CN203871707U - Maintenance platform - Google Patents
Maintenance platform Download PDFInfo
- Publication number
- CN203871707U CN203871707U CN201320885873.6U CN201320885873U CN203871707U CN 203871707 U CN203871707 U CN 203871707U CN 201320885873 U CN201320885873 U CN 201320885873U CN 203871707 U CN203871707 U CN 203871707U
- Authority
- CN
- China
- Prior art keywords
- connector
- base plate
- cylindrical portion
- lifting arm
- fixed part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及电力行业对电流互感器进行安装、检修用支撑工具,具体地说是一种检修平台。 The utility model relates to a support tool for installation and maintenance of current transformers in the electric power industry, specifically a maintenance platform.
背景技术 Background technique
现有电力行业对电流互感器更换作业中拆装时间长的主要原因是检修过程中由于作业空间限制而导致作业过程中必须对电流互感器进行人力支撑才能完成更换作业。这样每更换一台电流互感器就需要多人进行更换作业,而且作业过程中一名检修人员对电流互感器进行人力支撑多达40分钟。由此可见更换三台电流互感器对检修人员体力及耐力是一种极大的挑战与考验,这样费时费力的作业过程降低了我们的检修效率,检修的时间较长,相应的停电时间变长,影响人民生活和公司的生产;因更换时工人的操作较为费力,为了抓紧安装,有时不能达到其安装要求,精度减低,所以有必要开发一种工具,起到在安装和更换互感器时,达到省时省力且安装精度高的目的。 The main reason for the long disassembly and assembly time in the current transformer replacement operation in the existing electric power industry is that due to the limitation of the working space during the maintenance process, the current transformer must be supported by manpower during the operation to complete the replacement operation. In this way, multiple people are required to perform the replacement operation every time a current transformer is replaced, and during the operation, a maintenance personnel supports the current transformer manually for up to 40 minutes. It can be seen that replacing the three current transformers is a great challenge and test for the physical strength and endurance of the maintenance personnel. Such a time-consuming and laborious operation process reduces our maintenance efficiency, the maintenance time is longer, and the corresponding power outage time becomes longer. , affecting people's life and the company's production; because the workers' operation is more laborious during the replacement, in order to pay close attention to the installation, sometimes the installation requirements cannot be met, and the accuracy is reduced, so it is necessary to develop a tool to play a role in installing and replacing the transformer. The purpose of saving time and labor and high installation accuracy is achieved.
发明内容 Contents of the invention
本实用新型要解决的技术问题是提供一种操作使用方便,且结构简单,安全可靠的检修平台,以克服现有技术存在的上述缺陷。 The technical problem to be solved by the utility model is to provide a maintenance platform that is easy to operate, simple in structure, safe and reliable, so as to overcome the above-mentioned defects in the prior art.
为解决上述技术问题,本实用新型采用的技术方案为:检修平台包括移动小车、升降装置和放置台,在移动小车上固定安装有用于对电流互感器进行上下调节的升降装置,放置台安装在升降装置上。 In order to solve the above-mentioned technical problems, the technical solution adopted by the utility model is as follows: the maintenance platform includes a mobile trolley, a lifting device and a placement table, and a lifting device for adjusting the current transformer up and down is fixedly installed on the mobile trolley, and the placement platform is installed on the on the lifting device.
所述的移动小车由滚轮和车体组成,车体包括第一底板、第二底板和支撑杆,支撑杆的一端固定安装在第一底板上,支撑杆的另一端与第二底板固定安装,滚轮固定安装于第一底板的下表面上。 The mobile trolley is composed of rollers and a car body. The car body includes a first base plate, a second base plate and a support rod. One end of the support rod is fixedly installed on the first base plate, and the other end of the support rod is fixedly installed on the second base plate. The rollers are fixedly installed on the lower surface of the first bottom plate.
所述的支撑杆包括第一筒状部和第二筒状部,第一筒状部和第二筒状部通过套接的方式连接,同时第二筒状部可以沿着第一筒状部升降。 The support rod includes a first cylindrical portion and a second cylindrical portion, and the first cylindrical portion and the second cylindrical portion are connected by socketing, and the second cylindrical portion can be connected along the first cylindrical portion lift.
