CN203961899U - Upwards extend the hole sealing device of boring - Google Patents
Upwards extend the hole sealing device of boring Download PDFInfo
- Publication number
- CN203961899U CN203961899U CN201420353245.8U CN201420353245U CN203961899U CN 203961899 U CN203961899 U CN 203961899U CN 201420353245 U CN201420353245 U CN 201420353245U CN 203961899 U CN203961899 U CN 203961899U
- Authority
- CN
- China
- Prior art keywords
- flange
- pvc pipe
- valve
- grouting
- boring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
Description
所属技术领域Technical field
本实用新型涉及一种钻孔封孔装置,尤其是针对向上延伸钻孔的封孔装置。The utility model relates to a drilling and sealing device, in particular to a sealing device for upwardly extending drilling.
背景技术Background technique
注浆封孔是对于废弃钻孔最常用的处理方法,即在钻孔中灌注浆液,来充填钻孔,防止钻孔发生安全隐患。注浆法对于延伸方向向下的钻孔封堵比较简单,因为浆液的密度一般大于水,即使从孔口灌浆浆液最终也能充满整个钻孔,起到很好的封孔效果。而对于延伸方向向上的钻孔封堵比较困难,一是不可能直接从孔口灌浆,因为这样浆液将自然流出,二是如果在孔口安装孔口管向孔内强力压浆,因为钻孔处于相对封闭状态,注浆需要的注浆压力一般较高,一般的注浆机械根本无法满足。Grouting and sealing is the most commonly used treatment method for abandoned boreholes, that is, grout is poured into the boreholes to fill the boreholes and prevent potential safety hazards in the boreholes. The grouting method is relatively simple for the plugging of boreholes extending downward, because the density of the grout is generally greater than that of water, and the grout can eventually fill the entire borehole even if it is grouted from the orifice, and has a good sealing effect. It is more difficult to plug the drill hole extending upward. First, it is impossible to grout directly from the orifice, because the grout will flow out naturally. Second, if the orifice pipe is installed at the orifice to force grout into the hole, because In a relatively closed state, the grouting pressure required for grouting is generally high, which cannot be satisfied by general grouting machinery.
发明内容Contents of the invention
为了克服常用的向上延伸钻孔封孔方法封孔困难的不足,本实用新型提供一种向上延伸钻孔的封孔装置,该装置能实现对向上延伸钻孔的有效封孔。In order to overcome the disadvantage of the difficulty of sealing holes in the commonly used method of extending upward drilling and sealing holes, the utility model provides a sealing device for upward extending drilling, which can realize effective sealing of upward extending drilling.
本实用新型所采用的技术方案是:向上延伸钻孔的封孔装置包括孔口管、法兰盘、法兰盘蒙板、预紧螺丝、PVC管、PVC管阀、注浆管、注浆泵、注浆阀门。法兰盘与孔口管规格吻合,两者采用焊接方式连接;法兰盘与法兰盘蒙板规格吻合,两者采用预紧螺丝连接;采用小孔径的PVC管,其总长度等于或略小于钻孔深度,PVC管可连接在法兰盘蒙版背面上,其在法兰盘蒙板上连接位置的正面连接PVC管阀,通过PVC管阀可向PVC管中注入流体;注浆阀门连接于法兰盘蒙版上;注浆泵、注浆管、注浆阀门依次连接,注浆泵可向钻孔中注入浆液。The technical scheme adopted by the utility model is: the sealing device for extending the drilling upwards includes an orifice pipe, a flange, a flange cover, a pre-tightening screw, a PVC pipe, a PVC pipe valve, a grouting pipe, a grouting Pumps, grouting valves. The specifications of the flange plate and the orifice pipe are consistent, and the two are connected by welding; the specifications of the flange plate and the flange cover plate are consistent, and the two are connected by pre-tightening screws; the small-diameter PVC pipe is used, and its total length is equal to or slightly Less than the drilling depth, the PVC pipe can be connected to the back of the flange mask, and the front of the connection position on the flange mask is connected to the PVC pipe valve, and the fluid can be injected into the PVC pipe through the PVC pipe valve; the grouting valve Connected to the flange mask; the grouting pump, the grouting pipe, and the grouting valve are connected in sequence, and the grouting pump can inject grout into the borehole.
