CN203741775U - Processing structure for gap between concrete prefabricated beams - Google Patents

Processing structure for gap between concrete prefabricated beams Download PDF

Info

Publication number
CN203741775U
CN203741775U CN201320850345.7U CN201320850345U CN203741775U CN 203741775 U CN203741775 U CN 203741775U CN 201320850345 U CN201320850345 U CN 201320850345U CN 203741775 U CN203741775 U CN 203741775U
Authority
CN
China
Prior art keywords
gap
concrete prefabricated
processing structure
backfill
micro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320850345.7U
Other languages
Chinese (zh)
Inventor
周先练
姚元成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Guiyang Engineering Corp
Original Assignee
Hydrochina Guiyang Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Guiyang Engineering Corp filed Critical Hydrochina Guiyang Engineering Corp
Priority to CN201320850345.7U priority Critical patent/CN203741775U/en
Application granted granted Critical
Publication of CN203741775U publication Critical patent/CN203741775U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

The utility model discloses a processing structure for a gap between concrete prefabricated beams. The processing structure comprises the gap between the concrete prefabricated beams, a reverse hoisting formwork and a micro-expansive cement mortar backfill body, wherein the reverse hoisting formwork is detachably installed at the bottom of the gap, and the micro-expansive cement mortar backfill body is located in the gap. The processing structure for the gap between the concrete prefabricated beams has the advantages that due to the fact that the reverse hoisting formwork which is detachably installed serves as a construction formwork for concrete prefabricated beam gap backfill, installation is convenient, fast and reliable; due to the fact that backfill construction is carried out in the gap between the concrete prefabricated beams through the micro-expansive cement mortar backfill body, the working procedure is simplified, the backfill construction quality of the micro-expansive mortar is ensured, the phenomenon that because water flow scours the gap, cavitation happens is avoided, it is ensured that the surface of the gap between the concrete prefabricated beams is flat, flow passage is smooth, and safe operation of a project is ensured.

Description

A kind of processing structure for concrete prefabricated beam gap
Technical field
The utility model relates to a kind of processing structure for concrete prefabricated beam gap, belongs to technical field of building construction.
Background technology
In current hydroelectric project, for accelerating across the interim hole construction speed of dam body, generally concrete prefabricated beam is erected on to interim hole top as concrete construction formwork.But owing to being subject to the impact of precast beam construction technology and prefab form error, the larger gap of general existence between concrete prefabricated beam, in hydroelectric project practice of construction process, as bridge in husky a small bay in a river, lattice etc. has all been ignored the backfill processing to gap.For the interim hole that had water requirement, in the time that flow rate of water flow is larger, the concrete prefabricated girder construction at position, gap is formed and washes away and produce cavitation erosion, bring great potential safety hazard to interim hole operation.Facts have proved, between concrete prefabricated beam, gap processing is an extremely important easy unheeded technical problem again, once process in gap between concrete prefabricated beam, will bring hidden danger to engineering safety operation.
Summary of the invention
The purpose of this utility model is to provide a kind of processing structure for concrete prefabricated beam gap, overcomes the deficiencies in the prior art, can avoid current scour gap to cause the generation of cavitation erosion, guarantees engineering safety operation.
The purpose of this utility model is achieved through the following technical solutions: a kind of processing structure for concrete prefabricated beam gap, it comprises and is arranged in the gap of concrete prefabricated beam, is detachably arranged on the counter of gap bottom and hangs template and be arranged in the micro-expansion cement mortar backfill body in gap.
The described anti-template of hanging is fixed on lock(ing) bolt, and lock(ing) bolt is arranged in gap.
The bottom of described concrete prefabricated beam is provided with water resistant stream erosional layer.
The beneficial effects of the utility model are: use the detachable anti-construction formwork of template as the gap backfill of concrete prefabricated beam that hang of installing, install convenient reliable, secondly, between concrete prefabricated beam, gap adopts micro-expansion cement mortar backfill body to carry out backfill construction, simplify operation, ensure the backfill construction quality of microdilatancy mortar, avoid current scour gap to cause the generation of cavitation erosion, also guaranteed that between concrete prefabricated beam, gap face is smooth, overcurrent is smooth-going, has ensured engineering safety operation
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Wherein, the anti-template of hanging of 1-, 2-lock(ing) bolt, the concrete prefabricated beam of 3-, 4-micro-expansion cement mortar backfill body, 5-gap, 6-water resistant stream erosional layer.
Detailed description of the invention
Further describe the technical solution of the utility model below in conjunction with accompanying drawing, but described in claimed scope is not limited to.
As Fig. 1, a kind of processing structure for concrete prefabricated beam gap, it comprises the gap 5 that is arranged in concrete prefabricated beam 3, detachably being arranged on the counter of 5 bottoms, gap hangs template 1 and is arranged in the micro-expansion cement mortar backfill body 4 in gap 5, guarantee that 4 expansions of microdilatancy mortar fit tightly afterwards and between concrete prefabricated beam 3, micro-expansion cement mortar backfill body 4 not only possesses microdilatancy performance, gap between can intact fill concrete precast beam, and mortar possesses higher-strength, can resist high flow rate current scour, under the washing away of high-velocity flow, can not destroyed by rush of water or be produced and be come off, make the gap face in concrete prefabricated beam 3 smooth, overcurrent is smooth-going, the operation of guarantee engineering safety.
The described anti-template 1 of hanging is fixed on lock(ing) bolt 2, and lock(ing) bolt 2 is arranged in gap 5, spillage not when guaranteeing the gap 5 of concrete prefabricated beam 3 to carry out backfill.
The bottom of described concrete prefabricated beam 3 is provided with water resistant stream erosional layer 6, has met so the anti-current scour requirement of solidifying native precast beam 3.
Adopt micro-expansion cement mortar backfill body 4 to carry out backfill processing to the gap 5 of concrete prefabricated beam 3.When micro-expansion cement mortar backfill body 4 backfill constructions complete and reach after certain age strength, remove the anti-template 2 of hanging, install convenient, reliable.

