CN203895130U - Nuclear power plant switch checking device and system - Google Patents

Nuclear power plant switch checking device and system Download PDF

Info

Publication number
CN203895130U
CN203895130U CN201420277912.9U CN201420277912U CN203895130U CN 203895130 U CN203895130 U CN 203895130U CN 201420277912 U CN201420277912 U CN 201420277912U CN 203895130 U CN203895130 U CN 203895130U
Authority
CN
China
Prior art keywords
valve
communicated
tracheae
nuclear power
variable valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420277912.9U
Other languages
Chinese (zh)
Inventor
卢军
安佰涛
张立良
于江
张国财
韩伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CGN Power Co Ltd
Lingao Nuclear Power Co Ltd
China Nuclear Power Operation Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201420277912.9U priority Critical patent/CN203895130U/en
Application granted granted Critical
Publication of CN203895130U publication Critical patent/CN203895130U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

本实用新型提供一种核电站开关校验装置及校验系统。该核电站开关校验装置包括气源接头、微调阀、第一调节阀、标准表端接头、第二调节阀、被校端接头、第三调节阀和第一排气管,气源接头通过气管与微调阀的一端连通,与微调阀另一端连通的气管分为三路,第一路气管与所述第一调节阀的一端连通,第一调节阀的另一端与所述标准表端接头连通,第二路气管与所述第二调节阀的一端连通,所述第二调节阀的另一端与所述被校端接头连通,第三路气管与所述第三调节阀的一端连通,所述第三调节阀的另一端与所述第一排气管连通。本实用新型还提供另外三种核电站开关校验装置以及三种核电站开关校验系统。本实用新型组装方便,且可靠性高,不易出现泄露。

The utility model provides a nuclear power plant switch verification device and a verification system. The nuclear power plant switch verification device includes a gas source joint, a fine-tuning valve, a first regulating valve, a standard meter end joint, a second regulating valve, a calibrated end joint, a third regulating valve and a first exhaust pipe. The air source joint passes through the air pipe The air pipe connected with one end of the fine-tuning valve and the other end of the fine-tuning valve is divided into three paths, the first air pipe is connected with one end of the first regulating valve, and the other end of the first regulating valve is connected with the standard gauge end joint , the second air pipe communicates with one end of the second regulating valve, the other end of the second regulating valve communicates with the calibrated end joint, and the third air pipe communicates with one end of the third regulating valve, so The other end of the third regulating valve communicates with the first exhaust pipe. The utility model also provides three other nuclear power plant switch verification devices and three nuclear power plant switch verification systems. The utility model has the advantages of convenient assembly, high reliability and less leakage.

Description

一种核电站开关校验装置及校验系统A nuclear power plant switch calibration device and calibration system

技术领域 technical field

本实用新型涉及对核电站反应堆冷却剂系统中就地压力表和压力开关定值的校验,还可用于同步并网系统中压力开关定值的校验。 The utility model relates to the verification of the local pressure gauge and the fixed value of the pressure switch in the reactor coolant system of the nuclear power plant, and can also be used for the verification of the fixed value of the pressure switch in the synchronous grid-connected system.

背景技术 Background technique

核电站中,就地压力表、压力开关作为液位变送器的补充措施,用于监视储气罐的压力,而压力开关的定值及报警检查工作属于监督要求进行的项目。反应堆冷却剂系统中,就地压力表和压力开关因不具备带校验口的隔离阀,校验工作比较麻烦,需要对下降设定值、上升设定值同时进行校验,并且校验完成后还需要将储气罐的压力冲至要求范围,因此需要制作一台专用的校验装置,以满足校验工作的全部要求,并提高工作效率。 In nuclear power plants, on-site pressure gauges and pressure switches are used as supplementary measures for liquid level transmitters to monitor the pressure of gas storage tanks, and the setting and alarm inspection of pressure switches are items required by supervision. In the reactor coolant system, because the local pressure gauge and pressure switch do not have an isolation valve with a calibration port, the calibration work is cumbersome. It is necessary to calibrate the lower set value and the increased set value at the same time, and the calibration is completed. Finally, it is necessary to flush the pressure of the gas storage tank to the required range, so it is necessary to make a special calibration device to meet all the requirements of the calibration work and improve work efficiency.

此外,同步并网系统压力开关因其定值及回差稳定性要求较高,对校验装置的性能也提出了较高的要求,原有校验方式效率低下,工期较长。 In addition, the pressure switch of the synchronous grid-connected system has high requirements on the stability of the fixed value and hysteresis, so it also puts forward higher requirements on the performance of the calibration device. The original calibration method is inefficient and has a long construction period.

实用新型内容 Utility model content

为解决现有校验装置难以对反应堆冷却剂系统中的压力开关和就地压力表进行校验,以及原有对同步并网系统中的压力开关进行校验的方式效率低的技术问题,本实用新型提供一种核电站开关校验装置,其包括气源接头、微调阀、第一调节阀、标准表端接头、第二调节阀、被校端接头、第三调节阀和第一排气管,所述气源接头通过气管与所述微调阀的一端连通,与所述微调阀另一端连通的气管分为三路,第一路气管与所述第一调节阀的一端连通,所述第一调节阀的另一端与所述标准表端接头连通,第二路气管与所述第二调节阀的一端连通,所述第二调节阀的另一端与所述被校端接头连通,第三路气管与所述第三调节阀的一端连通,所述第三调节阀的另一端与所述第一排气管连通。 In order to solve the technical problems that it is difficult for the existing calibration device to calibrate the pressure switch and local pressure gauge in the reactor coolant system, and the original method of calibrating the pressure switch in the synchronous grid-connected system is inefficient, this paper The utility model provides a nuclear power plant switch verification device, which includes a gas source connector, a fine-tuning valve, a first regulating valve, a standard meter end connector, a second regulating valve, a calibrated end connector, a third regulating valve and a first exhaust pipe , the air source joint communicates with one end of the fine-tuning valve through a gas pipe, and the gas pipe connected with the other end of the fine-tuning valve is divided into three routes, the first gas pipe communicates with one end of the first regulating valve, and the second gas pipe communicates with one end of the first regulating valve. The other end of a regulating valve communicates with the standard meter end joint, the second air pipe communicates with one end of the second regulating valve, the other end of the second regulating valve communicates with the calibrated end joint, and the third The road air pipe communicates with one end of the third regulating valve, and the other end of the third regulating valve communicates with the first exhaust pipe.