向上延伸钻孔的封孔装置使用时具体的步骤为:①在向上延伸的钻孔中安装带有法兰盘的孔口管,孔口管安装长度3~5m;②向孔内下入PVC管,下入长度等于或略小于钻孔深度;③把PVC管与法兰盘蒙板连接;④把法兰盘及法兰盘蒙板通过预紧螺丝紧密连接;⑤注浆泵、注浆管、注浆阀门依次连接,打开PVC管阀,通过注浆泵对钻孔进行注浆,过程中PVC管阀一直处于打开状态;⑥待PVC管阀开始返浆时,说明钻孔已被浆液充满,则停止注浆泵,关闭PVC管阀及注浆阀门,待浆液充分固化后即完成对钻孔的封堵。The specific steps when using the sealing device for extending the drilling hole upwards are as follows: ①Install the orifice pipe with the flange in the upward extending drilling hole, the installation length of the orifice pipe is 3-5m; ②Put PVC into the hole Pipe, the running length is equal to or slightly less than the drilling depth; ③Connect the PVC pipe with the flange cover; ④Tightly connect the flange and the flange cover with pre-tightening screws; Connect the pipe and the grouting valve in sequence, open the PVC pipe valve, and grout the borehole through the grouting pump. During the process, the PVC pipe valve is always open; When it is full, stop the grouting pump, close the PVC pipe valve and the grouting valve, and complete the plugging of the borehole after the grout is fully solidified.
本实用新型最核心的是在钻孔中设置了一根PVC管,在浆液注入钻孔时,气体可从PVC管中外排,减小了注浆的难度;并且PVC管还可以起到检查注浆效果的作用,因为PVC管安装到钻孔的底部,只有当浆液液面升高到钻孔底部时,PVC管才会返浆,同理PVC管返浆说明浆液已经充满钻孔。The core of the utility model is to set a PVC pipe in the borehole. When the slurry is injected into the borehole, the gas can be discharged from the PVC pipe, which reduces the difficulty of grouting; and the PVC pipe can also play a role in inspection and injection. The effect of the slurry effect, because the PVC pipe is installed at the bottom of the drill hole, only when the slurry liquid level rises to the bottom of the drill hole, the PVC pipe will return to the slurry. Similarly, the return of the PVC tube to the slurry indicates that the slurry has filled the drill hole.
本实用新型的有益效果是,该装置能够应用于向上延伸钻孔的封孔作业,且其原理简单,操作方便,效果有保证。The beneficial effect of the utility model is that the device can be applied to the sealing operation of upwardly extending drilled holes, and the principle is simple, the operation is convenient, and the effect is guaranteed.
附图说明Description of drawings
下面结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
图1是本实用新型使用过程中的示意图。Fig. 1 is a schematic diagram during the use of the utility model.
图中:1.钻孔,2.孔口管,3.法兰盘,4.法兰盘蒙板,5.预紧螺丝,6.PVC管,7.PVC管阀,8.注浆阀门,9.注浆管,10.注浆泵,11.浆液,12.空气。In the figure: 1. drilling, 2. orifice pipe, 3. flange, 4. flange cover, 5. pre-tightening screw, 6. PVC pipe, 7. PVC pipe valve, 8. grouting valve , 9. Grouting pipe, 10. Grouting pump, 11. Grout, 12. Air.
具体实施方式Detailed ways
在图中,孔口管(2)与法兰盘(3)规格吻合,两者采用焊接方式连接;法兰盘(3)与法兰盘蒙板(4)规格吻合,两者采用预紧螺丝(5)连接;选用小孔径的PVC管(6),其总长度等于或略小于钻孔(1)深度;PVC管(6)连接在法兰盘蒙版(4)背面上,其在法兰盘蒙板(4)上连接位置的正面连接PVC管阀(7);注浆阀门(8)连接于法兰盘蒙版(4)上;注浆管(9)一端连接注浆阀门(8),另一端连接注浆泵(10);注浆泵(10)可泵送浆液(11)。本实用新型实施时具体的步骤为:先在钻孔(1)中安装带有法兰盘(3)的孔口管(2),孔口管(2)安装长度3~5m;再向孔内下入PVC管(6),下入长度等于或略小于钻孔(1)深度;然后把PVC管(6)与法兰盘蒙板(4)连接,把法兰盘(3)及法兰盘蒙板(4)通过预紧螺丝(5)紧密连接;最后打开PVC管阀(7),注浆阀门(8)连接注浆管(9),注浆管(9)连接注浆泵(10),对钻孔(1)进行注浆,注浆前期PVC管阀(7)将返空气,待PVC管阀(7)开始返浆时,则停止注浆泵(10),关闭PVC管阀(7)及注浆阀门(8),待浆液(11)充分固化后即完成对钻孔(1)的封堵。In the figure, the specifications of the orifice pipe (2) and the flange (3) are consistent, and the two are connected by welding; the specifications of the flange (3) and the flange cover (4) are consistent, and both are preloaded Screw (5) connection; select the PVC pipe (6) of small aperture for use, its total length is equal to or slightly less than the depth of drilling (1); PVC pipe (6) is connected on the back of the flange plate mask (4), and its The front side of the connection position on the flange mask (4) is connected to the PVC pipe valve (7); the grouting valve (8) is connected to the flange mask (4); one end of the grouting pipe (9) is connected to the grouting valve (8), the other end is connected to the grouting pump (10); the grouting pump (10) can pump the grout (11). The specific steps when the utility model is implemented are: first install the orifice pipe (2) with the flange (3) in the borehole (1), the orifice pipe (2) is installed with a length of 3-5m; Insert the PVC pipe (6) into the inside, the length of which is equal to or slightly less than the depth of the drilled hole (1); then connect the PVC pipe (6) with the flange cover (4), connect the flange (3) The blue plate cover (4) is tightly connected by the pre-tightening screw (5); finally open the PVC pipe valve (7), the grouting valve (8) is connected to the grouting pipe (9), and the grouting pipe (9) is connected to the grouting pump (10), carry out grouting to the borehole (1), the PVC pipe valve (7) will return air in the early stage of grouting, when the PVC pipe valve (7) starts to return grout, then stop the grouting pump (10), close the PVC The pipe valve (7) and the grouting valve (8) will complete the plugging of the borehole (1) after the slurry (11) is fully solidified.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420353245.8U CN203961899U (en) | 2014-06-23 | 2014-06-23 | Upwards extend the hole sealing device of boring |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420353245.8U CN203961899U (en) | 2014-06-23 | 2014-06-23 | Upwards extend the hole sealing device of boring |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203961899U true CN203961899U (en) | 2014-11-26 |
Family
ID=51922498
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420353245.8U Expired - Fee Related CN203961899U (en) | 2014-06-23 | 2014-06-23 | Upwards extend the hole sealing device of boring |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203961899U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105200978A (en) * | 2015-10-12 | 2015-12-30 | 山东大学 | Advancing type localized double-liquid grouting device and construction method |
| CN112459744A (en) * | 2020-11-25 | 2021-03-09 | 安徽铜冠(庐江)矿业有限公司 | Hole sealing system and hole sealing method for geological prospecting drill hole |
| CN113137204A (en) * | 2021-03-27 | 2021-07-20 | 山东新巨龙能源有限责任公司 | Hole sealing device for underground roof drilling and hole sealing method thereof |
-
2014
- 2014-06-23 CN CN201420353245.8U patent/CN203961899U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105200978A (en) * | 2015-10-12 | 2015-12-30 | 山东大学 | Advancing type localized double-liquid grouting device and construction method |
| CN112459744A (en) * | 2020-11-25 | 2021-03-09 | 安徽铜冠(庐江)矿业有限公司 | Hole sealing system and hole sealing method for geological prospecting drill hole |
| CN113137204A (en) * | 2021-03-27 | 2021-07-20 | 山东新巨龙能源有限责任公司 | Hole sealing device for underground roof drilling and hole sealing method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102628345B (en) | Sealing method of high sealing quasi-horizontal drilling hole | |
| CN101139911B (en) | Gas injection pressure-stabilizing drilling method | |
| CN103161478B (en) | Impulse-type grouting method | |
| CN103470212B (en) | Active drilling and hole sealing device and method | |
| CN203961899U (en) | Upwards extend the hole sealing device of boring | |
| CN103410467B (en) | Continuous under-pressure drilling and hole sealing device and method | |
| CN204753611U (en) | Deep basal pit pressure -bearing water precipitation gas well gas bag plugging device | |
| CN105781586B (en) | A kind of solid pipe method for blocking of gushing water borehole wall filter stream pressure relief vent inner sleeve | |
| CN102943687A (en) | Pressure equalizing and hole sealing method for gas extraction drilling | |
| CN202401465U (en) | High-pressure grouting hole sealing device | |
| CN104196492B (en) | A kind of dragging down-hole plugging valve with pressure | |
| CN204920900U (en) | Horizontal hole reaches and delays angling hole hole sealing device in pit | |
| CN203394430U (en) | Grouting hole packer | |
| CN103993901B (en) | A kind of projecting coal bed drilling waterpower is handled up anti-reflection method | |
| CN203948037U (en) | Segmented Quantitative Injection String | |
| CN103821540B (en) | Mixing two fluid grouting pipe at the bottom of fixed point control hole, territory | |
| CN106930294A (en) | A kind of bedrock fracture artesian area grouting method | |
| RU2615188C1 (en) | Well stage cementing method | |
| CN105735937A (en) | Plugging device for water-inrush borehole by filtration flow and pressure relief of hole wall and grouting and fixing of in-hole bushing | |
| CN201047292Y (en) | Plugging apparatus for mechanical water-shutoff construction of mine lane oculus elephantinus | |
| CN211342872U (en) | High-efficiency sealing and grouting layered water-stop device and its well pipe | |
| CN203394451U (en) | A production string for leak sealing and water plugging in heavy oil horizontal wells | |
| CN203531867U (en) | Primary sand prevention letting-in tool and secondary resanding extruding and filling tool of primary sand prevention letting-in tool | |
| CN209261528U (en) | A leak-stopping device for pressurized and large-flow gushing water grouting | |
| RU2354804C1 (en) | Method for well repair |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141126 Termination date: 20150623 |
|
| EXPY | Termination of patent right or utility model |