Claims (3)

1. for the processing structure in concrete prefabricated beam gap, it is characterized in that: it comprises and is arranged in the gap (5) of concrete prefabricated beam (3), is detachably arranged on the counter of gap (5) bottom and hangs template (1) and be arranged in the micro-expansion cement mortar backfill body (4) in gap (5).
2. the processing structure for concrete prefabricated beam gap according to claim 1, is characterized in that: the described anti-template (1) of hanging is fixed on lock(ing) bolt (2) above, and lock(ing) bolt (2) is arranged in gap (5).
3. the processing structure for concrete prefabricated beam gap according to claim 1, is characterized in that: the bottom of described concrete prefabricated beam (3) is provided with water resistant stream erosional layer (6).
CN201320850345.7U 2013-12-20 2013-12-20 Processing structure for gap between concrete prefabricated beams Expired - Lifetime CN203741775U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320850345.7U CN203741775U (en) 2013-12-20 2013-12-20 Processing structure for gap between concrete prefabricated beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320850345.7U CN203741775U (en) 2013-12-20 2013-12-20 Processing structure for gap between concrete prefabricated beams

Publications (1)

Publication Number Publication Date
CN203741775U true CN203741775U (en) 2014-07-30

Family

ID=51341596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320850345.7U Expired - Lifetime CN203741775U (en) 2013-12-20 2013-12-20 Processing structure for gap between concrete prefabricated beams

Country Status (1)

Country Link
CN (1) CN203741775U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638709A (en) * 2016-12-29 2017-05-10 上海建工二建集团有限公司 Anti-seepage method for cast-in-place concrete wall construction joint based on water swelling sealant
CN108999403A (en) * 2018-09-29 2018-12-14 北京首钢建设集团有限公司 A kind of tool-type applied to prefabricated laminated floor slab strip hangs mould method
CN111364629A (en) * 2020-03-20 2020-07-03 中交第三航务工程局有限公司 Water stopping process for construction joint

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638709A (en) * 2016-12-29 2017-05-10 上海建工二建集团有限公司 Anti-seepage method for cast-in-place concrete wall construction joint based on water swelling sealant
CN108999403A (en) * 2018-09-29 2018-12-14 北京首钢建设集团有限公司 A kind of tool-type applied to prefabricated laminated floor slab strip hangs mould method
CN111364629A (en) * 2020-03-20 2020-07-03 中交第三航务工程局有限公司 Water stopping process for construction joint

Similar Documents

Publication Publication Date Title
CN203741775U (en) Processing structure for gap between concrete prefabricated beams
CN203878547U (en) Novel structure for stilling pool
CN201605523U (en) Suspension cable type floating bridge
CN101769157B (en) Construction method for tunnel working face counterpressure treatment during tunnel excavation
CN203741792U (en) Concrete tooth groove stilling basin
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN203128998U (en) Temporary floating bridge for construction
CN204571433U (en) Fluid erosion prevention sulfuric acid tank
CN204676677U (en) Silting blocking formula inverted-siphon sewer system
CN204570446U (en) The T-shaped simply supported beam of a kind of precast assembly
CN204738299U (en) Form album device of sediment platform fast in steep side slope of height
CN103015459A (en) Construction method for underwater baring platform steel cover box on storm surge river mouth
CN203320497U (en) Tail water maintenance gate for power station
CN202990112U (en) Plate and beam reserved joint bar structure of hydropower house
CN205776115U (en) Diversion tunnel lock chamber maintenance structure
CN101377073A (en) Preposition oblique post apparatus for alleviating bridge abutment base dredging and erosion
CN104790353A (en) Sluice pier construction method for small and medium size sluices
CN204690705U (en) A kind of operator guards of high speed flow-passing surface
CN204475319U (en) There is pressure underground water bored pile in a kind of hole wall crack
CN204021215U (en) A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam
CN203546740U (en) Riverway closure dike structure
CN203878546U (en) Culvert with energy dissipation function
CN202265807U (en) Gate chamber of building for flow guide and drainage
CN203846463U (en) Sudden-drop and sudden-expansion structure in free-flow spillway tunnel reconstruction
CN202689242U (en) Door buttress wall brickwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140730