CN203850723U - Integral unreeling pulley and cable unreeling pulley node - Google Patents

Integral unreeling pulley and cable unreeling pulley node Download PDF

Info

Publication number
CN203850723U
CN203850723U CN201420276689.6U CN201420276689U CN203850723U CN 203850723 U CN203850723 U CN 203850723U CN 201420276689 U CN201420276689 U CN 201420276689U CN 203850723 U CN203850723 U CN 203850723U
Authority
CN
China
Prior art keywords
pulley
pay
shaped
cable
pulley block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420276689.6U
Other languages
Chinese (zh)
Inventor
张文惠
张绍新
张文露
李连河
钱建忠
李明
许可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jiyang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jiyang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jiyang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420276689.6U priority Critical patent/CN203850723U/en
Application granted granted Critical
Publication of CN203850723U publication Critical patent/CN203850723U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

一体式放线滑轮及电缆放线滑轮节点,其中一体式放线滑轮包括支撑体和滑轮,所述支撑体包括U型卡、支撑板、连接螺栓组件和滑轮轴,在U型卡的一侧板外侧焊接有至少两对支撑板,在U型卡的至少一个侧面设有一组顶紧螺钉,在每对支撑板组成的空间中自上而下依次为连接螺栓组件安装部、弧形的穿线部和滑轮安装部,滑轮轴两端固定在滑轮安装部两侧的支撑板上,且在滑轮轴上套置有套筒和滚动轴承,滑轮通过滚动轴承安装在所述滑轮轴上;滑轮中具有一个断面为U型的环状凹槽。使用方便,通过将放线滑轮固定在横担上,且使用一个小扳手即可进行所有的操作。固定后的放线滑轮固定性能很好,方便放线工艺的实施。

Integrated pay-off pulley and cable pay-off pulley node, wherein the integrated pay-off pulley includes a support body and a pulley, and the support body includes a U-shaped card, a support plate, a connecting bolt assembly and a pulley shaft, on one side of the U-shaped card There are at least two pairs of support plates welded on the outside of the plate, and a set of tightening screws is provided on at least one side of the U-shaped card. In the space formed by each pair of support plates, there are connecting bolt assembly installation parts and arc-shaped threading lines from top to bottom. part and the pulley installation part, the two ends of the pulley shaft are fixed on the supporting plates on both sides of the pulley installation part, and sleeves and rolling bearings are sleeved on the pulley shaft, and the pulley is installed on the pulley shaft through the rolling bearing; there is a The section is a U-shaped annular groove. Easy to use, by fixing the pay-off pulley on the cross arm, and using a small wrench for all operations. The fixing performance of the fixed pay-off pulley is very good, which is convenient for the implementation of the pay-off process.

Description

一体式放线滑轮及电缆放线滑轮节点Integrated pay-off pulley and cable pay-off pulley nodes

技术领域technical field

本实用新型涉及一种应用于0.4KV线路杆塔上放线使用的放线滑轮,以及使用该放线滑轮进行放线的节点。The utility model relates to a pay-off pulley applied to a 0.4KV line tower and a node for pay-off by using the pay-off pulley.

背景技术Background technique

低压线路改造换线,传统上放线使用的滑轮分散、每基线杆需要四只滑轮而且每只需要用铁丝捆绑固定横担上,采用钢丝捆绑存在捆绑不牢靠的问题,而且容易出现松动现象,带来的是成本费用高,装拆费工费时,不是便于标准化施工的进行。In the transformation of low-voltage lines, the pulleys used in traditional setting-out are scattered, and each baseline pole needs four pulleys, and each one needs to be bound with iron wire to fix the cross arm. The use of steel wire binding has the problem of unreliable binding, and it is prone to loosening. What brings is that the cost is high, the assembly and disassembly is labor-intensive and time-consuming, and it is not convenient for standardized construction.

实用新型内容Utility model content

为了解决使用放线滑轮在杆上放线时,滑轮数量多、装拆费工费时的问题,本实用新型提供一种一体式放线滑轮,及电缆放线滑轮节点。In order to solve the problems of large number of pulleys and labor-intensive assembly and disassembly when using the pay-off pulley to pay off the wire on the pole, the utility model provides an integrated pay-off pulley and a node of the cable pay-off pulley.

