CN203741824U - Rammed carrier strong core multi-component composite pile - Google Patents

Rammed carrier strong core multi-component composite pile Download PDF

Info

Publication number
CN203741824U
CN203741824U CN201420061390.9U CN201420061390U CN203741824U CN 203741824 U CN203741824 U CN 203741824U CN 201420061390 U CN201420061390 U CN 201420061390U CN 203741824 U CN203741824 U CN 203741824U
Authority
CN
China
Prior art keywords
pile
core
rammed
carrier
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420061390.9U
Other languages
Chinese (zh)
Inventor
邹胜勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Institute of Communications
Original Assignee
Zhejiang Institute of Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Institute of Communications filed Critical Zhejiang Institute of Communications
Priority to CN201420061390.9U priority Critical patent/CN203741824U/en
Application granted granted Critical
Publication of CN203741824U publication Critical patent/CN203741824U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种夯扩载体劲芯多元复合桩。目的是提供的复合桩同时兼具柔性桩和刚性桩的优点,具有排水效果好和承载能力高的优势。技术方案是:一种夯扩载体劲芯多元复合桩,包括竖直固定在土层中且采用建筑废弃物作为再生骨料的散体桩;其特征在于该散体桩中竖直穿插一由钢筋混凝土形成的刚性芯桩;所述刚性芯桩的底端与散体桩的底端平齐,刚性芯桩与散体桩的底端还共同连接一球形载体扩大头从而形成夯扩载体劲芯复合桩。

The utility model relates to a multi-element composite pile with a rammed expansion carrier and a core. The purpose is to provide a composite pile that has both the advantages of flexible piles and rigid piles, and has the advantages of good drainage effect and high bearing capacity. The technical solution is: a multi-element composite pile with a rammed and expanded carrier core, including a bulk pile vertically fixed in the soil layer and using construction waste as recycled aggregate; A rigid core pile formed of reinforced concrete; the bottom of the rigid core pile is flush with the bottom of the bulk pile, and the bottom of the rigid core pile and the bulk pile are also connected to a spherical carrier expansion head to form a rammed and expanded carrier strength core composite pile.

Description

一种夯扩载体劲芯多元复合桩A multi-element composite pile with rammed and expanded carrier core

技术领域technical field

本实用新型涉及一种多元复合桩加固软土地基技术,尤其是基于散体桩与刚性芯桩以及夯扩载体的复合技术,适于地层分布不均匀或承载力要求不一的软基加固。The utility model relates to a multi-element composite pile reinforcement technology for soft soil foundations, in particular a composite technology based on loose piles, rigid core piles and tamping carriers, which is suitable for reinforcement of soft foundations with uneven stratum distribution or different bearing capacity requirements.

背景技术Background technique

在公路软土地基处理技术中,提高复合地基中桩的承载力的方法包括以下3种:①增加桩身刚度减小压缩变形,②增加桩身直径增大侧摩阻力和③增加桩端体积增大受力面积。这些方法各自具有其局限性,单独使用都会受到各种因素的制约,从而不能最大限度地发挥桩土相互作用及其承载特性。In highway soft soil foundation treatment technology, the methods to improve the bearing capacity of piles in composite foundation include the following three methods: ① Increase the stiffness of the pile body to reduce the compression deformation, ② Increase the diameter of the pile body to increase the side friction resistance and ③ Increase the volume of the pile tip Increase the bearing area. Each of these methods has its own limitations, and the individual use will be restricted by various factors, so that the pile-soil interaction and its bearing characteristics cannot be maximized.

实用新型内容Utility model content

本实用新型的目的在于克服上述背景技术之不足,融合散体桩、刚性芯桩和载体桩的技术优点,提供一种夯扩载体劲芯多元复合桩;该复合桩同时兼具柔性桩和刚性桩的优点,具有排水效果好和承载能力高的优势。The purpose of this utility model is to overcome the deficiency of the above-mentioned background technology, integrate the technical advantages of bulk piles, rigid core piles and carrier piles, and provide a multi-component composite pile with a rammed and expanded carrier core; the composite pile has both flexible piles and rigid core piles. The advantage of the pile is that it has the advantages of good drainage effect and high bearing capacity.

