CN203684377U - Prefabricated drainage ditch - Google Patents

Prefabricated drainage ditch Download PDF

Info

Publication number
CN203684377U
CN203684377U CN201320793332.0U CN201320793332U CN203684377U CN 203684377 U CN203684377 U CN 203684377U CN 201320793332 U CN201320793332 U CN 201320793332U CN 203684377 U CN203684377 U CN 203684377U
Authority
CN
China
Prior art keywords
groove body
cover plate
gutter
wall
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320793332.0U
Other languages
Chinese (zh)
Inventor
孙学明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao New Century Prefabricated Components Co Ltd
Original Assignee
Qingdao New Century Prefabricated Components Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao New Century Prefabricated Components Co Ltd filed Critical Qingdao New Century Prefabricated Components Co Ltd
Priority to CN201320793332.0U priority Critical patent/CN203684377U/en
Application granted granted Critical
Publication of CN203684377U publication Critical patent/CN203684377U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a drainage ditch, particularly to a prefabricated drainage ditch. The drainage ditch consists of a groove main body and a cover plate, wherein the cover plate can cover the groove main body; a bellmouth is formed in the front end of the groove main body, and an inserting port is formed in the rear end of the groove main body; a tenon can be inserted into the bellmouth in the front end of the other section of the groove main body; a water inlet is formed in the cover plate. The drainage ditch is characterized in that a water blocking strip is arranged on one side, adjacent to the wall body of a building, of the cover plate; the drainage ditch can protect the wall body and prevent the wall body from being eroded by accumulated water.

