CN203924150U - Epr变形缝修补止水结构 - Google Patents

Epr变形缝修补止水结构 Download PDF

Info

Publication number
CN203924150U
CN203924150U CN201420270952.0U CN201420270952U CN203924150U CN 203924150 U CN203924150 U CN 203924150U CN 201420270952 U CN201420270952 U CN 201420270952U CN 203924150 U CN203924150 U CN 203924150U
Authority
CN
China
Prior art keywords
deformation joint
layer
sealing
water
epr
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420270952.0U
Other languages
English (en)
Inventor
毛晨阳
朱宏伟
元文新
汪明珠
吴许杰
夏航
余雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hongxu Construction Co ltd
Ningbo City High Tech Zone Baimao Polymer Materials Co ltd
Ping An Construction Group Co ltd
Original Assignee
HANGZHOU HONGXU CONSTRUCTION CO Ltd
KINGBIRD CONSTRUCTION GROUP
Ningbo High New District Baimao High Polymer Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HONGXU CONSTRUCTION CO Ltd, KINGBIRD CONSTRUCTION GROUP, Ningbo High New District Baimao High Polymer Material Co Ltd filed Critical HANGZHOU HONGXU CONSTRUCTION CO Ltd
Priority to CN201420270952.0U priority Critical patent/CN203924150U/zh
Application granted granted Critical
Publication of CN203924150U publication Critical patent/CN203924150U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Sealing Material Composition (AREA)

Abstract

本实用新型公开了一种EPR变形缝修补止水结构,所述变形缝形成于两混凝土结构层之间,所述止水结构包括由早强水泥构成的止水挡层、设于所述的两混凝土结构层之间的环氧树脂防渗层、由早强水泥构成的封口层及灌注于所述变形缝内的环氧树脂填充层;所述止水挡层设于所述变形缝后壁,封口层设于所述变形缝前壁。本实用新型结构简单,施工方便,防漏效果持久稳定。

Description

EPR变形缝修补止水结构
技术领域
本实用新型属于道路施工领域,尤其是涉及一种EPR变形缝修补止水结构。
背景技术
随着城市化进程的进一步推进,地下工程发展空间越来越广泛,随之而来的是地下工程防水问题,严重影响工程质量,变形缝更是地下工程防渗漏的难点。由于变形缝处于不断运动变化中,又受防水设计理论,防水材料,施工工艺的影响,变形缝很容易出现渗漏水现象,变形缝堵漏历来是最头痛的问题。
在实际施工中比较普遍,一般的施工单位在处理渗漏水时,采用水玻璃、水泥填实,也有用堵漏王、还有用聚合物水泥砂浆等等方法。但上述方法均属刚性堵漏方案,因抗拉强度低,不适应结构变形的需要,仍然出现渗水。聚氨酯灌浆处理虽属弹性材料,但粘性较大,可灌性受到限制,并且强度较低,施工后返工多,易在一段时间后再次出现渗漏水。
研发一种有效的地下工程变形缝修补止水结构将具有广泛的应用前景。
实用新型内容
本实用新型为了克服现有技术的不足,提供一种质量可靠且施工简便的EPR变形缝修补止水结构。
为了实现上述目的,本实用新型采用以下技术方案:一种EPR变形缝修补止水结构,所述变形缝形成于两混凝土结构层之间,所述止水结构包括由早强水泥构成的止水挡层、设于所述的两混凝土结构层之间的环氧树脂防渗层、由早强水泥构成的封口层及灌注于所述变形缝内的环氧树脂填充层;所述止水挡层设于所述变形缝后壁,封口层设于所述变形缝前壁。
进一步的,所述封口层上设有注浆口和排气口。
作为优选,所述变形缝内填充有麻丝层。
本实用新型的施工方法,包括如下步骤:
1)在漏水的变形缝上钻孔直至钻穿,向变形缝的壁后注入早强水泥浆直至堵住漏水为标准,形成止水挡层;
2)检查变形缝两侧的混凝土的密实程度,寻找变形缝两侧混凝土层内的渗漏水点,用环氧树脂加固以形成防渗层;
3)在变形缝处开槽取出聚苯板后同时填充麻丝,然后在变形缝的前侧采用早强水泥以形成封口层,并在封口层上留有用于注浆用的注浆口和出气口;
4)通过注浆口向变形缝中间注入环氧树脂材料以形成环氧树脂填充层(25),待该环氧树脂材料固化后即形成所述EPR变形缝修补止水结构。
本实用新型是在当地下结构原有变形缝止水失效时,采用一种具有柔韧性的环氧树脂做为变形缝中间填充料取代原有的止水结构,其柔韧性特点满足变形缝的变形需求,其固化物的物理性能同时满足止水防渗漏需求。在填充该环氧树脂之前,通过在变形缝的壁后注入早强水泥浆以形成一层止水挡层,利用水泥的可塑性能,以改善壁后的土层性质,从而达到即加固土层又建立起临时止水挡墙的目的;第二步检查变形缝两侧的混凝土的密实程度,寻找变形缝两侧混凝土的渗漏水点注入环氧树脂以形成防渗层,利用环氧树脂的高渗透性能进行防渗加固;第三步需在变形缝处开槽取出聚苯板同时填充麻丝,然后采用微膨胀早强水泥进行封口,并安装注浆口及出气口;最后往变形缝中间注入具有柔韧性的环氧树脂,待其环氧树脂材料固化后所形成就是完整的EPR变形缝修补止水结构。
综上所述,本实用新型具有以下优点:本止水结构简单、施工方便,防漏效果持久、稳定。
附图说明
图1为本实用新型的止水结构示意图。
图2为本实用新型的止水结构的局部示意图。
具体实施方式
为了使本技术领域的人员更好的理解本实用新型方案,下面将结合本实用新型实施例,对本实用新型实施例中的技术方案进行清楚、完整的描述,显然,所描述的实施例仅仅是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本实用新型保护的范围。
实施例1:
如图1、2所示,一种EPR变形缝修补止水结构,所述变形缝11形成于两混凝土结构层12之间,所述止水结构包括由早强水泥构成的止水挡层21、设于所述的两混凝土结构层12之间的环氧树脂防渗层22、由早强水泥构成的封口层24及灌注于所述变形缝内的环氧树脂填充层25;所述止水挡层21设于所述变形缝11后壁,封口层24设于所述变形缝11前壁,变形缝内填充有麻丝层,所述封口层24上穿射有一根注浆管241,注浆管上设有注浆口和,封口层上还设有用于排除气体的排气口。
实施例2:
某小区地下汽车库变形缝因原止水失效漏水严重急需修补:
设计要求:采用EPR变形缝修补止水技术修复变形缝,满足地下汽车库变形缝的正常使用。
具体实施步骤:
⑴在漏水的变形缝上钻孔直至钻穿,安装注浆口,向变形缝的后壁注入早强水泥浆以形成止水挡层,注入量大于每米100kg,直至堵住漏水为标准,建立第一道防水屏障;
⑵寻找变形缝两侧混凝土的渗漏水点,用亲水型高渗透的环氧树脂来修补,以形成一层防渗层,得以止水并补强,该环氧树脂为具有亲水型高渗透的现有材料;
(3)在变形缝处开槽取出聚苯板同时填充麻丝,然后用微膨胀早强水泥封口,形成封口层,在注入早强水泥之前先安装一个注浆管,该注浆管一端伸入变形缝内,另一端穿过封口层24,并在封口层上预留一个出气口,采用低压注浆机通过注浆管注入变形缝内,直至注满。
养生与定期保养,经过72小时环氧树脂强度达到设计要求,这样EPR变形缝修补止水技术已经完成。但由于沉降、混凝土的热胀冷缩,变形缝始终处于变化中,导致中间产生微小裂缝,最终导致有漏水现象,因此要定期保养。

Claims (3)

1.一种EPR变形缝修补止水结构,所述变形缝(11)形成于两混凝土结构层(12)之间,其特征在于:所述止水结构包括由早强水泥构成的止水挡层(21)、设于所述的两混凝土结构层(12)之间的环氧树脂防渗层(22)、由早强水泥构成的封口层(24)及灌注于所述变形缝内的环氧树脂填充层(25);所述止水挡层(21)设于所述变形缝(11)后壁,封口层(24)设于所述变形缝(11)前壁。
2.根据权利要求1所述的EPR变形缝修补止水结构,其特征在于:所述封口层(24)上设有注浆口和排气口。
3.根据权利要求1所述的EPR变形缝修补止水结构,其特征在于:所述变形缝内填充有麻丝层。
CN201420270952.0U 2014-05-26 2014-05-26 Epr变形缝修补止水结构 Expired - Lifetime CN203924150U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420270952.0U CN203924150U (zh) 2014-05-26 2014-05-26 Epr变形缝修补止水结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420270952.0U CN203924150U (zh) 2014-05-26 2014-05-26 Epr变形缝修补止水结构

