CN203951110U - The cable testing bridge of energy Fast Installation - Google Patents
The cable testing bridge of energy Fast Installation Download PDFInfo
- Publication number
- CN203951110U CN203951110U CN201420338632.4U CN201420338632U CN203951110U CN 203951110 U CN203951110 U CN 203951110U CN 201420338632 U CN201420338632 U CN 201420338632U CN 203951110 U CN203951110 U CN 203951110U
- Authority
- CN
- China
- Prior art keywords
- base plate
- testing bridge
- cable testing
- fast installation
- bulge loop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of cable testing bridge of energy Fast Installation, cable testing bridge comprises base plate and two side plates, between two side plates, be provided with base plate, base plate is square tube, side plate is connected with base plate by Quick connection part, two ends at base plate are provided with hole for injecting glue, between Quick connection part and base plate, are provided with glue-line, and side plate is C shaped steel or E shaped steel.The utlity model has simple in structurely, be applicable to on-the-spot Fast Installation, cost is low, adopts nonmetallic composite to make, and has that material is light, fire-retardant, anticorrosion and mechanical strength is high, perfect heat-dissipating, the effect that insulation effect is good, the advantage that bulk strength is higher.
Description
Technical field
The utility model relates to a kind of cable testing bridge, particularly a kind of cable testing bridge of energy Fast Installation.
Background technology
Cable testing bridge is generally applicable to the places such as the cable laying of large enterprise, heavy construction power transformation, erecting cable, large bridge, subway and marine drilling, existing cable testing bridge is made by bulk metal framework mostly, so not only make that overall structure is heavy, cost is highly unfavorable for transportation, install and remove and promote the use of, as be applied in erecting cable, can be because cable testing bridge breaks for a long time in air, easy-to-rust.In addition, existing composite material cable crane span structure, and because the glue directly using between its square tube and C shaped steel is fixed, glue can be because long term exposure is easily aging in air, so just exist very large safe shadow to suffer from, result of use is not good, another installs fixed form is in square tube, to glue together inner carrier, but mounting nuts or bolt need to punch on inner carrier, then use nut or bolt in bolt or nut and inner carrier to be connected and fixed, make like this cable testing bridge cost increase, complex process, easily stripped thread.Also having a kind of is directly to use stainless steel self-plugging rivet to be connected and fixed square tube and C shaped steel, makes like this construction intensity increase, and insulation effect is not good, is not suitable for antistatic place, and globality is poor, thereby the whole pressurized holding capacity of cable testing bridge is less.
Summary of the invention
The purpose of this utility model is in order to overcome above deficiency, provides that a kind of material is light, fire-retardant, heatproof, mechanical strength are high, the cable testing bridge of antistatic, energy Fast Installation that insulation effect is good.
The purpose of this utility model is achieved through the following technical solutions: a kind of cable testing bridge of energy Fast Installation, cable testing bridge comprises base plate and two side plates, between two side plates, be provided with base plate, base plate is square tube, side plate is connected with base plate by Quick connection part, two ends at base plate are provided with hole for injecting glue, between Quick connection part and base plate, be provided with glue-line, side plate is C shaped steel or E shaped steel, when side plate is E shaped steel, base plate is placed in the groove of E shaped steel bottom, on the transverse part in the middle of E type groove, be provided with the hole communicating with hole for injecting glue, Quick connection part comprises connector, in one end of connector, be provided with spacing end cap, periphery at connector is provided with two circular bulge loop B and a plurality of circular bulge loop A, circular bulge loop A is between two circular bulge loop B, and the external diameter of circular bulge loop A is less than the external diameter of circular bulge loop B, or on connector, be provided with annular groove.
The utility model compared with prior art has the following advantages:
Simple in structure, be applicable to on-the-spot Fast Installation, cost is low, adopts nonmetallic composite to make, and has that material is light, fire-retardant, anticorrosion and mechanical strength is high, perfect heat-dissipating, the effect that insulation effect is good, the advantage that bulk strength is higher.
accompanying drawing explanation:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of a kind of execution mode of the utility model Quick connection part;
Fig. 3 is the structural representation of the another kind of execution mode of the utility model;
Fig. 4 is the structural representation of the another kind of execution mode of the utility model Quick connection part;
Number in the figure: 1-side plate, 2-glue-line, 3-base plate, 4-Quick connection part, 5-hole for injecting glue, the spacing end cap of 6-, the circular bulge loop B of 7-, the circular bulge loop A of 8-, 9-annular groove, 10-connector.
embodiment:
in order to deepen understanding of the present utility model, below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail, and this embodiment only, for explaining the utility model, does not form the restriction to the utility model protection range.
