CN203843168U - Equipment for high-energy-beam additive manufacturing large-size metal parts - Google Patents

Equipment for high-energy-beam additive manufacturing large-size metal parts Download PDF

Info

Publication number
CN203843168U
CN203843168U CN201420265952.1U CN201420265952U CN203843168U CN 203843168 U CN203843168 U CN 203843168U CN 201420265952 U CN201420265952 U CN 201420265952U CN 203843168 U CN203843168 U CN 203843168U
Authority
CN
China
Prior art keywords
powder
high energy
energy beam
storage hopper
spreader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420265952.1U
Other languages
Chinese (zh)
Inventor
曾晓雁
魏恺文
王泽敏
王福德
朱海红
李祥友
蒋明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TECHGIIELASER TECHNOLOGY Co.,Ltd.
Original Assignee
Huazhong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology filed Critical Huazhong University of Science and Technology
Priority to CN201420265952.1U priority Critical patent/CN203843168U/en
Application granted granted Critical
Publication of CN203843168U publication Critical patent/CN203843168U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/25Process efficiency

Abstract

The utility model discloses equipment for high-energy-beam additive manufacturing large-size metal parts. The equipment comprises a working cavity, a workbench, a control system, a high-energy-beam scanning generator, a powder storage bucket, a powder spreading device and a gas purifying module, the workbench is composed of a forming cylinder and a powder recovery cylinder, the upper surfaces of the forming cylinder and the powder recovery cylinder are coplanar and form a working plane, and the control system controls the high-energy-beam scanning generator and the powder spreading device to synchronously move along the powder spreading direction relatively to the workbench. By adopting the equipment, 'waiting time' caused by presetting of a powder bed when conventional laser or electron beam selective melting technology is adopted to process parts is reduced greatly, so that forming efficiency of high-energy-beam additive manufacturing is improved obviously. By applying the equipment, quick manufacturing of meter-level-size, high-performance, high-accuracy and complex-structure metal parts can be realized efficiently.