所述的升降装置包括第一固定部、升降臂、第二固定部、螺母和螺杆,第一固定部包括底壁和左右侧壁,底壁设置固定孔,左右侧壁设置销轴固定孔,升降臂包括第一组升降臂和第二组升降臂,第一组升降臂包括第一连接件和第二连接件,第二组升降臂包括第三连接件和第四连接件,第一连接件、第二连接件、第三连接件和第四连接件的结构形状相同,第一连接件为一槽状体,第一连接件包括第一基板和自第一基板两侧延伸形成的两个第一侧板,第一侧板的两端为半圆状,于第一侧板两端的半圆状处设置第一插销孔。第二固定部也为槽状体,第二固定部包括第二基板和自第二基板折弯形成的第二侧板,第二侧板的两端部设置第二插销孔,于第二基板切除形成开口,螺母固定安装于第一连接件和第二连接件的连接处,于第三连接件和第四连接件的连接处同样也安装螺母,螺杆组装于螺母上。螺杆的一端设置长方体状部,于长方体状部设置插孔。放置台安装于第二固定部上。 The lifting device includes a first fixing part, a lifting arm, a second fixing part, a nut and a screw rod, the first fixing part includes a bottom wall and left and right side walls, the bottom wall is provided with fixing holes, and the left and right side walls are provided with pin fixing holes, The lifting arm includes a first group of lifting arms and a second group of lifting arms, the first group of lifting arms includes a first connecting piece and a second connecting piece, the second group of lifting arms includes a third connecting piece and a fourth connecting piece, the first connecting piece The structural shapes of the second connecting piece, the third connecting piece and the fourth connecting piece are the same. The first connecting piece is a trough-shaped body. The first connecting piece includes a first base plate and two A first side plate, the two ends of the first side plate are semicircular, and the first pin holes are arranged at the semicircular positions of the two ends of the first side plate. The second fixing part is also a groove-shaped body. The second fixing part includes a second base plate and a second side plate bent from the second base plate. The two ends of the second side plate are provided with second pin holes. The opening is formed by cutting, the nut is fixedly installed at the joint of the first connecting piece and the second connecting piece, the nut is also installed at the connecting place of the third connecting piece and the fourth connecting piece, and the screw rod is assembled on the nut. A rectangular parallelepiped part is arranged at one end of the screw, and an insertion hole is arranged on the rectangular parallelepiped part. The placing table is installed on the second fixing part.
所述的第一侧板包括直角梯形部、第一半圆部和第二半圆部,第一半圆部和第二半圆部上设置第一插销孔。 The first side plate includes a right-angled trapezoidal portion, a first semicircular portion and a second semicircular portion, and first pin holes are arranged on the first semicircular portion and the second semicircular portion.
使用时,将转动把手插入螺杆长方体部的插孔后再转动把手,从而带动螺杆转动,安装于第一组升降臂和第二组升降臂的螺母沿着螺杆相对靠近或远离,进而调整第二固定部与第一固定部的相对距离,进一步调整安装第二固定部上的放置台的高低,从而能将电流互感器调整到所需的高度位置处,便于安装或检修。 When in use, insert the turning handle into the socket of the cuboid part of the screw rod and then turn the handle, thereby driving the screw rod to rotate, and the nuts installed on the first group of lifting arms and the second group of lifting arms are relatively close or far away along the screw rod, and then adjust the second The relative distance between the fixed part and the first fixed part further adjusts the height of the placing table installed on the second fixed part, so that the current transformer can be adjusted to the required height position, which is convenient for installation or maintenance.
本实用新型相对现有技术来说,其有益效果在于:由于采用升降臂和移动小车的结构,装卸简单、便于运输移动,且可根据检修现场的需要进行高度调整,具有体积小、结构耐用、安全可靠、制作成本低、省时省力、安装精度高的优点。 Compared with the prior art, the utility model has the beneficial effects that: due to the structure of the lifting arm and the mobile trolley, the loading and unloading is simple, convenient for transportation and movement, and the height can be adjusted according to the needs of the maintenance site, and it has the advantages of small size, durable structure, It has the advantages of safety and reliability, low production cost, time saving and labor saving, and high installation precision. the
附图说明 Description of drawings
图1为本实用新型检修平台立体结构示意图。 Fig. 1 is a schematic diagram of the three-dimensional structure of the maintenance platform of the utility model.
