CN203781634U - Centering device for installing vertical pipeline - Google Patents

Centering device for installing vertical pipeline Download PDF

Info

Publication number
CN203781634U
CN203781634U CN201420198473.2U CN201420198473U CN203781634U CN 203781634 U CN203781634 U CN 203781634U CN 201420198473 U CN201420198473 U CN 201420198473U CN 203781634 U CN203781634 U CN 203781634U
Authority
CN
China
Prior art keywords
steel pipe
centering device
vertical pipeline
support frame
circular hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420198473.2U
Other languages
Chinese (zh)
Inventor
马少甫
张丽娜
丁航
万智勇
何练
吴迪
余海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
China Gezhouba Group No 3 Engineering Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201420198473.2U priority Critical patent/CN203781634U/en
Application granted granted Critical
Publication of CN203781634U publication Critical patent/CN203781634U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a centering device for installing a vertical pipeline. The centering device comprises three groups of L-shaped support frames which are assembled to form an assembled support frame at an included angle of 120 degrees, the assembled support frame is positioned at the upper part of a steel pipe, a tray is positioned at the bottom of the steel pipe, a connecting plate is positioned at the middle part of the assembled type support frame, a connecting plate round hole is formed in the center of the connecting plate, and a steel wire rope passes through the connecting plate round hole; support frame round holes are formed in the vertical edges of the L-shaped support frames, nuts are fixed at both sides of each support frame round hole, and bolts pass through the nuts and the support frame round holes. According to the utility model, the stable and accurate lifting of the vertical pipeline can be smoothly implemented through the centering device in the center of the upper part of the pipeline and the tray at the bottom of the pipeline, the construction safety can be guaranteed and the construction efficiency can be increased. The centering device has the advantages of simple arrangement structure, convenience for operation and usage and high practicability.

