CN203783442U - Solar streetlamp mounting tool - Google Patents
Solar streetlamp mounting tool Download PDFInfo
- Publication number
- CN203783442U CN203783442U CN201420101314.6U CN201420101314U CN203783442U CN 203783442 U CN203783442 U CN 203783442U CN 201420101314 U CN201420101314 U CN 201420101314U CN 203783442 U CN203783442 U CN 203783442U
- Authority
- CN
- China
- Prior art keywords
- joint
- lower joint
- vertical beam
- crossbeam
- upper joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model provides a solar streetlamp mounting tool. The solar streetlamp mounting tool is characterized by comprising a lower joint, a fixing pin, an upper joint and a working guard bar, wherein the upper joint is nested in the middle part of the lower joint and capable of moving in the middle of lower joint along the length direction, a positioning hole is formed in the lower joint, and the fixing pin is arranged in the positioning hole and used for limiting the movement range of the upper joint in the lower joint and further used for adjusting the overall height of a supporting main body formed by the upper joint and the lower joint. The solar streetlamp mounting tool is simple in structure and portable, and applicable to the wild and regions under bad road conditions; the mounting or repair cost of solar streetlamps can be reduced.
Description
Technical field
The utility model belongs to field of street lamp lighting, particularly a kind of instrument for the installation and maintenance of field solar energy street lamp.
Background technology
The installation of solar street light at present and maintenance are all aloft to carry out, mostly adopt special-purpose crane to that is to say that the crane adopting with workbench carries out, installation or maintenance personal stand on the hanging basket of crane, start crane, hanging basket is lifted to the working position of solar street light, hover over the working position of solar street light, by maintenance personal, street lamp is installed or keeped in repair, poor for road conditions, have inconvenient traffic, or when street lamp quantity is few, this method is just difficult to realize, or use cost is high.
Summary of the invention
For existing solar street light install or maintenance process in exist be difficult to realize or the high defect of job costs, the utility model proposes a kind of solar street light erecting tools, it is characterized in that: comprise lower joint, steady pin, upper joint, work guardrail; Upper joint is nested in the middle of lower joint and can in the middle of lower joint, moves along its length, on lower joint, be provided with locating hole, in locating hole, be provided with steady pin, steady pin is for limiting the moving range of joint in lower joint, for regulating the overall height of the support body of upper joint and lower joint composition; Work guardrail is arranged on the top of joint, adopts securing member and upper joint to fix; Described lower joint comprises vertical beam, crossbeam, reinforcing rib, locating hole; Crossbeam and vertical beam are welded into hollow quadrangular shape, and reinforcing rib is arranged on vertical beam and crossbeam junction firm with vertical beam and beam welding; Locating hole is arranged on vertical beam, according to conventional, a plurality of locating holes is set highly respectively for regulating whole height; Described upper joint comprises joint vertical beam and upper joint crossbeam, and upper joint vertical beam becomes hollow quadrangular with upper joint beam welding, and the length that the length of upper joint crossbeam is less than the crossbeam adopting on lower joint moves along vertical beam direction to guarantee upper energy-conservation reaching in the middle of lower joint; Described steady pin adopts straight pin or bolt, screw, and the locating hole place that can fix and be locked at lower joint can not free dropping; Described work guardrail comprises base plate, guardrail, column, upper frame, base plate is stood for being connected with upper joint with constructor, column is welded on base plate, and the height of column guarantees that constructor is unlikely to fall while standing on base plate, and guardrail is welded between every two columns, guarantee that constructor does not spill between column, upper frame and column weld together, and are positioned at the top of work guardrail, for vertical columns and stop constructor.
Beneficial effect
The beneficial effects of the utility model are: simple in structure, light, can be applicable to the bad area of field and road, and reduce installation or the maintenance cost of solar street light.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model
1. time joint, 2. steady pin, 3. on joint, 4. work guardrail.
Fig. 2 is the structural representation of lower joint
11. vertical beams, 12. crossbeams, 13. reinforcing ribs, 14. locating holes.
Fig. 3 is the structural representation of upper joint
On 31., save vertical beam, save crossbeam on 32..
Fig. 4 is work guard bar structure schematic diagram
41. base plates, 42. guardrails, 43. columns, 44. upper frames.
The specific embodiment
Now further illustrate by reference to the accompanying drawings the specific embodiment of the present utility model, as Fig. 2, adopt 50X50 millimeter angle steel as vertical beam 11,5X50 millimeter band steel is as crossbeam 12, by vertical beam 11 with crossbeam 12 according to uniformly-spaced welding, the seamed edge side edge of the both ends of crossbeam 12 and vertical beam 11, it is concordant with the end of vertical beam 11 that assurance is positioned at the one side of crossbeam 12 at vertical beam 11 two ends, the length of crossbeam 12 is 500 millimeters, spacing between two crossbeams 11 is 600 millimeters, the same one side of crossbeam 12 that is positioned at vertical beam 11 same cross sections is concordant, and locating hole 14 is set on vertical beam 11; By reinforcing rib 13 length of side of squaring up, be the triangle of 100 millimeters, by two right-angle sides respectively with vertical beam 11 and crossbeam 12 in junction welding, after welding all completes, forms a length of side and is the hollow four prisms cylinder of 600 millimeters, just completed and time saved 1 making; As Fig. 3, adopt 40X40 millimeter angle steel as upper joint vertical beam 31 and upper joint crossbeam 32, by the length setting of upper joint crossbeam 32, it is 500 millimeters, and weld with upper joint vertical beam 31, the upper joint crossbeam at upper joint vertical beam 31 two ends 32 on one side should be concordant with the end plane of upper joint vertical beam 31 and be provided for the installing hole of steady job guardrail 4; The upper joint crossbeam 32 of mid portion should be in the plane in same cross section, has welded the rear formation length of side and be the four prisms cylinder of 580 millimeters, can guarantee that like this joint 3 can be nested in the middle of lower joint 1 and can move along vertical beam 11 directions; As Fig. 4, the steel plate of 5 millimeters of thickness of employing is made the square floor 41 of 800X800 millimeter, corner welding four root posts 43 at base plate 41, at column 43 other end welding upper frames 44, between every two columns 43, weld respectively guardrail 42, and on base plate 41, arrange with on save the corresponding installation fixing hole in 1 end, just completed the making of the guardrail 4 of working; During transportation, steady pin 2 is arranged on lower joint 1, by lower joint 1, upper joint 3, work guardrail 4 separate transports, during use, the guardrail 4 of working adopts bolt to fix with upper joint 3, then it is middle that upper joint 3 is packed into lower joint 1, according to saving 3 and the insertion depth of lower joint 1 in construction height different adjustment, after regulating, steady pin 2 is fixing, hold up, constructor tramples crossbeam 12 and upper joint crossbeam 32 and climbs to the guardrail 4 of working, and stand on and on base plate 41, carries out work; After completing, construction operation takes upper joint 3 apart according to opposite sequence, work guardrail 4, and lower joint 1, carries, and has just completed enforcement of the present utility model.