Description

Prefabricated gutter
Technical field
The utility model relates to a kind of gutter, particularly a kind of prefabricated gutter.
Background technology
For the rainwater that prevents from flowing down from the eminence of the buildings such as building, the air conditioner water dripping or other living water uses accumulate near the base of building wall, corrode building wall, usually at the base place of building wall, gutter is set.Gutter of the prior art is general is first digging a groove along the base of building wall, the bottom surface in groove and two sides, front and back brick on it is then used brick upper cover plate on groove.There is following defect in gutter of the prior art: 1, lay bricks at the scene, complex steps, brickly takes a lot of work, time-consuming, and the engineering time is longer; 2, above-mentioned gutter is disposable products, can not reuse, and cost is higher comparatively speaking; 3, severe contamination job site environment.
In order to reach energy-conservation, material-saving, shortening construction period, to avoid Lou meeting texts, utility model patent CN 202936768 U provide a kind of prefabricated gutter, it is made up of rectangular groove body and the cover plate that is provided with inlet opening that can cover on groove body, front end at groove body arranges groove, and rear end arranges the tenon of the groove that can insert another joint groove body.But because above-mentioned prefabricated gutter exists following problems: 1, because cover plate is planar shaped, even because the error in manufacturing process may be to body of wall face tilt, so in the time that rainwater, water droplet in air conditioner or living water use drop to cover plate above building, still may between the adjacent construction wall of the entity part of cover plate and gutter, store, cause the erosion to construction wall.2, build now all a lot of negative and positive angles of periphery, but the groove body in the prefabricated gutter providing due to CN 202936768 U is cuboid, therefore can only be fast in installation gutter, the bottom surface of same face wall, and in metope junction and negative and positive angle place, must on-the-spotly cut into and be applicable to the shape that corner connects according to size, still have waste resource and the problem in man-hour.
Utility model content
For addressing the above problem, the purpose of this utility model is to provide a kind of can protect body of wall, prevent that it is subject to the prefabricated gutter that ponding corrodes.
The technical solution of the utility model is: a kind of prefabricated gutter, formed by groove body and cover plate, and described cover plate can cover on described groove body, and described cover plate is provided with inlet opening, and the side that described cover plate and construction wall are adjacent is provided with water bar.
Optimize, the front end of described groove body is provided with bellmouth, and the rear end of described groove body arranges socket, and described socket can insert in the bellmouth of another joint groove body front end.
Optimize, the bottom surface of described cover plate is provided with projection that can insertion groove main body.
Optimize, described groove body is cuboid.
Optimize, described groove body is provided with turning.
The working method in the prefabricated gutter that the utility model provides is: the prefabricated gutter that is first cuboid according to the groove body of the size Selection appropriate size of construction wall and be provided with the prefabricated gutter at turning, then discharge the prefabricated gutter of cuboid on the base of the same face construction wall, and prevent the prefabricated gutter with turning in the connected corner of two face walls.
Then dock assembling, after inserting by the socket of the last joint groove body rear end in the prefabricated gutter of cuboid under same face wall in the bellmouth of a joint groove body, the socket of groove body rear end in prefabricated gutter that is provided with turning is inserted in the bellmouth of a face wall first segment groove body wherein, the socket of another face wall final section groove body is inserted and is provided with turning in the bellmouth of groove body front end, thereby in groove body, formed drainage channel.
Finally on groove body, cover corresponding cover plate, the adjacent construction wall of water bar of cover plate side, simultaneously in the opening of the projection insertion groove main body upper end of cover plate bottom surface.
The beneficial effects of the utility model are: 1, by above-mentioned gutter being set on construction wall base, in the time that rainwater, water droplet in air conditioner or living water use drop to cover plate above building, owing to being on the cover board provided with water bar, played the effect of isolated water and body of wall, water can not corrode construction wall; After water enters in groove body by inlet opening, can discharge along the drainage channel forming in groove body, play the effect that prevents that body of wall is etched.2, by projection being set in cover plate bottom surface, played the effect of securing cover plate.3, by being provided with the groove body at turning, realize the quick connection in construction wall corner gutter, be convenient to install, improve efficiency of construction, save resource.4, the turning of groove body can make according to the angle of building wall adjacent, has adapted to the needs of different construction walls.
Brief description of the drawings
The schematic diagram of the prefabricated drainage ditch cover plate that Fig. 1 provides for the utility model;
The schematic diagram of the prefabricated gutter cuboid groove body that Fig. 2 provides for the utility model;
The prefabricated gutter that Fig. 3 provides for the utility model is provided with the schematic diagram of the groove body at turning.
1, bellmouth; 2, socket; 3, inlet opening; 4, water bar; 5, projection; 6, turning.
Detailed description of the invention
Illustrate the utility model below in conjunction with drawings and embodiments.
The technical scheme of present embodiment is: a kind of prefabricated gutter, formed by groove body and cover plate, and described cover plate can cover on described groove body, and described cover plate is provided with inlet opening 3, and the side that described cover plate and construction wall are adjacent is provided with water bar 4.
Wherein, the front end of described groove body is provided with bellmouth 1, and the rear end of described groove body arranges socket 2, and described socket can insert in the bellmouth of another joint groove body front end.
Wherein, the bottom surface of described cover plate is provided with projection 5 that can insertion groove main body.
Wherein, described groove body is cuboid.
Wherein, described groove body is provided with turning 6.
The working method in the prefabricated gutter that present embodiment provides is: the prefabricated gutter that is first cuboid according to the groove body of the size Selection appropriate size of construction wall and be provided with the prefabricated gutter at turning, then discharge the prefabricated gutter of cuboid on the base of the same face construction wall, and prevent the prefabricated gutter with turning in the connected corner of two face walls.In present embodiment, in order to adapt to the connection in right angle type body of wall corner gutter, the turning that is provided with the groove body at turning is 90 degree.
Then dock assembling, after inserting by the socket of the last joint groove body rear end in the prefabricated gutter of cuboid under same face wall in the bellmouth of a joint groove body, the socket of groove body rear end in prefabricated gutter that is provided with turning is inserted in the bellmouth of a face wall first segment groove body wherein, the socket of another face wall final section groove body is inserted and is provided with turning in the bellmouth of groove body front end, thereby in groove body, formed drainage channel.
Finally on groove body, cover corresponding cover plate, the adjacent construction wall of water bar of cover plate side, simultaneously in the opening of the projection insertion groove main body upper end of cover plate bottom surface.
The feature of present embodiment is: 1, by above-mentioned gutter being set on construction wall base, in the time that rainwater, water droplet in air conditioner or living water use drop to cover plate above building, owing to being on the cover board provided with water bar, played the effect of isolated water and body of wall, water can not corrode construction wall; After water enters in groove body by inlet opening, can discharge along the drainage channel forming in groove body, play the effect that prevents that body of wall is etched.2, by projection being set in cover plate bottom surface, played the effect of securing cover plate.3, by being provided with the groove body at turning, realize the quick connection in construction wall corner gutter, be convenient to install, improve efficiency of construction, save resource.4, the turning of groove body can make according to the angle of building wall adjacent, has adapted to the needs of different construction walls.