本实用新型提供的技术方案是:The technical scheme provided by the utility model is:

一种夯扩载体劲芯多元复合桩,包括竖直固定在土层中且采用建筑废弃物作为再生骨料的散体桩;其特征在于该散体桩中竖直穿插一由钢筋混凝土形成的刚性芯桩;所述刚性芯桩的底端与散体桩的底端平齐,刚性芯桩与散体桩的底端还共同连接一球形载体扩大头从而形成夯扩载体劲芯复合桩。A multi-element composite pile with a rammed and expanded carrier core, comprising a bulk pile vertically fixed in the soil layer and using construction waste as recycled aggregate; it is characterized in that a reinforced concrete concrete pile is vertically interspersed in the bulk pile Rigid core pile: the bottom end of the rigid core pile is flush with the bottom end of the bulk pile, and the bottom end of the rigid core pile and the bulk pile are also connected to a spherical carrier expansion head to form a rammed expansion carrier strength core composite pile.

所述球形载体扩大头由外部压密土体层包覆的建筑废弃物填料层和建筑废弃物填料层内部的干硬混凝土层组成。The expanding head of the spherical carrier is composed of a construction waste packing layer covered by an external compacted soil layer and a dry hard concrete layer inside the construction waste packing layer.

所述刚性芯桩与散体桩的轴线重合。The axis of the rigid core pile coincides with the bulk pile.

本实用新型的有益效果:The beneficial effects of the utility model:

(1)柱锤夯击建筑废弃物(即废弃物填料),挤压周围土体,使之获得有效的挤密、加固作用,作用范围包括桩端以下深度为3~5m和直径2~3m约10m3的土体(图中显示了受挤密的影响土体),形成由干硬性混凝土、建筑废弃物填料和挤密土体组成的扩大头复合载体。(1) The column hammer rams the construction waste (i.e. waste filling) and squeezes the surrounding soil to obtain effective compaction and reinforcement. The scope of action includes the depth below the pile tip is 3-5m and the diameter is 2-3m About 10m 3 of the soil mass (the figure shows the soil mass affected by compaction) forms an enlarged head composite carrier consisting of dry hard concrete, construction waste filler and compacted soil mass.

(2)载体劲芯多元复合桩利用散体材料外芯排水、护壁并挤密桩间土,而利用刚度和强度较大的芯桩可有效提高单桩承载力。(2) The carrier core multi-component composite pile uses the outer core of loose material to drain water, protect the wall and compact the soil between the piles, while the use of the core pile with high stiffness and strength can effectively improve the bearing capacity of the single pile.

(3)多元复合桩组合可形成多元复合地基。多种介质协调匹配,刚柔相济,相互补强,共同提高,集排水、固结、置换、挤密置换和竖向增强作用等于一体。多元复合桩可进行多型单元桩组合,以适应现场不同土质分布情况,满足上部结构对承载力的多元化要求。(3) The combination of multi-element composite piles can form a multi-element composite foundation. A variety of media are coordinated and matched, rigid and flexible, mutually reinforcing and improving together, integrating drainage, consolidation, displacement, compaction displacement and vertical reinforcement into one. Multi-component composite piles can be combined with multi-type unit piles to adapt to different soil distribution conditions on site and meet the diversified requirements of the upper structure for bearing capacity.

与其他类似的软基处理工艺相比,多元复合桩集成了多型单元桩的优点。其中,柔性短桩可加速排水固结,而载体与芯桩则可提高承载力,最大可将地基工后沉降控制于2~5cm范围。较之同体积刚性桩,单桩承载力与之相当,然而造价约为其1/2(采用建筑垃圾或其再生材料)。Compared with other similar soft foundation treatment processes, multi-element composite piles integrate the advantages of multi-type unit piles. Among them, the flexible short pile can accelerate drainage and consolidation, while the carrier and core pile can increase the bearing capacity, and the post-construction settlement of the foundation can be controlled within the range of 2-5cm at most. Compared with rigid piles of the same volume, the bearing capacity of a single pile is equivalent to it, but the cost is about 1/2 (using construction waste or recycled materials).

多元复合桩还可充分利用建筑垃圾作为填料,具有消耗大量建筑垃圾,扩大建筑材料来源,减少天然建材消耗和土地面积占用等多重功效,可节约建材成本和保护生态环境,由此产生较为显著的经济、环保和社会效益。The multi-component composite pile can also make full use of construction waste as filler, which has multiple functions such as consuming a large amount of construction waste, expanding the source of building materials, reducing the consumption of natural building materials and land area occupation, and can save the cost of building materials and protect the ecological environment. Economic, environmental and social benefits.