Publications (1)

Publication Number Publication Date
CN203924150U true CN203924150U (zh) 2014-11-05

Family

ID=51820004

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420270952.0U Expired - Lifetime CN203924150U (zh) 2014-05-26 2014-05-26 Epr变形缝修补止水结构

Country Status (1)

Country Link
CN (1) CN203924150U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018526A (zh) * 2014-05-26 2014-09-03 鲲鹏建设集团有限公司 Epr变形缝修补止水结构及其施工方法
CN109610504A (zh) * 2018-12-11 2019-04-12 中国铁路设计集团有限公司 一种铁路明挖隧道衬砌变形缝渗漏水的递进式整治方法

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018526A (zh) * 2014-05-26 2014-09-03 鲲鹏建设集团有限公司 Epr变形缝修补止水结构及其施工方法
CN104018526B (zh) * 2014-05-26 2015-09-30 宁波高新区百茂高分子材料有限公司 Epr变形缝修补止水结构及其施工方法
CN109610504A (zh) * 2018-12-11 2019-04-12 中国铁路设计集团有限公司 一种铁路明挖隧道衬砌变形缝渗漏水的递进式整治方法

Similar Documents

Publication Publication Date Title
CN104018526B (zh) Epr变形缝修补止水结构及其施工方法
CN106149764B (zh) 一种预制拼装综合管廊承插口防水结构
CN203742623U (zh) 隧道复合抗水压结构
CN108825269A (zh) 机械法联络通道t接部位自适应防水结构
CN207231732U (zh) 一种装配式管廊接头防水测试装置
CN202787329U (zh) 一种地下连续墙较大渗漏处理结构
CN102852121B (zh) 深厚覆盖层上修建粘土堆石坝的人工复合地基及施工方法
CN103397845A (zh) 一种通过浆液置换控制顶管穿越建筑物引起的沉降的方法
CN210163948U (zh) 一种用于地下室顶板后浇带浇筑的施工体系
CN206143827U (zh) 地下工程裂缝修补结构
CN105484204A (zh) 浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法
CN104314106A (zh) 一种带接缝止水和补缺结构的地下连续墙及其施工方法
CN207904991U (zh) 一种地下工程混凝土裂缝修补构造
CN204849781U (zh) 垂直铺设防渗土工膜与超流态压灌桩相结合的基坑支护系统
CN203924150U (zh) Epr变形缝修补止水结构
CN104278671B (zh) 插入倒置杯型钢桶的劲性水泥土搅拌支护桩及其施工方法
CN114411640B (zh) 一种堆石心墙坝加固修复施工方法
CN102535518B (zh) 一种地下连续墙大接缝的封堵方法
CN113373962B (zh) 一种深基坑组合堵漏施工方法
CN112960942B (zh) 无水砂层中土压平衡顶管用触变泥浆及其制备方法、注浆方法和浆液置换方法
CN202927358U (zh) 大直径混凝土非承压管道裂缝钢制内衬修补结构
CN112252491B (zh) 一种混凝土结构变形缝用防渗装置及其施工工艺
CN204941551U (zh) 一种曲线顶管支护结构扩建盾构施工的地铁车站
CN104089103A (zh) 一种衬有玻璃钢管的循环水管道及其衬入玻璃钢管法
CN104047268B (zh) 水坝加固方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 8020-49, No. 1558, Jiangnan Road, high tech Zone, Ningbo, Zhejiang 315000

Patentee after: NINGBO CITY HIGH-TECH ZONE BAIMAO POLYMER MATERIALS Co.,Ltd.

Patentee after: Ping An Construction Group Co.,Ltd.

Patentee after: HANGZHOU HONGXU CONSTRUCTION Co.,Ltd.

Address before: Room 8020-49, No. 1558, Jiangnan Road, high tech Zone, Ningbo, Zhejiang 315000

Patentee before: NINGBO CITY HIGH-TECH ZONE BAIMAO POLYMER MATERIALS Co.,Ltd.

Patentee before: KINGBIRD CONSTRUCTION GROUP Co.,Ltd.

Patentee before: HANGZHOU HONGXU CONSTRUCTION Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141105