Execution mode 1: as Fig. 1, Fig. 2 shows a kind of embodiment of the cable testing bridge of a kind of energy of the utility model Fast Installation, described cable testing bridge comprises base plate 3 and two side plates 1, between two side plates 1, be provided with base plate 3, base plate 3 is square tube, side plate 1 is connected with base plate 3 by Quick connection part 4, at the two ends of base plate 3, be provided with hole for injecting glue 5, between Quick connection part 4 and base plate 3, be provided with glue-line 2, side plate 1 is C shaped steel, Quick connection part 4 comprises connector 10, in one end of connector 10, be provided with spacing end cap 6, periphery at connector 10 is provided with two circular bulge loop B7 and a plurality of circular bulge loop A8, circular bulge loop A8 is between two circular bulge loop B7, and the external diameter of circular bulge loop A8 is less than the external diameter of circular bulge loop B7.
Execution mode 2: as Fig. 3, Fig. 4 shows a kind of embodiment of the cable testing bridge of a kind of energy of the utility model Fast Installation, described cable testing bridge comprises base plate 3 and two side plates 1, between two side plates 1, be provided with base plate 3, base plate 3 is square tube, side plate 1 is connected with base plate 3 by Quick connection part 4, at the two ends of base plate 3, be provided with hole for injecting glue 5, between Quick connection part 4 and base plate 3, be provided with glue-line 2, side plate 1 is E shaped steel, base plate 3 is placed in the groove of E shaped steel bottom, on the transverse part in the middle of E type groove, be provided with the hole communicating with hole for injecting glue 5, Quick connection part 4 comprises connector 10, in one end of connector 10, be provided with spacing end cap 6, on connector 10, be provided with annular groove 9.
Execution mode 3: as Fig. 1, Fig. 4 show a kind of embodiment of a kind of cable testing bridge that can Fast Installation of the utility model, described cable testing bridge comprises base plate 3 and two side plates 1, between two side plates 1, be provided with base plate 3, base plate 3 is square tube, side plate 1 is connected with base plate 3 by Quick connection part 4, at the two ends of base plate 3, be provided with hole for injecting glue 5, between Quick connection part 4 and base plate 3, be provided with glue-line 2, side plate 1 is C shaped steel, Quick connection part 4 comprises connector 10, in one end of connector 10, be provided with spacing end cap 6, on connector 10, be provided with annular groove 9.
Execution mode 4: as Fig. 2, Fig. 3 shows a kind of embodiment of the cable testing bridge of a kind of energy of the utility model Fast Installation, described cable testing bridge comprises base plate 3 and two side plates 1, between two side plates 1, be provided with base plate 3, base plate 3 is square tube, side plate 1 is connected with base plate 3 by Quick connection part 4, at the two ends of base plate 3, be provided with hole for injecting glue 5, between Quick connection part 4 and base plate 3, be provided with glue-line 2, side plate 1 is E shaped steel, base plate 3 is placed in the groove of E shaped steel bottom, on the transverse part in the middle of E type groove, be provided with the hole communicating with hole for injecting glue 5, Quick connection part 4 comprises connector 10, in one end of connector 10, be provided with spacing end cap 6, periphery at connector 10 is provided with two circular bulge loop B7 and a plurality of circular bulge loop A8, circular bulge loop A8 is between two circular bulge loop B7, and the external diameter of circular bulge loop A8 is less than the external diameter of circular bulge loop B7.
The utility model is simple in structure, is applicable to on-the-spot Fast Installation, and cost is low, adopts nonmetallic composite to make, and has that material is light, fire-retardant, anticorrosion and mechanical strength is high, perfect heat-dissipating, the effect that insulation effect is good, the advantage that bulk strength is higher.
Claims (5)
1. the cable testing bridge of an energy Fast Installation, described cable testing bridge comprises base plate (3) and two side plates (1), between two described side plates (1), be provided with base plate (3), described base plate (3) is square tube, it is characterized in that: described side plate (1) is connected with base plate (3) by Quick connection part (4), at the two ends of described base plate (3), be provided with hole for injecting glue (5), between described Quick connection part (4) and base plate (3), be provided with glue-line (2).