Description

A kind of high energy beam increases the equipment that material is manufactured large scale metallic element
Technical field
The utility model belongs to high energy beam processing technique field, is specifically related to a kind of high energy beam and increases the equipment that material is manufactured large scale metallic element.The utility model is the increasing material manufacturing technology being synchronized with the movement based on high energy beam sweep generator and Powder spreader, and the high efficiency that is particularly useful for large-size and high performance, high accuracy and labyrinth metallic element is shaped.
Background technology
Increasing material manufacturing technology, claim again three-dimensional printing technology (3D-Printing), is a kind of emerging manufacturing technology.Be different from traditional waiting material manufacture (casting, forging, welding) and subtract material manufacture (machined), increase material manufacturing technology based on discrete-accumulation rule, according to the three-dimensional data of parts, pattern with layering stack links together material, until complete the shaping of whole part, the feature with high flexible, personalization is current manufacturing frontier development.According to the difference of raw material, the manufacture of increasing material can be divided into rapid prototyping manufacture (Rapid Prototyping-RP) and the near-net-shape (Rapid Manufacturing-RM) of the parts that can directly come into operation.It is raw material that RP technique be take the nonmetallic materials such as liquid resin, paraffin, paper and silk material, manufactures prototype exemplar and the model of non-densification, is usually used in design optimization, Product evaluation and publicity.By contrast, take metal dust or the silk material parts near-net-shape technology that can directly come into operation that is raw material, can directly complete the quick manufacture of various shaped pieces, load-carrying member, there is higher using value.
The process of near-net-shape has a variety of, different with the mode of material category and interpolation material according to adopted energy source (such as laser beam, electron beam, ion beam, electric arc etc.), can be subdivided into many types again.Current, in the 3D of metallic element printing-forming technique, with laser beam, electron beam (below both being generically and collectively referred to as to " high energy beam "), be shaped with fastest developing speed, also industrial quarters is accepted the most.According to the difference of raw metal supply mode, use maximum increasing material manufacturing technologies to comprise: the direct manufacturing technology of Laser Melting Deposition (the Laser Melting Deposition based on synchronous powder feeding system, hereinafter to be referred as LMD technology), electron beam fuse based on automatic feeding increases material manufacturing technology (Electron Beam Wire Melting, hereinafter to be referred as EBWM technology), the laser selective melting of laying based on powder bed increases material manufacturing technology (Selective Laser Melting, hereinafter to be referred as SLM technology) and electron beam selective melting increasing material manufacturing technology (Electron Beam Selective Melting, hereinafter to be referred as EBSM technology).
Laser beam or beam power that LMD and EBWM technology adopt are very high, spot diameter (or beam spot diameter) is large, and deposition efficiency is high, particularly adopts heavy duty machine tools as motion, therefore be applicable to shaping large scale hardware, but be difficult to realize the Precision Machining of complex component.
The mode that SLM and EBSM technology are laid based on powder bed, its process can be summarized as follows: first utilize paving powder system to lay one deck at substrate surface and have certain thickness powder, laser beam or electron beam carry out selective melting according to default track to powder bed subsequently, and cooling, solidify formation sedimentary deposit; By the substrate decline height identical with deposit thickness, again lay powder bed selective melting, until complete the shaping of whole parts.SLM and EBSM technology generally adopt laser instrument that power is lower or electron gun as energy source, and its focal beam spot or beam spot diameter are less, are generally 0.1~0.2mm.In process, high energy beam is only rapid scanning on the bisque of 0.02~0.2mm at thickness, forms small molten bath and solidifies rapidly, and heat accumulation is little, and parts precision and surface quality are high.Therefore, SLM and EBSM technology are particularly suitable for the manufacture of complicated shape metal parts.
Yet the maximum deficiency that SLM and EBSM technology exist is that its forming efficiency is low.Because the high energy beam power adopting is low, hot spot or beam spot diameter little, its forming efficiency is starkly lower than LMD and EBWM technology, is manufacturing large scale parts overlong time.Therefore the forming efficiency that, further improves SLM and EBSM technology becomes the task of top priority of this technology of development.
At present, existing some relating to, is improved the method for SLM/EBSM working (machining) efficiency and the patent of relevant device is open.Domestic patent documentation " for multiple laser scanning system and the method for laser fast forming process equipment " (publication number is CN 103358555A) discloses a kind of method and apparatus that can be used for improving SLM efficiency.This equipment utilization laser beam splitter, is divided into a branch of the first laser and a branch of the second laser by initial laser beam.Equipment comprises the first scanning element and the second scanning element, the first scanning element and the second scanning element under the control of control signal, adjust respectively the first laser and the second laser scans according to default track simultaneously, thereby improved to a certain extent SLM working (machining) efficiency.Yet owing to adopting the method for beam splitting, the power of the first laser and the second laser, lower than initial laser beam, for guaranteeing the abundant fusing of powder, certainly will will reduce lift height or reduce sweep speed, thereby greatly having limited the room for promotion of SLM working (machining) efficiency.
Domestic patent documentation " precinct laser fusion building mortion and the method for medical magnesium alloy metal part " (publication number: CN 101856724A) disclose equally a kind of SLM equipment.This equipment comprises control device, powder sending and laying device, laser transmission mechanism, gas cleaning plant and sealing working chamber, the paving that wherein powder sending and laying device comprises hopper and is installed on both sides, hopper below is whitewashed, the corresponding setting of feeding port above hopper top and working chamber, the below that paving is whitewashed is corresponding with the upper surface level of formation cylinder, in the hopper of powder sending and laying device, is provided with heater strip.Before metal dust is preset to formation cylinder substrate, utilize this heater strip by its preheating in advance, improve the absorptivity of metal dust to laser energy.Under same laser energy input condition, can obtain higher forming efficiency.But this equipment adopts " unidirectional paving powder " mode, preset one deck powder needs powder sending and laying device back and forth movement one week in working chamber, and the non-productive work time is too much, has hindered equally the remarkable lifting of SLM working (machining) efficiency.
Domestic patent documentation " a kind of electron beam selective melting manufacturing process of no-welding-seam metal beehive member " (publication number: CN 103273065A) disclose a kind of EBSM method, the equipment that the method adopts comprises electron beam fast forming machine and the computer joining with electron beam fast forming machine, wherein electron beam fast forming machine comprises lifting workbench, Chu Fenxiang, Powder spreader and electron beam generator, the slicing profile data that generate according to computer, thus electron beam successively scans and obtains metal beehive member metal dust bed.The involved storage powder case of the method is symmetrically arranged in the left and right sides of working chamber, thereby realizes " two-way powder laying ", has improved the efficiency of EBSM processing metal honeycomb structure.Yet in above-mentioned patent, this step of high energy beam scanning deposition must be treated can carry out after powder bed is laid, the stand-by period that paving powder operation causes is longer.
Except published Patents, the EOS company of Germany has released the SLM equipment of model for " EOS M 400 " in the recent period, and equipment adopts " two-way powder laying " structure, can realize the high efficiency manufacture of metallic element.Germany Fraunhofer laser technology Research Institute goes out the SLM equipment that a kind of spot diameter can regulate continuously.When shaping large scale parts, adopt the laser beam flying deposition part core of high power, large spot, adopt the laser beam flying deposition part shell of low-power, small light spot simultaneously, thereby on the basis that guarantees parts precision and surface quality, realized the lifting of forming efficiency.The Arcam company of Sweden develops the EBSM equipment that model is " Arcam Q-20 ", and equipment adopts " two-way powder laying " structure, can complete the processing of high-precision metal parts.
Yet the said equipment is in reality processing, it is independently in time that powder bed is laid with these two processes of high energy beam scanning deposition.Only have when powder is preset complete after, high energy beam just scans and forms sedimentary deposit according to default track to this layer of powder constituency.According to the difference of concrete paving powder mode (unidirectional paving powder or two-way powder laying), the time of the preset one deck powder of existing SLM/EBSM equipment is approximately 10~30s.When being shaped larger-size parts, Chang Gaoda is thousands of and even up to ten thousand for the deposition number of plies, because " stand-by period " that fore-put powder bed causes can seriously reduce the forming efficiency of SLM/EBSM up to tens hours, and limited can process component dimension limit." EOS M400 " is not only 400mmx400mmx400mm with the limit formed body integration of " Arcam Q-20 " 3with 350x380mm (Φ/H).
In sum, existing SLM/EBSM technology is not owing to can finely working in coordination with between paving powder craft process and high energy beam scanning forming process, and causing cannot be in the efficient shaping that truly realizes large scale, high-test metal parts.Therefore, inventing a kind of high energy beam that can produce efficiently large-size and high performance, high accuracy, labyrinth metallic element, to increase material manufacturing equipment significant.
Utility model content
For the deficiency of existing SLM/EBSM technology, the utility model proposes a kind of high energy beam and increase the equipment that material is manufactured large scale metallic element, object is that the high efficiency that realizes large-size and high performance, high accuracy, labyrinth metallic element is shaped.
A kind of high energy beam that the utility model provides increases the equipment that material is manufactured large scale metallic element, it is characterized in that, this equipment comprises working chamber, workbench, control system and gas purification module;
Described workbench comprises the first Powder Recovery cylinder, the second Powder Recovery cylinder and formation cylinder, the first Powder Recovery cylinder and the second Powder Recovery cylinder lay respectively at formation cylinder both sides, and be all positioned at working chamber, the coplanar formation working face of upper surface of the first Powder Recovery cylinder, the second Powder Recovery cylinder and formation cylinder; Gas purification module is by air inlet and gas outlet and working chamber formation closed circulation;
This equipment also comprises high energy beam sweep generator, the first powder storage hopper, the second powder storage hopper and Powder spreader, and control system is connected and controls their collaborative works with high energy beam sweep generator, the first powder storage hopper, the second powder storage hopper, Powder spreader, workbench and gas cleaning module respectively;
High energy beam sweep generator is positioned at working chamber top, and the first powder storage hopper, the second powder storage hopper and Powder spreader are positioned at working chamber inside; The first powder storage hopper, the second powder storage hopper lay respectively at the both sides of high energy beam sweep generator, and Powder spreader is positioned at the below of the first powder storage hopper and the second powder storage hopper, to receive it for powder, and for carrying out two-way powder laying on formation cylinder surface;