附图说明Description of drawings

图1是散体桩的主视结构示意图。Fig. 1 is a schematic diagram of the front view structure of a bulk pile.

图2是夯扩载体劲芯复合桩的主视结构示意图。Fig. 2 is a schematic diagram of the front structure of the rammed and expanded carrier-cored composite pile.

图3是劲芯复合桩的主视结构示意图。Fig. 3 is a schematic diagram of the front view structure of the composite pile with strong core.

图4是夯扩载体劲芯复合桩的施工过程示意图。Fig. 4 is a schematic diagram of the construction process of the rammed and expanded carrier-core composite pile.

具体实施方式Detailed ways

如图所示的载体劲芯多元复合桩,包括以建筑废弃物为料源的散体桩1。The carrier-core multi-component composite pile shown in the figure includes a bulk pile 1 that uses construction waste as a material source.

本实用新型在上述散体桩中设置一刚性芯桩2(即劲芯,通常为钢筋混凝土制成),该刚性芯桩竖直穿插在前述散体桩中(所述芯桩与散体桩的轴线重合),芯桩与散体桩的底端平齐;芯桩与散体桩的底端形成一个球形载体扩大头。所述载体扩大头由外部压密土体层5包覆的建筑废弃物填料层4和建筑废弃物填料层3内部的干硬混凝土层组成。The utility model sets a rigid core pile 2 (that is, the core, usually made of reinforced concrete) in the above-mentioned loose pile, and the rigid core pile is vertically interspersed in the aforementioned loose pile (the core pile and the loose pile The axis coincides), the core pile is flush with the bottom of the bulk pile; the core pile and the bottom of the bulk pile form a spherical carrier expansion head. The expansion head of the carrier is composed of the construction waste packing layer 4 covered by the outer compacted soil layer 5 and the dry hard concrete layer inside the construction waste packing layer 3 .

一种载体劲芯多元复合桩加固软土地基施工方法,根据不同地质条件在软土地基中打入若干个相互间隔一定距离的散体桩、夯扩载体劲芯复合桩或/和劲芯复合桩(散体桩、夯扩载体劲芯复合桩、劲芯复合桩的数量、分布方式以及相互之间的间距根据不同地质条件确定);所述散体桩、夯扩载体劲芯复合桩工以及劲芯复合桩的施工步骤如下:A construction method for reinforcing soft soil foundations with carrier-core multi-component composite piles. According to different geological conditions, several loose piles, rammed and expanded carrier-core composite piles or/and composite core piles are driven into the soft soil foundation at a certain distance from each other. piles (the number, distribution and distance between loose piles, rammed and expanded carrier-cored composite piles, and reinforced-cored composite piles are determined according to different geological conditions); And the construction steps of the core composite pile are as follows:

1、建筑垃圾再生处理1. Recycling of construction waste

在旧城改造拆迁场地,进行建筑废弃物(如碎砖、碎瓦、混凝土)就地再生获得成桩主要原材料,包括各级粗骨料与细粒土等;旧城改造过程中,采用分选、破碎、筛分等技术环节,对建筑废弃物进行预处理,获得不同粒径范围的各级再生材料。In old city reconstruction and demolition sites, construction waste (such as broken bricks, broken tiles, and concrete) is regenerated on-site to obtain the main raw materials for piles, including coarse aggregate and fine-grained soil at all levels; The technical links of separation, crushing, screening, etc. are used to pretreat construction waste to obtain recycled materials of different particle sizes at all levels.

然后,针对劲芯桩复合地基不同结构部位用材特点,采用建筑废弃物作为夯扩载体填充料;既能解决天然骨料紧缺问题,又能解决建筑废弃物堆放、占地和污染等问题。Then, according to the material characteristics of different structural parts of the core pile composite foundation, construction waste is used as the filling material for the ramming carrier; it can not only solve the shortage of natural aggregates, but also solve the problems of construction waste stacking, land occupation and pollution.

2、散体桩(即柔性桩)施工2. Construction of bulk piles (i.e. flexible piles)

为有效减小软基工后沉降,加速排水固结进程,采用振动沉管法在软土地基中首先打入散体桩,桩身材料以再生材料替代传统砂石。In order to effectively reduce the post-construction settlement of the soft foundation and accelerate the drainage and consolidation process, the vibrating tube sinking method is used to drive loose piles into the soft soil foundation first, and the pile body materials are replaced by traditional sand and gravel with recycled materials.