本实用新型还提供第二种核电站开关校验装置,其包括气源接头、微调阀、第一调节阀、标准气压表、第二调节阀、被校端接头、第三调节阀和第一排气管,所述气源接头通过气管与所述微调阀的一端连通,与所述微调阀另一端连通的气管分为三路,第一路气管与所述第一调节阀的一端连通,所述第一调节阀的另一端与所述标准气压表连通,第二路气管与所述第二调节阀的一端连通,所述第二调节阀的另一端与所述被校端接头连通,第三路气管与所述第三调节阀的一端连通,所述第三调节阀的另一端与所述第一排气管连通。 The utility model also provides a second nuclear power plant switch verification device, which includes a gas source joint, a fine-tuning valve, a first regulating valve, a standard air pressure gauge, a second regulating valve, a terminal joint to be calibrated, a third regulating valve and a first row Air pipe, the air source joint communicates with one end of the fine-tuning valve through the air pipe, and the air pipe connected with the other end of the fine-tuning valve is divided into three routes, the first air pipe communicates with one end of the first regulating valve, so The other end of the first regulating valve communicates with the standard air gauge, the second air pipe communicates with one end of the second regulating valve, and the other end of the second regulating valve communicates with the joint of the calibrated end. The three-way air pipe communicates with one end of the third regulating valve, and the other end of the third regulating valve communicates with the first exhaust pipe.

本实用新型还提供第三种核电站开关校验装置,其包括气瓶、微调阀、第一调节阀、标准表端接头、第二调节阀、被校端接头、第三调节阀和第一排气管,所述气瓶通过气管与所述微调阀的一端连通,与所述微调阀另一端连通的气管分为三路,第一路气管与所述第一调节阀的一端连通,所述第一调节阀的另一端与所述标准表端接头连通,第二路气管与所述第二调节阀的一端连通,所述第二调节阀的另一端与所述被校端接头连通,第三路气管与所述第三调节阀的一端连通,所述第三调节阀的另一端与所述第一排气管连通。 The utility model also provides a third nuclear power plant switch verification device, which includes a gas cylinder, a fine-tuning valve, a first regulating valve, a standard meter end joint, a second regulating valve, a calibrated end joint, a third regulating valve and a first row Air pipe, the gas cylinder communicates with one end of the fine-tuning valve through the air pipe, and the air pipe connected with the other end of the fine-tuning valve is divided into three routes, the first air pipe communicates with one end of the first regulating valve, the The other end of the first regulating valve communicates with the standard gauge end joint, the second air pipe communicates with one end of the second regulating valve, the other end of the second regulating valve communicates with the calibrated end joint, and the second air pipe communicates with one end of the second regulating valve. The three-way air pipe communicates with one end of the third regulating valve, and the other end of the third regulating valve communicates with the first exhaust pipe.

本实用新型还提供第四种核电站开关校验装置,其包括气瓶、微调阀、第一调节阀、标准气压表、第二调节阀、被校端接头、第三调节阀和第一排气管,所述气瓶通过气管与所述微调阀的一端连通,与所述微调阀另一端连通的气管分为三路,第一路气管与所述第一调节阀的一端连通,所述第一调节阀的另一端与所述标准气压表连通,第二路气管与所述第二调节阀的一端连通,所述第二调节阀的另一端与所述被校端接头连通,第三路气管与所述第三调节阀的一端连通,所述第三调节阀的另一端与所述第一排气管连通。 The utility model also provides a fourth nuclear power plant switch verification device, which includes a gas cylinder, a fine-tuning valve, a first regulating valve, a standard air pressure gauge, a second regulating valve, a connector at the terminal to be calibrated, a third regulating valve and a first exhaust valve. The gas cylinder communicates with one end of the fine-tuning valve through a gas pipe, and the gas pipe connected with the other end of the fine-tuning valve is divided into three routes, the first gas pipe communicates with one end of the first regulating valve, and the second The other end of a regulating valve communicates with the standard air gauge, the second air pipe communicates with one end of the second regulating valve, the other end of the second regulating valve communicates with the terminal joint to be calibrated, and the third air pipe communicates with one end of the second regulating valve. The air pipe communicates with one end of the third regulating valve, and the other end of the third regulating valve communicates with the first exhaust pipe.

进一步的,上述核电站开关校验装置还包括通断阀,所述通断阀设于所述第一排气管上; Further, the above nuclear power plant switch verification device also includes an on-off valve, and the on-off valve is arranged on the first exhaust pipe;

和/或, and / or,

所述核电站开关校验装置还包括安全泄压阀和第二排气管,所述与所述微调阀另一端连通的气管还分出第四路气管,所述第四路气管与所述安全泄压阀的一端连通,所述安全泄压阀的另一端与所述第二排气管连通。 The nuclear power plant switch verification device also includes a safety pressure relief valve and a second exhaust pipe. The air pipe connected to the other end of the fine-tuning valve is also divided into a fourth air pipe, and the fourth air pipe is connected to the safety valve. One end of the pressure relief valve is communicated, and the other end of the safety pressure relief valve is communicated with the second exhaust pipe.

本实用新型还提供一种核电站开关校验系统,包括压力开关、储气罐、液位变送器、第一对空排气阀、第一排气管接头、第一阀门、万用表、第二阀门和上述四种核电站开关校验装置中的任一种校验装置;自所述储气罐接出的气管分作两路,一路气管与所述第一阀门的一端连通,所述第一阀门的另一端与所述压力开关连通,另一路气管与所述第二阀门的一端连通;自所述第二阀门接出的气管分作两路,一路气管与液位变送器连通,另一路与所述第一对空排气阀的一端连通,与所述第一对空排气阀的另一端连通的气管的末端设有所述第一排气管接头;所述压力开关的信号输出端子与所述万用表的校表专用航空插头信号端连接;所述核电站开关校验装置的所述被校端接头与所述第一排气管接头对接。 The utility model also provides a nuclear power plant switch verification system, including a pressure switch, a gas storage tank, a liquid level transmitter, a first pair of air exhaust valves, a first exhaust pipe joint, a first valve, a multimeter, a second Valve and any one of the above-mentioned four kinds of nuclear power plant switch verification devices; the gas pipe connected from the gas storage tank is divided into two routes, one route of gas pipe communicates with one end of the first valve, and the first The other end of the valve communicates with the pressure switch, and the other air pipe communicates with one end of the second valve; the air pipe connected from the second valve is divided into two, one air pipe communicates with the liquid level transmitter, and the other air pipe communicates with the liquid level transmitter. One way communicates with one end of the first pair of air exhaust valves, and the end of the air pipe communicated with the other end of the first pair of air exhaust valves is provided with the first exhaust pipe joint; the signal of the pressure switch The output terminal is connected to the signal terminal of the multimeter's special aviation plug for meter calibration; the connector of the calibrated terminal of the nuclear power plant switch calibration device is connected to the first exhaust pipe connector.