Described workbench or high energy beam sweep generator are provided with motion.
The utlity model has following technique effect:
(1) the utility model is by controlling high energy beam sweep generator, Powder spreader synchronously and the relative motion of workbench generation edge paving powder direction, greatly shortened " stand-by period " of while adopting conventional SLM/EBSM technology process component, because of independent preset metal dust bed process, causing, greatly improved high energy beam and increased the forming efficiency that material is manufactured;
(2) the utility model adopts two-way powder laying mode, has further improved the forming efficiency of laser or electron beam selective melting Quick-forming;
(3) the utility model is according to the requirement of forming quality, efficiency, both can adopt flexibly " double galvanometer combines (double beam deflector combination) or arranges galvanometer combination (arranging beam deflector combination) more more; can the relative velocity between high energy beam sweep generator, Powder spreader and workbench be regulated continuously again, thereby further improves forming efficiency and the crudy of metallic element;
(4), because forming efficiency significantly improves, can apply the Quick-forming that the utility model is realized the oversize metallic element that reaches " rice " level;
(5) because " stand-by period " of causing because of fore-put powder bed greatly shortened, parts remain higher temperature in process, because stress, distortion and the problems of crack that thermal cycle causes is repeatedly improved;
(6) at high energy beam, increase in material manufacture process, high energy beam sweep generator both can carry out constituency scanning under " flight " state with workbench relative motion, thereby guarantee the track while scan desirable machining area in high energy beam sweep generator constantly, while avoiding being shaped large scale metallic element away from the track while scan distortion of desirable machining area position, can synchronize with Powder spreader again along paving powder direction step motion, after each mobile distance suitable with effective processing overlay area diameter, under static state complete the fusing scanning of corresponding region powder bed, taking into account precision and the surface quality that further guarantees metallic element under the condition of cost.
Accompanying drawing explanation
Fig. 1 is that the related high energy beam of the utility model increases the first specific embodiment schematic diagram that material is manufactured large scale metallic element equipment;
Fig. 2 (a) is the layout schematic diagram of the scanning galvanometer group in Fig. 1, the structural representation of the galvanometer system in Fig. 2 (b) in scanning galvanometer group;
Fig. 3 carries out in metallic element process powder bed and lays and synchronize the detailed schematic of carrying out with high energy beam scanning process for adopting the high energy beam shown in Fig. 1 to increase material manufacturing equipment;
Fig. 4 is that the related high energy beam of the utility model increases the second specific embodiment schematic diagram that material is manufactured large scale metallic element equipment;
Fig. 5 is that the related high energy beam of the utility model increases the third specific embodiment schematic diagram that material is manufactured large scale metallic element equipment;
Fig. 6 carries out in metallic element process powder bed and lays and synchronize the detailed schematic of carrying out with high energy beam scanning process for adopting the high energy beam shown in Fig. 5 to increase material manufacturing equipment;
Fig. 7 is the first structural representation of the related beam deflector group of the utility model;
Fig. 8 is the related double galvanometer combination (double beam deflector combination) of the utility model or arranges the structural representation of galvanometer combination (arranging beam deflector combination) more more;
Fig. 9 is the schematic diagram of relative velocity method between the related a kind of continuous adjusting high energy beam sweep generator of the utility model and workbench.
Figure 10 (a), Figure 10 (b) are the related a kind of step-by-step movement high energy beam scanning process schematic diagram of the utility model.
The specific embodiment
Below by by embodiment and accompanying drawing, the utility model being described in further detail, but the following example and accompanying drawing are only illustrative, and protection domain of the present utility model is not subject to the restriction of these embodiment.In addition,, in each embodiment of described the utility model, involved technical characterictic just can not combine mutually as long as do not form each other conflict.
Embodiment 1
As shown in Figure 1, the first specific embodiment that the related high energy beam of the utility model increases material manufacturing equipment comprises powder feeding and scan module 1, working chamber 9, workbench, control system 10 and gas purification module 11.
Control system 10 calculating processing tracks also generate relevant digital control signal, and this digital control signal is for the powder feeding that regulates and controls to be connected with control system 10 and the collaborative work of scan module 1, workbench and gas cleaning module 11.For graphic simplicity, in Fig. 1, only shown being connected of powder feeding and scan module 1 and control system 10, remaining part does not show with the connection of control system 10.It should be noted that this connection both can comprise that the contact of physical circuit etc. connected, can be also the untouchable links such as electronic signal.
Powder feeding and scan module 1 are comprised of scanning galvanometer group 2, the first powder storage hopper 3, the unidirectional Powder spreader 5 of the second powder storage hopper 4, first and the second unidirectional Powder spreader 6.Wherein, scanning galvanometer group 2 is positioned at working chamber 9 tops, and for high energy beam increases material manufacture, provides energy as high energy beam sweep generator.The first powder storage hopper 3, the unidirectional Powder spreader 5 of the second powder storage hopper 4, first and the second 6 of unidirectional Powder spreaders are positioned at working chamber 9 inside, and the first powder storage hopper 3, the second powder storage hopper 4 and the unidirectional Powder spreader 6 of the first unidirectional Powder spreader 5, second be take respectively the center line of scanning galvanometer group 2 as distributing with reference to being mirror image.Powder feeding and scan module 1 are connected with mechanism'ss (being aforesaid motion) such as high accuracy screw mandrel, slide block, guide rail, to guarantee that powder feeding and inner each parts of scan module 1 can be with identical speed along paving powder direction cooperative motions.The unidirectional Powder spreader 6 of the first unidirectional Powder spreader 5, second lays respectively under the first powder storage hopper 3, the second powder storage hopper 4, to receive it for powder, and for carrying out two-way powder laying on formation cylinder 16 surfaces;
As shown in Fig. 2 (a), scanning galvanometer group 2 is by n the galvanometer system 18 being arranged in a linear perpendicular to paving powder direction 1, 18 2..., 18 nform.Each galvanometer system is l along the effective processing covering diameter perpendicular to paving powder direction, and the quantity n of galvanometer system should equate with the size L of formation cylinder 16 perpendicular to paving powder direction with the product of l, meet n*l=L.
As shown in Fig. 2 (b), galvanometer system 18 includes scanning galvanometer 20, light-conducting system 21, lasing light emitter 22, f-θ compound lens 23 and the protective glass 24 being arranged in dust cover 19; Lasing light emitter 22 can adopt and comprise optical fiber laser, Nd:YAG laser instrument and CO 2laser instrument is at interior middle superpower laser.Laser beam, after lasing light emitter 22 sends, enters light-conducting system 21 and completes corresponding collimation, expands processing, enters afterwards scanning galvanometer 20.The machining locus guiding laser beam that scanning galvanometer 20 generates according to control system 10 carries out corresponding deflection; laser beam after deflection focuses on via f-θ compound lens 23 again; final through protective glass 24 arrival moulding cylinder upper surfaces; and the graph data that section provides according to control system; selective scanning powder bed, realizes the shaping of metal parts.
Workbench consists of the first Powder Recovery cylinder 7, the second Powder Recovery cylinder 8 and formation cylinder 16, and in the inner also transfixion of working chamber 9.It should be noted that, defined " static " state refers to that workbench is along the absolute rest of paving powder direction here.The first Powder Recovery cylinder 7 and the second Powder Recovery cylinder 8 lay respectively at formation cylinder 16 both sides.The upper surface of the first Powder Recovery cylinder 7, the second Powder Recovery cylinder 8 and formation cylinder 16 is coplanar, and then formed working face, the the first unidirectional Powder spreader of unidirectional Powder spreader 5, second 6 lower ends are parallel with working face, and retain a working clearance and be convenient to powder and flow out and strike off.Formation cylinder 16 is respectively forming board 14, heating system 15 and elevating mechanism 17 from top to bottom.Heating system 15 is for preheating forming board 14.Under the drive of elevating mechanism 17, the forming board 14 of formation cylinder 16 inside and heating system 15 can be along institute's process component short transverse high-precision motion, and elevating mechanism 17 can be comprised of location structures such as high accuracy screw mandrels.
Gas purification module 11 is by air inlet and gas outlet and working chamber 9 formation closed circulation.Before the manufacture of high energy beam increasing material starts, gas purification module 11 is filled with a certain amount of nitrogen, the argon gas of comprising in interior inert protective gas to working chamber 9 inside, make working chamber 9 internal water, oxygen content meet job requirement.
High energy beam based on shown in Fig. 1 increases material manufacturing equipment, and the first control method that the related high energy beam increasing material of the utility model is manufactured large-scale metallic element is as follows:
(1) powder feeding and scan module 1 are placed in to working face upper left side, wherein the second unidirectional Powder spreader 6 lower ends are placed between the first Powder Recovery cylinder 7 and formation cylinder 16.According to the required precision of part, design increases individual layer powder thickness increment T in manufacture process process, regulates the single flow of the second powder storage hopper 4, is the disposable metal dust that meets the required weight of single berth powder that provides of the second unidirectional Powder spreader 6;
(2) powder feeding and scan module 1 at the uniform velocity move right with a certain speed V along paving powder direction.The second unidirectional Powder spreader 6 moves to the metal powder layer that to start at formation cylinder 16 surface uniform laying depths behind formation cylinder 16 surfaces be T; Now as shown in Figure 3, the second unidirectional Powder spreader 6 has been laid layer of metal powder 25 in its left side, and this layer of powder can be positioned at and deposit part 12 or powder bed 13 tops.Powder feeding and scan module 1 continue at the uniform velocity to move right with speed V along paving powder direction, and drive effective processing overlay area 26 of scanning galvanometer group 2 to move right in the lump, until planning scanning filling path enters 26 inside, effective processing overlay area.Now, scanning galvanometer group 2 is carried out selective melting deposition for new layer of metal powder 25.
It should be noted that: the first, the distance S of scanning galvanometer group 2 center lines and first unidirectional Powder spreader the 5, second unidirectional Powder spreader 6 should be greater than the effectively radius of processing overlay area 26 of scanning galvanometer group 2, to guarantee that powder bed is laid with laser scanning process, is independent of each other; The second, because scanning galvanometer group 2 is worked under " flight " state, for guaranteeing powder smelting and avoiding track while scan distortion, control system 10 need be carried out the motion compensation of mating with speed V to the track while scan of scanning galvanometer group 2; The 3rd, the movement velocity V of powder feeding and scan module 1 needs to be regulated in conjunction with effectively processing overlay area 26 inner scanning filling areas, to guarantee that track while scan is positioned at effectively processing 26 inside, overlay area of scanning galvanometer group 2 all the time;
