CN203928906U - A kind of fireworks group basin machine send leading-in device automatically - Google Patents
A kind of fireworks group basin machine send leading-in device automatically Download PDFInfo
- Publication number
- CN203928906U CN203928906U CN201420359903.4U CN201420359903U CN203928906U CN 203928906 U CN203928906 U CN 203928906U CN 201420359903 U CN201420359903 U CN 201420359903U CN 203928906 U CN203928906 U CN 203928906U
- Authority
- CN
- China
- Prior art keywords
- send
- running wheel
- lead
- fireworks
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000001514 detection method Methods 0.000 claims abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 3
- 230000000007 visual effect Effects 0.000 description 2
- 230000000875 corresponding Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 230000001502 supplementation Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Abstract
The utility model relates to assembling firework forming machine field, specifically disclose a kind of fireworks group basin machine and automatically send leading-in device, this fireworks group basin machine send leading-in device to comprise that installing plate, first send running wheel, second to send running wheel and detecting sensor automatically, described first send running wheel and second to send running wheel to be installed on described installing plate, lead-in wire is located at described first and is sent running wheel and second to send between running wheel, and described detecting sensor consumes and send the drive motors signal of running wheel to be connected with first for detection of lead-in wire.Consumption timely feed wire that fireworks group basin machine of the present utility model send leading-in device can automatically detect lead-in wire automatically, lead-in wire is carried smooth and easy, has improved production efficiency.
Description
Technical field
The utility model relates to assembling firework forming machine field, specifically discloses a kind of fireworks group basin machine and automatically send leading-in device.
Background technology
Along with social development, also more and more higher for the requirement of fireworks visual effect, in order to obtain bright and colourful visual effect in the time setting off, after single fireworks are made, multiple assembling fireworks need to be become to one group of fireworks.In assembling firework process, need on fireworks tube, punch and insert lead-in wire, all fireworks tubes can be seted off in succession.Conventionally be all that multiple stand-by lead-in wire coils are hung on group basin power traction coil holder, lead-in wire in each coil is for assembling firework operation, lead-in wire is constantly consumed in this course, need timely tractive, conveying, because lead-in wire winding volume is large, quality weight, usually there is lead-in wire and carry unhappy and carry situation not in time, cause organizing in basin process available without lead-in wire; In addition existing multiple lead-in wire coil is suspended on group basin power traction coil holder jointly, when lead-in wire coil consumption in the middle part of being positioned at comparatively fast need to be changed, other all coils all need to be taken off, after supplementing well, lead-in wire is hanging to one by one again on lead frame, waste time and energy, seriously affected production efficiency.
Utility model content
For one or more technical problem existing in prior art, it is a kind of simple in structure, reliable that the purpose of this utility model is to provide, can detect in real time the consumption of lead-in wire and in time the fireworks group basin machine of feed wire automatically send leading-in device.
For achieving the above object, the technical solution of the utility model is:
A kind of fireworks group basin machine send leading-in device automatically, comprise that installing plate, first send running wheel, second to send running wheel and detecting sensor, described first send running wheel and second to send running wheel to be installed on described installing plate, lead-in wire is located at described first and is sent running wheel and second to send between running wheel, and described detecting sensor is for detection of the consumption going between and send the drive motors signal of running wheel to be connected with first.
Preferably, be also provided with the support for described detecting sensor is installed on described installing plate, described bracket-rotatable is installed on described installing plate movingly, and described detecting sensor is installed on support one end, and the support other end is set up in lead-in wire top the support that gone between.
Preferably, described frame is provided with second and send running wheel installing rack, and described installing rack is provided with lead-in wire guide.
Preferably, described first send the periphery of running wheel to be provided with the cannelure adapting with the gabarit that goes between.
Preferably, on described drive motors, be also provided with the time relay.
Preferably, on described installing plate, offer installing hole.
Beneficial effect
Compared with prior art, the utility model can detect consumption the timely feed wire of lead-in wire automatically, and lead-in wire is carried more smooth and easy, and guaranteeing to organize in basin machine has the lead-in wire of enough surpluses available; Can be by multiple leading-in devices serial connections automatically sent, eachly automatically send a leading-in device corresponding lead-in wire coil respectively, then each lead-in wire coil is hung on respectively on group basin power traction coil holder independently, be convenient to the dismounting of each lead-in wire coil, reduce workload, accelerated replacing speed, improved production efficiency.