图2为本实用新型检修平台前视结构示意图。 Fig. 2 is a schematic diagram of the front view structure of the maintenance platform of the present invention.
图3为本实用新型检修平台之第一固定部立体结构示意图。 Fig. 3 is a schematic diagram of the three-dimensional structure of the first fixing part of the maintenance platform of the present invention.
图4为本实用新型检修平台之第一连接件立体结构示意图。 Fig. 4 is a schematic diagram of the three-dimensional structure of the first connector of the maintenance platform of the present invention.
图5为本实用新型检修平台之第一连接件前视结构示意图。 Fig. 5 is a schematic diagram of the front view of the first connector of the maintenance platform of the present invention.
图6为本实用新型检修平台之第二固定部立体结构示意图。 Fig. 6 is a schematic diagram of the three-dimensional structure of the second fixing part of the maintenance platform of the present invention.
图中:移动小车1、升降装置2、放置台3、滚轮11、车体12、第一底板13、第二底板14、支撑杆15、第一筒状部151、第二筒状部152、第一固定部21、升降臂22、第二固定部23、螺母24、螺杆25、底壁211、侧壁212、固定孔213、销轴固定孔214、第一组升降臂221、第二组升降臂222、第一连接件223、第二连接件224、第三连接件225、第四连接件226、第一基板2231、第一侧板2232、第一插销孔2233、第二基板231、第二侧板232、第二插销孔233、开口234、长方体状部251、插孔252、直角梯形部2234、第一半圆部2235、第二半圆部2236。 In the figure: mobile trolley 1, lifting device 2, placing table 3, roller 11, car body 12, first base plate 13, second base plate 14, support rod 15, first cylindrical portion 151, second cylindrical portion 152, The first fixing part 21, the lifting arm 22, the second fixing part 23, the nut 24, the screw rod 25, the bottom wall 211, the side wall 212, the fixing hole 213, the pin fixing hole 214, the first group of lifting arms 221, the second group The lifting arm 222, the first connecting piece 223, the second connecting piece 224, the third connecting piece 225, the fourth connecting piece 226, the first base plate 2231, the first side plate 2232, the first pin hole 2233, the second base plate 231, The second side plate 232 , the second pin hole 233 , the opening 234 , the rectangular parallelepiped portion 251 , the insertion hole 252 , the right-angled trapezoidal portion 2234 , the first semicircle portion 2235 , and the second semicircle portion 2236 .
具体实施方式 Detailed ways
下面结合附图对本实用新型进行详细说明,参阅图1与图2,检修平台包括移动小车1、升降装置2和放置台3,在移动小车1上固定安装有用于对电流互感器(未显示)进行上下调节的升降装置2,放置台3安装在升降装置2上。 The utility model will be described in detail below in conjunction with the accompanying drawings. Referring to Fig. 1 and Fig. 2, the maintenance platform includes a mobile trolley 1, a lifting device 2 and a placement platform 3, and a current transformer (not shown) is fixedly installed on the mobile trolley 1. Carry out the lifting device 2 that adjusts up and down, and the placement platform 3 is installed on the lifting device 2 .
参阅图1与图2,所述的移动小车1由滚轮11和车体12组成,车体12包括第一底板13、第二底板14和支撑杆15,支撑杆15的一端固定安装在第一底板13上,支撑杆15的另一端与第二底板14固定安装,滚轮11固定安装于第一底板13的下表面上。 Referring to Fig. 1 and Fig. 2, described moving trolley 1 is made up of roller 11 and car body 12, and car body 12 comprises first base plate 13, second base plate 14 and support rod 15, and one end of support rod 15 is fixedly installed on the first On the base plate 13 , the other end of the support rod 15 is fixedly installed on the second base plate 14 , and the roller 11 is fixedly installed on the lower surface of the first base plate 13 .
