CN203869387U - Novel heat gathering plate pipeline - Google Patents

Novel heat gathering plate pipeline Download PDF

Info

Publication number
CN203869387U
CN203869387U CN201420385281.2U CN201420385281U CN203869387U CN 203869387 U CN203869387 U CN 203869387U CN 201420385281 U CN201420385281 U CN 201420385281U CN 203869387 U CN203869387 U CN 203869387U
Authority
CN
China
Prior art keywords
pipeline
working medium
novel heat
gathering plate
heat gathering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420385281.2U
Other languages
Chinese (zh)
Inventor
敬长训
王荣法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gingko Science And Technology Joint-Stock Co
Original Assignee
Gingko Science And Technology Joint-Stock Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gingko Science And Technology Joint-Stock Co filed Critical Gingko Science And Technology Joint-Stock Co
Priority to CN201420385281.2U priority Critical patent/CN203869387U/en
Application granted granted Critical
Publication of CN203869387U publication Critical patent/CN203869387U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)

Abstract

The utility model discloses a novel heat gathering plate pipeline. The novel heat gathering plate pipeline comprises a first pipeline, a second pipeline, a third pipeline, a fourth pipeline, a fifth pipeline, a sixth pipeline, a small pipe, a working medium flow dividing hole and a working medium inlet; the first pipeline, second pipeline and third pipeline are abreast connected in one time, the fourth pipeline, fifth pipeline and sixth pipeline are connected corresponding to the first pipeline, the second pipeline and the third pipeline, and the small pipe is connected with the fourth pipeline, fifth pipeline and sixth pipeline. The novel heat gathering plate pipeline solves the problems of unreasonable pipeline distribution, uneven cooling medium flow division, small evaporation area and inconvenience in mounting. The novel heat gathering plate pipeline improves the pipeline distribution, expands the evaporation area, enables the pipeline evaporation area to be expanded from the left and right surfaces and enables the energy efficiency ratio to be improved.

Description

A kind of pipeline of novel heat collector panel
Technical field
the utility model relates to the field that manufactures and designs of a kind of heat energy utilization, refrigeration plant, especially a kind of pipeline of novel heat collector panel.
Background technology
the heat collector panel pipeline irrational distribution of the different poly-state heat utilization system of current solar energy and method of work (CN102538195A) thereof, and disengagement area is little, and regardless of left and right, make troubles when mounted.
Utility model content
for the problems referred to above, the utility model aims to provide a kind of pipeline of novel heat collector panel.
for realizing this technical purpose, scheme of the present utility model is: a kind of pipeline of novel heat collector panel, comprise pipeline one, pipeline two, pipeline three, pipeline four, pipeline five, pipeline six, tubule, working medium diffluence pass, working medium import, described pipeline one, pipeline two and pipeline three once connect side by side, described pipeline four, pipeline five, pipeline six respectively corresponding pipeline one, pipeline two, pipeline three connect, and described tubule is connected with pipeline four, pipeline five, pipeline six.
as preferably, described working medium is divided into three pipelines from working medium import, i.e. pipeline one, pipeline two, pipeline three.
as preferably, described working medium from working medium diffluence pass to pipeline one, the flow of pipeline two, pipeline three equates.
as preferably, described pipeline one equates to the flow of pipeline six to pipeline five, pipeline three to pipeline four, pipeline two.
as preferably, described tubule plays the effect of expenditure and pressure, promotes evaporation.
as preferably, described working medium diffluence pass communicates with pipeline one, pipeline two, pipeline three.
the utility model in use working medium through after capillary-compensated decompression, large because of volume change after flowing into heat collector panel, pressure diminishes, liquid working medium is evaporated absorption, in order to evaporate completely, being diverted to pipeline one, pipeline two, pipeline three evaporates separately, the flow process of each pipeline should be the same, otherwise after evaporative cooling, can affect the evaporation effect of side pipeline.While just starting, working medium is after flowing to pipeline four, pipeline five, pipeline six positions, can at this position, pile up not because of pressure, carrying out along with evaporation, pressure herein constantly increases, the effect of reducing pressure by regulating flow just in time can be played in tubule position, and when actual installation, number of tubes calculates according to disengagement area.It has solved pipeline irrational distribution, and coolant distribution is unequal, and disengagement area is little, and inconvenience is installed.To achieve the above object, the present invention adopts new heat collector panel to improve the distribution of pipeline, has strengthened that steam must area, and two of minute left and right, expands the disengagement area of pipeline, improves Energy Efficiency Ratio.
Accompanying drawing explanation
fig. 1 is structural representation of the present utility model.
The specific embodiment
below in conjunction with accompanying drawing basis and specific embodiment, the utility model is described in further details.
as shown in Figure 1, the pipeline of a kind of novel heat collector panel of the utility model embodiment, comprise pipeline 1, pipeline 22, pipeline 33, pipeline 44, pipeline 55, pipeline 66, tubule 7, working medium diffluence pass 8, working medium import 9, described pipeline 1, pipeline 22 and pipeline 33 once connect side by side, described pipeline 44, pipeline 55, pipeline 66 respectively corresponding pipeline 1, pipeline 22, pipeline 33 connect, and described tubule 7 is connected with pipeline 44, pipeline 55, pipeline 66.
as preferably, described working medium is divided into three pipelines from working medium import, i.e. pipeline 1, pipeline 22, pipeline 33.
as preferably, described working medium from working medium diffluence pass to pipeline 1, the flow of pipeline 22, pipeline 33 equates.
as preferably, described pipeline 1 equates to the flow of pipeline 66 to pipeline 55, pipeline 33 to pipeline 44, pipeline 22.
as preferably, described tubule 7 plays the effect of expenditure and pressure, promotes evaporation.
as preferably, described working medium diffluence pass 8 communicates with pipeline 1, pipeline 22, pipeline 33.
the utility model in use working medium through after capillary-compensated decompression, large because of volume change after flowing into heat collector panel, pressure diminishes, liquid working medium is evaporated absorption, in order to evaporate completely, being diverted to pipeline one, pipeline two, pipeline three evaporates separately, the flow process of each pipeline should be the same, otherwise after evaporative cooling, can affect the evaporation effect of side pipeline.While just starting, working medium is after flowing to pipeline four, pipeline five, pipeline six positions, can at this position, pile up not because of pressure, carrying out along with evaporation, pressure herein constantly increases, the effect of reducing pressure by regulating flow just in time can be played in tubule position, and when actual installation, number of tubes calculates according to disengagement area.It has solved pipeline irrational distribution, and coolant distribution is unequal, and disengagement area is little, and inconvenience is installed.To achieve the above object, the present invention adopts new heat collector panel to improve the distribution of pipeline, has strengthened that steam must area, and two of minute left and right, expands the disengagement area of pipeline, improves Energy Efficiency Ratio.
the above; it is only preferred embodiment of the present utility model; not in order to limit the utility model, any trickle modification that every foundation technical spirit of the present utility model is done above embodiment, be equal to and replace and improve, within all should being included in the protection domain of technical solutions of the utility model.

