cm,并做防水措施防止雨水倒灌。  As a preference, the doorway of the opening and closing door of the upper part of the inspection well is higher than the outdoor ground level by 20cm, and waterproof measures are taken to prevent rainwater from pouring back. the

作为优选,所述镀锌安全盖板的水平面处修筑导流槽按5‰坡度汇至检查井下部集水坑,收集的雨水通过导流槽流入集水坑内,提高电缆隧道的排水防洪能力。  As a preference, a diversion groove is built on the horizontal surface of the galvanized safety cover to flow into the sump at the bottom of the inspection shaft at a slope of 5‰, and the collected rainwater flows into the sump through the diversion groove to improve the drainage and flood control capacity of the cable tunnel. the

作为优选,所述集水坑顶部设置方便开启的镀锌安全盖板,方便运维人员敷设电缆、检修设备等工作。  As a preference, an easy-to-open galvanized safety cover is provided on the top of the sump, which is convenient for operation and maintenance personnel to lay cables and repair equipment. the

作为优选,所述智能排污控制箱内装有液位智能控制模块,实现液位智能排水。  As a preference, the intelligent sewage control box is equipped with a liquid level intelligent control module to realize liquid level intelligent drainage. the

本实用新型为了优化电缆隧道的照明、通风、排水方案,提高安全防护措施,将电缆隧道检查井的通风、排水、照明系统集成化、简约化,选用新型潜水式排污泵和智能排污控制箱,实现液位智能排水;采用太阳能电池供电用于检修照明;增加通风窗实现自然通风,提高了电缆隧道了防洪排水能力和通风效率,为检修人员提供安全方便的运维环境,多功能检查井占地面积、体积小,对周围环境影响小;同时其安装简易、维护方便、造型美观、节能环保。  In order to optimize the lighting, ventilation and drainage scheme of the cable tunnel and improve the safety protection measures, the utility model integrates and simplifies the ventilation, drainage and lighting system of the inspection well of the cable tunnel, and selects a new submersible sewage pump and an intelligent sewage control box. Realize liquid level intelligent drainage; use solar battery power supply for maintenance lighting; increase ventilation windows to achieve natural ventilation, improve flood control and drainage capacity and ventilation efficiency of cable tunnels, and provide maintenance personnel with a safe and convenient operation and maintenance environment. The floor area and volume are small, and the impact on the surrounding environment is small; at the same time, it is easy to install, easy to maintain, beautiful in appearance, energy-saving and environmentally friendly. the

附图说明 Description of drawings

图1为本实用新型的剖面结构示意图。  Fig. 1 is a schematic cross-sectional structure diagram of the utility model. the

具体实施方式 Detailed ways

为了使本实用新型的实现技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本实用新型。  In order to make the technical means, creative features, goals and effects of the present invention easy to understand, the present invention will be further elaborated below in conjunction with specific illustrations. the

如图1所示,一种电缆隧道多功能检查井,包括智能排污控制箱1、开关门2、蓄电池3、太阳能电池板4、灯具5、防雨百叶窗6、防护网7、镀锌安全盖板8、集水坑9、液位计10、潜水排污泵11、柔性防水套管12、排水管13、电缆支架14、爬梯15、,所述智能排污控制箱1安装在检查井上部屋体墙壁一侧,所述开关门2设置在检查井上部屋体的向路面,所述太阳能电池板4安装在检查井上部屋体的顶部,所述蓄电池3安装在检查井上部屋体内并与太阳能电池板4相连,所述灯具5分别安装在检查井上部屋体顶部,所述防雨百叶窗6安装在检查井上部屋体的三面并安装有防护网7,所述镀锌安全盖板8安装在集水坑9上 部,所述爬梯15在检查井下部,所述电缆支架14在电缆沟内并延至检查井下部,所述集水坑9在检查井下部,所述液位计10在集水坑9内,所述潜水排污泵11在集水坑9内,所述柔性防水套管12在排水管穿墙处,所述排水管13与潜水排污泵11连接,所述排水管13连接至外部排水检查井。本实用新型安装简易、维护方便、造型美观、节能环保。  As shown in Figure 1, a cable tunnel multifunctional inspection well, including intelligent sewage control box 1, switch door 2, battery 3, solar panels 4, lamps 5, rain-proof shutters 6, protective net 7, galvanized safety cover Plate 8, sump 9, liquid level gauge 10, submersible sewage pump 11, flexible waterproof casing 12, drainage pipe 13, cable support 14, climbing ladder 15, and the intelligent sewage control box 1 is installed on the wall of the upper part of the inspection well On one side, the switch door 2 is arranged on the road surface of the upper house of the inspection well, the solar cell panel 4 is installed on the top of the upper house of the inspection shaft, and the battery 3 is installed in the upper house of the inspection shaft and connected to the solar cell panel 4 , the lamps 5 are respectively installed on the top of the upper house of the inspection well, the rain-proof shutters 6 are installed on three sides of the upper house of the inspection well and are equipped with protective nets 7, and the galvanized safety cover 8 is installed on the sump 9 The ladder 15 is at the lower part of the inspection well, the cable bracket 14 is in the cable trench and extends to the lower part of the inspection well, the sump 9 is at the lower part of the inspection well, and the liquid level gauge 10 is in the sump 9, The submersible sewage pump 11 is in the sump 9, the flexible waterproof casing 12 is at the place where the drainage pipe passes through the wall, the drainage pipe 13 is connected to the submersible sewage pump 11, and the drainage pipe 13 is connected to the external drainage inspection well . The utility model has the advantages of simple installation, convenient maintenance, beautiful appearance, energy saving and environmental protection. the