(3) powder feeding and scan module 1 continue at the uniform velocity to move right with speed V along paving powder direction, and by laser beam, it are carried out to selective melting deposition when laying metal powder layer.Afterwards, powder feeding and scan module 1 sail out of formation cylinder 16 surfaces, and the laying of metal powder layer 25 and selective melting deposition finish;
(4) powder feeding and scan module 1 continue at the uniform velocity to move right with speed V along paving powder direction, and the second unidirectional Powder spreader 6 may be sent into the second Powder Recovery cylinder 8 by remaining metal dust;
(5) powder feeding and scan module 1 continue at the uniform velocity to move right with speed V along paving powder direction, until the first unidirectional Powder spreader 5 lower ends move between the second Powder Recovery cylinder 8 and formation cylinder 16.After this, according to increasing individual layer powder thickness increment T in manufacture process process, regulating the single flow of the first powder storage hopper 3, is the disposable metal dust that meets the required weight of single berth powder that provides of the first unidirectional Powder spreader 5; The forming board 14 decline distance identical with deposit thickness T;
(6) powder feeding and scan module 1 edge paving powder direction are with speed V at the uniform velocity to left movement, and the first unidirectional Powder spreader 5 moves to behind formation cylinder 16 surfaces, starts the new layer of metal powder that is T at formation cylinder 16 surface uniform laying depths.Powder feeding and scan module 1 continues along paving powder direction with speed V at the uniform velocity to left movement, and by laser beam, it carried out to selective melting deposition when laying new layer of metal powder.Afterwards, powder feeding and scan module 1 sail out of formation cylinder 16 surfaces, and new layer of metal powder is laid and selective melting deposition finishes.Powder feeding and scan module 1 continuation edge paving powder direction are with speed V at the uniform velocity to left movement, and the first unidirectional Powder spreader 5 may be sent into the first Powder Recovery cylinder 7 by remaining metal dust.Powder feeding and scan module 1 continues along paving powder direction with speed V at the uniform velocity to left movement, until the second unidirectional Powder spreader 6 lower ends move between the first Powder Recovery cylinder 7 and formation cylinder 16.The forming board 14 decline distance identical with deposit thickness T;
(7) repeating step (1)~(6), until complete the final shaping of metallic element.
Embodiment 2
At the related high energy beam of the utility model, increase on the basis of the first specific embodiment of material manufacturing equipment and improved, can obtain the second specific embodiment that the related high energy beam of the utility model increases material manufacturing equipment, as shown in Figure 4.In this embodiment, powder feeding and scan module 1 are still comprised of scanning galvanometer group 2, the first powder storage hopper 3, the unidirectional Powder spreader 6 of the unidirectional Powder spreader 5, second of the second powder storage hopper 4, first, and the arrangement mode between powder feeding and inner each parts of scan module 1 is also consistent with the first specific embodiment of high energy beam increasing material manufacturing equipment.Difference is, scanning galvanometer group 2 and the first powder storage hopper 3, the unidirectional Powder spreader 6 of the unidirectional Powder spreader 5, second of the second powder storage hopper 4, first are individually fixed in working chamber 9 inside and outside both sides, top, middle part transfixions, it should be noted that, defined " static " state refers to that powder feeding and scan module 1 are along the absolute rest that spreads powder direction here.
Workbench still consists of jointly the first Powder Recovery cylinder 7, the second Powder Recovery cylinder 8 and formation cylinder 16, and the arrangement mode of each parts of workbench is also consistent with the first specific embodiment of high energy beam increasing material manufacturing equipment.Difference is, by thereunder installing table transmission mechanism 28 (being aforesaid motion) and table transmission mechanism power source 29 additional, workbench is improved to moving bolster 27.Wherein, table transmission mechanism 28 can be comprised of high accuracy detent mechanisms such as high accuracy screw mandrel, high precision belt wheels, the motion for table transmission mechanism 28 of 29 of table transmission mechanism power sources provides driving force, and drives moving bolster 27 to move along paving powder direction high-precision reciprocatings.The the first unidirectional Powder spreader of unidirectional Powder spreader 5, second 6 lower ends are still parallel with the working face that the first Powder Recovery cylinder 7, the second Powder Recovery cylinder 8 and formation cylinder 16 upper surfaces form, and retain a working clearance and be convenient to powder and flow out and strike off.
The arrangement mode of control system 10 and gas purification module 11 is still consistent with the first specific embodiment of high energy beam increasing material manufacturing equipment.Difference is, control system 10 regulates and controls the collaborative work of powder feeding and scan module 1, moving bolster 27, workbench transmission mechanism power source 29, workbench transmission mechanism 28 and gas purification module 11 simultaneously.
High energy beam based on shown in Fig. 4 increases material manufacturing equipment, and the second control method that the related high energy beam increasing material of the utility model is manufactured large-scale metallic element is as follows:
(1) moving bolster 27 is placed in to powder feeding and scan module 1 lower right, wherein the second unidirectional Powder spreader 6 lower ends should be between the first Powder Recovery cylinder 7 and formation cylinder 16.According to the required precision of part, design increases individual layer powder thickness increment T in manufacture process process, regulates the single flow of the second powder storage hopper 4, is the disposable metal dust that meets the required weight of single berth powder that provides of the second unidirectional Powder spreader 6;
(2) moving bolster 27 edge paving powder directions are with a certain speed V at the uniform velocity to left movement, and formation cylinder 16 moves to behind the second unidirectional Powder spreader 6 belows, and the second unidirectional Powder spreader 6 starts the metal powder layer that is T at formation cylinder 16 surface uniform laying depths; Moving bolster 27 continues along paving powder directions with speed V at the uniform velocity to left movement, until planning scanning filling path enters effectively processing 26 inside, overlay area of scanning galvanometer group 2, now scanning galvanometer group 2 is carried out selective melting deposition for the metal powder layer of having laid.It should be noted that: the first, the distance S of scanning galvanometer group 2 center lines and first unidirectional Powder spreader the 5, second unidirectional Powder spreader 6 should be greater than the effectively radius of processing overlay area 26 of scanning galvanometer group 2, to guarantee that powder bed is laid with laser scanning process, is independent of each other; The second, because scanning galvanometer group 2 is worked under " flight " state, for guaranteeing powder smelting and avoiding track while scan distortion, control system 10 need be carried out the motion compensation of mating with speed V to the track while scan of scanning galvanometer group 2; The 3rd, the movement velocity V of moving bolster 27 needs to be regulated in conjunction with effectively processing overlay area 26 inner scanning filling areas, to guarantee that track while scan is positioned at effectively processing 26 inside, overlay area of scanning galvanometer group 2 all the time;
(3) moving bolster 27 continues along paving powder directions with speed V at the uniform velocity to left movement, and by laser beam, it is carried out to selective melting deposition when laying metal powder layer.Afterwards, formation cylinder 16 sails out of the second unidirectional Powder spreader 6 and scanning galvanometer group 2 belows in succession, and metal powder layer is laid and selective melting deposition finishes;
(4) moving bolster 27 continuation edge paving powder directions are with speed V at the uniform velocity to left movement, and the second unidirectional Powder spreader 6 may be sent into the second Powder Recovery cylinder 8 by remaining metal dust;
(5) moving bolster 27 continues along paving powder directions with speed V at the uniform velocity to left movement, until the second Powder Recovery cylinder 8 and formation cylinder 16 lay respectively at the first unidirectional Powder spreader 5 both sides, lower end.After this, according to increasing individual layer powder thickness increment T in manufacture process process, regulating the single flow of the first powder storage hopper 3, is the disposable metal dust that meets the required weight of single berth powder that provides of the first unidirectional Powder spreader 5; The forming board 14 decline distance identical with deposit thickness T;
(6) moving bolster 27 at the uniform velocity moves right with speed V along paving powder direction, and formation cylinder 16 moves to behind the first unidirectional Powder spreader 5 belows, and the first unidirectional Powder spreader 5 starts the new metal powder layer that is T at formation cylinder 16 surface uniform laying depths.Moving bolster 27 continues at the uniform velocity to move right with speed V along paving powder direction, and by laser beam, its selective melting is deposited when laying new layer of metal powder.Afterwards, formation cylinder 16 sails out of the first unidirectional Powder spreader 5 and scanning galvanometer group 2 belows, and new layer of metal powder is laid and selective melting deposition finishes.Moving bolster 27 continues at the uniform velocity to move right with speed V along paving powder direction, and the first unidirectional Powder spreader 5 may be sent into the first Powder Recovery cylinder 7 by remaining metal dust.Moving bolster 27 continues at the uniform velocity to move right with speed V along paving powder direction, until the first Powder Recovery cylinder 7 and formation cylinder 16 lay respectively at the second unidirectional Powder spreader 6 both sides, lower end.The forming board 14 decline distance identical with deposit thickness T;
(7) repeating step (1)~(6), until complete the Quick-forming of metallic element.
As increasing for above-mentioned high energy beam the improvement that material is manufactured equipment the first and the second specific embodiment of large-scale metallic element, in order further to improve forming efficiency, and while avoiding individual layer powder thickness increment T larger, the obstruction of the too much metal dust in the first unidirectional Powder spreader 5 and second unidirectional Powder spreader 6 the place aheads to unidirectional Powder spreader and working face relative motion, can do following improvement: as Fig. 1, shown in Fig. 4, make the first powder storage hopper 3 and the second powder storage hopper 4 in the process of powder feeding and scan module 1 and working face generation relative motion, supply with continuously respectively powder stock, the delivery rate of the first powder storage hopper 3 and the second powder storage hopper 4 can regulate according to actual conditions, can meet the even laying of specific thicknesses metal powder layer.
Embodiment 3
On the basis of Fig. 1 apparatus shown, remove the first unidirectional Powder spreader 5 and the second unidirectional Powder spreader 6, and set up two-way powder laying device 30, thereby form the related high energy beam of the utility model, increase the third specific embodiment that material is manufactured large-scale metallic element, as shown in Figure 5.
Workbench still consists of the first Powder Recovery cylinder 7, the second Powder Recovery cylinder 8 and formation cylinder 16, and static in the inner maintenance of working chamber 9.It should be noted that, defined " static " state refers to that inner each parts of workbench are along the absolute rest of paving powder direction here.The first Powder Recovery cylinder 7 and the second Powder Recovery cylinder 8 still lay respectively at formation cylinder 16 both sides.The upper surface of the first Powder Recovery cylinder 7, the second Powder Recovery cylinder 8 and formation cylinder 16 is still coplanar, and forms working face.The first powder storage hopper 3, the second powder storage hopper 4 are positioned at working face top and are fixed on working chamber 9 inside, and the first powder storage hopper 3 lower ends are between the first Powder Recovery cylinder 7 and formation cylinder 16, and the second powder storage hopper 4 lower ends are between the second Powder Recovery cylinder 8 and formation cylinder 16.Two-way powder laying device 30 is positioned at the first powder storage hopper 3, the second powder storage hopper 4 belows, to receive it for powder, and for carrying out two-way powder laying on formation cylinder 16 surfaces.Two-way powder laying device 30 lower ends are parallel with working face, and retain a working clearance and be convenient to powder and flow out and strike off.Under the structures such as high accuracy screw mandrel, slide block are auxiliary, two-way powder laying device 30 can move back and forth along paving powder direction.