本实用新型还提供另一种核电站开关校验系统,包括就地压力表、储气罐、液位变送器、第一对空排气阀、第一排气管接头、第一阀门、万用表、第二阀门和上述四种核电站开关校验装置中的任一种校验装置;自所述储气罐接出的气管分作两路,一路气管与所述第一阀门的一端连通,所述第一阀门的另一端与所述就地压力表连通,另一路气管与所述第二阀门的一端连通;自所述第二阀门接出的气管分作两路,一路气管与液位变送器连通,另一路与所述第一对空排气阀的一端连通,与所述第一对空排气阀的另一端连通的气管的末端设有所述第一排气管接头;所述核电站开关校验装置的所述被校端接头与所述第一排气管接头对接。 The utility model also provides another nuclear power plant switch calibration system, including an on-site pressure gauge, a gas storage tank, a liquid level transmitter, a first pair of air exhaust valves, a first exhaust pipe joint, a first valve, and a multimeter , the second valve and any one of the above four kinds of nuclear power plant switch verification devices; the gas pipe connected from the gas storage tank is divided into two routes, and one route of the gas pipe communicates with one end of the first valve. The other end of the first valve is connected with the local pressure gauge, and the other air pipe is connected with one end of the second valve; The other way is connected with one end of the first pair of air exhaust valves, and the end of the air pipe communicated with the other end of the first pair of air exhaust valves is provided with the first exhaust pipe joint; The calibrated end joint of the nuclear power plant switch verification device is docked with the first exhaust pipe joint.

本实用新型还提供一种核电站开关校验系统,包括同步并网系统压力开关、万用表和上述四种核电站开关校验装置中的任一种校验装置,所述万用表与所述同步并网系统压力开关的触点连接,所述同步并网系统压力开关与所述核电站开关校验装置的所述被校端接头连接。 The utility model also provides a nuclear power plant switch calibration system, including a synchronous grid-connected system pressure switch, a multimeter and any of the above four nuclear power plant switch calibration devices, the multimeter and the synchronous grid-connected system The contacts of the pressure switch are connected, and the pressure switch of the synchronous grid-connected system is connected with the calibrated terminal joint of the switch verification device of the nuclear power plant.

本实用新型具有以下有益效果:本实用新型采用高性能微调阀、标准接头等标准件进行组装,组装方便,且可靠性高,不易出现泄露;使用微调阀进行调节,降低了人为引进的校验误差;结合现场设备的运行需求,校验的同时对运行设备不造成影响;提高了仪表校验工作的效率,提高了仪表校验精度;结构简单,易于操作;集成度高,便于携带。 The utility model has the following beneficial effects: the utility model adopts high-performance fine-tuning valves, standard joints and other standard parts for assembly, which is convenient to assemble, has high reliability, and is not easy to leak; the fine-tuning valve is used for adjustment, which reduces the artificially introduced calibration error; combined with the operation requirements of the field equipment, the calibration will not affect the running equipment at the same time; the efficiency of the instrument calibration work is improved, and the accuracy of the instrument calibration is improved; the structure is simple, easy to operate; the integration is high, and it is easy to carry.

附图说明 Description of drawings

图1为本实用新型核电站开关校验装置第一实施例的结构示意图; Fig. 1 is the structural representation of the first embodiment of the utility model nuclear power plant switch calibration device;

图2为本实用新型核电站开关校验装置第二实施例的结构示意图; Fig. 2 is the structural representation of the second embodiment of the utility model nuclear power plant switch calibration device;

图3为本实用新型核电站开关校验装置第三实施例的结构示意图; Fig. 3 is the structure diagram of the third embodiment of the utility model nuclear power plant switch calibration device;

图4为本实用新型核电站开关校验装置第四实施例的结构示意图; Fig. 4 is the schematic structural diagram of the fourth embodiment of the utility model nuclear power plant switch calibration device;

图5为核电站中反应堆冷却剂系统一实施例的结构示意图。 Fig. 5 is a schematic structural diagram of an embodiment of a reactor coolant system in a nuclear power plant.

具体实施方式 Detailed ways

下面结合附图和具体实施方式对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and specific embodiment, the utility model is further described.

如图1所示,图1为本实用新型核电站开关校验装置第一实施例的结构示意图。第一实施例的核电站开关校验装置包括气源接头1a、微调阀2、第一调节阀3、标准表端接头4a、第二调节阀5、被校端接头6、第三调节阀7和第一排气管8,气源接头1a通过气管与微调阀2的一端连通,与微调阀2另一端连通的气管分为三路,第一路气管与第一调节阀3的一端连通,第一调节阀3的另一端与标准表端接头4a连通,第二路气管与第二调节阀5的一端连通,第二调节阀5的另一端与被校端接头6连通,第三路气管与第三调节阀7的一端连通,第三调节阀7的另一端与第一排气管8连通。 As shown in FIG. 1 , FIG. 1 is a schematic structural diagram of a first embodiment of a nuclear power plant switch verification device of the present invention. The nuclear power plant switch verification device of the first embodiment includes a gas source connector 1a, a fine-tuning valve 2, a first regulating valve 3, a standard gauge end connector 4a, a second regulating valve 5, a calibrated end connector 6, a third regulating valve 7 and The first exhaust pipe 8, the air source joint 1a communicates with one end of the fine-tuning valve 2 through the air pipe, and the air pipe connected with the other end of the fine-tuning valve 2 is divided into three routes, the first air pipe communicates with one end of the first regulating valve 3, and the second air pipe communicates with one end of the first regulating valve 3 The other end of a regulating valve 3 communicates with the standard surface end joint 4a, the second air pipe communicates with one end of the second regulating valve 5, the other end of the second regulating valve 5 communicates with the calibrated end joint 6, and the third air pipe communicates with One end of the third regulating valve 7 is connected, and the other end of the third regulating valve 7 is connected with the first exhaust pipe 8 .