作为优选,所述灯具5为高效节能防水防尘灯具,照明采用24V安全电压,采用太阳能电池板4和蓄电池3供电,无需外接电源,节能环保。  Preferably, the lamp 5 is a high-efficiency, energy-saving, waterproof and dust-proof lamp. The lighting adopts a 24V safe voltage, and is powered by a solar panel 4 and a storage battery 3 without external power supply, which is energy-saving and environmentally friendly. the

作为优选,所述开关门2的上部和下部均设有防雨百叶窗6,尽可能地增大通风面积,提高自然通风效率。  Preferably, the upper and lower parts of the switch door 2 are provided with rain-proof shutters 6 to increase the ventilation area as much as possible and improve the natural ventilation efficiency. the

作为优选,所述开关门2的门口高于室外地平面20cm,并做防水措施防止雨水倒灌。  As a preference, the doorway of the switch door 2 is 20cm higher than the outdoor ground level, and waterproof measures are taken to prevent rainwater from pouring back. the

作为优选,所述镀锌安全盖板8的水平面处修筑导流槽按5‰坡度汇至检查井下部集水坑9,收集的雨水通过导流槽流入集水坑9内,提高电缆隧道的排水防洪能力。  As a preference, a diversion groove is built on the horizontal surface of the galvanized safety cover plate 8 to flow to the sump 9 at the lower part of the inspection shaft according to a slope of 5‰, and the collected rainwater flows into the sump 9 through the diversion groove to improve the safety of the cable tunnel. Drainage and flood control capabilities. the

作为优选,所述集水坑顶部设置方便开启的镀锌安全盖板8,方便运维人员敷设电缆、检修设备等工作。  As a preference, an easy-to-open galvanized safety cover 8 is provided on the top of the sump, which is convenient for operation and maintenance personnel to lay cables and repair equipment. the

作为优选,所述智能排污控制箱1内装有液位智能控制模块,实现液位智能排水。  As a preference, the intelligent sewage control box 1 is equipped with a liquid level intelligent control module to realize liquid level intelligent drainage. the

本实用新型为了优化电缆隧道的照明、通风、排水方案,提高安全防护措施,将电缆隧道检查井的通风、排水、照明系统集成化、简约化,选用新型潜水式排污泵和智能排污控制箱,实现液位智能排水;采用太阳能电池供电用于检修照明;增加通风窗实现自然通风,提高了电缆隧道了防洪排水能力和通风效率,为检修人员提供安全方便的运维环境,多功能检查井占地面积、体积小,对周围环境影响小;同时其安装简易、维护方便、造型美观、节能环保。  In order to optimize the lighting, ventilation and drainage scheme of the cable tunnel and improve the safety protection measures, the utility model integrates and simplifies the ventilation, drainage and lighting system of the inspection well of the cable tunnel, and selects a new submersible sewage pump and an intelligent sewage control box. Realize liquid level intelligent drainage; use solar battery power supply for maintenance lighting; increase ventilation windows to achieve natural ventilation, improve flood control and drainage capacity and ventilation efficiency of cable tunnels, and provide maintenance personnel with a safe and convenient operation and maintenance environment. The floor area and volume are small, and the impact on the surrounding environment is small; at the same time, it is easy to install, easy to maintain, beautiful in appearance, energy-saving and environmentally friendly. the