Scanning galvanometer group 2 is positioned at working chamber 9 tops, also can be auxiliary lower to the reciprocating motion of paving powder direction in structures such as high accuracy screw mandrel, slide blocks.The arrangement mode of control system 10 and gas purification module 11 is still consistent with the first specific embodiment of high energy beam increasing material manufacturing equipment.Control system 10 is for regulating and controlling scanning galvanometer group 2, two-way powder laying device 30, the first powder storage hopper 3, the second powder storage hopper 4, workbench and 11 collaborative works of gas purification module.
The control method that the third specific embodiment of using high energy beam to increase material manufacturing equipment is manufactured large scale metallic element method is:
(1) two-way powder laying device 30 is placed in to the first powder storage hopper 3 belows, according to the required precision of part, design increases individual layer powder thickness increment T in manufacture process process, regulate the single flow of the first powder storage hopper 3, the metal dust that meets the required weight of single berth powder is provided for two-way powder laying device 30 is disposable;
(2) two-way powder laying device 30 at the uniform velocity moves right with a certain speed V along paving powder directions, moves to the metal powder layer that to start at formation cylinder 16 surface uniform laying depths behind formation cylinder 16 surfaces be T; Two-way powder laying device 30 moves sometime after t, and scanning galvanometer group 2, from two-way powder laying device 30 upper left sides, starts at the uniform velocity to move right along paving powder direction with same speed V.Now as shown in Figure 6, two-way powder laying device 30 has laid in its left side the metal powder layer 25 that a layer thickness is T, and this layer of powder can be positioned at and deposit part 12 tops, also can be positioned at powder bed 13 tops.Two-way powder laying device 30 continues to move right with speed V along paving powder direction with scanning galvanometer group 2, and drive effective processing overlay area 26 of scanning galvanometer group 2 to move right in the lump, until planning scanning filling path enters 26 inside, effective processing overlay area, now scanning galvanometer group 2 is carried out selective melting deposition for metal powder layer 25.It should be noted that: the first, during scanning, the distance S of scanning galvanometer group 2 center lines and two-way powder laying device 30 should keep being greater than the effectively radius of processing overlay area 26 of scanning galvanometer group 2, to guarantee that powder bed is laid with laser scanning process, is independent of each other; The second, because scanning galvanometer group 2 is worked under " flight " state, for guaranteeing powder smelting and avoiding track while scan distortion, control system 10 need be carried out the motion compensation of mating with speed V to the track while scan of scanning galvanometer group 2; The 3rd, two-way powder laying device 30 needs to be regulated in conjunction with concrete scanning filling area with the movement velocity V of scanning galvanometer group 2, to guarantee that track while scan is positioned at effectively processing 26 inside, overlay area of scanning galvanometer group 22 all the time;
(3) two-way powder laying device 30 continues at the uniform velocity to move right with speed V along paving powder direction with scanning galvanometer group 2, and by laser beam, its selective melting is deposited when laying metal powder layer 25.Afterwards, two-way powder laying device 30 sails out of formation cylinder 16 surfaces in succession with scanning galvanometer group 2, and the laying of metal powder layer 25 and selective melting deposition finish;
(4) 2 motions of scanning galvanometer group stop, and two-way powder laying device 30 continues at the uniform velocity to move right with speed V along paving powder direction, and may send into the second Powder Recovery cylinder 8 by remaining metal dust;
(5) two-way powder laying device 30 moves to the second powder storage hopper 4 belows along paving powder direction at the uniform velocity left with speed V, according to increasing individual layer powder thickness increment T in manufacture process process, regulate the single flow of the second powder storage hopper 4, the metal dust that meets the required weight of single berth powder is provided for two-way powder laying device 30 is disposable; The forming board 14 decline distance identical with deposit thickness T;
(6) two-way powder laying device 30 along paving powder directions with speed V at the uniform velocity to left movement, and the new metal powder layer that to start at formation cylinder 16 surface uniform laying depths after moving to formation cylinder 16 surfaces be T.Two-way powder laying device 30 moves sometime after t, and scanning galvanometer group 2 is from two-way powder laying device 30 upper right side, start along paving powder direction with same speed V at the uniform velocity to left movement, and when two-way powder laying device 30 is laid new layer of metal powder to its selective melting deposition.Afterwards, two-way powder laying device 30 sails out of formation cylinder 16 surfaces in succession with scanning galvanometer group 2, and new layer of metal powder is laid and selective melting deposition finishes.Scanning galvanometer group 2 motion stops, and two-way powder laying device 30 continues along paving powder directions with speed V at the uniform velocity to left movement, and may send into the first Powder Recovery cylinder 7 by remaining metal dust.The forming board 14 decline distance identical with deposit thickness T;
(7) repeating step (1)~(6), until complete the Quick-forming of metallic element.
The high energy beam that embodiment 1 to 3 adopts is laser beam.If the high energy beam adopting is not laser beam but electron beam, the scanning galvanometer group 2 in the related equipment of above-described embodiment substitutes the beam deflector group 31 by with magnetic field, and for high energy beam increases material manufacture, provides energy as high energy beam sweep generator.As shown in Figure 7, beam deflector group 31 is by m the magnetic deflection system 33 being arranged in a linear perpendicular to paving powder direction 1, 33 2..., 33 mform.Magnetic deflection system 33 is comprised of magnetic deflection arrangement and electron gun.Each magnetic deflection system is k along the effective processing covering diameter perpendicular to paving powder direction, and the quantity m of magnetic deflection system should equate with the size L of formation cylinder 16 perpendicular to paving powder direction with the product of k, meet m*k=L.While adopting electron beam as machining energy source, gas purification module 11 still forms confined space with working chamber 9, and increase before material manufacture starts and vacuumize processing for working chamber 9 inside at high energy beam, so that working chamber 9 internal vacuums meet electron beam job requirement.
Provide the embodiment of another structure of the central high energy beam sweep generator of above-described embodiment below.
As shown in Figure 8, high energy beam sweep generator is still comprised of a series of galvanometer systems 18 (magnetic deflection system 33), and wherein the structure of galvanometer system 18 (magnetic deflection system 33) is identical with previous embodiment.Galvanometer system (magnetic deflection system ) perpendicular to paving powder direction, be arranged in a linear, and form the 1st row energy source.Galvanometer system (magnetic deflection system ) perpendicular to paving powder direction, be arranged in a linear, and form the 2nd row energy source.The 2nd row energy source is placed in the 1st row energy source right side, and jointly forms double scanning galvanometer group 2 (double beam deflector group 31) with the 1st row energy source.For each row energy source, the quantity h of galvanometer system 18 (magnetic deflection system 33) should equate with the size L of formation cylinder 16 perpendicular to paving powder direction with its product along the effective processing covering diameter f perpendicular to paving powder direction, meet h*f=L.According to described arrangement mode, according to element size and working (machining) efficiency requirement, can also further on the 2nd row energy source right side, add the 3rd row energy source and even g row energy source, thereby form many row's scanning galvanometer groups 2 (arranging beam deflector group 31) more.Apply double/when arranging high energy beam that scanning galvanometer group 2 (double/arrange beam deflector group 31) carries out large parts more more and increasing material and manufacture, be accompanied by double/arrange the relative motion of scanning galvanometer group 2 (double/arrange beam deflector group 31) and workbench, each galvanometer system more more (magnetic deflection system ) keep relatively static, and the powder bed of effectively processing separately in coverage is carried out to selective melting deposition according to planning scanning filling path simultaneously.It should be noted that: the first, the first unidirectional Powder spreader 6 of unidirectional Powder spreader 5, second or two-way powder laying device 30 and the double/distance of arranging scanning galvanometer group 2 (double/arrange beam deflector group 31) center line should meet the first unidirectional Powder spreader 6 of unidirectional Powder spreader 5, second and two-way powder laying device 30 not in each galvanometer system more more (magnetic deflection system ) effective processing overlay area in, to guarantee that powder bed is laid with high energy beam scanning process, be independent of each other; The second, when double/arrange scanning galvanometer group 2 (double/arrange beam deflector group 31) while working under " flight " state more more, for guaranteeing powder smelting and avoiding track while scan distortion, control system need be to galvanometer system (magnetic deflection system ) track while scan carry out the motion compensation of mating with speed V; The 3rd, double/speed of related movement V of arranging scanning galvanometer group 2 (double/arrange beam deflector group 31) and working face needs be regulated in conjunction with concrete scanning filling area more more, to guarantee each galvanometer system (magnetic deflection system ) track while scan be positioned at all the time its effectively processing overlay area.
As supplementing above-mentioned many embodiment, for further improving high energy beam, increase the forming efficiency that material is manufactured, while stating in the use high energy beam increasing material manufacturing equipment manufacture large scale metallic element involved in embodiment, can adopt the control method of relative velocity V between a kind of continuous adjusting operating platform and high energy beam sweep generator, as shown in Figure 9.
Control system is cut into slices according to metallic element cad model, obtains current machined layer scanning filling track, and this fill area can be divided into a plurality of regions, for example S along paving powder direction according to size 1, S 2, S 3three regions.Under condition without loss of generality, suppose that three region area magnitude relationship are S 1<S 2<S 3.According to three area filling areas and actual high energy beam sweep parameter, guaranteeing that track while scan is positioned at all the time high energy beam sweep generator and effectively processes under the prerequisite of coverage, can be respectively for S 1, S 2, S 3the relative velocity of different workbench and high energy beam sweep generator, i.e. V are set in three regions 1, V 2, V 3, and make V 1, V 2, V 3magnitude relationship meets V 1>V 2>V 3.
In the middle of above-mentioned all embodiment, high energy beam sweep generator all with workbench relative motion " flight " state under carry out output and the selective scanning of high energy beam, for guaranteeing powder smelting and avoiding track while scan distortion, control system need be carried out motion compensation to the track while scan of high energy beam sweep generator, this has obviously improved the requirement to control system data-handling capacity, thereby has improved to a certain extent the cost of high energy beam increasing material manufacturing equipment.Therefore, in order to take into account high energy beam, increase material manufacture efficiency and cost, can also adopt a kind of step-by-step movement high energy beam scan method.Now, the concrete control flow based on the related high energy beam increasing material manufacturing equipment of embodiment 1,2 is as follows:
(1) powder feeding and scan module 1 are placed in to working face upper left side, wherein the second unidirectional Powder spreader 6 lower ends are placed between the first Powder Recovery cylinder 7 and formation cylinder 16.According to the required precision of part, design increases individual layer powder thickness increment T in manufacture process process, regulates the single flow of the second powder storage hopper 4, for the second unidirectional Powder spreader 6 provides the metal dust that meets the required weight of single berth powder;
(2) powder feeding and scan module 1 move right along the relative working face of paving powder direction.The second unidirectional Powder spreader 6 relative motions are to metal powder layer that to start at formation cylinder 16 surface uniform laying depths behind formation cylinder 16 surfaces be T; Powder feeding and scan module 1 continue to move right along the relative working face of paving powder direction, and drive effective processing overlay area relative motion to the right in the lump of high energy beam sweep generator, until effectively process after overlay area enters formation cylinder 16 tops completely, stop.Now, as shown in Figure 10 (a), effective processing overlay area 26 left border of high energy beam sweep generator overlap with moulding cylinder 16 left border just, 6 of the unidirectional Powder spreaders of the first unidirectional Powder spreader 5, second are symmetrically distributed in 26 both sides, effective processing overlay area, to guarantee that powder bed is laid with high energy beam scanning process, are independent of each other.The high energy beam sweep generator graph data that section provides according to control system, selective scanning is effectively processed the powder bed of 26 inside, overlay area;
(3) as shown in Figure 10 (b), after effectively the powder bed of processing 26 inside, overlay area has scanned, powder feeding and scan module 1 move right along the relative working face of paving powder direction again, and the effective processing overlay area 26 that drives high energy beam sweep generator stops after the relative working faces of paving powder direction move right a distance that is equivalent to effectively to process overlay area 26 diameter D, the high energy beam sweep generator graph data that section provides according to control system again, selective scanning is effectively processed the powder bed of 26 inside, overlay area;
(4) afterwards, powder feeding and scan module 1 are according to aforementioned manner, continue to do step distance to the right along the relative working face of paving powder direction and equal an effectively step motion of processing overlay area 26 diameter D, after step distance of every motion, the high energy beam sweep generator graph data that section provides according to control system, selective scanning is effectively processed the powder bed of 26 inside, overlay area, until complete the scanning of all graph datas of current machined layer; Powder feeding and scan module 1 continue to move right along the relative working face of paving powder direction, and the second unidirectional Powder spreader 6 may be sent into the second Powder Recovery cylinder 8 by remaining metal dust;
(5) powder feeding and scan module 1 continue to move right along the relative working face of paving powder direction, until the first unidirectional Powder spreader 5 lower ends move between the second Powder Recovery cylinder 8 and formation cylinder 16.After this, according to increasing individual layer powder thickness increment T in manufacture process process, regulating the single flow of the first powder storage hopper 3, is the disposable metal dust that meets the required weight of single berth powder that provides of the first unidirectional Powder spreader 5; The forming board 14 decline distance identical with deposit thickness T;
(6) powder feeding and scan module 1 are along the relative working face of paving powder direction to left movement.The first unidirectional Powder spreader 5 moves to behind formation cylinder 16 surfaces, starts the new layer of metal powder that is T at formation cylinder 16 surface uniform laying depths.Powder feeding and scan module 1 continue along the relative working face of paving powder direction to left movement, and drive effective processing overlay area relative motion left in the lump of high energy beam sweep generator, until effective processing overlay area 26 right side boundary of high energy beam sweep generator stop after just overlapping with moulding cylinder 16 right side boundary, the unidirectional Powder spreader 6 of the first unidirectional Powder spreader 5, second is still symmetrically distributed in 26 both sides, effective processing overlay area, to guarantee that powder bed is laid with high energy beam scanning process, is independent of each other.The graph data that high energy beam sweep generator provides according to control system section, selective scanning is effectively processed the powder bed of 26 inside, overlay area;
(7) powder feeding and scan module 1 continue to do along the relative working face of paving powder direction the step motion that step distance equals effective processing overlay area 26 diameter D left, after step distance of every motion, the high energy beam sweep generator graph data that section provides according to control system, selective scanning is effectively processed the powder bed of 26 inside, overlay area, until complete the scanning of all graph datas of current machined layer; Then, powder feeding and scan module 1 continue along the relative working face of paving powder direction to left movement, and the first unidirectional Powder spreader 5 may be sent into the first Powder Recovery cylinder 7 by remaining metal dust.Powder feeding and scan module 1 continue along the relative working face of paving powder direction to left movement, until the second unidirectional Powder spreader 6 lower ends move between the first Powder Recovery cylinder 7 and formation cylinder 16.The forming board 14 decline distance identical with deposit thickness T;
(8) repeating step (1)~(7), until complete the final shaping of metallic element.
Adopt step-by-step movement high energy beam scan method, on the one hand, can avoid high energy beam sweep generator under " flight " state, to carry out output and the selective scanning of high energy beam, reduce equipment cost, further guarantee parts precision and surface quality; On the other hand, the laying of powder bed is still synchronizeed with the motion of high energy beam sweep generator, still can greatly shorten and adopt conventional high energy beam increasing material manufacturing equipment to add " stand-by period " of causing because of fore-put powder bed man-hour, thereby guarantee that high energy beam increases the efficiency that material is manufactured.Obviously, step-by-step movement high energy beam scan method also can be applicable to the related high energy beam of embodiment 3 and increases material manufacturing equipment, and now, concrete control flow is as follows:
(1) two-way powder laying device 30 is placed in to the first powder storage hopper 3 belows, according to the required precision of part, design increases individual layer powder thickness increment T in manufacture process process, regulate the single flow of the first powder storage hopper 3, the metal dust that meets the required weight of single berth powder is provided for two-way powder laying device 30 is disposable;
(2) two-way powder laying device 30 at the uniform velocity moves right along paving powder directions, moves to the metal powder layer that to start at formation cylinder 16 surface uniform laying depths behind formation cylinder 16 surfaces be T; Two-way powder laying device 30 moves sometime after t, and high energy beam sweep generator, from two-way powder laying device 30 upper left sides, starts to move right along paving powder direction with same speed, and drives effective processing overlay area 26 of high energy beam sweep generator to move right in the lump.After effective processing overlay area 26 left border overlap with moulding cylinder 16 left border just, two-way powder laying device 30 stops with the motion of high energy beam sweep generator.Two-way powder laying device 30 is positioned at 26 right sides, effective processing overlay area, to guarantee that powder bed is laid with high energy beam scanning process, is independent of each other.The high energy beam sweep generator graph data that section provides according to control system, selective scanning is effectively processed the powder bed of 26 inside, overlay area;
(3) after the powder bed of effectively processing 26 inside, overlay area has scanned, two-way powder laying device 30 and high energy beam sweep generator continue to stop after paving powder direction moves right a distance that is equivalent to effectively to process overlay area 26 diameter D with same speed, the high energy beam sweep generator graph data that section provides according to control system again, selective scanning is effectively processed the powder bed of 26 inside, overlay area;
(4) afterwards, two-way powder laying device 30 and high energy beam sweep generator are according to aforementioned manner, with same speed, continue to do step distance to the right along paving powder direction and equal an effectively step motion of processing overlay area 26 diameter D, after step distance of every motion, the high energy beam sweep generator graph data that section provides according to control system, selective scanning is effectively processed the powder bed of 26 inside, overlay area, until complete the scanning of all graph datas of current machined layer;
(5) motion of high energy beam sweep generator stops, and two-way powder laying device 30 continues to move right along paving powder direction, and may send into the second Powder Recovery cylinder 8 by remaining metal dust;
(6) two-way powder laying device 30 moves to the second powder storage hopper 4 belows left along paving powder direction, according to increasing individual layer powder thickness increment T in manufacture process process, regulate the single flow of the second powder storage hopper 4, the metal dust that meets the required weight of single berth powder is provided for two-way powder laying device 30 is disposable; The forming board 14 decline distance identical with deposit thickness T;
(7) two-way powder laying device 30 along paving powder directions at the uniform velocity to left movement, and the new metal powder layer that to start at formation cylinder 16 surface uniform laying depths after moving to formation cylinder 16 surfaces be T.Two-way powder laying device 30 moves sometime after t, high energy beam sweep generator is from two-way powder laying device 30 upper right side, start along paving powder direction with same speed at the uniform velocity to left movement, and drive effective processing overlay area of high energy beam sweep generator in the lump to left movement, until effective processing overlay area 26 right side boundary of high energy beam sweep generator stop after just overlapping with moulding cylinder 16 right side boundary.Now, two-way powder laying device 30 is positioned in 26 left sides, effective processing overlay area, to guarantee that powder bed is laid with high energy beam scanning process, is independent of each other.The high energy beam sweep generator graph data that section provides according to control system, selective scanning is effectively processed the powder bed of 26 inside, overlay area;
(8) afterwards, two-way powder laying device 30 continues according to aforementioned manner with high energy beam sweep generator, with same speed, along paving powder direction, do step distance left and equal an effectively step motion of processing overlay area 26 diameter D, after step distance of every motion, the high energy beam sweep generator graph data that section provides according to control system, selective scanning is effectively processed the powder bed of 26 inside, overlay area, until complete the scanning of all graph datas of current machined layer;
(9) motion of high energy beam sweep generator stops, and two-way powder laying device 30 continues along paving powder direction to left movement, and may send into the first Powder Recovery cylinder 7 by remaining metal dust.The forming board 14 decline distance identical with deposit thickness T;
(10) repeating step (1)~(9), until complete the Quick-forming of metallic element.
The foregoing is only preferred embodiments of the present utility model, but the utility model should not be confined to the disclosed content of above-mentioned example and accompanying drawing.Everyly do not depart from the equivalence completing under spirit disclosed in the utility model or revise, within must being considered as the utility model protection domain.