参阅图1与图2,所述的支撑杆15包括第一筒状部151和第二筒状部152,第一筒状部151和第二筒状部152通过套接的方式连接,同时第二筒状部152可以沿着第一筒状部151升降。 1 and 2, the support rod 15 includes a first cylindrical portion 151 and a second cylindrical portion 152, the first cylindrical portion 151 and the second cylindrical portion 152 are connected by socketing, while the second The second cylindrical part 152 can move up and down along the first cylindrical part 151 .
参阅图1、图2、图3、图4、图5和图6,所述的升降装置2包括第一固定部21、升降臂22、第二固定部23、螺母24和螺杆25,第一固定部21包括底壁211和自底壁两侧朝上延伸形成的左右两侧壁212,底壁211设置固定孔213,侧壁212设置销轴固定孔214,升降臂22包括第一组升降臂221和第二组升降臂222,第一组升降臂221包括第一连接件223和第二连接件224,第二组升降臂222包括第三连接件225和第四连接件226,第一连接件223、第二连接件224、第三连接件225和第四连接件226的结构形状相同,第一连接件223为一槽状体,第一连接件223包括第一基板2231和自第一基板2231两侧延伸形成的两个第一侧板2232,第一侧板2232的两端为半圆状,于第一侧板2232两端的半圆状处设置第一插销孔2233。第二固定部23也为槽状体,第二固定部23包括第二基板231和自第二基板231折弯形成的第二侧板232,第二侧板232的两端部设置第二插销孔233,于第二基板231切除形成开口234,螺母24固定安装于第一连接件223和第二连接件224的连接处,于第三连接件225和第四连接件226的连接处同样也安装螺母24,螺杆25组装于螺母24上。螺杆25的一端设置长方体状部251,于长方体状部251设置插孔252。放置台3安装于第二固定部23上。 Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5 and Fig. 6, the lifting device 2 includes a first fixing part 21, a lifting arm 22, a second fixing part 23, a nut 24 and a screw rod 25, the first The fixed part 21 includes a bottom wall 211 and left and right side walls 212 extending upward from both sides of the bottom wall. The bottom wall 211 is provided with a fixing hole 213, and the side wall 212 is provided with a pin fixing hole 214. The lifting arm 22 includes a first set of lifting Arm 221 and the second group of lifting arms 222, the first group of lifting arms 221 includes a first connecting piece 223 and a second connecting piece 224, the second group of lifting arms 222 includes a third connecting piece 225 and a fourth connecting piece 226, the first The structural shapes of the connecting piece 223, the second connecting piece 224, the third connecting piece 225 and the fourth connecting piece 226 are the same. The first connecting piece 223 is a groove-shaped body. Two first side plates 2232 extending from two sides of a base plate 2231 are formed. Both ends of the first side plate 2232 are semicircular, and first pin holes 2233 are provided at the semicircular positions of the two ends of the first side plate 2232 . The second fixing part 23 is also a groove-shaped body. The second fixing part 23 includes a second base plate 231 and a second side plate 232 bent from the second base plate 231. Second pins are arranged at both ends of the second side plate 232. The hole 233 is cut out on the second substrate 231 to form an opening 234, and the nut 24 is fixedly installed at the junction of the first connector 223 and the second connector 224, and also at the junction of the third connector 225 and the fourth connector 226. The nut 24 is installed, and the screw rod 25 is assembled on the nut 24 . A rectangular parallelepiped portion 251 is disposed at one end of the screw 25 , and an insertion hole 252 is disposed on the rectangular parallelepiped portion 251 . The placing table 3 is installed on the second fixing part 23 .
参阅图5,所述的第一侧板2232包括直角梯形部2234、第一半圆部2235和第二半圆部2236,第一半圆部2235和第二半圆部2236上设置第一插销孔2233。 Referring to FIG. 5 , the first side plate 2232 includes a right-angled trapezoidal portion 2234 , a first semicircular portion 2235 and a second semicircular portion 2236 , and a first pin hole 2233 is provided on the first semicircular portion 2235 and the second semicircular portion 2236 .
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320885873.6U CN203871707U (en) | 2013-12-31 | 2013-12-31 | Maintenance platform |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320885873.6U CN203871707U (en) | 2013-12-31 | 2013-12-31 | Maintenance platform |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203871707U true CN203871707U (en) | 2014-10-08 |
Family
ID=51652630
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320885873.6U Expired - Lifetime CN203871707U (en) | 2013-12-31 | 2013-12-31 | Maintenance platform |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203871707U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103762510A (en) * | 2013-12-31 | 2014-04-30 | 国网宁夏电力公司固原供电公司 | Maintenance platform |
| CN105514846A (en) * | 2016-01-27 | 2016-04-20 | 云南电网有限责任公司电力科学研究院 | All-direction-adjustable VFTO generator fixing device and system |
| CN105625701A (en) * | 2016-03-11 | 2016-06-01 | 广西建工集团第五建筑工程有限责任公司 | Universal supporting combined frame supporting unit and universal supporting combined frame |
-
2013
- 2013-12-31 CN CN201320885873.6U patent/CN203871707U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103762510A (en) * | 2013-12-31 | 2014-04-30 | 国网宁夏电力公司固原供电公司 | Maintenance platform |
| CN103762510B (en) * | 2013-12-31 | 2016-11-09 | 国网宁夏电力公司固原供电公司 | Maintenance platform |
| CN105514846A (en) * | 2016-01-27 | 2016-04-20 | 云南电网有限责任公司电力科学研究院 | All-direction-adjustable VFTO generator fixing device and system |
| CN105514846B (en) * | 2016-01-27 | 2017-05-31 | 云南电网有限责任公司电力科学研究院 | A kind of comprehensive adjustable VFTO generators fixing device and system |
| CN105625701A (en) * | 2016-03-11 | 2016-06-01 | 广西建工集团第五建筑工程有限责任公司 | Universal supporting combined frame supporting unit and universal supporting combined frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103762510B (en) | Maintenance platform | |
| CN203871707U (en) | Maintenance platform | |
| CN103423105A (en) | Wind generation set impeller assembling device and impeller assembling method | |
| CN203237266U (en) | a trolley | |
| CN205708634U (en) | A kind of device of the accumulator pole group for pushing on chain conveying line | |
| CN207015233U (en) | A kind of new automobile-used elevating mechanism of inner clamping type carload freight | |
| CN204455739U (en) | High-speed switch is grown up part replacement special purpose device | |
| CN103894805B (en) | Installing platform of power system of fuel cell car | |
| CN203266040U (en) | Mounting platform for power system of fuel battery automobile | |
| CN205171288U (en) | Magnetism floats section of track and moves gantry crane | |
| CN118881187B (en) | High-precision installation device and construction method for damper | |
| CN210708426U (en) | A battery module transport tray | |
| CN103264719B (en) | Hand cart | |
| CN202808300U (en) | Mobile lever for transformation equipment changing device | |
| CN209553159U (en) | Positioning and lifting system for power swapping platform, power swapping platform and charging and swapping station | |
| CN106379829A (en) | Material lifting system for construction machinery | |
| CN205262454U (en) | Be used for a dull and stereotyped amount of deflection measuring placer and dull and stereotyped amount of deflection measurement system | |
| CN204487140U (en) | A kind of direct-current transmission converter valve assembling automatic production line device | |
| CN103010955B (en) | Bridge crane power supply sliding antenna device and current collector installation fixing device thereof | |
| CN209773832U (en) | A flexible assembly device for large box girder cover plates | |
| CN202599649U (en) | Self-balanced fixture for box test | |
| CN102413490A (en) | Test fixture for wireless router firmware | |
| CN209242572U (en) | A liftable mobile electrical equipment maintenance device | |
| CN102897488B (en) | Silicon wafer carrying device | |
| CN109822280B (en) | A hoisting device for automatically aligning and hoisting main girder partitions of a crane |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20141008 Effective date of abandoning: 20161012 |
|
| C25 | Abandonment of patent right or utility model to avoid double patenting |