(1)桩机就位:合拢桩尖合瓣,使桩管竖直,桩尖对准桩位标记。(1) The pile driver is in place: close the pile tips and flaps, make the pile tube vertical, and the pile tips are aligned with the pile position marks.

(2)振动沉管:利用锤重和沉管自重,徐徐静压至一定深度后,开启振动锤使桩管振动下沉到设计深度。通常在此过程中,每下沉0.5m留振30s。(2) Vibrating sinking tube: Use the weight of the hammer and the weight of the sinking tube to slowly statically press to a certain depth, then turn on the vibrating hammer to vibrate and sink the pile tube to the design depth. Usually during this process, the vibration is kept for 30s for every 0.5m subsidence.

(3)稍微提升桩管使桩尖合瓣彻底打开。(3) Slightly lift the pile tube to completely open the pile tip flap.

(4)投放骨料:在停止振动沉管后,立即将建筑垃圾再生骨料由加料口投入桩管内,灌入量按桩身理论方案量值与充盈系数计算。(4) Adding aggregates: After stopping the vibrating sinking tube, immediately put the recycled aggregate of construction waste into the pile tube from the feeding port, and the filling amount is calculated according to the value of the theoretical scheme of the pile body and the filling coefficient.

(5)振动拔管:拔管前先振动1min,以后边振动边拔管。每提升0.5~1.0m导管反插40cm,留振30~60s。如此反复,直至全管拔出,拔管平均速度为1.2~1.5m/min。(5) Vibration extubation: Vibrate for 1 min before extubation, and then extubate while vibrating. For every 0.5-1.0m lift, the catheter was inserted 40cm backwards, and the vibration was left for 30-60s. Repeat this until the whole cannula is pulled out, and the average speed of extubation is 1.2-1.5m/min.

(6)反插密实:根据单桩设计的再生骨料用量,确定第1次投料的成桩长度,进行数次反插直至桩管内再生骨料密实为止。(6) Reverse insertion and compaction: According to the amount of recycled aggregate designed for the single pile, determine the pile length of the first feeding, and perform several reverse insertions until the recycled aggregate in the pile tube is dense.

(7)二次投料:当桩管提升至一定高度后,停止振动并开启第二投料口,进行第2次投料直至桩管灌满为止。(7) Second feeding: When the pile tube is lifted to a certain height, stop the vibration and open the second feeding port, and carry out the second feeding until the pile tube is filled.

(8)拔出地表:继续边拔管边振动,直至拔出地面;将桩管提至高于地面,停止振动,并进行孔口投料(第3次投料),直至骨料灌至与地表齐平为止。(8) Pulling out the ground surface: Continue to vibrate while pulling out the pipe until the ground is pulled out; lift the pile pipe above the ground, stop the vibration, and feed the orifice (the third feeding) until the aggregate is filled to the level with the ground surface until flat.

(9)孔口补料:启动反插,并及时进行孔口补料,至设计用量全部投完为止。(9) Orifice feeding: start the reverse insertion, and carry out the orifice feeding in time until the design dosage is completely used up.

(10)孔口加压至前机架抬起,完成1根散体桩的施工。(10) The hole is pressurized until the front frame is lifted, and the construction of a loose pile is completed.

3、劲芯复合桩施工3. Construction of strong core composite pile

对于部分需要复合处理(穿插刚性芯桩)的散体桩,在振动沉管打设过程中预置内管(内管直径约等于劲芯桩直径,较之外管直径小约100~150mm)。待振动沉管完成后同时在内管灌注混凝土(形成刚性芯桩)而内外管空腔内投放再生骨料,最后边拔管边振动直至桩身完成(刚性芯桩的底端低于散体桩的底端1m以上)。其中,散体桩施工过程按前述相关步骤进行,而刚性芯桩的施工过程详述如下:For some loose piles that require compound treatment (interpenetrating rigid core piles), the inner tube is preset during the setting of the vibrating sinking tube (the diameter of the inner tube is approximately equal to the diameter of the core pile, which is about 100-150mm smaller than the diameter of the outer tube) . After the vibratory sinking tube is completed, concrete is poured into the inner tube (to form a rigid core pile), and recycled aggregate is placed in the cavity of the inner and outer tubes, and finally the tube is pulled out while vibrating until the pile body is completed (the bottom of the rigid core pile is lower than the loose core pile). 1m above the bottom of the pile). Among them, the construction process of bulk piles is carried out according to the above-mentioned relevant steps, while the construction process of rigid core piles is described in detail as follows:

(1)吊放钢筋笼。通过内管用柱锤冲出一定直径(优选150mm)深孔,为后续桩身与载体发生良好黏结提供条件。清理孔底浮土,然后将钢筋笼吊放入内管,底部要求坐入深孔的孔底;(1) Hanging the reinforcement cage. Punch a deep hole with a certain diameter (preferably 150mm) through the inner pipe with a column hammer to provide conditions for good bonding between the subsequent pile body and the carrier. Clean up the floating soil at the bottom of the hole, and then hang the steel cage into the inner pipe, and the bottom is required to sit in the bottom of the deep hole;

(2)浇筑混凝土。钢筋笼放置完成后,向内管中灌入标号为C25混凝土,至设计桩顶标高以上50cm左右。振捣混凝土,振捣时要快插慢拔;一次插至桩底并逐渐上拔,振捣时间不少于1.5min。(2) Pouring concrete. After the reinforcement cage is placed, pour concrete labeled C25 into the inner pipe to about 50cm above the design pile top elevation. When vibrating the concrete, insert it quickly and pull it out slowly; insert it to the bottom of the pile once and pull it up gradually, and the vibration time is not less than 1.5min.

(3)拔出内(外)管。混凝土浇筑完毕后,将柴油锤压在管内混凝土之上,之后开始将内外管逐渐拔出。振动拔管施工过程参照散体桩施工中相关步骤进行。对于内管而言边拔管边压实形成载体劲芯复合桩。拔管速度应控制在1m/min~2m/min。(3) Pull out the inner (outer) tube. After the concrete is poured, the diesel hammer is pressed on the concrete in the pipe, and then the inner and outer pipes are gradually pulled out. The construction process of vibrating pipe pulling is carried out by referring to the relevant steps in the construction of bulk piles. For the inner pipe, it is compacted while pulling out the pipe to form a carrier-core composite pile. The extubation speed should be controlled at 1m/min to 2m/min.

4、夯扩载体劲芯复合桩4. Rammed and expanded carrier core composite pile

对于部分需要复合处理的散体桩,在振动沉管打设过程中预置内管。要求:内管直径约等于劲芯桩直径,较之外管直径小约100~150mm。待振动沉管完成后,首先进行夯扩载体施工,然后同时在内管灌注混凝土而内外管空腔内投放再生骨料,最后边拔管边振动直至桩身完成。For some bulk piles that require composite treatment, the inner tube is preset during the setting of the vibrating immersed tube. Requirements: The diameter of the inner tube is approximately equal to the diameter of the core pile, which is about 100-150mm smaller than the diameter of the outer tube. After the vibrating immersed tube is completed, first carry out tamping and expansion carrier construction, then pour concrete into the inner tube at the same time and put recycled aggregate in the cavity of the inner and outer tubes, and finally vibrate while pulling the tube until the pile body is completed.

其中夯扩载体的施工过程详述如下:The construction process of the tamping carrier is described in detail as follows:

(1)夯扩桩机就位(1) The tamping and expanding pile machine is in place

在检查认定桩机设备正常后,即可实施夯扩桩机就位工作。在现场拼装桩机及其夯击部件,并用方木整平桩机。主机上悬挂一吊锤,用以测控钻杆的竖直度,同时保证柱锤与桩孔中心线重合。After checking that the pile driver equipment is normal, the tamping and expanding pile driver can be put in place. Assemble the pile driver and its tamping components on site, and level the pile driver with square logs. A hanging hammer is hung on the main machine to measure and control the verticality of the drill pipe, and at the same time ensure that the column hammer coincides with the center line of the pile hole.

(2)夯填建筑废弃物(2) Ramming construction waste

首先,将柱锤提升至一定高度,以确保填料顺利投放(如图4的a步骤);其次,在护筒底部分次分批填入一定量(共0.3-0.5m3)的建筑废弃物;最后,分层锤击夯实(如图4的b步骤)。Firstly, raise the column hammer to a certain height to ensure the filling is put in smoothly (step a in Figure 4); secondly, fill a certain amount (0.3-0.5m 3 in total) of construction waste in batches at the bottom of the casing ; Finally, layered hammer compaction (as shown in step b of Figure 4).

柱锤锤击可使填料向四周土体挤压,而使获得有效的挤密、加固效果。有效影响范围包括:桩端下深度约3~5m和直径约2~3m(总体积约10m3)的土体。The hammering of the column hammer can make the filler squeeze to the surrounding soil, so as to obtain effective compaction and reinforcement effects. The effective range of influence includes: the soil body with a depth of about 3-5m and a diameter of about 2-3m (total volume about 10m 3 ) below the pile tip.