本实用新型解决其技术问题所采取的技术方案是:The technical scheme that the utility model solves its technical problem to take is:

一体式放线滑轮,包括支撑体和滑轮,其特征在于,An integrated pay-off pulley, including a support body and a pulley, is characterized in that,

所述支撑体包括U形卡、支撑板、连接螺栓组件和滑轮轴,在所述U形卡的一侧板外侧焊接有至少两对支撑板,在所述U形卡的至少一个侧面设有一组顶紧螺钉,在每对支撑板组成的空间中自上而下依次为连接螺栓组件安装部、弧形的穿线部和滑轮安装部,所述连接螺栓组件连接两支撑板并形成一体,所述滑轮轴两端固定在滑轮安装部两侧的支撑板上,且在所述滑轮轴上套置有套筒和滚动轴承,所述滑轮通过滚动轴承安装在所述滑轮轴上;The support body includes a U-shaped card, a support plate, a connecting bolt assembly and a pulley shaft, at least two pairs of support plates are welded on the outside of one side plate of the U-shaped card, and at least one side of the U-shaped card is provided with a A set of jacking screws, in the space formed by each pair of support plates, from top to bottom are the installation part of the connecting bolt assembly, the arc-shaped threading part and the installation part of the pulley. The connecting bolt assembly connects the two support plates and forms a whole. The two ends of the pulley shaft are fixed on the support plates on both sides of the pulley installation part, and a sleeve and a rolling bearing are sleeved on the pulley shaft, and the pulley is installed on the pulley shaft through the rolling bearing;

所述滑轮中具有一个断面为U形的环状凹槽,对导线具有导向作用。There is a U-shaped annular groove in the pulley, which has a guiding effect on the wire.

进一步地,所述滑轮为尼龙滑轮。Further, the pulley is a nylon pulley.

进一步地,在所述环状凹槽的槽底设有一个小直径的第二凹槽。Further, a second groove with a small diameter is provided at the bottom of the annular groove.

一种电缆放线滑轮节点,包括电杆、横担和放线滑轮,在所述横担上侧设有固定电缆的绝缘柱,其特征在于,A cable pay-off pulley node, including a pole, a cross-arm and a pay-off pulley, an insulating column for fixing cables is arranged on the upper side of the cross-arm, and it is characterized in that,

所述放线滑轮为上述的一体式放线滑轮,所述放线滑轮中的U形卡固定在两两绝缘柱之间的横担上,且所述放线滑轮整体位于横担上侧,待放线的电缆穿过并搭放在所述滑轮的环状凹槽中。The pay-off pulley is the above-mentioned integrated pay-off pulley, the U-shaped clip in the pay-off pulley is fixed on the cross arm between two insulating columns, and the whole pay-off pulley is located on the upper side of the cross arm, The cable to be set out passes through and rides on the annular groove of the pulley.

本实用新型的有益效果是:结构简单,整个结构仅仅使用了一些钢板焊接件、尼龙滑轮和螺栓等紧固件。The beneficial effect of the utility model is that the structure is simple, and the whole structure only uses some fasteners such as steel plate weldments, nylon pulleys and bolts.

使用方便,通过将放线滑轮固定在横担上,且使用一个小扳手即可进行所有的操作。固定后的放线滑轮固定性能很好,方便放线工艺的实施。Easy to use, by fixing the pay-off pulley on the cross arm, and using a small wrench for all operations. The fixing performance of the fixed pay-off pulley is very good, which is convenient for the implementation of the pay-off process.

附图说明Description of drawings

图1为本实用新型的立体图(正面)。Fig. 1 is a perspective view (front) of the utility model.

图2为本实用新型的立体图(背面)。Fig. 2 is a perspective view (back side) of the utility model.

图3为本实用新型的主视图。Fig. 3 is the front view of the utility model.

图4为本实用新型的全剖视图。Figure 4 is a full sectional view of the utility model.

图5为电缆放线滑轮节点示意图。Figure 5 is a schematic diagram of the node of the cable pay-off pulley.

图中:11U形卡,12支撑板,13连接螺栓组件,14滑轮轴,15顶紧螺钉,16套筒和滚动轴承,21连接螺栓组件安装部,22弧形的穿线部,23滑轮安装部,3滑轮,31环状凹槽,32第二凹槽,4电缆,5电杆,51横担。In the figure: 11 U-shaped card, 12 support plate, 13 connecting bolt assembly, 14 pulley shaft, 15 jacking screw, 16 sleeve and rolling bearing, 21 connecting bolt assembly installation part, 22 arc-shaped threading part, 23 pulley installation part, 3 pulleys, 31 annular grooves, 32 second grooves, 4 cables, 5 poles, 51 cross arms.

具体实施方式Detailed ways

如图1至图4所示,一体式放线滑轮,包括支撑体和滑轮。As shown in Figures 1 to 4, the integrated pay-off pulley includes a support body and a pulley.

支撑体包括U形卡11、支撑板12、连接螺栓组件13和滑轮轴14,U形卡11采用角钢和钢条经过焊接形成一个断面为U形的结构。该U形空间可以正好卡在横担上,并在U形卡11的下侧面上紧固顶紧螺钉15,通过该螺钉可以实现将支撑件固定在横担上。为提高顶紧螺钉处的螺纹强度,在对应的U行卡侧面焊接一个螺帽。The supporting body includes a U-shaped card 11, a support plate 12, a connecting bolt assembly 13 and a pulley shaft 14. The U-shaped card 11 is welded with angle steel and steel bars to form a U-shaped structure in section. This U-shaped space can just be stuck on the cross-arm, and fastening screw 15 is fastened on the underside of U-shaped card 11, can realize that support member is fixed on the cross-arm by this screw. In order to improve the thread strength at the tightening screw, a nut is welded on the side of the corresponding U-line card.