Description

A kind of vertical pipeline is installed centering device
Technical field
The utility model relates to a kind of pipeline erecting device, and particularly a kind of vertical pipeline is installed centering device.
Background technology
In the time that the higher interior of building of floor is installed vertical pipeline, general employing lifts steel wire penetrating steel pipe from top to bottom by the mode of root docking, at hoisting process, because steel rope and pipeline enclosure have very large gap, cause pipeline double swerve very easily to be toppled over, need manually go righting to respective storey, there is larger construction safety risk, and the steel pipe rocking is not easy the pipeline preformed hole through each floor plate, and operating efficiency is low, installs and caused very large puzzlement to vertical pipeline.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of vertical pipeline centering device is installed, can successfully realize vertical pipeline steadily, lifting smoothly, ensure construction safety.And arrange simple in structure, easy to operate, use quick, practicality is high.
For addressing the above problem, the technical solution adopted in the utility model is: a kind of vertical pipeline is installed centering device, comprise L-type support, three groups of L-type supports are 120 degree angles and are combined into a sectional shelf-unit, sectional shelf-unit is positioned at steel pipe top, has pallet in steel pipe bottom, and there is connecting panel at described Combined support middle part, connecting panel center is provided with connecting panel circular hole, steel wire penetrating connecting panel circular hole; Described L-type support upstanding edge is provided with support circular hole, and support circular hole both sides are fixed with nut, and bolt is through nut and support circular hole.
Between L-type support outside and steel pipe inner wall, leave gap.
Pallet is circular discs, and its external diameter is greater than diameter of steel tube, is fixed on steel pipe bottom outside by steel rope.
Steel rope runs through steel pipe, by winch and track adjusting wheel traction.
A kind of vertical pipeline that the utility model provides is installed centering device, has solved in the time that the higher interior of building of floor is installed vertical pipeline, and pipeline double swerve is very easily toppled over and is difficult to the problem through preformed hole.By conduit upper center arrange centering device and duct bottom arrange pallet, realize smoothly vertical pipeline steadily, accurately lifting, can ensure construction safety, improve operating efficiency.
Brief description of the drawings
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the A-A cutaway view of Fig. 1.
Fig. 3 is the B-B cutaway view of Fig. 1.
Fig. 4 is use schematic diagram of the present utility model.
Detailed description of the invention
As shown in FIG. 1 to 3, a kind of vertical pipeline is installed centering device, comprise L-type support 1, three groups of L-type supports 1 are 120 degree angles and are combined into a sectional shelf-unit, be that the angle that adjacent two L-type combinations are propped up between 1 is 120 degree, three groups of L-type supports 1 form the structure of similar " Y " shape, and sectional shelf-unit is positioned at steel pipe 7 tops, between L-type support 1 outside and steel pipe 7 inwalls, leave 4~6cm gap; Have pallet 8 in steel pipe 7 bottoms, pallet 8 is circular discs, and its external diameter is greater than steel pipe 7 diameters, is fixed on steel pipe 7 bottom outside by steel rope 6.There is connecting panel 2 at Combined support middle part, and connecting panel 2 centers are provided with connecting panel circular hole 3, and steel rope 6 is through connecting panel circular hole 3; Described L-type support 1 upstanding edge is provided with support circular hole 11, and support circular hole 11 both sides are fixed with nut 5, and bolt 4 is through nut 5 and support circular hole 11.
Steel rope 6 runs through steel pipe 7, draws by winch 9 and track adjusting wheel 10.
In the utility model, L-type support 1 adopts steel plate to make, and bolt 4 is selected φ 10 hex bolts, and connecting panel 2 adopts steel plate to make, and its center connecting plate bores circular hole 3 and matches with steel rope 6, and support circular hole 3 diameters are a bit larger tham steel rope 6 external diameter 10~15mm.
Tighten hex bolt 4 and make its screw rod one end hold out against steel pipe 7 inwalls, " Y " type sectional shelf-unit can be fixed on to steel pipe 7 central upper portion; Unclamp hex bolt 4 and make its screw rod one end depart from pipeline 7 inwalls, can make " Y " type sectional shelf-unit along steel rope 6 landings to steel pipe 7 bottoms.
Described pallet 8 is for steel plate is made into circular discs, and its external diameter is greater than steel pipe 7 diameter 6~10cm, is fixed on steel pipe 7 bottom outside by steel rope 6.
As shown in Figure 4, winch 9 and track adjusting wheel 10 are in place for the concrete implementation step of the utility model, steel rope 6 centers and floor preformed hole centres." Y " type sectional shelf-unit of this device is placed on to steel pipe to be lifted 7 about 30cm suitable for reading place, steel rope 6 is run through to steel pipe 7, and pass the connecting panel circular hole 3 of " Y " type sectional shelf-unit middle part connecting panel 2, steel pipe 7 bottom fixed trays 8.Tighten 3 groups of hex bolts 4 on L-type support 1, make its screw rod one end hold out against steel pipe 7 inwalls, " Y " type sectional shelf-unit is fixed on steel pipe 7 inwalls.By winch 9, track adjusting wheel 10 and steel rope 6, slowly vertical-lifting steel pipe 7, in the time that the steel pipe 7 promoting approaches with steel pipe in position, unclamp hex bolt 4 and make its screw rod one end depart from pipeline 7 inwalls, " Y " type sectional shelf-unit along steel rope 6 landings to steel pipe 7 bottoms; Continue to promote steel pipe 7, steel pipe 7 to be lifted is docked to fixation with mounted steel pipe.Unclamp the fixing pallet 8 of steel pipe 7 bottoms and steel rope 6, steel rope 6, " Y " type support are penetrated to next root steel pipe, fixing steel pipe bottom tray, carries out next root lifting steel pipes.According to above-mentioned steps, the lifting of all steel pipes that so circulated.

Claims (4)

1. a vertical pipeline is installed centering device, comprise L-type support (1), it is characterized in that, three groups of L-type supports (1) are 120 degree angles and are combined into a sectional shelf-unit, sectional shelf-unit is positioned at steel pipe (7) top, has pallet (8) in steel pipe (7) bottom, and there is connecting panel (2) at described Combined support middle part, connecting panel (2) center is provided with connecting panel circular hole (3), and steel rope (6) is through connecting panel circular hole (3); Described L-type support (1) upstanding edge is provided with support circular hole (11), and support circular hole (11) both sides are fixed with nut (5), and bolt (4) is through nut (5) and support circular hole (11).
2. a kind of vertical pipeline according to claim 1 is installed centering device, it is characterized in that: between L-type support (1) outside and steel pipe (7) inwall, leave gap.
3. a kind of vertical pipeline according to claim 1 is installed centering device, it is characterized in that: pallet (8) is circular discs, and its external diameter is greater than steel pipe (7) diameter, is fixed on steel pipe (7) bottom outside by steel rope (6).
4. a kind of vertical pipeline according to claim 1 is installed centering device, it is characterized in that: steel rope (6) runs through steel pipe (7), by winch (9) and track adjusting wheel (10) traction.
CN201420198473.2U 2014-04-23 2014-04-23 Centering device for installing vertical pipeline Expired - Fee Related CN203781634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420198473.2U CN203781634U (en) 2014-04-23 2014-04-23 Centering device for installing vertical pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420198473.2U CN203781634U (en) 2014-04-23 2014-04-23 Centering device for installing vertical pipeline