(3)测定三击贯入度(3) Determination of three-stroke penetration

在填料被夯实且不再填料后,测定三击贯入度,即:采用35kN重锤,以落距6m做自由落体运动,连续夯击三次所测贯入度。After the filler is tamped and no longer filled, measure the three-stroke penetration, that is, use a 35kN weight to perform free fall movement with a drop distance of 6m, and tamp three times to measure the penetration.

三击贯入度应小于10cm或设计要求。否则,应重复实施填料和重锤夯击的施工步骤,直至三击贯入度满足设计要求为止。The three-stroke penetration should be less than 10cm or design requirements. Otherwise, the construction steps of packing and heavy hammer tamping should be repeated until the three-strike penetration meets the design requirements.

(4)夯填干硬性混凝土(如图4的c步骤)(4) Ramping and filling dry hard concrete (step c as shown in Figure 4)

通过护筒投料孔,再向孔底分次投入干硬性混凝土,每填0.01m3干硬性混凝土锤击1次,累计填约0.3m3则夯扩载体施工结束。在夯填完毕时,控制锤底高出内管底部3~5cm。Through the feeding hole of the casing, dry hard concrete is put into the bottom of the hole in stages, and the dry hard concrete is hammered once for every 0.01m 3 filled, and the construction of the tamping and expanding carrier is completed when the accumulative filling is about 0.3m 3 . When the tamping is completed, the bottom of the control hammer is 3-5cm higher than the bottom of the inner pipe.

干硬性混凝土与桩身混凝土标号一致,同时要求:①水灰比0.3~0.4;②维勃稠度16~20s。所用砂、石和水泥按配比保持变,主要控制用水量,以使成品达到手攥成团、落地开花的效果。The dry hard concrete has the same label as the pile body concrete, and at the same time requires: ①Water-cement ratio 0.3-0.4; ②Viber consistency 16-20s. The sand, stone and cement used are kept variable according to the ratio, and the water consumption is mainly controlled, so that the finished product can achieve the effect of clumping in hands and blooming on the ground.

接着在内管灌注混凝土(参照步骤3进行),完成后拔出内(外)管。Then pour concrete into the inner pipe (refer to step 3), and pull out the inner (outer) pipe after completion.

上述散体桩、劲芯复合桩、夯扩载体劲芯复合桩,可根据需要安装连接钢筋和桩帽;具体在达到桩帽连接钢筋底部标高时,先安放桩帽连接钢筋,待桩身混凝土强度达到设计值的80%时,绑扎桩帽钢筋并浇注桩帽混凝土。The above-mentioned bulk piles, core composite piles, and reinforced core composite piles with rammed and expanded carriers can be installed with connecting steel bars and pile caps as required; specifically, when the bottom elevation of the pile cap connecting steel bars is reached, the pile cap connecting steel bars are placed first, and the pile body is concreted. When the strength reaches 80% of the design value, the pile cap reinforcement is bound and the pile cap concrete is poured.

最后是桩成品检测、验收;可在成桩后7~28d对上述散体桩、复合桩进行质量检测试验,包括开挖检测、钻孔检测和载荷试验等。每个场地工程桩的检测数量不少于总数的0.5%~1.0%,且不应少于3点。为保证工程质量,可适当加大检测频次。Finally, the inspection and acceptance of the finished pile; the quality inspection test of the above-mentioned loose piles and composite piles can be carried out 7 to 28 days after the pile is completed, including excavation inspection, drilling inspection and load test. The number of detection piles in each site shall not be less than 0.5% to 1.0% of the total number, and shall not be less than 3 points. In order to ensure the quality of the project, the inspection frequency can be appropriately increased.

为缩短检测时间,加快作业循环,采用声波透射法快速检测,辅助钻孔取芯法对比校正,既可满足较大频次检测要求,又可保证检测结果的准确性。In order to shorten the detection time and speed up the operation cycle, the sound wave transmission method is used for rapid detection, and the auxiliary drilling and coring method is used for comparison and correction, which can not only meet the requirements of relatively large frequency detection, but also ensure the accuracy of the detection results.