Claims (1)
1. a solar street light erecting tools, is characterized in that: comprise lower joint, steady pin, upper joint, work guardrail; Upper joint is nested in the middle of lower joint and can in the middle of lower joint, moves along its length, on lower joint, be provided with locating hole, in locating hole, be provided with steady pin, steady pin is for limiting the moving range of joint in lower joint, for regulating the overall height of the support body of upper joint and lower joint composition; Work guardrail is arranged on the top of joint, adopts securing member and upper joint to fix; Described lower joint comprises vertical beam, crossbeam, reinforcing rib, locating hole; Crossbeam and vertical beam are welded into hollow quadrangular shape, and reinforcing rib is arranged on vertical beam and crossbeam junction firm with vertical beam and beam welding; Locating hole is arranged on vertical beam, according to conventional, a plurality of locating holes is set highly respectively for regulating whole height; Described upper joint comprises joint vertical beam and upper joint crossbeam, and upper joint vertical beam becomes hollow quadrangular with upper joint beam welding, and the length that the length of upper joint crossbeam is less than the crossbeam adopting on lower joint moves along vertical beam direction to guarantee upper energy-conservation reaching in the middle of lower joint; Described steady pin adopts straight pin or bolt, screw, and the locating hole place that can fix and be locked at lower joint can not free dropping; Described work guardrail comprises base plate, guardrail, column, upper frame, base plate is stood for being connected with upper joint with constructor, column is welded on base plate, and the height of column guarantees that constructor is unlikely to fall while standing on base plate, and guardrail is welded between every two columns, guarantee that constructor does not spill between column, upper frame and column weld together, and are positioned at the top of work guardrail, for vertical columns and stop constructor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420101314.6U CN203783442U (en) | 2014-03-07 | 2014-03-07 | Solar streetlamp mounting tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420101314.6U CN203783442U (en) | 2014-03-07 | 2014-03-07 | Solar streetlamp mounting tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203783442U true CN203783442U (en) | 2014-08-20 |
Family
ID=51319642
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420101314.6U Expired - Fee Related CN203783442U (en) | 2014-03-07 | 2014-03-07 | Solar streetlamp mounting tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203783442U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343307A (en) * | 2018-01-15 | 2018-07-31 | 江苏灵屹成科技有限公司 | A kind of street lamp mounting device and installation method |
-
2014
- 2014-03-07 CN CN201420101314.6U patent/CN203783442U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108343307A (en) * | 2018-01-15 | 2018-07-31 | 江苏灵屹成科技有限公司 | A kind of street lamp mounting device and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104532735B (en) | A kind of assembled steel bridge and building method thereof | |
CN203783165U (en) | Multi-directional accurate adjusting device for embedded part | |
CN204455794U (en) | A kind of assembled steel bridge | |
CN103737235B (en) | Case beam dividing plate positioning tool and localization method | |
CN203783442U (en) | Solar streetlamp mounting tool | |
CN202517214U (en) | Upper car platform welding fixture | |
CN202299020U (en) | A unit pottery pipe decoration curtain wall member | |
CN103243730A (en) | Mould for casting concrete foundation | |
CN204465425U (en) | A kind of solar panels ground mounting support structure | |
CN203751586U (en) | Box girder clapboard positioning tool | |
CN204590640U (en) | A kind of prefabricated concrete structure longitudinal reinforcement location adjustment jig | |
CN102704696A (en) | Space locator for high, big and heavy steel upright column | |
CN203437916U (en) | Adjustable centerline regulation wire rack | |
CN210946505U (en) | Jacking transfer equipment for on-site bridge installation | |
CN204000620U (en) | A kind of Bridge Erector is packed device | |
CN204195599U (en) | Locomotive cab in-built top board skeleton mounting tool | |
CN204126077U (en) | A kind of temporary fastening device for prefabricated panel and steel column connection | |
CN205840326U (en) | A kind of stair template fixing device | |
CN104668871A (en) | Bogie welding and clamping device and clamping method | |
CN205804988U (en) | Prefabricated thermal insulation structural wall board installs special mould clamp | |
CN204370569U (en) | A kind of steel work fixture | |
CN204216829U (en) | The simple photovoltaic erecting device of a kind of structure | |
CN103572978A (en) | Steel structure piece mounting tool | |
CN219826211U (en) | Light I-beam spliced positioning deviation correcting device | |
CN209990237U (en) | Isolation guardrail convenient to mount and dismount |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140820 Termination date: 20160307 |