在所述U形卡11的上侧焊接有两对支撑板12,两对支撑板的结构完全相同,下面对其中的一对支撑板的结构进行详细的说明。支撑板采用钢板冲压而成,整体,在每对支撑板组成的空间中自上而下依次为连接螺栓组件安装部21、弧形的穿线部22和滑轮安装部23,其中,连接螺栓组件安装部21空间较小,并在该部位使用一组或者两组连接螺栓组件13将两侧的支撑板进行连接并形成一体,形成一个上部的支撑点。滑轮轴14两端固定在滑轮安装部两侧的支撑板12上,且在所述滑轮轴上套置有套筒和滚动轴承16,所述滑轮通过滚动轴承安装在所述滑轮轴上,使得滑轮3可以自由的转动。优选的,滚动轴承使用告诉轴承。穿线部为向外突出的部位,空间较大,方便穿线工作的进行。Two pairs of support plates 12 are welded on the upper side of the U-shaped card 11. The structures of the two pairs of support plates are identical. The structure of one pair of support plates will be described in detail below. The support plates are stamped from steel plates. As a whole, in the space formed by each pair of support plates, there are connection bolt assembly installation parts 21, arc-shaped threading parts 22 and pulley installation parts 23 in sequence from top to bottom. Among them, the connection bolt assembly installation The space of the part 21 is small, and one or two sets of connecting bolt assemblies 13 are used at this part to connect the supporting plates on both sides and form a whole to form an upper supporting point. The two ends of the pulley shaft 14 are fixed on the support plates 12 on both sides of the pulley installation part, and a sleeve and a rolling bearing 16 are sleeved on the pulley shaft, and the pulley is installed on the pulley shaft by a rolling bearing, so that the pulley 3 Can rotate freely. Preferably, the rolling bearing uses a high-speed bearing. The threading part is an outwardly protruding part with a large space, which is convenient for threading work.

上述,滑轮3优选尼龙滑轮,滑轮中具有一个断面为U形的环状凹槽31,在所述环状凹槽的槽底设有一个小直径的第二凹槽32,其中第二凹槽用于电缆4直接的配合,形成一个电缆的卡槽。Above-mentioned, the preferred nylon pulley of pulley 3, has a section in the pulley and is the annular groove 31 of U shape, is provided with the second groove 32 of a small diameter at the groove bottom of described annular groove, wherein the second groove It is used for direct fitting of the cable 4 to form a cable slot.

如图5所示,使用上述的放线滑轮进行放线的节点,包括电杆5、横担51和放线滑轮,在横担上侧设有固定电缆的绝缘柱,放线完成后,电缆4被固定在绝缘柱上,在放线的过程中临时使用的放线滑轮的安装方式如下:As shown in Figure 5, the nodes that use the above-mentioned pay-off pulley to pay out include pole 5, cross arm 51 and pay-off pulley, and an insulating column for fixing cables is provided on the upper side of the cross-arm. After the completion of the pay-off, the cable 4 is fixed on the insulating column, and the installation method of the temporarily used pay-off pulley during the pay-out process is as follows:

放线滑轮为上述的一体式放线滑轮,放线滑轮中的U形卡固定在两两绝缘柱之间的横担51上,且放线滑轮整体位于横担51上侧,待放线的电缆穿过并搭放在所述滑轮的环状凹槽31中,电缆4涨紧后松开支撑板顶端的连接螺栓组件即可,然后将电缆固定在绝缘柱上,完成放线与紧线的工作。The pay-off pulley is the above-mentioned integrated pay-off pulley. The U-shaped clip in the pay-off pulley is fixed on the cross arm 51 between two insulating columns, and the pay-off pulley is located on the upper side of the cross arm 51 as a whole. The cable passes through and is placed in the annular groove 31 of the pulley. After the cable 4 is tightened, loosen the connecting bolt assembly on the top of the support plate, and then the cable is fixed on the insulating column to complete the setting out and tightening work.

除说明书所述的技术特征外,均为本专业技术人员的已知技术。Except for the technical features described in the instructions, all are known technologies by those skilled in the art.