Claims (6)

1. high energy beam increases the equipment that material is manufactured large scale metallic element, it is characterized in that, this equipment comprises working chamber (9), workbench, control system (10) and gas purification module (11);
Described workbench comprises the first Powder Recovery cylinder (7), the second Powder Recovery cylinder (8) and formation cylinder (16), the first Powder Recovery cylinder (7) lays respectively at formation cylinder (16) both sides with the second Powder Recovery cylinder (8), and be all positioned at working chamber (9), the coplanar formation working face of upper surface of the first Powder Recovery cylinder (7), the second Powder Recovery cylinder (8) and formation cylinder (16); Gas purification module (11) is by air inlet and gas outlet and working chamber (9) formation closed circulation;
This equipment also comprises high energy beam sweep generator, the first powder storage hopper (3), the second powder storage hopper (4) and Powder spreader, and control system (10) is connected and controls their collaborative works with high energy beam sweep generator, the first powder storage hopper (3), the second powder storage hopper (4), Powder spreader, workbench and gas cleaning module (11) respectively;
High energy beam sweep generator is positioned at working chamber (9) top, and the first powder storage hopper (3), the second powder storage hopper (4) and Powder spreader are positioned at working chamber (9) inside; The first powder storage hopper (3), the second powder storage hopper (4) lay respectively at the both sides of high energy beam sweep generator, Powder spreader is positioned at the below of the first powder storage hopper (3) and the second powder storage hopper (4), to receive it for powder, and for carrying out two-way powder laying on formation cylinder (16) surface;
Described workbench or high energy beam sweep generator are provided with motion.
2. high energy beam according to claim 1 increases the equipment that material is manufactured large scale metallic element, it is characterized in that, described high energy beam sweep generator, the first powder storage hopper (3), the second powder storage hopper (4), Powder spreader are fixedly mounted on motion, jointly form powder feeding and scan module (1);
Powder spreader is comprised of the first unidirectional Powder spreader (5) and the second unidirectional Powder spreader (6), the first powder storage hopper (3), the second powder storage hopper (4) be take the center line of high energy beam sweep generator as distributing with reference to being mirror image, the first unidirectional Powder spreader (5) and the second unidirectional Powder spreader (6) also be take the center line of high energy beam sweep generator as distributing with reference to being mirror image, and the first unidirectional Powder spreader (5) and the second unidirectional Powder spreader (6) lay respectively under the first powder storage hopper (3) and the second powder storage hopper (4).
3. high energy beam according to claim 1 increases the equipment that material is manufactured large scale metallic element, it is characterized in that, described high energy beam sweep generator, the first powder storage hopper (3), the second powder storage hopper (4), Powder spreader are fixedly installed in working chamber (9) middle part, jointly form powder feeding and scan module (1); Wherein, the first powder storage hopper (3), the second powder storage hopper (4) be take the center line of high energy beam sweep generator as distributing with reference to being mirror image; Powder spreader is comprised of the first unidirectional Powder spreader (5) and the second unidirectional Powder spreader (6), the first unidirectional Powder spreader (5) and the second unidirectional Powder spreader (6) lay respectively under the first powder storage hopper (3), the second powder storage hopper (4), and take the center line of high energy beam sweep generator as distributing with reference to being mirror image;
Described workbench is arranged on table transmission mechanism (28).
4. high energy beam according to claim 1 increases the equipment that material is manufactured large scale metallic element, it is characterized in that, Powder spreader is two-way powder laying device (30), the first powder storage hopper (3) and the second powder storage hopper (4) are separately fixed at working chamber (9) both sides, top, and high energy beam sweep generator and two-way powder laying device (30) are respectively equipped with motion.
5. according to arbitrary described high energy beam in claim 1 to 4, increase the equipment that material is manufactured large scale metallic element; it is characterized in that; described high energy beam is laser beam; described high energy beam sweep generator is scanning galvanometer group; scanning galvanometer group consists of row or the multiple row galvanometer system along perpendicular to the parallel placement of paving powder direction, and gas purification module (11) is inert protective gas environment for making working chamber (9) inner.
6. according to arbitrary described high energy beam in claim 1 to 4, increase the equipment that material is manufactured large scale metallic element, it is characterized in that, described high energy beam is electron beam, described high energy beam sweep generator is beam deflector group, beam deflector group consists of row or the multiple row magnetic deflection system along perpendicular to the parallel placement of paving powder direction, and it is vacuum environment that gas purification module is used for making working chamber (9) inner.
CN201420265952.1U 2014-05-22 2014-05-22 Equipment for high-energy-beam additive manufacturing large-size metal parts Active CN203843168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420265952.1U CN203843168U (en) 2014-05-22 2014-05-22 Equipment for high-energy-beam additive manufacturing large-size metal parts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420265952.1U CN203843168U (en) 2014-05-22 2014-05-22 Equipment for high-energy-beam additive manufacturing large-size metal parts