2. cable testing bridge that according to claim 1 can Fast Installation, it is characterized in that: described side plate (1) is C shaped steel or E shaped steel, when described side plate (1) is E shaped steel, described base plate (3) is placed in the groove of E shaped steel bottom, on the transverse part in the middle of described E type groove, is provided with the hole communicating with hole for injecting glue (5).
3. cable testing bridge that according to claim 1 can Fast Installation, is characterized in that: described Quick connection part (4) comprises connector (10), in one end of described connector (10), is provided with spacing end cap (6).
4. cable testing bridge that according to claim 3 can Fast Installation, it is characterized in that: the periphery at described connector (10) is provided with two circular bulge loop B(7) and a plurality of circular bulge loop A(8), described circular bulge loop A(8) be positioned at two circular bulge loop B(7) between, and described circular bulge loop A(8) external diameter be less than circular bulge loop B(7) external diameter.
5. cable testing bridge that according to claim 3 can Fast Installation, is characterized in that: on described connector (10), be provided with annular groove (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420338632.4U CN203951110U (en) | 2014-06-24 | 2014-06-24 | The cable testing bridge of energy Fast Installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420338632.4U CN203951110U (en) | 2014-06-24 | 2014-06-24 | The cable testing bridge of energy Fast Installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203951110U true CN203951110U (en) | 2014-11-19 |
Family
ID=51893128
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420338632.4U Active CN203951110U (en) | 2014-06-24 | 2014-06-24 | The cable testing bridge of energy Fast Installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203951110U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104022473A (en) * | 2014-06-24 | 2014-09-03 | 中格复合材料(南通)有限公司 | Cable bridge capable of being rapidly mounted |
-
2014
- 2014-06-24 CN CN201420338632.4U patent/CN203951110U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104022473A (en) * | 2014-06-24 | 2014-09-03 | 中格复合材料(南通)有限公司 | Cable bridge capable of being rapidly mounted |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190285208A1 (en) | Cable Protective Device for a Subsea Cable in an Offshore Wind Farm | |
CN203951110U (en) | The cable testing bridge of energy Fast Installation | |
CN204012583U (en) | A kind of suspension clamp | |
CN203361166U (en) | Supporting beam for building foundation pit support | |
CN204558683U (en) | A kind of parallel groove clamp | |
CN104499653A (en) | Automatic tool anchor plate | |
CN104022473A (en) | Cable bridge capable of being rapidly mounted | |
CN204326677U (en) | Novel power transmission power line steel tuble pole | |
CN204592635U (en) | A kind of flange with pile body mounting hole mould | |
CN203050118U (en) | Easily-assembling type discharging platform steel wire rope pulling ring | |
CN104098016A (en) | Easy lifting bracket of transformer | |
CN204156460U (en) | High-tension cable fixture on steel tower | |
CN207878655U (en) | A kind of prefabricated cabin of cabin top installation photovoltaic component | |
CN203839817U (en) | Power transmission line foundation finished product protection cover | |
CN203673966U (en) | Capacitor fixing device used for electric automobile | |
CN203006796U (en) | Embrace hoop type wall-attached connecting piece used for tower crane | |
CN206313378U (en) | A kind of angle steel tower bracket fixing device | |
CN204356834U (en) | A kind of vertical bearing plate of rainwater-collecting module | |
CN203711894U (en) | Brake drum clamp | |
CN203560356U (en) | Steel wire rope fastener | |
CN202972202U (en) | Fixing device for automobile pipeline | |
CN204191079U (en) | DC-DC converter circuit board Performance Detection fixture | |
CN204991461U (en) | Electric capacity anchor clamps | |
CN202720905U (en) | Irradiation capsule metal wire sealing structure | |
CN202952018U (en) | On-site maintenance device of wind electricity coupler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: Southeast of the intersection of Haixin road and Jiangxin Road, Tongzhou Bay, Nantong City, Jiangsu Province Patentee after: CHINAGRATE COMPOSITE STRUCTURES (NANTONG) Ltd. Address before: 226000, No. 11 Tong Fu Nan Road, Nantong economic and Technological Development Zone, Jiangsu Patentee before: CHINAGRATE COMPOSITE STRUCTURES (NANTONG) Ltd. |
|
CP02 | Change in the address of a patent holder |