Claims (4)

1. integral type pulley block, comprises supporter and pulley, it is characterized in that,
Described supporter comprises U-shaped card, supporting bracket, connecting bolt assembly and pulley spindle, side plate outside at described U-shaped card is welded with at least two pairs of supporting brackets, be provided with one group at least one side of described U-shaped card and hold out against screw, in the space of every pair of supporting bracket composition, be followed successively by connecting bolt assembly installation portion from top to bottom, the threading portion of arc and pulley installation portion, described connecting bolt assembly connects two supporting brackets and forms one, described pulley spindle two ends are fixed in the supporting bracket of pulley installation portion both sides, and on described pulley spindle, be equipped with sleeve and rolling bearing, described pulley is arranged on described pulley spindle by rolling bearing,
In described pulley, there is the annular recess that a section is U-shaped.
2. integral type pulley block according to claim 1, is characterized in that, described pulley is nylon pulley.
3. integral type pulley block according to claim 1, is characterized in that, is provided with the second groove of a minor diameter at the bottom land of described annular recess.
4. a cable pulley block node, comprises electric pole, cross-arm and pulley block, is provided with the insulated column of attached cable at described cross-arm upside, it is characterized in that,
Described pulley block is the integral type pulley block described in any one in claims 1 to 3, U-shaped in described pulley block fastens on the cross-arm between insulated column between two, and described pulley block entirety is positioned at cross-arm upside, treat that the cable of unwrapping wire passes and takes in the annular recess that is placed on described pulley.
CN201420276689.6U 2014-05-28 2014-05-28 Integral unreeling pulley and cable unreeling pulley node Expired - Fee Related CN203850723U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420276689.6U CN203850723U (en) 2014-05-28 2014-05-28 Integral unreeling pulley and cable unreeling pulley node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420276689.6U CN203850723U (en) 2014-05-28 2014-05-28 Integral unreeling pulley and cable unreeling pulley node

Publications (1)

Publication Number Publication Date
CN203850723U true CN203850723U (en) 2014-09-24

Family

ID=51563695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420276689.6U Expired - Fee Related CN203850723U (en) 2014-05-28 2014-05-28 Integral unreeling pulley and cable unreeling pulley node

Country Status (1)

Country Link
CN (1) CN203850723U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105305299A (en) * 2015-10-13 2016-02-03 南宁市正极机电有限公司 Combined roller device for erecting overhead power cable
CN107425480A (en) * 2017-06-15 2017-12-01 国网四川省电力公司德阳供电公司 A kind of cable shaft special pulley
CN109244960A (en) * 2018-11-16 2019-01-18 广东电网有限责任公司 Cable laying specific purpose tool
CN114907686A (en) * 2022-04-26 2022-08-16 淮安市建工尼龙制品有限公司 Wear-resistant nylon pulley and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105305299A (en) * 2015-10-13 2016-02-03 南宁市正极机电有限公司 Combined roller device for erecting overhead power cable
CN107425480A (en) * 2017-06-15 2017-12-01 国网四川省电力公司德阳供电公司 A kind of cable shaft special pulley
CN109244960A (en) * 2018-11-16 2019-01-18 广东电网有限责任公司 Cable laying specific purpose tool
CN114907686A (en) * 2022-04-26 2022-08-16 淮安市建工尼龙制品有限公司 Wear-resistant nylon pulley and preparation method thereof

Similar Documents

Publication Publication Date Title
CN203850723U (en) Integral unreeling pulley and cable unreeling pulley node
CN203674624U (en) A sleeve-type combination tool for fastening and draining wire clips
CN103594976B (en) Combination stringing instrument for line conductor stringing
CN202534977U (en) V-shaped clamping apparatus for transposing double insulator strings of power transmission line
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN204801830U (en) Portable ficus pumila car
CN203456802U (en) Supporting bottle live fastening tool
CN102691436B (en) T-connection device for connecting the upper cross-arm on the live working line
CN203859448U (en) Special tool for righting two-gang board during live working on double bundle conductor
CN103322298B (en) Pulley bracket for cable laying in tunnel
CN203536865U (en) Combined wire-tightening tool for tightening line wire
CN202111437U (en) Separate bolt butt joint double-wing fixture
CN205583533U (en) Right insulator specialized tool with electricity
CN206099164U (en) Change combination tool of extra -high voltage with two dead end insulator of returning of tower with electricity
CN103928867A (en) Double-hoisting-point pole head clamp for replacing straight-line insulator of 220 kV line steel pipe pole in electrified mode
CN103594974B (en) Combined tightener for overhead line stringing
CN203348723U (en) Pulley support used for laying of cable in tunnel
CN207283054U (en) 220kV insulating insulator bracket auxiliary fixing devices
CN204651789U (en) The special hanger of hot-line insulator string replacement
CN203942212U (en) wire stretcher special safety clip
CN203871746U (en) Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line
CN103579952B (en) Bulb fixing-line device for overhead transmission line stringing
CN203398636U (en) Fast coil holder for insulating rope
CN205692652U (en) A kind of combination type distribution transformer stand
CN208608633U (en) Wellhead Block for Cable Erection

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140924

Termination date: 20170528