如图2所示,图2为本实用新型核电站开关校验装置第二实施例的结构示意图。第二实施例的核电站开关校验装置包括气源接头1a、微调阀2、第一调节阀3、标准气压表4、第二调节阀5、被校端接头6、第三调节阀7和第一排气管8,气源接头1a通过气管与微调阀2的一端连通,与微调阀2另一端连通的气管分为三路,第一路气管与第一调节阀3的一端连通,第一调节阀3的另一端与标准气压表4连通,第二路气管与第二调节阀5的一端连通,第二调节阀5的另一端与被校端接头6连通,第三路气管与第三调节阀7的一端连通,第三调节阀7的另一端与第一排气管8连通。 As shown in FIG. 2 , FIG. 2 is a structural schematic diagram of a second embodiment of a nuclear power plant switch verification device of the present invention. The nuclear power plant switch verification device of the second embodiment includes a gas source joint 1a, a fine-tuning valve 2, a first regulating valve 3, a standard air pressure gauge 4, a second regulating valve 5, a terminal joint 6 to be calibrated, a third regulating valve 7 and a first regulating valve 7. An exhaust pipe 8, the gas source connector 1a communicates with one end of the fine-tuning valve 2 through the air pipe, and the air pipe connected with the other end of the fine-tuning valve 2 is divided into three routes, the first air pipe communicates with one end of the first regulating valve 3, the first The other end of the regulating valve 3 communicates with the standard air gauge 4, the second air pipe communicates with one end of the second regulating valve 5, the other end of the second regulating valve 5 communicates with the calibrated end joint 6, and the third air pipe communicates with the third One end of the regulating valve 7 is communicated, and the other end of the third regulating valve 7 is communicated with the first exhaust pipe 8 .

如图3所示,图3为本实用新型核电站开关校验装置第三实施例的结构示意图。第三实施例的核电站开关校验装置包括气瓶1、微调阀2、第一调节阀3、标准表端接头4a、第二调节阀5、被校端接头6、第三调节阀7和第一排气管8,气瓶通过气管与微调阀2的一端连通,与微调阀2另一端连通的气管分为三路,第一路气管与第一调节阀3的一端连通,第一调节阀3的另一端与标准表端接头4a连通,第二路气管与第二调节阀5的一端连通,第二调节阀5的另一端与被校端接头6连通,第三路气管与第三调节阀7的一端连通,第三调节阀7的另一端与第一排气管8连通。 As shown in FIG. 3 , FIG. 3 is a structural schematic diagram of a third embodiment of a nuclear power plant switch verification device of the present invention. The nuclear power plant switch verification device of the third embodiment includes a gas cylinder 1, a fine-tuning valve 2, a first regulating valve 3, a standard gauge end connector 4a, a second regulating valve 5, a calibrated terminal connector 6, a third regulating valve 7 and a first An exhaust pipe 8, the gas cylinder communicates with one end of the fine-tuning valve 2 through the air pipe, and the air pipe connected with the other end of the fine-tuning valve 2 is divided into three routes, the first air pipe communicates with one end of the first regulating valve 3, and the first regulating valve The other end of 3 communicates with the standard surface end connector 4a, the second air pipe communicates with one end of the second regulating valve 5, the other end of the second regulating valve 5 communicates with the calibrated end joint 6, and the third air pipe communicates with the third regulating valve. One end of the valve 7 is communicated, and the other end of the third regulating valve 7 is communicated with the first exhaust pipe 8 .

如图4所示,图4为本实用新型核电站开关校验装置第四实施例的结构示意图。第四实施例的核电站开关校验装置包括气瓶1、微调阀2、第一调节阀3、标准气压表4、第二调节阀5、被校端接头6、第三调节阀7和第一排气管8,所述气瓶1通过气管与所述微调阀2的一端连通,与所述微调阀2另一端连通的气管分为三路,第一路气管与所述第一调节阀3的一端连通,所述第一调节阀3的另一端与所述标准气压表4连通,所述第二路气管与所述第二调节阀5的一端连通,所述第二调节阀5的另一端与所述被校端接头6连通,第三路气管与所述第三调节阀7的一端连通,所述第三调节阀7的另一端与所述第一排气管8连通。 As shown in FIG. 4 , FIG. 4 is a structural schematic diagram of a fourth embodiment of a nuclear power plant switch verification device of the present invention. The nuclear power plant switch verification device of the fourth embodiment includes a gas cylinder 1, a fine-tuning valve 2, a first regulating valve 3, a standard air pressure gauge 4, a second regulating valve 5, a terminal joint 6 to be calibrated, a third regulating valve 7 and a first Exhaust pipe 8, the gas cylinder 1 communicates with one end of the fine-tuning valve 2 through the gas pipe, and the gas pipe connected with the other end of the fine-tuning valve 2 is divided into three routes, the first road gas pipe is connected with the first regulating valve 3 One end of the first regulating valve 3 communicates with the standard air pressure gauge 4, the second air pipe communicates with one end of the second regulating valve 5, and the other end of the second regulating valve 5 One end communicates with the calibrated end joint 6 , the third air pipe communicates with one end of the third regulating valve 7 , and the other end of the third regulating valve 7 communicates with the first exhaust pipe 8 .

第一实施例和第二实施例的气源接头1a用于与气源气瓶1连接,第一实施例和第三实施例的标准表端接头4a用于与标准气压表4连接。气源接头1a、标准表端接头4a和被校端接头6均为快速接头。 The gas source connector 1 a of the first embodiment and the second embodiment is used for connecting with the gas source cylinder 1 , and the standard gauge end connector 4 a of the first embodiment and the third embodiment is used for connecting with the standard barometer 4 . The gas source connector 1a, the standard meter end connector 4a and the calibrated end connector 6 are all quick connectors.

优选的,在第一实施例、第二实施例、第三实施例和第四实施例的核电站开关校验装置中,还包括设于第一排气管8上的通断阀9,进一步的防止泄露,是为了保障安全性和可靠性而作的冗余设计;核电站开关校验装置还包括安全泄压阀10和第二排气管11,与微调阀2另一端连通的气管还分出第四路气管,第四路气管与安全泄压阀10的一端连通,安全泄压阀10的另一端与第二排气管11连通,这样设计的目的是出于安全性考虑,核电站开关校验装置内超压后安全泄压阀10动作,泄压。 Preferably, in the first embodiment, the second embodiment, the third embodiment and the fourth embodiment, the nuclear power plant switch verification device also includes an on-off valve 9 arranged on the first exhaust pipe 8, further To prevent leakage, it is a redundant design to ensure safety and reliability; the nuclear power plant switch verification device also includes a safety pressure relief valve 10 and a second exhaust pipe 11, and the air pipe connected to the other end of the fine-tuning valve 2 is also separated The fourth air pipe, the fourth air pipe communicates with one end of the safety pressure relief valve 10, and the other end of the safety pressure relief valve 10 communicates with the second exhaust pipe 11. The purpose of this design is for safety considerations. After the overpressure in the test device, the safety relief valve 10 acts to release the pressure.

上述四个实施例的核电站开关校验装置可分别用于对核电站反应堆冷却剂系统内压力开关和就地压力表的校验,如图5所示,反应堆冷却剂系统包括就地压力表21、压力开关22、储气罐23、液位变送器24、第一对空排气阀25、第二对空排气阀26、第一排气管接头27、第二排气管接头28、第一阀门29、第二阀门30和第三阀门31;自储气罐23接出的气管分作两路,一路气管与第一阀门29的一端连通,第一阀门29的另一端分别与压力开关22和就地压力表21连通,另一路气管又分作两路,其中一路与第二阀门30的一端连通,另一路与第三阀门31的一端连通;自第二阀门30的另一端接出的气管分作两路,一路气管与液位变送器24的一端连通,另一路与第一对空排气阀25的一端连通,与第一对空排气阀25的另一端连通的气管的末端设有第一排气管接头27;自第三阀门31的另一端接出的气管分作两路,一路气管与液位变送器24的另一端连通,另一路与第二对空排气阀26的一端连通,与第二对空排气阀26的另一端连通的气管的末端设有第二排气管接头28。 The nuclear power plant switch verification device of above-mentioned four embodiments can be respectively used in the verification of pressure switch and local pressure gauge in nuclear power plant reactor coolant system, as shown in Figure 5, reactor coolant system comprises local pressure gauge 21, Pressure switch 22, gas storage tank 23, liquid level transmitter 24, first pair of air exhaust valve 25, second pair of air exhaust valve 26, first exhaust pipe joint 27, second exhaust pipe joint 28, The first valve 29, the second valve 30 and the third valve 31; the trachea connected from the gas storage tank 23 is divided into two routes, the one-way trachea communicates with one end of the first valve 29, and the other end of the first valve 29 is connected to the pressure respectively. The switch 22 is communicated with the local pressure gauge 21, and the other air pipe is divided into two routes, one of which communicates with one end of the second valve 30, and the other communicates with one end of the third valve 31; The air pipe out is divided into two paths, one path is connected with one end of the liquid level transmitter 24, the other path is connected with one end of the first pair of air exhaust valves 25, and the other end of the first pair of air exhaust valves 25 is communicated. The end of the gas pipe is provided with a first exhaust pipe joint 27; the gas pipe connected from the other end of the third valve 31 is divided into two routes, one route of the gas pipe communicates with the other end of the liquid level transmitter 24, and the other route communicates with the second pair of One end of the air exhaust valve 26 communicates, and the end of the air pipe communicated with the other end of the second pair of air exhaust valves 26 is provided with a second exhaust pipe connector 28 .

压力开关22的信号输出端子与万用表(图5中未示出)的校表专用航空插头信号端连接;核电站开关校验装置的被校端接头6与第一排气管接头27或第二排气管接头28对接。第一对空排气阀25、第一排气管接头27与第二对空排气阀26、第二排气管接头28分别属于低压和高压两路,校验过程中操作其中任何一路都可以(前提要求是不能操作第二阀门29和第三阀门30,如操作这两个阀门会造成液位变送器24单侧受压,影响液位变送器24功能),以下,以被校端接头6与第一排气管接头27对接为例进行描述。 The signal output terminal of the pressure switch 22 is connected to the signal end of the special aviation plug for meter calibration of the multimeter (not shown in Figure 5); The trachea joint 28 is butted. The first pair of air exhaust valves 25, the first exhaust pipe connector 27, the second pair of air exhaust valves 26, and the second exhaust pipe connector 28 belong to the low-pressure and high-pressure circuits respectively, and any one of them can be operated during the verification process. Yes (the premise is that the second valve 29 and the third valve 30 cannot be operated. If these two valves are operated, one side of the liquid level transmitter 24 will be pressurized, which will affect the function of the liquid level transmitter 24). The butt connection between the calibration end joint 6 and the first exhaust pipe joint 27 will be described as an example.

