CN203701602U - Rapid chimney construction device - Google Patents

Rapid chimney construction device Download PDF

Info

Publication number
CN203701602U
CN203701602U CN201420024148.4U CN201420024148U CN203701602U CN 203701602 U CN203701602 U CN 203701602U CN 201420024148 U CN201420024148 U CN 201420024148U CN 203701602 U CN203701602 U CN 203701602U
Authority
CN
China
Prior art keywords
steel
wire rope
chimney
construction device
standard knot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420024148.4U
Other languages
Chinese (zh)
Inventor
宋永恒
董勤良
宗进营
寇华伟
杨真
马庆海
于浩
常欢欢
杨良
张晓娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Original Assignee
PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION filed Critical PINGMEI SHENMA CONSTRUCTION ENGINEERING GROUP Co Ltd CIVIL WORK SECTION
Priority to CN201420024148.4U priority Critical patent/CN203701602U/en
Application granted granted Critical
Publication of CN203701602U publication Critical patent/CN203701602U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a rapid chimney construction device which can effectively solve the problems of high labor intensity, waste of human resources and difficulty of control over materials and quality in chimney construction. According to the technical scheme, the rapid chimney construction device comprises standard joints, an operation platform, a concrete pedestal and a lift motor, wherein the standard joint is fixed to the concrete pedestal, second fixed pulleys are arranged at the joints of the bottoms of the standard joints and the concrete pedestal and respectively connected with a steel wire rope sleeve auxiliary wheel, a first fixed pulley and the operation platform through a steel wire rope, the steel wire rope sleeve auxiliary wheels are connected with a steel wire rope sleeve main wheel through web members, and the steel wire rope sleeve main wheel is connected with the lift motor. The rapid chimney construction device is fast in construction progress, convenient to install and use and good in effect, saves human and material resources and is an innovation in the field of chimney construction devices, and quality can be easily controlled.

