CN203922129U - Building sandstone Handling device - Google Patents

Building sandstone Handling device Download PDF

Info

Publication number
CN203922129U
CN203922129U CN201420216067.4U CN201420216067U CN203922129U CN 203922129 U CN203922129 U CN 203922129U CN 201420216067 U CN201420216067 U CN 201420216067U CN 203922129 U CN203922129 U CN 203922129U
Authority
CN
China
Prior art keywords
guide rail
strut bar
handling
cotton rope
fixed pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420216067.4U
Other languages
Chinese (zh)
Inventor
徐建平
Original Assignee
徐建平
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 徐建平 filed Critical 徐建平
Priority to CN201420216067.4U priority Critical patent/CN203922129U/en
Application granted granted Critical
Publication of CN203922129U publication Critical patent/CN203922129U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of building sandstone Handling device, comprises straight line the first guide rail, arc the second guide rail, arc the 3rd guide rail, the first strut bar, the second strut bar, trolley, fork and cotton rope.The second guide rail is connected with the first guide rail, and second guide rail one end is provided with stopper; The 3rd guide rail is connected with the second guide rail; The first strut bar and the second strut bar are hinged, and the second strut bar other end is connected with the first guide rail and the second guide rail cohesive end, and the first strut bar and the second strut bar pin jointed end are provided with the first fixed pulley; Trolley has car body, front vehicle wheel and rear wheel, and front vehicle wheel rolls and is connected in the track of the first guide rail and the formation of the second guide rail, and rear wheel rolls and is connected in the track that the first guide rail, the second guide rail and the 3rd guide rail form; Fork one end and car body are hinged; Cotton rope one end is connected with the fork other end, and the cotton rope other end is walked around the first fixed pulley and extended.Adopt this device, do not need large-scale hook machine, reduce energy resource consumption, do not need manpower to carry sandstone, enhance productivity.

Description

Building sandstone Handling device
Technical field
The utility model relates to a kind of Handling device, particularly relates to a kind of building sandstone Handling device.
Background technology
In building ground, building sandstone need to be transported to another place from a place, to carry out production and construction.Normally with large-scale hook machine, sandstone are carried out to entrucking, the transport by vehicle is to reach the object of transporting sandstone.And for some small-sized building ground, due to its sandstone amount little, conventionally do not need to adopt this type of large-scale hook machine.Because hook machine need to consume a large amount of diesel oil equal energy sources, so just greatly improve production cost.And, in small-sized building ground, limit by its local area, and be not suitable for the heavy mechanical equipments such as hook machine and carry out operation.
Based on the consideration of above-mentioned factor, in small-sized building ground, conventionally all adopt manpower transport's mode to carry out operation.Adopt manpower transport, can produce again new problem, because people can produce sense tired out in the process of long-time work, in the course of time, just can reduce the efficiency of production.
Hence one can see that, in small building building site, adopts heavy mechanical equipment to carry out operation, or adopt manual work, all can bring drawback, formed contradiction.
Utility model content
In view of the foregoing, be necessary to provide a kind of applicable building sandstone Handling device that the sandstone in small building building site are carried.
A kind of building sandstone Handling device, comprising:
The first guide rail is line slideway;
The second guide rail, be bent to form arc, described the second guide rail is connected and rounding off mutually with described the first guide rail, and one end of described the second guide rail is provided with stopper, and described stopper is positioned at one end away from described the second guide rail and described the first guide rail cohesive end on described the second guide rail;
The 3rd guide rail, is bent to form arc, and described the 3rd guide rail is connected mutually with described the second guide rail;
The first strut bar, the second strut bar, one end of one end of described the first strut bar and described the second strut bar is hinged, the other end of described the second strut bar is fixedly connected with the cohesive end of described the first guide rail and described the second guide rail, and the pin jointed end of described the first strut bar and described the second strut bar is provided with the first fixed pulley;
Trolley, described trolley has car body, front vehicle wheel and rear wheel, described front vehicle wheel rolls and is connected in the track of described the first guide rail and described the second guide rail formation, and described rear wheel rolls and is connected in the track that described the first guide rail, described the second guide rail and described the 3rd guide rail form;
Fork, one end of described fork and described car body are hinged;
Cotton rope, one end of described cotton rope is connected with the other end of described fork, and the other end of described cotton rope is walked around described the first fixed pulley and is extended.
In an embodiment, described building sandstone Handling device also comprises motor and rotating disk therein, and described motor drives and is connected with described rotating disk, and the described cotton rope of walking around described the first fixed pulley is wound on described rotating disk.
In an embodiment, described the first strut bar is provided with the second fixed pulley therein, and described the first fixed pulley walked around successively by described cotton rope and described the second fixed pulley is wound on described rotating disk.
In an embodiment, described building sandstone Handling device also comprises the 3rd strut bar therein, and one end of described the 3rd strut bar is connected with described the second guide rail, and the other end is connected with described the second strut bar.
In an embodiment, on described the first guide rail, have the first guiding groove therein, on described the second guide rail, have the second guiding groove, described front vehicle wheel and described rear wheel are contained in described the first guiding groove and described the second guiding groove.
In an embodiment, described car body is the hollow cavity structure with an open end therein.
The principle of work of building sandstone Handling device is as follows:
One end of one end of the first strut bar and the first guide rail is fixed on ground, forms triangle support frame;
Regulate the angle between the first strut bar and the second strut bar, thereby regulate the second guide rail and the 3rd guide rail distance between overhead;
When trolley starts, be placed on ground, on trolley, load building sandstone;
Starter motor, motor rotates around the second fixed pulley and the first fixed pulley by driven by rotary disc cotton rope, thereby pulls trolley motion;
Trolley, first along the first guide rail movement, then enters into the second guide rail of arc, and in the time that front vehicle wheel touches stopper, trolley stops mobile;
Cotton rope continues to pull trolley, and the fork hinged with car body makes rear wheel enter into the 3rd guide rail, thereby car body is rotated, and the sandstone that are placed in car body drop in truck under the effect of gravity in car body;
Motor reversal, cotton rope is released, and rear wheel enters in the second guide rail from the 3rd guide rail, and then front vehicle wheel and rear wheel enter into the first guide rail from the second guide rail, connect former circuit and turn back to ground, thereby complete the handling process of sandstone.
In small building building site, adopt building sandstone Handling device, on the one hand, do not need to adopt large-scale hook machine, reduced the consumption of the energy; On the other hand, do not need to adopt manpower to carry sandstone, improved the efficiency of producing.
Brief description of the drawings
Fig. 1 is the structural representation of the building sandstone Handling device of the utility model one preferred embodiment;
Fig. 2 is the connection diagram of the first guide rail shown in Fig. 1, the second guide rail, the second strut bar, trolley;
Fig. 3 is the structural representation of another state of the building sandstone Handling device shown in Fig. 1;
Fig. 4 is the enlarged drawing of the building sandstone Handling device shown in Fig. 3 at A place.
Detailed description of the invention
Please refer to Fig. 1 and Fig. 2, building sandstone Handling device 10 comprises: the first guide rail 100, the second guide rail 200, the 3rd guide rail 300, the first strut bar 400, the second strut bar 500, trolley 600, fork 700 and cotton rope 800.
The first guide rail 100 is line slideway, and the second guide rail 200 is arc-shaped guide rail, and the second guide rail 200 is bent to form arc.The second guide rail 200 is connected and rounding off mutually with the first guide rail 100, and shape is in aggregates, and the first guide rail 100 and the second guide rail 200 that are mutually connected are " J " font.One end of the second guide rail 200 is provided with stopper 210, and stopper 210 is positioned at one end away from the second guide rail 200 and the first guide rail 100 cohesive ends on the second guide rail 200.
The 3rd guide rail 300 is arc-shaped guide rail, and the 3rd guide rail 300 is bent to form arc, and the 3rd guide rail 300 is connected mutually with the second guide rail 200.The second guide rail 200 and the 3rd guide rail 300 that are mutually connected are " Y " font.
See also Fig. 3 and Fig. 4, one end of one end of the first strut bar 400 and the second strut bar 500 is hinged, the other end of the second strut bar 500 is fixedly connected with the cohesive end of the first guide rail 100 and the second guide rail 200, and the pin jointed end of the first strut bar 400 and the second strut bar 500 is provided with the first fixed pulley 510.Be noted that, the first strut bar 400 and the second strut bar 500 are hinged, the first strut bar 400, the second strut bar 500 and the first guide rail 100 form a triangular supports and are fixed on ground, can be by changing the corner dimension between the first strut bar 400 and the second strut bar 500, thereby regulate the distance between the second guide rail 200 and the 3rd guide rail 300 and ground, to adapt to the requirement of varying environment.
Trolley 600 has car body 610, front vehicle wheel 620 and rear wheel 630, and front vehicle wheel 620 rolls and is connected between the first guide rail 100 and the second guide rail 200, and rear wheel 630 rolls and is connected between the first guide rail 100, the second guide rail 200 and the 3rd guide rail 300.Concrete, car body 610 is for having the hollow cavity structure of an open end, and car body 610 is for loading building sandstone.
One end of fork 700 and car body 610 are hinged, and one end of cotton rope 800 is connected with the other end of fork 700, and the other end of cotton rope 800 is walked around the first fixed pulley 510 and extended.Pull cotton rope 800, can make trolley 600 move along the first guide rail 100, the second guide rail 200 and the 3rd guide rail 300.
In the present embodiment, building sandstone Handling device 10 also comprises motor 910 and rotating disk 920, and motor 910 drives and is connected with rotating disk 920, and the cotton rope 800 of walking around the first fixed pulley 510 is wound on rotating disk 920.Further, the first strut bar 400 is provided with the second fixed pulley 410, and the first fixed pulley 510 walked around successively by cotton rope 800 and the second fixed pulley 410 is wound on rotating disk 920.Motor 910 rotates, and drives rotating disk 920 to rotate, and so that cotton rope 800 is wound on rotating disk, thereby pulls trolley 600 to move.
By motor 910 and rotating disk 920 are set, use electric power pull cotton rope 800, than pull by manpower cotton rope 800 save time, laborsaving, improved work efficiency.
In the present embodiment, have on the first guiding groove 110, the second guide rails 200 and have the second guiding groove 220 on the first guide rail 100, front vehicle wheel 620 and rear wheel 630 are contained in the first guiding groove 110 and the second guiding groove 220.The first guiding groove 110 and the second guiding groove 220 can prevent that front vehicle wheel 620 and rear wheel 630 from derailing, and ensured the stationarity that trolley 600 moves.
In the present embodiment, building sandstone Handling device 10 also comprises that one end of the 3rd strut bar 230, the three strut bars 230 is connected with the second guide rail 200, and the other end is connected with the second strut bar 500.Between the second guide rail 200 and the second strut bar 500, the 3rd strut bar 230 is set, prevents that the second guide rail 200 from fractureing from the first guide rail 100, make the second guide rail 200 can bear larger external influence power.
Please again consult Fig. 1, Fig. 3 and Fig. 4, the principle of work of building sandstone Handling device 10 is as follows:
One end of one end of the first strut bar 400 and the first guide rail 100 is fixed on ground, forms triangle support frame;
Regulate the angle between the first strut bar 400 and the second strut bar 500, thereby regulate the second guide rail 200 and the 3rd guide rail 300 distance between overhead;
Trolley 600 is placed on ground while beginning, on trolley 600, loads building sandstone;
Starter motor 910, motor 910 drives cotton rope 800 to rotate around the second fixed pulley 410 and the first fixed pulley 510 by rotating disk 920, thereby pulls trolley 600 to move;
First trolley 600 moves along the first guide rail 100, then enters into the second guide rail 200 of arc, and in the time that front vehicle wheel 620 touches stopper 210, trolley 600 stops mobile;
Cotton rope 800 continues to pull trolley 600, and the fork 700 hinged with car body 610 makes rear wheel 630 enter into the 3rd guide rail 300, thereby car body 610 is rotated, and the sandstone that are placed in car body 610 drop in truck 20 under the effect of gravity in car body 610;
Motor 910 reverses, cotton rope 800 is released, and rear wheel 630 enters in the second guide rail 200 from the 3rd guide rail 300, and then front vehicle wheel 620 and rear wheel 630 enter into the first guide rail 100 from the second guide rail 200, connect former circuit and turn back to ground, thereby complete the handling process of sandstone.
In small building building site, adopt building sandstone Handling device 10, on the one hand, do not need to adopt large-scale hook machine, reduced the consumption of the energy; On the other hand, do not need to adopt manpower to carry sandstone, improved the efficiency of producing.
The above embodiment has only expressed several embodiment of the present utility model, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that for the person of ordinary skill of the art, not departing from the change done under Spirit Essence of the present utility model and principle, modification, substitute, combination, simplify, these all belong to protection domain of the present utility model.Therefore, the protection domain of the utility model patent should be as the criterion with claims.

Claims (6)

1. a building sandstone Handling device, is characterized in that, comprising:
The first guide rail is line slideway;
The second guide rail, be bent to form arc, described the second guide rail is connected and rounding off mutually with described the first guide rail, and one end of described the second guide rail is provided with stopper, and described stopper is positioned at one end away from described the second guide rail and described the first guide rail cohesive end on described the second guide rail;
The 3rd guide rail, is bent to form arc, and described the 3rd guide rail is connected mutually with described the second guide rail;
The first strut bar, the second strut bar, one end of one end of described the first strut bar and described the second strut bar is hinged, the other end of described the second strut bar is fixedly connected with the cohesive end of described the first guide rail and described the second guide rail, and the pin jointed end of described the first strut bar and described the second strut bar is provided with the first fixed pulley;
Trolley, described trolley has car body, front vehicle wheel and rear wheel, described front vehicle wheel rolls and is connected in the track of described the first guide rail and described the second guide rail formation, and described rear wheel rolls and is connected in the track that described the first guide rail, described the second guide rail and described the 3rd guide rail form;
Fork, one end of described fork and described car body are hinged;
Cotton rope, one end of described cotton rope is connected with the other end of described fork, and the other end of described cotton rope is walked around described the first fixed pulley and is extended.
2. building sandstone Handling device according to claim 1, is characterized in that, described building sandstone Handling device also comprises motor and rotating disk, and described motor drives and is connected with described rotating disk, and the described cotton rope of walking around described the first fixed pulley is wound on described rotating disk.
3. building sandstone Handling device according to claim 2, is characterized in that, described the first strut bar is provided with the second fixed pulley, and described the first fixed pulley walked around successively by described cotton rope and described the second fixed pulley is wound on described rotating disk.
4. building sandstone Handling device according to claim 1, is characterized in that, described building sandstone Handling device also comprises the 3rd strut bar, and one end of described the 3rd strut bar is connected with described the second guide rail, and the other end is connected with described the second strut bar.
5. building sandstone Handling device according to claim 1, it is characterized in that, on described the first guide rail, have the first guiding groove, on described the second guide rail, have the second guiding groove, described front vehicle wheel and described rear wheel are contained in described the first guiding groove and described the second guiding groove.
6. building sandstone Handling device according to claim 1, is characterized in that, described car body is the hollow cavity structure with an open end.
CN201420216067.4U 2014-04-30 2014-04-30 Building sandstone Handling device Expired - Fee Related CN203922129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420216067.4U CN203922129U (en) 2014-04-30 2014-04-30 Building sandstone Handling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420216067.4U CN203922129U (en) 2014-04-30 2014-04-30 Building sandstone Handling device

Publications (1)

Publication Number Publication Date
CN203922129U true CN203922129U (en) 2014-11-05

Family

ID=51817988

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420216067.4U Expired - Fee Related CN203922129U (en) 2014-04-30 2014-04-30 Building sandstone Handling device

Country Status (1)

Country Link
CN (1) CN203922129U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106800171A (en) * 2017-02-17 2017-06-06 苏州益普敦新材料科技有限公司 A kind of construction material transport uses servicing unit
CN111392398A (en) * 2019-03-05 2020-07-10 项赛赛 Loading attachment that field was used is built in room

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106800171A (en) * 2017-02-17 2017-06-06 苏州益普敦新材料科技有限公司 A kind of construction material transport uses servicing unit
CN111392398A (en) * 2019-03-05 2020-07-10 项赛赛 Loading attachment that field was used is built in room

Similar Documents

Publication Publication Date Title
CN204549886U (en) A kind of building operation crane
CN203922129U (en) Building sandstone Handling device
CN204775774U (en) Utilize balance car driven conveyer
CN106004609B (en) The handling method of Self-loading-unloading boxcar
CN209079928U (en) A kind of grey trolley of building transport
CN203654981U (en) Automatic door and moving device of automatic door
CN206142741U (en) Heavy object hoisting device
CN110901725B (en) Efficient energy-saving environment-friendly building construction operation tool vehicle
CN203920540U (en) A kind of indoor large equipment transporter
CN204076194U (en) Revolution controls reciprocator
CN207877059U (en) A kind of safety and stability and the Cargo Lift for facilitating unloading
CN202848919U (en) Straight track type crane
CN205773188U (en) A kind of mould vehicle traction machine
CN202465162U (en) Small electric lifting feeding machine for building
CN202413580U (en) Electric pole transport cart with multifunctional grinding support leg
CN206023155U (en) A kind of communication cable take-up and pay-off device
CN205526161U (en) Cable conductor moves to install and is equipped with convenient to remove
CN203996312U (en) External hanging type doffing cart
CN204324738U (en) With the lifting mechanism of balanced system
CN204418756U (en) Honeycomb type nappe type parking lot
CN204452160U (en) Compartment or the built-in goods lifting appliance of freight container
CN203558467U (en) Monorail hoist applicable to roadways
CN203410904U (en) Sanitation truck
CN207434774U (en) A kind of portable cable reel
CN203159074U (en) Gantry crane with hook

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105

Termination date: 20150430

EXPY Termination of patent right or utility model