Claims (5)

1. the pipeline of a novel heat collector panel, comprise pipeline one, pipeline two, pipeline three, pipeline four, pipeline five, pipeline six, tubule, working medium diffluence pass, working medium import, it is characterized in that: described pipeline one, pipeline two and pipeline three once connect side by side, described pipeline four, pipeline five, pipeline six respectively corresponding pipeline one, pipeline two, pipeline three connect, and described tubule is connected with pipeline four, pipeline five, pipeline six.
2. the pipeline of a kind of novel heat collector panel according to claim 1, is characterized in that: described working medium is divided into three pipelines from working medium import, i.e. pipeline one, pipeline two, pipeline three.
3. the pipeline of a kind of novel heat collector panel according to claim 1, is characterized in that: described working medium from working medium diffluence pass to pipeline one, the flow of pipeline two, pipeline three equates.
4. the pipeline of a kind of novel heat collector panel according to claim 1, is characterized in that: described pipeline one equates to the flow of pipeline six to pipeline five, pipeline three to pipeline four, pipeline two.
5. the pipeline of a kind of novel heat collector panel according to claim 1, is characterized in that: described working medium diffluence pass communicates with pipeline one, pipeline two, pipeline three.
CN201420385281.2U 2014-07-14 2014-07-14 Novel heat gathering plate pipeline Expired - Lifetime CN203869387U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420385281.2U CN203869387U (en) 2014-07-14 2014-07-14 Novel heat gathering plate pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420385281.2U CN203869387U (en) 2014-07-14 2014-07-14 Novel heat gathering plate pipeline

Publications (1)

Publication Number Publication Date
CN203869387U true CN203869387U (en) 2014-10-08

Family

ID=51650331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420385281.2U Expired - Lifetime CN203869387U (en) 2014-07-14 2014-07-14 Novel heat gathering plate pipeline

Country Status (1)

Country Link
CN (1) CN203869387U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111964280A (en) * 2020-09-23 2020-11-20 白果科技股份公司 Novel heat-collecting plate convenient for pipeline layout

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111964280A (en) * 2020-09-23 2020-11-20 白果科技股份公司 Novel heat-collecting plate convenient for pipeline layout

Similar Documents

Publication Publication Date Title
CN203757824U (en) Heat supply system capable of reducing return water temperature of primary network
CN203869387U (en) Novel heat gathering plate pipeline
CN201926082U (en) Integral air conditioner
CN204240642U (en) Aluminum fabrication plant air compressor unit heat circulating system
CN204730694U (en) A kind of industrial production recirculated water vacuum system
CN202885395U (en) Multiloop water supply pipeline system of cooler
CN104234763A (en) Organic Rankine cycle system recovering waste heat through heat pipe technology
CN204594028U (en) The energy-conservation feeding mechanism of technique chilled water
CN201751776U (en) Process water heat exchange device
CN204457889U (en) A kind of water chiller exhaust steam shunting spike cooling system
CN203116212U (en) Sewage-source heat pump air conditioner
CN202973576U (en) Simple solar heat collection device
CN201381967Y (en) Novel thermal energy converter
CN202598942U (en) Lithium bromide refrigerating unit for steam condensate waste heat recovery system
CN202054818U (en) Softened water circulating system of air compressors in beer production technology
CN205138254U (en) High fructose syrup production cooling system of workshop section
CN203687752U (en) Energy-saving water supply and drainage system
CN203364319U (en) System for utilizing waste heat of chemical cooling water
CN202881132U (en) Crude naphthalene single-furnace and double-tower device
CN201643755U (en) Evaporating device with nozzles
CN204359182U (en) A kind of water circulation processing system
CN204227602U (en) A kind of air-conditioner set cold water water system
CN203255993U (en) Seawater desalination solar heat collection system
CN204716628U (en) A kind of large-size thermal power plant vacuum pump cold cooling unit
CN204006245U (en) Back pressure turbine recirculated water direct heating system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Pipeline of a new type of heat collecting plate

Effective date of registration: 20220222

Granted publication date: 20141008

Pledgee: Bank of China Limited Xining Chengzhong sub branch

Pledgor: BAIGUO TECHNOLOGY Co.,Ltd.

Registration number: Y2022630000001

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231208

Granted publication date: 20141008

Pledgee: Bank of China Limited Xining Chengzhong sub branch

Pledgor: BAIGUO TECHNOLOGY Co.,Ltd.

Registration number: Y2022630000001

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141008