CN203671160U - Equipment foundation mounting and fixing structure - Google Patents
Equipment foundation mounting and fixing structure Download PDFInfo
- Publication number
- CN203671160U CN203671160U CN201420042837.8U CN201420042837U CN203671160U CN 203671160 U CN203671160 U CN 203671160U CN 201420042837 U CN201420042837 U CN 201420042837U CN 203671160 U CN203671160 U CN 203671160U
- Authority
- CN
- China
- Prior art keywords
- equipment
- screw rod
- fixing structure
- supporting disk
- equipment foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 5
- 239000002002 slurry Substances 0.000 abstract description 5
- 238000004873 anchoring Methods 0.000 abstract 4
- 238000009434 installation Methods 0.000 description 5
- 239000004575 stone Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000010412 perfusion Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses an equipment foundation mounting and fixing structure, comprises equipment and an equipment foundation on the side wall of the equipment, wherein a reserved anchoring hole corresponding to the equipment foundation up and down is arranged on the side lower part of the equipment, a screw is arranged in the reserved anchoring hole, and the upper end of the screw penetrates through the equipment foundation; a lock nut, an elevation adjusting nut and a support disk are sequentially arranged on the upper part of the screw from the top down; the upper end face of the support disk is abutted against the bottom surface of the equipment; the screw is fixed on the equipment foundation by the elevation adjusting nut and the lock nut. The equipment foundation mounting and fixing structure is simple in structure; when in use, the screw is placed in the reserved anchoring hole, the equipment foundation mounting and fixing structure is mounted on the equipment foundation by the lock nut, the elevation adjusting nut is adjusted to enable the support disk to be abutted against the bottom surface of the equipment, the lock nut is screwed, and then slurry is poured into the reserved anchoring hole; through the above processes, fixing requirements of the equipment can be met, and the equipment elevation can be rapidly and accurately adjusted to improve the equipment elevation adjusting speed, and thus the operation efficiency can be greatly improved, the equipment elevation deviation can be reduced; the equipment foundation mounting and fixing structure is particularly suitable for adjusting elevations of the equipment in groups and rows.
Description
Technical field
The utility model belongs to equipment technique for fixing field, particularly a kind of equipment Foundations mount fixing structure is installed.
Background technique
At present, various industrial and mining enterprise all can use equipment, and the installation of equipment be unable to do without stone bolt, and the Main Function of stone bolt is that equipment and foundation are coupled together securely, in order to avoid equipment is subjected to displacement and topples in the time of work.Therefore, the use of stone bolt is very general.
In existing equipment installation process, adopt common parallels to adjust equipment absolute altitude more, complicated operation, and waste time and energy, working efficiency is low, can not meet in groups the in a row absolute altitude of equipment and adjust requirement.
Model utility content
The purpose of this utility model is to provide a kind of simple in structure, easy and simple to handle and equipment Foundations mount fixing structure of accurate adjustment equipment absolute altitude fast.
For achieving the above object, the technical solution of the utility model is: a kind of equipment Foundations mount fixing structure, comprise the equipment base on equipment and equipment sidewall, equipment side below is provided with the reserved lower margin hole upper and lower corresponding with equipment base, described reserved lower margin is provided with screw rod in hole, and screw rod upper end is through equipment base; Screw rod top is provided with locking nut, absolute altitude adjusting nut and supporting disk from top to bottom successively, and supporting disk upper-end surface withstands on equipment bottom surface, and screw rod is fixed on equipment base by absolute altitude adjusting nut and locking nut.
Described supporting disk area is greater than reserved lower margin hole area, and supporting disk is provided with material filling hole.
Between described locking nut and equipment base, be provided with Upper gasket, between absolute altitude adjusting nut and equipment base, be provided with lower levelling plate.
Described screw rod lower end is vertically provided with girth member, and girth member and screw rod form T shape.
Compared with prior art, the utility model has the advantages that:
1, the utility model comprises the equipment base on equipment and equipment sidewall, and equipment side below is provided with the reserved lower margin hole upper and lower corresponding with equipment base, and described reserved lower margin is provided with screw rod in hole, and screw rod upper end is through equipment base; Screw rod top is provided with locking nut, absolute altitude adjusting nut and supporting disk from top to bottom successively, supporting disk upper-end surface withstands on equipment bottom surface, screw rod is fixed on equipment base by absolute altitude adjusting nut and locking nut, it is simple in structure, easy and simple to handle, when use, first screw rod is placed in reserved lower margin hole, equipment base is passed in screw rod upper end, and is installed on equipment base by locking nut; Adjusting elevation adjusting nut, pushes up to equipment bottom surface supporting disk, and the centering of finishing equipment mounting point, screws locking nut; In reserved lower margin hole, pour into slurry by material filling hole, reach installation acceptance condition; Said process can meet the fixing requirement of equipment, can adjust accurately fast again equipment absolute altitude, regulates the speed to improve equipment absolute altitude, can greatly improve operating efficiency, and can reduce equipment absolute altitude deviation, is specially adapted in groups the in a row absolute altitude adjustment of equipment.
2, be vertically provided with girth member in screw rod lower end, girth member and screw rod form T shape, can greatly improve installation stability, improve fixed effect is installed; The area of supporting disk is greater than the area in reserved lower margin hole, is provided with material filling hole on supporting disk, be convenient to pour into slurry in reserved lower margin hole, and beautiful shape.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of supporting disk in Fig. 1.