Publications (1)

Publication Number Publication Date
CN203843168U true CN203843168U (en) 2014-09-24

Family

ID=51556229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420265952.1U Active CN203843168U (en) 2014-05-22 2014-05-22 Equipment for high-energy-beam additive manufacturing large-size metal parts

Country Status (1)

Country Link
CN (1) CN203843168U (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104923788A (en) * 2015-06-24 2015-09-23 广东信达雅三维科技有限公司 Single-cylinder type desktop type laser area selecting fusion forming device and control method
CN105328187A (en) * 2015-11-21 2016-02-17 天津清研智束科技有限公司 Control device and method for achieving wide-range scanning of electron beam and additive manufacturing device
CN105945279A (en) * 2015-11-17 2016-09-21 中研智能装备有限公司 Selective plasma melting rapid prototyping device and prototyping method
CN106735214A (en) * 2016-12-30 2017-05-31 湖南航天新材料技术研究院有限公司 The 3D printing device and 3D printing manufacturing process of a kind of Functional Gradient Materials
CN107530832A (en) * 2015-03-26 2018-01-02 德马吉森精机株式会社 Increase material Working head and processing equipment
CN107735215A (en) * 2015-05-25 2018-02-23 德马吉森精机株式会社 Processing equipment
CN107737922A (en) * 2017-10-26 2018-02-27 华中科技大学鄂州工业技术研究院 A kind of online processing unit of increasing material manufacturing local uniform radiating
CN108698160A (en) * 2016-02-03 2018-10-23 网格逻辑有限公司 System and method for manufacturing component
CN109261966A (en) * 2018-11-29 2019-01-25 汕头大学 A kind of mobile pressure-vaccum cigarette precinct laser fusion intelligence equipment of large scale
CN110576608A (en) * 2019-09-24 2019-12-17 华中科技大学 high-efficiency additive manufacturing method
CN113172236A (en) * 2021-04-25 2021-07-27 西北工业大学 Additive manufacturing method and device based on high-energy beam

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107530832A (en) * 2015-03-26 2018-01-02 德马吉森精机株式会社 Increase material Working head and processing equipment
CN107530832B (en) * 2015-03-26 2019-05-17 德马吉森精机株式会社 Increase material Working head and processing equipment
CN107735215A (en) * 2015-05-25 2018-02-23 德马吉森精机株式会社 Processing equipment
US10377002B2 (en) 2015-05-25 2019-08-13 Dmg Mori Co., Ltd. Manufacturing machine
CN104923788A (en) * 2015-06-24 2015-09-23 广东信达雅三维科技有限公司 Single-cylinder type desktop type laser area selecting fusion forming device and control method
CN105945279A (en) * 2015-11-17 2016-09-21 中研智能装备有限公司 Selective plasma melting rapid prototyping device and prototyping method
CN105328187A (en) * 2015-11-21 2016-02-17 天津清研智束科技有限公司 Control device and method for achieving wide-range scanning of electron beam and additive manufacturing device
CN108698160A (en) * 2016-02-03 2018-10-23 网格逻辑有限公司 System and method for manufacturing component
CN106735214A (en) * 2016-12-30 2017-05-31 湖南航天新材料技术研究院有限公司 The 3D printing device and 3D printing manufacturing process of a kind of Functional Gradient Materials
CN107737922B (en) * 2017-10-26 2023-08-08 华中科技大学鄂州工业技术研究院 Online processing device for local uniform heat dissipation in additive manufacturing
CN107737922A (en) * 2017-10-26 2018-02-27 华中科技大学鄂州工业技术研究院 A kind of online processing unit of increasing material manufacturing local uniform radiating
CN109261966A (en) * 2018-11-29 2019-01-25 汕头大学 A kind of mobile pressure-vaccum cigarette precinct laser fusion intelligence equipment of large scale
WO2021057715A1 (en) * 2019-09-24 2021-04-01 华中科技大学 Highly efficient method for additive manufacturing
CN110576608A (en) * 2019-09-24 2019-12-17 华中科技大学 high-efficiency additive manufacturing method
CN113172236A (en) * 2021-04-25 2021-07-27 西北工业大学 Additive manufacturing method and device based on high-energy beam
CN113172236B (en) * 2021-04-25 2023-07-21 西北工业大学 Additive manufacturing method and equipment based on high energy beam

Similar Documents

Publication Publication Date Title
CN203843168U (en) Equipment for high-energy-beam additive manufacturing large-size metal parts
CN104001915A (en) Equipment for manufacturing large-size metal part in high energy beam additive manufacturing mode and control method of equipment
CA2932620C (en) Diode laser fiber array for powder bed fabrication or repair
CN104827664B (en) A kind of 3D printer
CN105880593B (en) The device and method of more laser line beam printing-type scanning Rapid Prototyping Manufacturing parts
CN109434107B (en) Multi-energy-beam high-efficiency additive manufacturing method
CN109434109B (en) Selective laser melting forming method based on dynamic powder cylinder
CN109590470B (en) Multi-energy-field additive manufacturing and forming system
CN103726049A (en) Laser additive manufacturing method and device of metal parts
CN112839766B (en) Method for forming laminate and method for forming machining path
CN109130171B (en) Polymer multi-material multi-laser flexible additive manufacturing system and method
CN102328081A (en) Method for rapidly forming three-dimensional metal parts by high-power lasers
CN104493492A (en) Selective laser melting (SLM) and milling compound machining equipment and selective laser melting and milling compound machining method
CN104668563A (en) High-energy beam additive manufacturing method and equipment with high powder raw material utilization rate
CN104493165A (en) Electron beam melting and laser milling composite 3D printing apparatus
CN106624826B (en) A kind of microplasma 3D printing and milling combined-machining equipment and method
CN102764889A (en) Electron beam synchronous powder feeding and quick forming method
CN103357875A (en) Vector sintering system and additive manufacturing method
CN109604596B (en) Additive manufacturing dynamic powder laying system
CN103498142B (en) The special-shaped syndeton manufacturing process of laser melting coating high temperature alloy
CN104493166A (en) Method for quickly forming metal component through laminar direct-current plasma torch
CN204524257U (en) Electron beam melting and laser milling compound 3D printing device
CN110271183A (en) A kind of three-dimension object is slightly variable the forming method and device of thickness
CN110733176A (en) Light beam shaping mechanism, laser light source system, laser 3D printing equipment and method
CN104526359A (en) Multi-electron-beam fusing and milling composite 3D printing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160523

Address after: 200002 No. 110 middle Sichuan Road, Shanghai

Patentee after: Shanghai electric (Group) Corporation

Address before: 430074 Hubei Province, Wuhan city Hongshan District Luoyu Road No. 1037

Patentee before: Huazhong University of Science and Technology

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210202

Address after: Building 511, 1076 Jungong Road, Yangpu District, Shanghai 200093

Patentee after: SHANGHAI TECHGIIELASER TECHNOLOGY Co.,Ltd.

Address before: 200002 No. 110 middle Sichuan Road, Shanghai

Patentee before: SHANGHAI ELECTRIC GROUP Co.,Ltd.