Claims (5)

1. a prefabricated gutter, is made up of groove body and cover plate, and described cover plate can cover on described groove body, and described cover plate is provided with inlet opening, it is characterized in that: the side that described cover plate and construction wall are adjacent is provided with water bar.
2. prefabricated gutter according to claim 1, is characterized in that: the front end of described groove body is provided with bellmouth, the rear end of described groove body arranges socket, and described socket can insert in the bellmouth of another joint groove body front end.
3. prefabricated gutter according to claim 2, is characterized in that: the bottom surface of described cover plate is provided with projection that can insertion groove main body.
4. according to the prefabricated gutter described in claim 1-3 any one, it is characterized in that: described groove body is cuboid.
5. according to the prefabricated gutter described in claim 1-3 any one, it is characterized in that: described groove body is provided with turning.
CN201320793332.0U 2013-12-06 2013-12-06 Prefabricated drainage ditch Expired - Fee Related CN203684377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320793332.0U CN203684377U (en) 2013-12-06 2013-12-06 Prefabricated drainage ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320793332.0U CN203684377U (en) 2013-12-06 2013-12-06 Prefabricated drainage ditch

Publications (1)

Publication Number Publication Date
CN203684377U true CN203684377U (en) 2014-07-02

Family

ID=51006300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320793332.0U Expired - Fee Related CN203684377U (en) 2013-12-06 2013-12-06 Prefabricated drainage ditch

Country Status (1)

Country Link
CN (1) CN203684377U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821893A (en) * 2016-04-12 2016-08-03 山东大学 Recyclable drainage device applicable to underground engineering and construction method thereof
CN109024843A (en) * 2017-06-08 2018-12-18 苏州爱拼金属制品有限公司 Ground groove
WO2019210868A1 (en) * 2018-05-03 2019-11-07 上海墒抢环境技术有限公司 Road gutter having dust collection function

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821893A (en) * 2016-04-12 2016-08-03 山东大学 Recyclable drainage device applicable to underground engineering and construction method thereof
CN105821893B (en) * 2016-04-12 2018-08-28 山东大学 Recyclable drainage arrangement and its construction method suitable for underground engineering
CN109024843A (en) * 2017-06-08 2018-12-18 苏州爱拼金属制品有限公司 Ground groove
WO2019210868A1 (en) * 2018-05-03 2019-11-07 上海墒抢环境技术有限公司 Road gutter having dust collection function
JP2021521367A (en) * 2018-05-03 2021-08-26 上海▲シャン▼搶環境技術有限公司 Drainage ditch with dust collection function for roads

Similar Documents

Publication Publication Date Title
CN104727470B (en) A kind of removable partition wall system
CN203684377U (en) Prefabricated drainage ditch
CN102127944A (en) Metal roof ridge waterproofing system and mounting method thereof
CN203821637U (en) Insertion assembly for partition wall system and specially-shaped keel thereof
CN209742130U (en) Screw connection's assembled wallboard
WO2013143045A1 (en) Rain-proof external wall panel and construction method of rain-proof external wall
CN109577511B (en) Vertical seam connecting structure and connecting method for prefabricated wall panel
CN208396083U (en) A kind of novel prefabricated out-hung panel system
CN203701342U (en) Demountable partition wall system
CN104712105A (en) Tile plate preventing rainwater leakage
CN203701348U (en) U-shaped groove body used for partition system
CN203347082U (en) Energy-saving day-lighting roof capable of draining water structurally
CN105239802A (en) Multifunctional plastic drainage channel
CN215483044U (en) Well head protector of tenon fourth of twelve earthly branches structure precipitation well
CN104018651B (en) Wall plastering Yang Jiao rushes muscle bar and using method thereof
CN211396015U (en) Right-angle connecting structure of prefabricated house
CN211548481U (en) Energy-conserving wallboard of building of easily installing
CN206919216U (en) A kind of pre-buried mounting box of air-conditioning
CN202925703U (en) Rainwater detention prevention outer heat-preservation low-carbon board for external wall of building
CN210918234U (en) Hand hole block structure
CN103469946B (en) Clean and flat open-type metallic curtain wall system
CN219654158U (en) Wallboard hanging structure
CN217480523U (en) Waterproof component at top of building curtain wall
CN201952946U (en) Building wall panel
CN212427615U (en) Novel assembled wallboard

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140702

Termination date: 20211206

CF01 Termination of patent right due to non-payment of annual fee