对压力开关22和就地压力表21的校验过程如下:确认储气罐23的第一对空排气阀25和第二对空排气阀26是关闭的;拔下压力开关22的信号输出接线端子,将万用表的校表专用航空插头信号连线接到压力开关的信号输出端子上,万用表的动作信号即反映压力开关22的动作;关闭核电站开关校验装置的所有阀门,确认气瓶1、标准气压表4等已接入核电站开关校验装置中;旋开第一排气管接头27,将核电站开关校验装置的被校端接头6用耐压软管与第一排气管接头27相连;打开与标准气压表4连通的第一调节阀3,然后缓慢打开气瓶1(其中装有压缩空气)的出气阀和微调阀2,在标准气压表4的值达到20bar(此值是根据压力开关的下降保护定值18.4bar来设定的)时,关闭压缩空气气瓶1的出气阀;打开校验装置被校端的第二调节阀5,打开与被校端接头6相连接的第一对空排气阀25,储气罐23中气压(储气罐正常工作压力值为25bar)高于校验装置中气压,空气由储气罐23中向校验装置中流动,最终使储气罐23中气压与校验装置中气压实现平衡,由于校验装置内部的气体空间相对于储气罐23气体空间来讲很小,因此,最终两者内部的气压几乎为25bar;打开校验装置的第一排气管8上的通断阀9和第三调节阀7,使内部空气压力逐步下降,当万用表发出动作信号时(即压力开关发出动作信号),读出当时标准气压表的值,该读数即为压力开关22的下降设定值;在内部空气压力逐步下降的过程中,与标准气压表4进行对照,对就地压力表21进行校验;对压力开关22和就地压力表21的校验完毕后,迅速关闭校验装置的通断阀9和第三调节阀7。 The verification process of the pressure switch 22 and the local pressure gauge 21 is as follows: confirm that the first pair of air exhaust valves 25 and the second pair of air exhaust valves 26 of the air storage tank 23 are closed; pull out the signal of the pressure switch 22 Output connection terminal, connect the special aviation plug signal cable for meter calibration of the multimeter to the signal output terminal of the pressure switch, the action signal of the multimeter will reflect the action of the pressure switch 22; close all valves of the switch calibration device of the nuclear power plant, and confirm that the gas cylinder 1. The standard barometer 4 has been connected to the nuclear power plant switch calibration device; unscrew the first exhaust pipe joint 27, and connect the calibrated end joint 6 of the nuclear power plant switch calibration device to the first exhaust pipe with a pressure-resistant hose. The joint 27 is connected; open the first regulating valve 3 connected with the standard air pressure gauge 4, and then slowly open the outlet valve of the gas cylinder 1 (which contains compressed air) and the fine-tuning valve 2, when the value of the standard air pressure gauge 4 reaches 20bar (this The value is set according to the drop protection setting value of the pressure switch 18.4bar), close the outlet valve of the compressed air cylinder 1; open the second regulating valve 5 at the calibrated end of the calibration device, and open With the first pair of air exhaust valves 25 connected, the air pressure in the air storage tank 23 (the normal working pressure of the air storage tank is 25bar) is higher than the air pressure in the calibration device, and the air flows from the air storage tank 23 to the calibration device. Finally, the air pressure in the gas storage tank 23 and the calibration device are balanced. Since the gas space inside the calibration device is relatively small compared to the gas space of the gas storage tank 23, the final air pressure inside the two is almost 25 bar; Open the on-off valve 9 and the third regulating valve 7 on the first exhaust pipe 8 of the calibration device to gradually reduce the internal air pressure. When the multimeter sends out an action signal (that is, the pressure switch sends out an action signal), read the current standard The value of the barometer, the reading is the drop set value of the pressure switch 22; in the process of the gradual decline of the internal air pressure, it is compared with the standard barometer 4, and the local pressure gauge 21 is checked; the pressure switch 22 After the verification of the local pressure gauge 21 is completed, the on-off valve 9 and the third regulating valve 7 of the verification device are quickly closed.

之后,缓慢打开压缩空气气瓶1的出气阀,并调节微调阀2,使内部空气压力回升,当万用表发出动作信号时,读出当时标准气压表的值,该读数即为压力开关22的上升设定值;在内部空气压力上升的过程中,与标准气压表4进行对照,对就地压力表21进行校验;对压力开关22和就地压力表21的校验完毕后,关闭气瓶出气阀。 After that, slowly open the outlet valve of the compressed air cylinder 1, and adjust the fine-tuning valve 2, so that the internal air pressure rises. When the multimeter sends out an action signal, read the value of the standard barometer at that time, and the reading is the rise of the pressure switch 22. Set value; in the process of rising internal air pressure, compare it with the standard barometer 4, and check the local pressure gauge 21; after the calibration of the pressure switch 22 and the local pressure gauge 21 is completed, close the gas cylinder outlet valve.

如果校验出压力开关22的上升设定值或下降设定值超出允许的误差范围,则需调整压力开关22的设定值,然后重复上述校验过程。 If it is verified that the rising set value or falling set value of the pressure switch 22 exceeds the allowable error range, then the set value of the pressure switch 22 needs to be adjusted, and then the above checking process is repeated.

全部校验完毕后,缓慢打开气瓶1的出气阀,监视标准气压表4和储气罐23的就地压力表21的压力指示,当压力达到25bar(储气罐正常工作时的气压值)时关闭气瓶1的出气阀,再关闭与被校端接头6相连的储气罐23的第一对空排气阀25。然后,打开校验装置第一排气管8上的通断阀9,缓慢打开第三调节阀7,使校验装置中的空气排出。最后,拆下与储气罐23的第一排气管接头27连接的耐压软管。 After all the calibration is completed, slowly open the outlet valve of the gas cylinder 1, monitor the pressure indication of the standard barometer 4 and the local pressure gauge 21 of the gas storage tank 23, when the pressure reaches 25bar (the air pressure value when the gas storage tank is working normally) Close the gas outlet valve of gas cylinder 1, then close the first pair of air exhaust valves 25 of the gas storage tank 23 connected to the connected end joint 6. Then, open the on-off valve 9 on the first exhaust pipe 8 of the verification device, and slowly open the third regulating valve 7 to discharge the air in the verification device. Finally, the pressure-resistant hose connected to the first exhaust pipe joint 27 of the gas storage tank 23 is removed.

上述四个实施例的校验装置还可分别用于对核电站中同步并网系统内压力开关的校验,校验过程如下:关闭校验装置的所有阀门,确认气源气瓶1、标准气压表4接入校验装置中,将同步并网系统压力开关与被校端接头6连通,将万用表接到同步并网系统压力开关的触点,万用表的动作信号即反映同步并网系统压力开关的动作;打开第二调节阀5和第一调节阀3,缓慢调整微调阀2,观察到标准气压表4压力值上升,当万用表发出动作信号时,立即关闭微调阀2,读出当时标准气压表4的值,该读数即为同步并网系统压力开关的动作压力值。然后,打开第一排气管8上的通断阀9,缓慢开启第三调节阀7进行排气,观察到标准气压表4压力值下降,当万用表发出动作信号时立即关闭第三调节阀7及通断阀9,读出当时标准气压表4的值,该读数即同步并网系统压力开关的复位压力值。 The verification devices of the above four embodiments can also be used to verify the pressure switches in the synchronous grid-connected system in nuclear power plants respectively. The verification process is as follows: close all valves of the verification device, confirm that the gas source gas cylinder 1, the standard air pressure Connect Table 4 to the verification device, connect the pressure switch of the synchronous grid-connected system with the joint 6 of the calibrated terminal, connect the multimeter to the contact of the pressure switch of the synchronous grid-connected system, and the action signal of the multimeter reflects the pressure switch of the synchronous grid-connected system Open the second regulating valve 5 and the first regulating valve 3, adjust the fine-tuning valve 2 slowly, observe the pressure value of the standard air pressure gauge 4 rises, when the multimeter sends out an action signal, immediately close the fine-tuning valve 2, and read the standard air pressure at that time The value in Table 4, the reading is the action pressure value of the pressure switch of the synchronous grid-connected system. Then, open the on-off valve 9 on the first exhaust pipe 8, slowly open the third regulating valve 7 to exhaust, observe that the pressure value of the standard air gauge 4 drops, and close the third regulating valve 7 immediately when the multimeter sends an action signal And the on-off valve 9, read the value of the standard barometer 4 at that time, this reading is the reset pressure value of the pressure switch of the synchronous grid-connected system.

如上所述是结合具体的优选实施方式对本实用新型所作的进一步详细说明,不能认定本实用新型的具体实施只局限于这些说明。对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思前提下,还可以做出若干简单推演或替换,都应当视为属于本实用新型的保护范围。 The above is a further detailed description of the utility model in conjunction with specific preferred embodiments, and it cannot be assumed that the specific implementation of the utility model is only limited to these descriptions. For those of ordinary skill in the technical field to which the utility model belongs, without departing from the concept of the utility model, some simple deductions or replacements can be made, which should be regarded as belonging to the protection scope of the utility model.

Claims (10)

1. a nuclear power station switch calibration equipment, it is characterized in that: comprise gas source connector (1a), micrometering valve (2), the first variable valve (3), standard scale end connector (4a), the second variable valve (5), by school end connector (6), the 3rd variable valve (7) and downtake pipe (8), described gas source connector (1a) is communicated with one end of described micrometering valve (2) by tracheae, the tracheae being communicated with described micrometering valve (2) other end is divided into three tunnels, first via tracheae is communicated with one end of described the first variable valve (3), the other end of described the first variable valve (3) is communicated with described standard scale end connector (4a), the second road tracheae is communicated with one end of described the second variable valve (5), the other end of described the second variable valve (5) is communicated with by school end connector (6) with described, Third Road tracheae is communicated with one end of described the 3rd variable valve (7), the other end of described the 3rd variable valve (7) is communicated with described downtake pipe (8).
2. nuclear power station switch calibration equipment according to claim 1, is characterized in that:
Described nuclear power station switch calibration equipment also comprises on-off valve (9), and described on-off valve (9) is located on described downtake pipe (8);
And/or,
Described nuclear power station switch calibration equipment also comprises safety relief valve (10) and second exhaust pipe (11), the tracheae that described and described micrometering valve (2) other end is communicated with also separates Si road tracheae, described Si road tracheae is communicated with one end of described safety relief valve (10), and the other end of described safety relief valve (10) is communicated with described second exhaust pipe (11).
3. a nuclear power station switch calibration equipment, it is characterized in that: comprise gas source connector (1a), micrometering valve (2), the first variable valve (3), normal barometer (4), the second variable valve (5), by school end connector (6), the 3rd variable valve (7) and downtake pipe (8), described gas source connector (1a) is communicated with one end of described micrometering valve (2) by tracheae, the tracheae being communicated with described micrometering valve (2) other end is divided into three tunnels, first via tracheae is communicated with one end of described the first variable valve (3), the other end of described the first variable valve (3) is communicated with described normal barometer (4), the second road tracheae is communicated with one end of described the second variable valve (5), the other end of described the second variable valve (5) is communicated with by school end connector (6) with described, Third Road tracheae is communicated with one end of described the 3rd variable valve (7), the other end of described the 3rd variable valve (7) is communicated with described downtake pipe (8).
4. nuclear power station switch calibration equipment according to claim 3, is characterized in that:
Described nuclear power station switch calibration equipment also comprises on-off valve (9), and described on-off valve (9) is located on described downtake pipe (8);
And/or,
Described nuclear power station switch calibration equipment also comprises safety relief valve (10) and second exhaust pipe (11), the tracheae that described and described micrometering valve (2) other end is communicated with also separates Si road tracheae, described Si road tracheae is communicated with one end of described safety relief valve (10), and the other end of described safety relief valve (10) is communicated with described second exhaust pipe (11).
5. a nuclear power station switch calibration equipment, it is characterized in that: comprise gas cylinder (1), micrometering valve (2), the first variable valve (3), standard scale end connector (4a), the second variable valve (5), by school end connector (6), the 3rd variable valve (7) and downtake pipe (8), described gas cylinder (1) is communicated with one end of described micrometering valve (2) by tracheae, the tracheae being communicated with described micrometering valve (2) other end is divided into three tunnels, first via tracheae is communicated with one end of described the first variable valve (3), the other end of described the first variable valve (3) is communicated with described standard scale end connector (4a), the second road tracheae is communicated with one end of described the second variable valve (5), the other end of described the second variable valve (5) is communicated with by school end connector (6) with described, Third Road tracheae is communicated with one end of described the 3rd variable valve (7), the other end of described the 3rd variable valve (7) is communicated with described downtake pipe (8).
6. a nuclear power station switch calibration equipment, it is characterized in that: comprise gas cylinder (1), micrometering valve (2), the first variable valve (3), normal barometer (4), the second variable valve (5), by school end connector (6), the 3rd variable valve (7) and downtake pipe (8), described gas cylinder (1) is communicated with one end of described micrometering valve (2) by tracheae, the tracheae being communicated with described micrometering valve (2) other end is divided into three tunnels, first via tracheae is communicated with one end of described the first variable valve (3), the other end of described the first variable valve (3) is communicated with described normal barometer (4), the second road tracheae is communicated with one end of described the second variable valve (5), the other end of described the second variable valve (5) is communicated with by school end connector (6) with described, Third Road tracheae is communicated with one end of described the 3rd variable valve (7), the other end of described the 3rd variable valve (7) is communicated with described downtake pipe (8).
7. nuclear power station switch calibration equipment according to claim 6, is characterized in that:
Described nuclear power station switch calibration equipment also comprises on-off valve (9), and described on-off valve (9) is located on described downtake pipe (8);
And/or,
Described nuclear power station switch calibration equipment also comprises safety relief valve (10) and second exhaust pipe (11), the tracheae that described and described micrometering valve (2) other end is communicated with also separates Si road tracheae, described Si road tracheae is communicated with one end of described safety relief valve (10), and the other end of described safety relief valve (10) is communicated with described second exhaust pipe (11).
8. a nuclear power station switch check system, comprises pressure switch (22), gas-holder (23), fluid level transmitter (24), first pair of empty vent valve (25), downtake pipe joint (27), the first valve (29), multimeter, the second valve (30) and according to the nuclear power station switch calibration equipment described in any one in claim 1-6; The tracheorrhaphy picking out from described gas-holder (23) is made two-way, one road tracheae is communicated with one end of described the first valve (29), the other end of described the first valve (29) is communicated with described pressure switch (22), and another road tracheae is communicated with one end of described the second valve (30); The tracheorrhaphy picking out from described the second valve (30) is made two-way, one road tracheae is communicated with fluid level transmitter (24), another road is communicated with one end of described first pair of empty vent valve (25), and the end of the tracheae being communicated with the other end of described first pair of empty vent valve (25) is provided with described downtake pipe joint (27); The signal output terminal of described pressure switch (22) is connected with the calibration general aviation plug signal end of described multimeter; The described of described nuclear power station switch calibration equipment docked with described downtake pipe joint (27) by school end connector (6).
9. a nuclear power station switch check system, comprises on the spot tensimeter (21), gas-holder (23), fluid level transmitter (24), first pair of empty vent valve (25), downtake pipe joint (27), the first valve (29), multimeter, the second valve (30) and according to the nuclear power station switch calibration equipment described in any one in claim 1-6; The tracheorrhaphy picking out from described gas-holder (23) is made two-way, one road tracheae is communicated with one end of described the first valve (29), the other end of described the first valve (29) is communicated with described tensimeter on the spot (21), and another road tracheae is communicated with one end of described the second valve (30); The tracheorrhaphy picking out from described the second valve (30) is made two-way, one road tracheae is communicated with fluid level transmitter (24), another road is communicated with one end of described first pair of empty vent valve (25), and the end of the tracheae being communicated with the other end of described first pair of empty vent valve (25) is provided with described downtake pipe joint (27); The described of described nuclear power station switch calibration equipment docked with described downtake pipe joint (27) by school end connector (6).
10. a nuclear power station switch check system, comprise synchronous grid-connected system pressure switch, multimeter and according to the nuclear power station switch calibration equipment described in any one in claim 1-6, described multimeter connects with described contact of synchronizeing grid-connected system pressure switch, and described synchronous grid-connected system pressure switch is connected by school end connector (6) with the described of described nuclear power station switch calibration equipment.
CN201420277912.9U 2014-05-28 2014-05-28 Nuclear power plant switch checking device and system Expired - Lifetime CN203895130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420277912.9U CN203895130U (en) 2014-05-28 2014-05-28 Nuclear power plant switch checking device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420277912.9U CN203895130U (en) 2014-05-28 2014-05-28 Nuclear power plant switch checking device and system

Publications (1)

Publication Number Publication Date
CN203895130U true CN203895130U (en) 2014-10-22

Family

ID=51721502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420277912.9U Expired - Lifetime CN203895130U (en) 2014-05-28 2014-05-28 Nuclear power plant switch checking device and system

Country Status (1)

Country Link
CN (1) CN203895130U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111256907A (en) * 2020-01-03 2020-06-09 武汉钢铁有限公司 Intelligent line inspection checking device of transmitter
CN112269125A (en) * 2020-10-21 2021-01-26 中广核核电运营有限公司 Pressure switch on-line checking method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111256907A (en) * 2020-01-03 2020-06-09 武汉钢铁有限公司 Intelligent line inspection checking device of transmitter
CN111256907B (en) * 2020-01-03 2021-08-17 武汉钢铁有限公司 Intelligent line inspection checking device of transmitter
CN112269125A (en) * 2020-10-21 2021-01-26 中广核核电运营有限公司 Pressure switch on-line checking method

Similar Documents

Publication Publication Date Title
CN204514627U (en) Subsea tree ground testing system
CN207962090U (en) A kind of charging device of gas extinguishing agent
CN103207048A (en) Calibration instrument for low-pressure pressure instrument
CN103234698A (en) Low-static pressure differential transmitter calibration instrument
CN105083586B (en) Device for testing aerial refueling adapter equipment
CN110441007B (en) Intelligent water seal test system
CN103674510A (en) Superhigh-pressure pressure-reducing valve performance testing bench
CN103792082B (en) Safety return-flow valve detection device and method
CN207336053U (en) A kind of low-temperature safety valve performance detecting system
CN206387538U (en) A kind of device for calibrating high static pressure differential pressure device
CN205940868U (en) Detection apparatus for be used for differential pressure transmitter
CN108613772A (en) The off-line calibration method of nuclear power station differential pressure transmitter
CN217765416U (en) Portable explosion-proof miniature gas cylinder driving pilot-operated safety valve online calibration device
CN203241194U (en) Calibrator of low-pressure pressure instrument
CN103277665B (en) SF6 gas recoverable means of deflation
CN204882079U (en) Engine bleed air system testing arrangement
CN102901671A (en) Water pressure testing system of manual pressure container
CN202853986U (en) Manual type water pressure testing system for pressure vessel
CN105675288A (en) Inlet/exhaust valve performance test device
CN201886787U (en) Pressure testing device for nuclear power station
CN215639993U (en) Automatic rapid tester for pipeline pressure of motor train unit braking system
CN204007999U (en) A kind of tensimeter meter checking device
CN206193189U (en) Portable transformer buchholz relay calibration equipment
CN204718724U (en) A kind of shunting selecting type pressure tester
CN204286725U (en) The online signal detecting equipment of gate valve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151118

Address after: 518031 Guangdong city of Shenzhen province Futian District science and technology building, Shangbu Road West 15

Patentee after: LING'AO NUCLEAR POWER Co.,Ltd.

Patentee after: CHINA NUCLEAR POWER OPERATIONS Co.,Ltd.

Patentee after: CGN POWER Co.,Ltd.

Address before: 518031 Guangdong city of Shenzhen province Futian District science and technology building, Shangbu road 18

Patentee before: CHINA NUCLEAR POWER OPERATIONS Co.,Ltd.

Patentee before: CGN POWER Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20141022

CX01 Expiry of patent term