以上方案的特点是:The features of the above schemes are:

1、以柔性桩作为加速软基排水固结的主体单元,而以柔性桩复合后形成的(夯扩载体)劲芯桩作为提高承载能力的主要单元,多种类型的桩单元与软土共同作用构成了多元复合地基。对柔性桩的复合类型包括2种:①劲芯复合桩和②夯扩载体劲芯复合桩。复合类型选择及桩单元的分布可以根据现场承载力要求决定。1. The flexible pile is used as the main unit to accelerate the drainage and consolidation of the soft foundation, and the core pile formed after the combination of the flexible pile (tamping and expansion carrier) is used as the main unit to improve the bearing capacity. Various types of pile units work together with the soft soil The action constitutes the multi-element composite foundation. The composite types of flexible piles include two types: ① composite pile with strong core and ② composite pile with reinforced core with rammed and expanded carrier. The selection of composite types and the distribution of pile units can be determined according to the requirements of the bearing capacity of the site.

(1)夯扩(废弃物)载体扩大头。采用柱锤夯击建筑废弃物再生填料,使之挤压周围土体,从而得到有效挤密与加固。作用范围包括:桩端以下深度3~5m和直径2~3m约10m3的土体,形成由干硬性混凝土、废弃物填料和挤密土体组合而成的扩大头复合载体。(1) Ramping expansion (waste) carrier expansion head. Pillar hammers are used to tamp the recycled construction waste filling to squeeze the surrounding soil, thereby achieving effective compaction and reinforcement. The scope of action includes: the soil body with a depth of 3-5m below the pile tip and a diameter of 2-3m about 10m 3 forms a composite carrier of an enlarged head composed of dry hard concrete, waste filler and compacted soil.

(2)长—短或刚—柔桩组合。柔性桩(如砂石桩)通常击穿软弱层底形成短桩,“短而密”的柔性桩可加速排水固结且振密、挤密软土。在部分柔性桩中心,打入刚性芯桩(如混凝土桩)并进入较硬持力层形成长桩。劲芯长桩与部分柔性短桩以及砂石垫层等形成多元桩复合地基。劲芯长桩利用散体材料外芯排水、护壁并挤密桩间土,而利用刚度和强度较大的劲芯有效提高单桩承载力。(2) Combination of long-short or rigid-flexible piles. Flexible piles (such as sand and gravel piles) usually break through the soft bottom to form short piles. "Short and dense" flexible piles can accelerate drainage and consolidation and vibrate and compact soft soil. In the center of some flexible piles, a rigid core pile (such as a concrete pile) is driven into a harder bearing layer to form a long pile. The long core piles, part of the flexible short piles and the sand and gravel cushion form a multi-component pile composite foundation. Long core piles use loose materials for drainage, wall protection and compaction of the soil between piles, while strong cores with high rigidity and strength can effectively increase the bearing capacity of single piles.

(3)桩土相互作用共同承载。在多元复合地基中,夯扩载体、劲芯长桩、柔性短桩和桩间土体等多个单元协调匹配、刚柔相济、相互补强、共同提高,集置换、竖向增强、排水、固结、振密和充填作用于一体。该型多元复合地基大幅提高了软土地基的强度和稳定性,降低了压缩性,可以适应现场不同土质分布的实际工况,并能满足上部结构对承载力的多元化要求。(3) The pile-soil interaction bears the load together. In the multi-component composite foundation, multiple units such as the rammed and expanded carrier, the long core pile, the flexible short pile, and the soil between the piles are coordinated and matched, rigid and flexible, mutually reinforced, and jointly improved, integrating replacement, vertical reinforcement, drainage, and consolidation. , vibration density and filling functions in one. This type of multi-component composite foundation greatly improves the strength and stability of the soft soil foundation, reduces the compressibility, can adapt to the actual working conditions of different soil distributions on site, and can meet the diversified requirements of the upper structure for the bearing capacity.

Claims (3)

1.一种夯扩载体劲芯多元复合桩,包括竖直固定在土层中且采用建筑废弃物作为再生骨料的散体桩(1);其特征在于该散体桩中竖直穿插一由钢筋混凝土形成的刚性芯桩(2);所述刚性芯桩的底端与散体桩的底端平齐,刚性芯桩与散体桩的底端还共同连接一球形载体扩大头从而形成夯扩载体劲芯复合桩。1. A multi-component composite pile with a rammed and expanded carrier core, comprising a loose pile (1) vertically fixed in the soil layer and using construction waste as recycled aggregate; it is characterized in that a A rigid core pile (2) formed of reinforced concrete; the bottom end of the rigid core pile is flush with the bottom end of the bulk pile, and the bottom ends of the rigid core pile and the bulk pile are also jointly connected with a spherical carrier expanding head to form Rammed expanded carrier strength core composite pile. 2.根据权利要求1所述的夯扩载体劲芯多元复合桩,其特征在于:所述球形载体扩大头由外部压密土体层(5)包覆的建筑废弃物填料层(4)和建筑废弃物填料层内部的干硬混凝土层(3)组成。2. The multi-element composite pile with rammed and expanded carrier strength core according to claim 1, characterized in that: the spherical carrier enlarged head is covered by a construction waste filler layer (4) and an outer compacted soil layer (5) and It consists of a dry hard concrete layer (3) inside the construction waste filling layer. 3.根据权利要求2所述的夯扩载体劲芯多元复合桩,其特征在于:所述刚性芯桩与散体桩的轴线重合。3. The multi-element composite pile with rammed and expanded carrier core core according to claim 2, characterized in that: the axis of the rigid core pile coincides with that of the bulk pile.
CN201420061390.9U 2014-02-11 2014-02-11 Rammed carrier strong core multi-component composite pile Expired - Fee Related CN203741824U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420061390.9U CN203741824U (en) 2014-02-11 2014-02-11 Rammed carrier strong core multi-component composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420061390.9U CN203741824U (en) 2014-02-11 2014-02-11 Rammed carrier strong core multi-component composite pile

Publications (1)

Publication Number Publication Date
CN203741824U true CN203741824U (en) 2014-07-30

Family

ID=51341645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420061390.9U Expired - Fee Related CN203741824U (en) 2014-02-11 2014-02-11 Rammed carrier strong core multi-component composite pile

Country Status (1)

Country Link
CN (1) CN203741824U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821139A (en) * 2014-02-11 2014-05-28 浙江交通职业技术学院 Reamed carrier and stiffness core multi-component composite pile and soft soil foundation strengthening construction method
CN115852932A (en) * 2023-02-13 2023-03-28 石家庄铁道大学 Construction method of a carrier pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821139A (en) * 2014-02-11 2014-05-28 浙江交通职业技术学院 Reamed carrier and stiffness core multi-component composite pile and soft soil foundation strengthening construction method
CN115852932A (en) * 2023-02-13 2023-03-28 石家庄铁道大学 Construction method of a carrier pile
CN115852932B (en) * 2023-02-13 2024-02-23 北京波森特岩土工程有限公司 Construction method of carrier pile

Similar Documents

Publication Publication Date Title
CN103821139B (en) A kind of rammer expands carrier strength core multiple elements design stake and reinforced soft soil ground construction method
CN102277867B (en) A construction method of collapsible loess foundation
CN110318394B (en) Construction method of composite pile
CN102733378B (en) Construction method of concrete pile
CN114517472B (en) Construction method of a carrier pile
CN106013132B (en) A kind of reducing built pile
CN100375820C (en) Concrete pile construction method
CN104711974A (en) Steel tube recycled concrete composite bearing base pile and manufacturing method thereof
CN108677912A (en) A kind of CFG core sands stone built pile, its composite foundation constituted and construction method
CN102839683B (en) Granular pile-permeable concrete stake dual compound foundation and processing method
CN104947648A (en) Deep replacement dynamic compaction gravel pile foundation reinforcement method
CN104762956B (en) A pile-forming method based on recycled aggregate piles from construction waste
CN103790148A (en) Combined treatment construction method for collapsible loess foundation
CN108797578A (en) Crushed stone grouting pile and its construction method with classification enlarged footing
CN209162869U (en) Pile End Construction Recycled Materials Compact and Expand Composite Pile Foundation
CN203741824U (en) Rammed carrier strong core multi-component composite pile
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN103615002B (en) A kind of expansion end broken stone pile pile steel pipe and construction method
CN104895078B (en) A kind of to hold the construction method of the prefabricated pile of holding capacity
CN110593242A (en) Heavy-load ground foundation structure of seepage-proofing area of soft foundation and processing method thereof
CN205999887U (en) Boring steel reinforcement cage hoop slip casting broken stone pile
CN100424272C (en) Construction Method of Static Pressure Pile Composite Foundation with Scattered Material
CN204530683U (en) A kind of pile making device ramming expansion CFG stake for spiral pore-forming
CN104674795B (en) The method for prefabricating and its construction method of concrete-pile
CN100387789C (en) Concrete pile construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20160211