Brief description of the drawings
Fig. 1 is the three-dimensional structure diagram that the utility model fireworks group basin machine send leading-in device automatically.
Fig. 2 is the front view that the utility model fireworks group basin machine send leading-in device automatically.
Fig. 3 is the structural representation of lead frame of the present utility model.
Wherein: 1 first send running wheel, 2 installing racks, 3 second send running wheel, 4 wire-lead parts, 5 detecting sensors, 6 installing holes, 7 installing plates, 8 drive motors, 9 supports, 10 lead-in wires, 11 lead frames, 12 lead-in wire coils, 13 mounting rods.
Detailed description of the invention
Below in conjunction with specific embodiment, structure of the present utility model and principle are described further.
As shown in Figure 1 to Figure 3, the fireworks group basin machine of the present embodiment send leading-in device automatically, comprise installing plate 7, first send running wheel 1, second send running wheel 3 and detecting sensor 5, first send running wheel 1 and second to send running wheel 3 to be installed on installing plate 7, lead-in wire 10 is located at first and is sent running wheel 1 and second to send between running wheel 3, described detecting sensor 5 is for detection of lead-in wire 10 consumption and send drive motors 8 signals of running wheel 1 to be connected with first, in the time that lead-in wire 10 consumes, signal is transferred to drive motors 8 by detecting sensor 5, drive motors 8 drives first to send running wheel 1 to rotate, send the cooperation that running wheel 1 and second send running wheel 3 to realize the automatic transport going between by first.
Preferably, on installing plate 7, be also provided with the support 9 for described detecting sensor 5 is installed, support 9 is rotatably installed on installing plate 7, detecting sensor 5 is installed on support 9 one end, support 9 other ends are set up in lead-in wire 10 tops 10 supports that gone between, after using consumption, lead-in wire 10 can be tensioned, and then drive its top support 9 one end on rise, the other end that detecting sensor 5 is installed declines, now detecting sensor 5 detects that support 9 positions change, signal is transferred to drive motors 8, drive motors 8 starts to rotate, realize and automatically send and draw, can also before the work of fireworks group basin machine, just provide certain lead-in wire 10 surpluses, guarantee to go between 10 enough use.
Preferably, described frame is provided with second and send running wheel installing rack 2, and described installing rack 2 is provided with lead-in wire guide 4, and the guide pipe that in the present embodiment, guide 4 is arranged for vertical direction, is conducive to the sizing going between in 10 course of conveying.
Preferably, described first send the periphery of running wheel 1 to be provided with the cannelure adapting with 10 gabarits that go between, and lead-in wire 10 is stuck in cannelure, 10 slips of avoiding going between in traction process.
Preferably, on described drive motors 8, be also provided with time relay (not shown), can be by the rotation of time relay control drive motors 8, and then control to send and draw the time and send and draw length, in the present embodiment, send that to draw set of time be 2S-5S.
Preferably, on described installing plate 7, offer installing hole 6, automatically send leading-in device to be connected in series on the mounting rod 13 that is arranged on lead frame 12 to adapt to multiple lead-in wire coils 12 in multiple fireworks group basin machines by installing hole 6, coil 12 quantity that go between in the present embodiment are 6, be suspended on fireworks group basin power traction coil holder 11 relatively independently, can realize the separate dismounting of each lead-in wire coil 12, reduce workload, improve replacing speed.
Applied specific embodiment herein principle of the present utility model and embodiment are set forth, the explanation of above embodiment is just for helping to understand method of the present utility model and core concept thereof.The above is only preferred embodiment of the present utility model, should be understood that, due to the finiteness of literal expression, and objectively there is unlimited concrete structure, for those skilled in the art, not departing under the prerequisite of the utility model principle, can also make some improvement, retouching or variation, also above-mentioned technical characterictic can be combined by rights; These improve retouching, change or combination, or without improving, the design of utility model and technical scheme are directly applied to other occasion, all should be considered as protection domain of the present utility model.
Claims (6)
1. a fireworks group basin machine send leading-in device automatically, it is characterized in that: comprise that installing plate, first send running wheel, second to send running wheel and detecting sensor, described first send running wheel and second to send running wheel to be installed on described installing plate, lead-in wire is arranged in described first and send running wheel and second to send between running wheel, and described detecting sensor is for detection of the consumption going between and send the drive motors signal of running wheel to be connected with first.
2. fireworks group basin machine according to claim 1 send leading-in device automatically, it is characterized in that: on described installing plate, be also provided with the support for described detecting sensor is installed, described bracket-rotatable is installed on described installing plate movingly, described detecting sensor is installed on support one end, and the support other end is set up in lead-in wire top the support that gone between.
3. fireworks group basin machine according to claim 2 send leading-in device automatically, it is characterized in that: described frame is provided with second and send running wheel installing rack, and described installing rack is provided with lead-in wire guide.
4. fireworks group basin machine according to claim 3 send leading-in device automatically, it is characterized in that: described first send the periphery of running wheel to be provided with the cannelure adapting with the gabarit that goes between.
5. automatically send leading-in device according to the fireworks group basin machine described in any one in claim 1 to 4, it is characterized in that: on described drive motors, be also provided with the time relay.
6. fireworks group basin machine according to claim 5 send leading-in device automatically, it is characterized in that: in described frame, offer installing hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420359903.4U CN203928906U (en) | 2014-06-26 | 2014-06-26 | A kind of fireworks group basin machine send leading-in device automatically |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420359903.4U CN203928906U (en) | 2014-06-26 | 2014-06-26 | A kind of fireworks group basin machine send leading-in device automatically |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203928906U true CN203928906U (en) | 2014-11-05 |
Family
ID=51824708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420359903.4U Expired - Fee Related CN203928906U (en) | 2014-06-26 | 2014-06-26 | A kind of fireworks group basin machine send leading-in device automatically |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203928906U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105547052A (en) * | 2016-01-13 | 2016-05-04 | 黄承亮 | Fireworks lead conveying device |
-
2014
- 2014-06-26 CN CN201420359903.4U patent/CN203928906U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105547052A (en) * | 2016-01-13 | 2016-05-04 | 黄承亮 | Fireworks lead conveying device |
CN105547052B (en) * | 2016-01-13 | 2017-03-22 | 黄承亮 | fireworks lead conveying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203781495U (en) | Automatic winding device for wire | |
CN203928906U (en) | A kind of fireworks group basin machine send leading-in device automatically | |
CN205143961U (en) | Intelligent wardrobe that market was used | |
CN204198136U (en) | One is moulded and is compiled the clear silk machine of bobbin | |
CN205675896U (en) | A kind of cable length measuring formula unwinding device used for geological prospecting | |
CN202642965U (en) | Copper wire unreeling device | |
CN203292225U (en) | Internal drawing type discharge mechanism | |
CN202116039U (en) | Positioning device for loading mechanism of glass double-turning single-station glass loading machine | |
CN204453026U (en) | Electricity-saving lamp automatic box packing machine propulsive mechanism | |
CN204150755U (en) | Novel volume complete machine structure | |
CN203781504U (en) | Automatic wire jumping mechanism for winding machine | |
CN203439822U (en) | Novel winding machine | |
CN102815429B (en) | Multi-label-box automatic replacing method of labeling machine | |
CN205027913U (en) | Jacketing machine goes out a detection structure | |
CN104150030A (en) | Bag mouth shaping and clamping mechanism | |
CN204354175U (en) | The full-automatic end chamfer equipment of a kind of packing tube | |
CN204949308U (en) | Juice machine is hung to meat products | |
CN204857450U (en) | Automatic coil winding machine | |
CN201801656U (en) | Connecting part for yarn magazine type automatic winding machine and spinning trolley | |
CN204171622U (en) | A kind of horizontal dress linkage for hydraulic jack | |
CN202626397U (en) | Tube-inserting device with rotating wheel | |
CN203683795U (en) | Bobbin insertion device for doffing machine | |
CN204030252U (en) | A kind of wire harness machine table for assembly line operation | |
CN203439355U (en) | Automatic label stripping machine | |
CN203833375U (en) | Movable cabling rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141105 Termination date: 20170626 |