Publications (1)

Publication Number Publication Date
CN203781634U true CN203781634U (en) 2014-08-20

Family

ID=51317843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420198473.2U Expired - Fee Related CN203781634U (en) 2014-04-23 2014-04-23 Centering device for installing vertical pipeline

Country Status (1)

Country Link
CN (1) CN203781634U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108439190A (en) * 2018-05-17 2018-08-24 中能电力科技开发有限公司 A kind of tool structure for steel-pipe pile lifting
CN111362118A (en) * 2020-05-11 2020-07-03 成都建工第四建筑工程有限公司 Tool for vertically hoisting and installing pipeline and hoisting method thereof
CN111962821A (en) * 2020-07-10 2020-11-20 广东省工业设备安装有限公司 Automatic centering and inverting method for vertical shaft pipeline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108439190A (en) * 2018-05-17 2018-08-24 中能电力科技开发有限公司 A kind of tool structure for steel-pipe pile lifting
CN111362118A (en) * 2020-05-11 2020-07-03 成都建工第四建筑工程有限公司 Tool for vertically hoisting and installing pipeline and hoisting method thereof
CN111962821A (en) * 2020-07-10 2020-11-20 广东省工业设备安装有限公司 Automatic centering and inverting method for vertical shaft pipeline

Similar Documents

Publication Publication Date Title
CN203640309U (en) Adjustable pipe carrier used on large-span steel structure roof primary truss general assembly jig frame
CN203781634U (en) Centering device for installing vertical pipeline
CN102936962A (en) Construction method of slanting cantilever steel structure supported by temporary steel frame
CN201417657Y (en) Installation device of indoor transformer
CN204370833U (en) Elements of Space Grid Truss supporting apparatus
CN202302300U (en) Combined pipeline mounting operation platform
CN202689498U (en) Liftable scaffold for simple and easy building outer wall
CN101225817A (en) Supporting device for maintenance of pump
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN204064788U (en) Oil tank of transformer strength test bracing or strutting arrangement
CN103291078B (en) A kind of steel girder erection equipment
MY158699A (en) Method for constructing boiler facility
CN205873760U (en) Embrace roof beam hoisting apparatus
CN202785394U (en) Compact-type lead-in mechanism for tower
CN202115707U (en) Device for detaching main undercarriage of plane
CN205777537U (en) A kind of upper and lower pressurizing unit of interior wall
CN104652833A (en) Manufacturing method for fixing device for pulleys for installation and lifting of purlines of steel structure factory building
CN204324748U (en) A kind of large-scale gas storage holder Steel Structure Installation hoisting device
CN204711557U (en) The servicing unit of large-scale vertical mill spiral system assembling
CN103711299A (en) Liftable scaffold for building outer wall
CN204101271U (en) A kind of cucurbit testing jig
CN204690198U (en) A kind of lifting support that can correct fine spining machine girder
CN204940878U (en) Electrical installation erecting device in a kind of prepackage type electrical house
CN204000633U (en) A kind of sandbox detachable precompressed reaction frame for precompressed
CN203905436U (en) Steel chimney annular installation platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA GEZHOUBA GROUP NO.3 ENGINEERING CO., LTD.

Effective date: 20140911

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Ma Shaofu

Inventor after: Xia Yongzhong

Inventor after: Li Linhui

Inventor after: Zhang Lina

Inventor after: Ding Hang

Inventor after: Wan Zhiyong

Inventor after: He Lian

Inventor after: Wu Di

Inventor after: Yu Haitao

Inventor after: Long Xiaoming

Inventor after: Chen Enyu

Inventor before: Ma Shaofu

Inventor before: Zhang Lina

Inventor before: Ding Hang

Inventor before: Wan Zhiyong

Inventor before: He Lian

Inventor before: Wu Di

Inventor before: Yu Haitao

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: MA SHAOFU ZHANG LINA DING HANG WAN ZHIYONG HE LIAN WU DI YU HAITAO TO: MA SHAOFU ZHANG LINA DING HANG WAN ZHIYONG HE LIAN WU DI YU HAITAO LONG XIAOMING CHEN ENYU XIA YONGZHONG LI LINHUI

TR01 Transfer of patent right

Effective date of registration: 20140911

Address after: 443002 Hubei province Yichang City Road No. 1

Patentee after: CHINA GEZHOUBA GROUP Co.,Ltd.

Patentee after: CHINA GEZHOUBA GROUP NO.3 ENGINEERING Co.,Ltd.

Address before: 443002 Hubei province Yichang City Road No. 1

Patentee before: CHINA GEZHOUBA GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140820