Description

A kind of chimney rapid construction device
Technical field
The utility model relates to building implements, particularly a kind of chimney rapid construction device.
Background technology
Aspect chimney construction, mainly adopt at present sliding mode technology, sliding mode technology is only applicable to concrete structure, and brick mix structure is also inapplicable.Traditional mode not only makes labour intensity large, and operation can not reasonable link, causes the waste of manpower, material, and construction inherent quality, and outward curve and smooth in appearance degree are difficult to control, and therefore, the improvement of chimney construction device is the problem of needing at present solution badly.
Summary of the invention
For above-mentioned situation, for solving the defect of prior art, the object of the utility model is just to provide a kind of chimney rapid construction device, and can effectively solve chimney construction time, labour intensity is large, waste of manpower, material, the problem of difficult quality control.
The technical scheme that the utility model solves is, comprise standard knot, operating platform, concrete pedestal and lifter motor, standard knot is fixed on concrete pedestal, the second fixed pulley is equipped with concrete pedestal junction in standard knot bottom, the second fixed pulley is connected with wire rope sleeve accessory whorl, the first fixed pulley, operating platform respectively by wire rope, wire rope sleeve accessory whorl links together through web member and wire rope sleeve main wheel, and wire rope sleeve main wheel is connected with lifter motor.
The utility model construction speed is fast, easy to install, and quality is easily controlled, effective, saves man power and material, is the innovation on chimney construction device.
Accompanying drawing explanation
Fig. 1 is structural front view of the present utility model.
Fig. 2 is standard knot structural representation of the present utility model.
Fig. 3 is operating platform structural front view of the present utility model.
Fig. 4 is operating platform 1-1 sectional drawing of the present utility model.
Fig. 5 is attached arm configuration front view of the present utility model.
Fig. 6 is attached arm embedded part structure front view of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail.
Provided by Fig. 1-6, the utility model comprises standard knot, operating platform, concrete pedestal and lifter motor, standard knot 5 is fixed on concrete pedestal 4, the second fixed pulley 9 is equipped with in standard knot 5 bottoms and concrete pedestal 4 junctions, the second fixed pulley 9 is connected with wire rope sleeve accessory whorl 11, the first fixed pulley 7, operating platform 3 respectively by wire rope 8, wire rope sleeve accessory whorl 11 links together through web member 12 and wire rope sleeve main wheel 10, and wire rope sleeve main wheel 10 is connected with lifter motor 13.
In order to guarantee result of use, described standard knot 5 is by column 5A, framework 5B, guide rail 6 and brace 5C form, framework 5B is made up of 4 angle steel, between 4 root post 5A, there is framework 5B along peripheral transverse weld, obliquely be welded with brace 5C along diagonal between column 5A, on standard knot 5, be welded with guide rail 6, guide rail 6 is by C shaped steel 6A, T-steel 6C, the first Guide rollers 6B, the second Guide rollers 6D forms, T-steel 6C is welded on framework 5B and goes up and be inlaid in C shaped steel 6A, the first Guide rollers 6B, the second Guide rollers 6D is placed between T-steel 6C and C shaped steel 6A, form and slide up and down structure, C shaped steel 6A and operating platform 3 weld together.
Described operating platform 3 is made up of steel joist 3A, balancing pole 3B, guard rail 3D and the first steel plate 3E, the first steel plate 3E is housed on steel joist 3A, guard rail 3D and balancing pole 3B are housed above steel plate 3E, there is tie point 3C at balancing pole 3B center, and operating platform 3 links together by tie point 3C and wire rope 9.
There is control hole 3F at described steel joist 3A center, and guard rail 3D is the rectangle of the spacing 150mm that makes of stainless-steel pipe, height 1100mm.
On described standard knot, every 30m arranges attached arm 2 together, attached arm 2 is made up of the second steel plate 2A, square steel 2C and adjustable and retractable screw rod 2D, attached arm 2 two ends are fixed with circular arc the second steel plate 2A that 16mm is thick, on the second steel plate 2A, there is bolt hole 2B, middle part is fixed with square steel 2C, and there is adjustable and retractable screw rod 2D at center.
Attached arm built-in fitting 1 is equipped with in described attached arm 2 bottoms, and attached arm built-in fitting 1 is welded together and formed by thick circular arc the 3rd steel plate 1B of bolt 1A, 16mm, and bolt 1A is contained in bolt hole 2B.
Service condition of the present utility model is that the vertical-lift power of this equipment adopts hoist motor special, joins wire rope sleeve, diameter phi 14 wire rope; By 2 fixed pulleys, complete and being connected of operating platform the work that slides up and down of the platform operating.When construction, template, reinforcing bar, concrete etc. are transported to operating platform with trolley, then rise on the operation platform on top, then complete the installing of template, the colligation of reinforcing bar, concrete building.Reserve 200mm × 200mm aperture in operating platform center, as the hole of measuring stack shell center line in work progress.
The utility model is taked chimney interior construction technique, can effectively solve and be cold, the low problem that cannot construct of temperature, can effectively save the duration, construction equipment equipment is succinct, good assembled, technique is simple, safety factor is high, the scope of application is wide, has not only solved difficult quality control, and accelerating construction progress, save lot of materials, saving construction cost, is the innovation on chimney construction device, and economic and social benefit is remarkable.

Claims (6)

