CN203944447U - The comprehensive jockey of a kind of boiler of power plant coal pulverizer - Google Patents

The comprehensive jockey of a kind of boiler of power plant coal pulverizer Download PDF

Info

Publication number
CN203944447U
CN203944447U CN201420393598.0U CN201420393598U CN203944447U CN 203944447 U CN203944447 U CN 203944447U CN 201420393598 U CN201420393598 U CN 201420393598U CN 203944447 U CN203944447 U CN 203944447U
Authority
CN
China
Prior art keywords
coal
pipeline
pulverizer
boiler
pebble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420393598.0U
Other languages
Chinese (zh)
Inventor
孔凡新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420393598.0U priority Critical patent/CN203944447U/en
Application granted granted Critical
Publication of CN203944447U publication Critical patent/CN203944447U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model relates to the comprehensive jockey of a kind of boiler of power plant coal pulverizer, comprise burning boiler and coal pulverizer, described coal pulverizer upper end arranges former coal pipeline, coal pulverizer lower surface arranges the coal-fired pipeline being connected with burning boiler, in the connecting pipe of described coal-fired pipeline and coal pulverizer lower surface, be provided with grid and filter filter, coal-fired pipeline is provided with hot-wind inlet with the crooked pipeline that is connected of burning boiler, and coal-fired pipeline side pipe wall above grid filters filter connects tiltedly lower pipeline, described oblique lower pipeline is connected with pebble coal storage bin hopper upper end charging aperture, described pebble coal storage bin hopper is connected with pulverizer by vertical pipeline, between described pulverizer and former coal pipeline, be connected feeding pipe.The utility model, through the circulating filtration crushing grinding to the pebble coal in raw coal, makes pebble coal meet the combustion requirements of burning boiler, enters burning boiler burning, and syndeton is reasonable in design, has guaranteed that raw coal combustion is abundant, and has reduced disposal of pollutants.

Description

The comprehensive jockey of a kind of boiler of power plant coal pulverizer
Technical field
The utility model relates to boiler of power plant technical field, relates in particular to the comprehensive jockey of a kind of boiler of power plant coal pulverizer.
Background technology
Development along with heavy-duty generator group, use coal pulverizer increases, the pebble coal of discharging has become thermal power plant's heavy burden, the processing of the pebble coal that coal pulverizer is discharged is at present entered boiler slag removal system or is manually transported boiler to abandon outward in the open, waste resource pollution surrounding enviroment.
Utility model content
The purpose of this utility model is in order to overcome the deficiencies in the prior art, provides a kind of boiler of power plant coal pulverizer comprehensive jockey, the pebble coal in circulating filtration processing raw coal, and the boiler raw coal that fully burns, energy utilization rate is high, and has reduced disposal of pollutants.
The utility model is achieved through the following technical solutions: the comprehensive jockey of a kind of boiler of power plant coal pulverizer, comprise burning boiler and coal pulverizer, described coal pulverizer upper end arranges former coal pipeline, coal pulverizer lower surface arranges the coal-fired pipeline being connected with burning boiler, in the connecting pipe of described coal-fired pipeline and coal pulverizer lower surface, be provided with grid and filter filter, coal-fired pipeline is provided with hot-wind inlet with the crooked pipeline that is connected of burning boiler, and coal-fired pipeline side pipe wall above grid filters filter connects tiltedly lower pipeline, described oblique lower pipeline is connected with pebble coal storage bin hopper upper end charging aperture, described pebble coal storage bin hopper is connected with pulverizer by vertical pipeline, between described pulverizer and former coal pipeline, be connected feeding pipe.
Further, described coal-fired pipeline is provided with pipe control gate I below grid filters filter.
Further, the upper end charging aperture of described pebble coal storage bin hopper is provided with magnetic force screen pack.
Further, the vertical pipeline of described pebble coal storage bin hopper and pulverizer is provided with pipe control gate II.
Further, described feeding pipe is provided with conveyer.
Compared with prior art, the beneficial effects of the utility model are: the utility model filters filter by grid is set in the coal-fired pipeline being connected with burning boiler at coal pulverizer, filtering out in raw coal can not clean-burning pebble coal, pebble coal enters pebble coal storage bin hopper along coal-fired pipeline tiltedly lower pipeline of a side above grid filters filter, the magnetic force screen pack of pebble coal storage bin hopper upper end charging aperture is used for filtering the iron block in pebble coal simultaneously, pebble coal in pebble coal storage bin hopper is transmitted back to and in the former coal pipeline of coal pulverizer upper end, is reentered coal pulverizer and grind by the conveyer on feeding pipe after pulverizer fragmentation, through the circulating filtration crushing grinding to the pebble coal in raw coal, make pebble coal meet the combustion requirements of burning boiler, enter burning boiler burning, syndeton is reasonable in design, guaranteed that raw coal combustion is abundant, and reduced disposal of pollutants.
Accompanying drawing explanation
Fig. 1 is the structural representation of the comprehensive jockey of a kind of boiler of power plant coal pulverizer of the utility model.
Wherein: 1, coal pulverizer; 2, former coal pipeline; 3, coal-fired pipeline; 4, grid filters filter; 5, pipe control gate I; 6, tiltedly descend pipeline; 7, pebble coal storage bin hopper; 8, magnetic force screen pack; 9, pipe control gate II; 10, pulverizer; 11, hot-wind inlet; 12, burning boiler; 13, feeding pipe; 14, conveyer.
The specific embodiment
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein is only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the utility model relates to the comprehensive jockey of a kind of boiler of power plant coal pulverizer, comprise burning boiler 12 and coal pulverizer 1, described coal pulverizer 1 upper end arranges former coal pipeline 2, coal pulverizer 1 lower surface arranges the coal-fired pipeline 3 being connected with burning boiler 12, in the connecting pipe of described coal-fired pipeline 3 and coal pulverizer 1 lower surface, be provided with grid and filter filter 4, coal-fired pipeline 3 is provided with hot-wind inlet 11 with the crooked pipeline that is connected of burning boiler 12, and coal-fired pipeline 3 side pipe wall above grid filters filter 4 connects tiltedly lower pipeline 6, described oblique lower pipeline 6 is connected with pebble coal storage bin hopper 7 upper end charging apertures, described pebble coal storage bin hopper 7 is connected with pulverizer 10 by vertical pipeline, between described pulverizer 10 and former coal pipeline 2, be connected feeding pipe 13, described coal-fired pipeline 3 is provided with pipe control gate I5 below grid filters filter 4, the upper end charging aperture of described pebble coal storage bin hopper 7 is provided with magnetic force screen pack 8, described pebble coal storage bin hopper 7 is provided with pipe control gate II9 with the vertical pipeline of pulverizer 10, described feeding pipe 13 is provided with conveyer 14.
In sum, the utility model filters filter 4 by the interior grid that arranges of coal-fired pipeline 3 being connected with burning boiler 12 at coal pulverizer 1, filtering out in raw coal can not clean-burning pebble coal, pebble coal enters pebble coal storage bin hopper 7 along coal-fired pipeline 1 tiltedly lower pipeline 6 of a side above grid filters filter 4, the magnetic force screen pack 8 of pebble coal storage bin hopper 7 upper end charging apertures is used for filtering the iron block in pebble coal simultaneously, pebble coal in pebble coal storage bin hopper 7 is transmitted back to and in the former coal pipeline 2 of coal pulverizer 1 upper end, is reentered coal pulverizer 1 and grind by the conveyer 14 on feeding pipe 13 after pulverizer 10 fragmentations, through the circulating filtration crushing grinding to the pebble coal in raw coal, make pebble coal meet the combustion requirements of burning boiler, enter burning boiler burning, syndeton is reasonable in design, guaranteed that raw coal combustion is abundant, and reduced disposal of pollutants.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all any modifications of doing within spirit of the present utility model and principle, be equal to and replace and improvement etc., within all should being included in protection domain of the present utility model.

Claims (5)