以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型的要求保护范围由所附的权利要求书及其等效物界定。  The basic principles and main features of the present utility model and the advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The required protection scope of the utility model is defined by the appended claims and their equivalents. the

Claims (6)

1.一种电缆隧道多功能检查井,包括检查井上部屋体和检查井下部两部分,所述检查井上部屋体和检查井下部,是以水平面为分界线,其中检查井上部屋体包括智能排污控制箱、开关门、蓄电池、太阳能电池板、灯具、防雨百叶窗、防护网,检查井下部包括镀锌安全盖板、集水坑、液位计、潜水排污泵、柔性防水套管、排水管、电缆支架、爬梯,其特征在于,所述智能排污控制箱安装在检查井上部屋体墙壁一侧,所述开关门设置在检查井上部屋体的向路面,所述太阳能电池板安装在检查井上部屋体的顶部,所属蓄电池安装在检查井上部屋体内并与太阳能电池板相连,所述灯具安装在检查井上部屋体顶部,所述防雨百叶窗安装在检查井上部屋体的三面并安装有防护网,所述镀锌安全盖板安装在集水坑上部,所述爬梯在检查井下部,所述电缆支架在电缆沟内并延至检查井下部,所述集水坑在检查井下部,所述液位计在集水坑内,所述潜水排污泵在集水坑内,所述柔性防水套管在排水管穿墙处,所述排水管与潜水排污泵连接,所述排水管连接至外部排水检查井。  1. A cable tunnel multifunctional inspection well, including two parts: the upper part of the inspection well and the lower part of the inspection well. Boxes, switch doors, batteries, solar panels, lamps, rain-proof shutters, protective nets, inspection wells including galvanized safety covers, sumps, liquid level gauges, submersible sewage pumps, flexible waterproof casings, drainage pipes, The cable bracket and the climbing ladder are characterized in that the intelligent sewage control box is installed on one side of the upper house wall of the inspection well, the switch door is arranged on the road surface of the upper house body of the inspection well, and the solar panel is installed on the upper house body of the inspection well. The accumulator is installed in the upper part of the inspection well and connected to the solar panel. The lamp is installed on the top of the upper part of the inspection well. The galvanized safety cover is installed on the upper part of the sump, the ladder is at the lower part of the inspection well, the cable bracket is in the cable trench and extends to the lower part of the inspection well, the sump is at the lower part of the inspection well, and the liquid level gauge is at the lower part of the inspection well. In the sump, the submersible sewage pump is in the sump, the flexible waterproof casing is at the place where the drainage pipe passes through the wall, the drainage pipe is connected to the submersible sewage pump, and the drainage pipe is connected to an external drainage inspection well. the 2.根据权利要求1所述的一种电缆隧道多功能检查井,其特征在于,所述灯具为高效节能防水防尘灯具,照明采用24V安全电压,采用太阳能电池板和蓄电池供电。  2. A cable tunnel multifunctional inspection shaft according to claim 1, wherein the lamps are high-efficiency, energy-saving, waterproof and dustproof lamps, and the lighting adopts 24V safety voltage, powered by solar panels and batteries. the 3.根据权利要求1所述的一种电缆隧道多功能检查井,其特征在于,所述智能排污控制箱内装有液位智能控制模块。  3. The multifunctional inspection well of a cable tunnel according to claim 1, characterized in that an intelligent liquid level control module is installed in the intelligent sewage control box. the 4.根据权利要求1所述的一种电缆隧道多功能检查井,其特征在于,所述检查井上部屋体开关门的门口高于室外地平面20cm。  4. A cable tunnel multifunctional inspection shaft according to claim 1, characterized in that the doorway of the upper house opening and closing door of the inspection shaft is 20 cm higher than the outdoor ground level. the 5.根据权利要求1所述的一种电缆隧道多功能检查井,其特征在于,所述开关门的上部和下部均设有防雨百叶窗。  5. A cable tunnel multifunctional inspection shaft according to claim 1, characterized in that the upper and lower parts of the switch door are provided with rain-proof shutters. the 6.根据权利要求1所述的一种电缆隧道多功能检查井,其特征在于,所述镀锌安全盖板的水平面处修筑导流槽按5‰坡度汇至检查井下部集水坑。  6 . The multifunctional inspection shaft of a cable tunnel according to claim 1 , wherein a diversion groove is built on the horizontal surface of the galvanized safety cover to flow to the sump at the lower part of the inspection shaft at a slope of 5‰. the
CN201420453099.6U 2014-08-06 2014-08-06 A kind of cable tunnel multifunctional examining well Expired - Lifetime CN203977456U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420453099.6U CN203977456U (en) 2014-08-06 2014-08-06 A kind of cable tunnel multifunctional examining well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420453099.6U CN203977456U (en) 2014-08-06 2014-08-06 A kind of cable tunnel multifunctional examining well

Publications (1)

Publication Number Publication Date
CN203977456U true CN203977456U (en) 2014-12-03

Family

ID=51974915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420453099.6U Expired - Lifetime CN203977456U (en) 2014-08-06 2014-08-06 A kind of cable tunnel multifunctional examining well

Country Status (1)

Country Link
CN (1) CN203977456U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104164892A (en) * 2014-08-06 2014-11-26 枣庄力源电力设计有限公司 Multifunctional cable tunnel inspection well
CN108517894A (en) * 2018-04-12 2018-09-11 安徽瑞瑶环保科技有限公司 A kind of cable tunnel multifunctional examining well
CN111719589A (en) * 2020-06-10 2020-09-29 江苏万年达杭萧钢构有限公司 Prefabricated assembled square shaft

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104164892A (en) * 2014-08-06 2014-11-26 枣庄力源电力设计有限公司 Multifunctional cable tunnel inspection well
CN104164892B (en) * 2014-08-06 2015-12-02 枣庄力源电力设计有限公司 A kind of cable tunnel multifunctional examining well
CN108517894A (en) * 2018-04-12 2018-09-11 安徽瑞瑶环保科技有限公司 A kind of cable tunnel multifunctional examining well
CN111719589A (en) * 2020-06-10 2020-09-29 江苏万年达杭萧钢构有限公司 Prefabricated assembled square shaft
CN111719589B (en) * 2020-06-10 2021-03-09 江苏万年达杭萧钢构有限公司 Prefabricated assembled square shaft

Similar Documents

Publication Publication Date Title
CN104164892B (en) A kind of cable tunnel multifunctional examining well
US20170025988A1 (en) Mobile house utilising renewable energy
CN106091094B (en) A kind of the compound type energy utilization system and control method of skyscraper
CN104197266A (en) Dual-energy-efficient streetlamp
CN205743097U (en) A kind of multi-functional sentry box
CN204103297U (en) Heat radiation cable branch box
CN214255336U (en) Power distribution cabinet with cooling function
KR102345578B1 (en) Private power generation type non-distribution structure
CN204435529U (en) United villa subsurface stormwater concentrates discharge structure
CN201541073U (en) An environmentally friendly non-metal fully buried flood-proof pre-installed box-type substation
CN218814212U (en) A control system for pumping away accumulated water in draft pipe valve wells using solar energy
CN209211472U (en) An automatic control system for foundation pit tube well dewatering that can be quickly installed and disassembled
CN118014245A (en) Underground water dispersion-based supply type wetland water resource regulation and control system and method
KR100927993B1 (en) Outdoor control panel of pump station
CN105220708B (en) A basic well for power distribution equipment
CN212987084U (en) Energy-saving power supply system for public facility illumination
CN204125968U (en) The anti-water collecting device of a kind of cable shaft
CN102691310A (en) Precast assembled comprehensive pipe gallery downcast shaft
CN209227739U (en) A kind of ground water permeable device based on sponge urban construction
CN210507774U (en) Novel energy-saving device for green building
CN202870137U (en) Rain-proof electric energy metering box
CN206956834U (en) A kind of new energy touring safety accident water and electricity supply equipment
CN219627216U (en) Landscape type box-type substation
CN114197689B (en) Energy-saving building using natural resources
CN220079900U (en) Flood control dike

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141203

Effective date of abandoning: 20151202

AV01 Patent right actively abandoned

Granted publication date: 20141203

Effective date of abandoning: 20151202

C25 Abandonment of patent right or utility model to avoid double patenting