1. a chimney rapid construction device, comprise standard knot, operating platform, concrete pedestal and lifter motor, it is characterized in that, standard knot (5) is fixed on concrete pedestal (4), the second fixed pulley (9) is equipped with concrete pedestal (4) junction in standard knot (5) bottom, the second fixed pulley (9) by wire rope (8) respectively with wire rope sleeve accessory whorl (11), the first fixed pulley (7), operating platform (3) is connected, wire rope sleeve accessory whorl (11) links together through web member (12) and wire rope sleeve main wheel (10), wire rope sleeve main wheel (10) is connected with lifter motor (13).
2. chimney rapid construction device according to claim 1, it is characterized in that, described standard knot (5) is by column (5A), framework (5B), guide rail (6) and brace (5C) form, framework (5B) is made up of 4 angle steel, between 4 root posts (5A), there is framework (5B) along peripheral transverse weld, obliquely be welded with brace (5C) along diagonal between column (5A), on standard knot (5), be welded with guide rail (6), guide rail (6) is by C shaped steel (6A), T-steel (6C), the first Guide rollers (6B), the second Guide rollers (6D) forms, T-steel (6C) is welded on framework (5B) and goes up and be inlaid in C shaped steel (6A), the first Guide rollers (6B), the second Guide rollers (6D) is placed between T-steel (6C) and C shaped steel (6A), form and slide up and down structure, C shaped steel (6A) welds together with operating platform (3).
3. chimney rapid construction device according to claim 1, it is characterized in that, described operating platform (3) is made up of steel joist (3A), balancing pole (3B), guard rail (3D) and the first steel plate (3E), the first steel plate (3E) is housed on steel joist (3A), the first steel plate (3E) is equipped with guard rail (3D) and balancing pole (3B) above, there is tie point (3C) at balancing pole (3B) center, and operating platform (3) links together by tie point (3C) and wire rope (9).
4. chimney rapid construction device according to claim 3, it is characterized in that, there is control hole (3F) at described steel joist (3A) center, the spacing 150mm that guard rail (3D) is made for stainless-steel pipe, the rectangle of height 1100mm.
5. chimney rapid construction device according to claim 1, it is characterized in that, on described standard knot, every 30m arranges attached arm (2) together, attached arm (2) is made up of the second steel plate (2A), square steel (2C) and adjustable and retractable screw rod (2D), attached arm (2) two ends are fixed with circular arc the second steel plate (2A) that 16mm is thick, on the second steel plate (2A), there is bolt hole (2B), middle part is fixed with square steel (2C), and there is adjustable and retractable screw rod (2D) at center.
6. chimney rapid construction device according to claim 5, it is characterized in that, attached arm built-in fitting (1) is equipped with in described attached arm (2) bottom, attached arm built-in fitting (1) welds together formation by bolt (1A), circular arc the 3rd steel plate (1B) that 16mm is thick, and bolt (1A) is contained in bolt hole (2B).
CN201420024148.4U 2014-01-15 2014-01-15 Rapid chimney construction device Expired - Fee Related CN203701602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420024148.4U CN203701602U (en) 2014-01-15 2014-01-15 Rapid chimney construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420024148.4U CN203701602U (en) 2014-01-15 2014-01-15 Rapid chimney construction device

Publications (1)

Publication Number Publication Date
CN203701602U true CN203701602U (en) 2014-07-09

Family

ID=51052058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420024148.4U Expired - Fee Related CN203701602U (en) 2014-01-15 2014-01-15 Rapid chimney construction device

Country Status (1)

Country Link
CN (1) CN203701602U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108750970A (en) * 2018-06-07 2018-11-06 重庆工业职业技术学院 A kind of tower crane occasional passage and its installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108750970A (en) * 2018-06-07 2018-11-06 重庆工业职业技术学院 A kind of tower crane occasional passage and its installation method

Similar Documents

Publication Publication Date Title
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN201818051U (en) Supporting frame for overhanging mold plate
CN103586618A (en) Large pipe welding platform
CN203392766U (en) Lightweight lifting bracket arranged on roof
CN205123121U (en) Action bars is strideed across to electric wire
CN204224128U (en) A kind of safe tower crane
CN203795311U (en) Multi-leg high pier and slip form construction device
CN203701602U (en) Rapid chimney construction device
CN203592268U (en) Large pipe welding platform
CN203462736U (en) Operating platform for lift shaft structural steel construction
CN204040515U (en) Cat ladder
CN203924695U (en) A kind of indirect cool tower mould-lifting device
CN204198306U (en) A kind of device for purlin lifting in building operation
CN209721363U (en) A kind of lifting pipeline auxiliary device
CN203760929U (en) Tension tower line-tightening steering pulley used during construction of power transmission line tower
CN203613464U (en) Slip form construction cargo transportation device
CN203624932U (en) Portable indoor material lifter
CN205400045U (en) Simple and easy type concrete mould shell machine
CN204266584U (en) A kind of steel work circle and ellipse light shaft regularization construction operation platform
CN205116776U (en) Support access structure
CN103498551B (en) Elevator hoistways shaped steel construction operation platform
CN203613461U (en) Slip form construction lifting system
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN203783108U (en) Movable lifting bracket for elevator shaft
CN203394060U (en) Concrete transporting device for bridge construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140709

Termination date: 20150115

EXPY Termination of patent right or utility model