1. the comprehensive jockey of boiler of power plant coal pulverizer, comprise burning boiler (12) and coal pulverizer (1), it is characterized in that, described coal pulverizer (1) upper end arranges former coal pipeline (2), coal pulverizer (1) lower surface arranges the coal-fired pipeline (3) being connected with burning boiler (12), in the connecting pipe of described coal-fired pipeline (3) and coal pulverizer (1) lower surface, be provided with grid and filter filter (4), coal-fired pipeline (3) is provided with hot-wind inlet (11) with the crooked pipeline that is connected of burning boiler (12), and coal-fired pipeline (3) filters filter (4) top one side pipe wall at grid and connects tiltedly lower pipeline (6), described oblique lower pipeline (6) is connected with pebble coal storage bin hopper (7) upper end charging aperture, described pebble coal storage bin hopper (7) is connected with pulverizer (10) by vertical pipeline, between described pulverizer (10) and former coal pipeline (2), be connected feeding pipe (13).
2. the comprehensive jockey of a kind of boiler of power plant coal pulverizer according to claim 1, is characterized in that, described coal-fired pipeline (3) filters filter (4) below at grid and is provided with pipe control gate I (5).
3. the comprehensive jockey of a kind of boiler of power plant coal pulverizer according to claim 1, is characterized in that, the upper end charging aperture of described pebble coal storage bin hopper (7) is provided with magnetic force screen pack (8).
4. the comprehensive jockey of a kind of boiler of power plant coal pulverizer according to claim 1, is characterized in that, described pebble coal storage bin hopper (7) is provided with pipe control gate II (9) with the vertical pipeline of pulverizer (10).
5. the comprehensive jockey of a kind of boiler of power plant coal pulverizer according to claim 1, is characterized in that, described feeding pipe (13) is provided with conveyer (14).
CN201420393598.0U 2014-07-13 2014-07-13 The comprehensive jockey of a kind of boiler of power plant coal pulverizer Expired - Fee Related CN203944447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420393598.0U CN203944447U (en) 2014-07-13 2014-07-13 The comprehensive jockey of a kind of boiler of power plant coal pulverizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420393598.0U CN203944447U (en) 2014-07-13 2014-07-13 The comprehensive jockey of a kind of boiler of power plant coal pulverizer

Publications (1)

Publication Number Publication Date
CN203944447U true CN203944447U (en) 2014-11-19

Family

ID=51886507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420393598.0U Expired - Fee Related CN203944447U (en) 2014-07-13 2014-07-13 The comprehensive jockey of a kind of boiler of power plant coal pulverizer

Country Status (1)

Country Link
CN (1) CN203944447U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104676623A (en) * 2015-02-04 2015-06-03 华电电力科学研究院 Coal-fired deashing and upgrading power plant coal pulverizing system and method
CN105170281A (en) * 2015-08-12 2015-12-23 中国大唐集团科学技术研究院有限公司 Coal grinding, impurity removing and coal feeding integrated device for power plant
CN110132681A (en) * 2019-06-10 2019-08-16 大唐淮北发电厂 A kind of coal sample preparation with regulatory function with dividing sampling device automatically

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104676623A (en) * 2015-02-04 2015-06-03 华电电力科学研究院 Coal-fired deashing and upgrading power plant coal pulverizing system and method
CN105170281A (en) * 2015-08-12 2015-12-23 中国大唐集团科学技术研究院有限公司 Coal grinding, impurity removing and coal feeding integrated device for power plant
CN110132681A (en) * 2019-06-10 2019-08-16 大唐淮北发电厂 A kind of coal sample preparation with regulatory function with dividing sampling device automatically
CN110132681B (en) * 2019-06-10 2021-08-20 大唐淮北发电厂 Automatic sample separation device with adjusting function for coal sample preparation

Similar Documents

Publication Publication Date Title
CN204648249U (en) The melting of one way of life refuse gasification is from incinerating and treating device
CN105170281A (en) Coal grinding, impurity removing and coal feeding integrated device for power plant
CN203944447U (en) The comprehensive jockey of a kind of boiler of power plant coal pulverizer
CN203316237U (en) Activated carbon crushing equipment
CN204787204U (en) Energy -concerving and environment -protective boiler of using
CN204620062U (en) Gathering dust and recycle device of a kind of building block raw material crushing system
CN204987077U (en) Device is optimized to boiler control fuel
CN209333905U (en) A kind of domestic garbage treating system
CN203923112U (en) A kind of junked tire pyrolytic gasification treatment system
CN203304046U (en) Device for removing dust and iron from powder
CN105013596B (en) Device and process for sorting difficult-to-grind mineral substances in cyclic load of coal mill
CN205109318U (en) Active carbon tower
CN206613598U (en) A kind of new washing systems
CN204165068U (en) Stokehold feed bin dust recycling system
CN209383725U (en) The upgrading system of low-order coal pulverized coal forming is carried out using waste heat flue gas
CN203955698U (en) A kind of waste separation treatment system
CN204042915U (en) A kind of garbage combustion device
CN204063848U (en) A kind of coal slime rapid drying device
CN205904225U (en) Civil engineering construction waste processing apparatus
CN203960151U (en) One way of life refuse reclamation treatment system
CN205628241U (en) Phosphorus slag grinding system
CN204358759U (en) A kind of high water content brown coal adaptive type medium-speed pulverizer
CN201992673U (en) Device utilizing boiler waste heat to prepare coal powder
CN205462631U (en) Slay roller system of grinding for sleeping in
CN208728295U (en) A kind of circulating rural area solid waste processing equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141119

Termination date: 20150713

EXPY Termination of patent right or utility model