Embodiment
Equipment Foundations mount fixing structure as depicted in figs. 1 and 2, it comprises the equipment base 2 on equipment 1 and equipment 1 sidewall, equipment 1 side-lower is provided with that Shang Xia 2 corresponding reserved lower margin hole 3 with equipment base.In reserved lower margin hole 3, be provided with screw rod 4, screw rod 4 upper ends are provided with screw thread, and screw rod 4 upper ends are through equipment base 2; Screw rod 4 tops are provided with locking nut 7, absolute altitude adjusting nut 6 and supporting disk 5 from top to bottom successively, supporting disk 5 upper-end surfaces withstand on the bottom surface of equipment 1, screw rod 4 is fixed on equipment base 2 by absolute altitude adjusting nut 6 and locking nut 7, and between locking nut 7 and equipment base 2, be provided with Upper gasket 9, between absolute altitude adjusting nut 6 and equipment base 2, be provided with lower levelling plate 8.In order to improve installation fixed effect, be vertically provided with girth member 10 in screw rod 4 lower ends, girth member 10 forms T shape with screw rod 4.
The area of supporting disk 5 is greater than the area in reserved lower margin hole 3, is provided with material filling hole 11 on supporting disk 5, for to reserved lower margin hole 3 interior perfusion slurries.
The utility model is applicable on the transmission device below 20T, and using process is: first, screw rod 4 is placed in reserved lower margin hole 3, equipment base 2 is passed in screw rod 4 upper ends, and is installed on equipment base 2 by locking nut 7; Secondly, adjusting elevation adjusting nut 6, pushes up to equipment 1 bottom surface supporting disk 5, and the centering of finishing equipment 1 mounting point, screws locking nut 7; Finally, to reserved lower margin hole 3 interior perfusion slurries, reach installation acceptance condition by material filling hole 11.
Claims (4)
1. an equipment Foundations mount fixing structure, comprise the equipment base on equipment and equipment sidewall, equipment side below is provided with the reserved lower margin hole upper and lower corresponding with equipment base, it is characterized in that: described reserved lower margin is provided with screw rod in hole, and screw rod upper end is through equipment base; Screw rod top is provided with locking nut, absolute altitude adjusting nut and supporting disk from top to bottom successively, and supporting disk upper-end surface withstands on equipment bottom surface, and screw rod is fixed on equipment base by absolute altitude adjusting nut and locking nut.
2. equipment Foundations mount fixing structure as claimed in claim 1, is characterized in that: described supporting disk area is greater than reserved lower margin hole area, and supporting disk is provided with material filling hole.
3. equipment Foundations mount fixing structure as claimed in claim 1 or 2, is characterized in that: between described locking nut and equipment base, be provided with Upper gasket, between absolute altitude adjusting nut and equipment base, be provided with lower levelling plate.
4. equipment Foundations mount fixing structure as claimed in claim 3, is characterized in that: described screw rod lower end is vertically provided with girth member, and girth member and screw rod form T shape.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420042837.8U CN203671160U (en) | 2014-01-23 | 2014-01-23 | Equipment foundation mounting and fixing structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420042837.8U CN203671160U (en) | 2014-01-23 | 2014-01-23 | Equipment foundation mounting and fixing structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203671160U true CN203671160U (en) | 2014-06-25 |
Family
ID=50967453
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420042837.8U Expired - Fee Related CN203671160U (en) | 2014-01-23 | 2014-01-23 | Equipment foundation mounting and fixing structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203671160U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108260930A (en) * | 2018-01-16 | 2018-07-10 | 中山市华盛家具制造有限公司 | A kind of splicing rack |
-
2014
- 2014-01-23 CN CN201420042837.8U patent/CN203671160U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108260930A (en) * | 2018-01-16 | 2018-07-10 | 中山市华盛家具制造有限公司 | A kind of splicing rack |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201649690U (en) | Height adjustable support of steel-tube back shore | |
| CN201326876Y (en) | Tail regulator | |
| CN203795877U (en) | Mounting height adjusting device for cup-mouth-shaped foundation steel column | |
| CN203222977U (en) | Screeding template for plastering external corner | |
| CN203223002U (en) | Large pre-burying board installing and leveling device | |
| CN204843587U (en) | Supporting height -adjustable V shape piece positioning fixture | |
| CN203671160U (en) | Equipment foundation mounting and fixing structure | |
| CN203175052U (en) | Leveler for building floor beam slab construction | |
| CN203757298U (en) | Device installation adjustment support bar | |
| CN201818965U (en) | Ground bolt for large-scale equipment installation | |
| CN204026048U (en) | Spiral horizontal adjusting tool | |
| WO2018086509A1 (en) | Methods for mounting and erecting mechanical constant-resistance single prop | |
| CN203890896U (en) | Jacking device for bridge construction | |
| CN202247939U (en) | Mounting mechanism for equipment without sizing block | |
| CN202419048U (en) | Machine tool disc regulating shim practical assembly | |
| CN204225448U (en) | Wire rope floating screed take-up device | |
| CN205200982U (en) | Alignment equipment of making level of compressor | |
| CN202622764U (en) | Work platform capable of adjusting height | |
| CN203509847U (en) | Motor lifting device for hanging scaffold rattler | |
| CN204003377U (en) | The device that when a kind of compressor centering, motor substantially horizontal position is adjusted | |
| CN203358839U (en) | Fine adjustment type scaffold support | |
| CN204024089U (en) | Architectural workpieces bearing height adjusting device | |
| CN203237575U (en) | Backrest frame for glass transportation | |
| CN201671336U (en) | Top and bottom dual-purpose steel tube support holder | |
| CN203141105U (en) | Device capable of adjusting column |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 Termination date: 20220123 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |