CN203669500U - High-strength road construction temporary fencing mechanism - Google Patents
High-strength road construction temporary fencing mechanism Download PDFInfo
- Publication number
- CN203669500U CN203669500U CN201320879490.8U CN201320879490U CN203669500U CN 203669500 U CN203669500 U CN 203669500U CN 201320879490 U CN201320879490 U CN 201320879490U CN 203669500 U CN203669500 U CN 203669500U
- Authority
- CN
- China
- Prior art keywords
- steel
- road construction
- strength road
- construction temporary
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a fence, in particular to a high-strength road construction temporary fencing mechanism. The high-strength road construction temporary fencing mechanism mainly solves the technical problems in the prior art that a fence is poor in strength, prone to collapse under large impact and unable to play a role of warning as the fence is erected temporarily and accidents are prone to occurring. The high-strength road construction temporary fencing mechanism comprises a brick setting body (1) and is characterized in that the bottom of the brick setting body (1) is provided with a water draining hole (2), two perpendicular steel pipes (3) are perpendicularly fixed to the brick setting body and a cross steel pipe (4) is fixed to the perpendicular steel pipes. A colored steel plate (5) is welded to a support composed of the perpendicular steel pipes and the cross steel pipe. One side of the colored steel plate is provided with a ring buckle (6) which can be connected with the steel pipes in a penetrating mode and arranged in an inclined mode.
Description
Technical field
The utility model relates to a kind of fence, especially relates to a kind of high strength road construction temporary construction fence mechanism.
Background technology
At present the common practice of temporary construction fence is: in the boring of the permanent position of square steel column and square steel crossbeam, square steel column and square steel crossbeam are linked together with bolt, or directly by square steel beam welding on steel post.Chinese patent discloses a kind of chevron shaped temporary construction fence (notice of authorization number: CN 202416631 U), it is made up of chevron shaped pedestal and upper guard-plate two parts, chevron shaped pedestal top is provided with tenon, the bottom of upper guard-plate is provided with mortise, and chevron shaped pedestal and upper guard-plate are plugged in together and are formed monolithic enclosing by tenon and mortise; Chevron shaped pedestal and upper guard-plate are steel concrete or reinforced concrete structure, by reinforced mesh concreting or cement production systD; The bight, upper end of upper guard-plate is provided with jack; Also be provided with latch, by latch and jack, polylith monolithic enclosing be connected to form to overall enclosing structure; Upper guard-plate also arranges hole.But the intensity of this enclosing is poor, in the time being subject to larger impact force, enclosing easily collapses, and enclosing is owing to being to set up temporarily, cannot play the effect of warning, is prone to accidents.
Utility model content
The utility model is to provide a kind of high strength road construction temporary construction fence mechanism, it is mainly that to solve the intensity of prior art existing enclosing poor, in the time being subject to larger impact force, enclosing easily collapses, and enclosing is owing to being to set up temporarily, cannot play the effect of warning, the technical problem being prone to accidents etc.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
A kind of high strength road construction temporary construction fence of the present utility model mechanism, comprise brickwork, the bottom of described brickwork has drain hole, on brickwork, be vertically fixed with two vertical steel tubes, on vertical steel tube, be fixed with horizontal steel pipe, vertical steel tube, laterally on the support of steel pipe composition, be welded with color steel, a side of color steel is fixed with latch closure that can cross-under steel pipe, and latch closure is oblique setting.The latch closure of multiple oblique settings is set on color steel, can in latch closure, inserts steel pipe, steel pipe just can obliquely be fixed on color steel like this, has strengthened the intensity of whole color steel.Laterally steel pipe, vertical steel tube, oblique steel pipe have formed a rack, are conducive to the assurance of intensity.Drain hole can be discharged the water in enclosing in time.
As preferably, the upper surface of described color steel has mounting groove, slidably connects wedge fixed block in mounting groove, and wedge fixed block is fixed with direction board, and direction board and color steel are orthogonal to be set up.In mounting groove, insert after direction board, wedge fixed block, along mounting groove down sliding, can lock direction board, and operation more for convenience.Direction board can play the effect of warning.
As preferably, the upper surface of described color steel is provided with some warning lamps.Warning lamp can play the effect of warning, and warning lamp can be reflectorized material, can be solar powered, can be also self-powered power supply.
Therefore, the utility model arranges oblique latch closure on the color steel of enclosing, and the oblique steel pipe of pegging graft on latch closure can make the intensity of whole enclosing stronger, and enclosing can play warning function, prevents the generation of contingency, simple and reasonable for structure.
Accompanying drawing explanation
Accompanying drawing 1 is a kind of structural representation of the present utility model;
Accompanying drawing 2 is syndeton schematic diagrames of the utility model color steel and direction board 9.
Component, position and numbering in figure: brickwork 1, drain hole 2, vertical steel tube 3, horizontal steel pipe 4, color steel 5, latch closure 6, mounting groove 7, wedge fixed block 8, direction board 9, warning lamp 10.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment: a kind of high strength road construction temporary construction fence mechanism of this example, as Fig. 1, comprise brickwork 1, the bottom of brickwork has drain hole 2, on brickwork, be vertically fixed with two vertical steel tubes 3, on vertical steel tube, be fixed with horizontal steel pipe 4, on the support of vertical steel tube, horizontal steel pipe composition, be welded with color steel 5, one side of color steel is fixed with latch closure 6 that can cross-under steel pipe, and latch closure is oblique setting.As Fig. 2, the upper surface of color steel has mounting groove 7, slidably connects wedge fixed block 8 in mounting groove, and wedge fixed block is fixed with direction board 9, and direction board and color steel are orthogonal to be set up.The upper surface of color steel is provided with some warning lamps 10.
When use, fixed vertical steel pipe 3, horizontal steel pipe 4 on brickwork 1, then weld color steel 5 on vertical steel tube, horizontal steel pipe, and as need increase enclosing intensity, only need be at the steel pipe of the oblique setting of the interior insertion of latch closure 6.
The foregoing is only specific embodiment of the utility model, but architectural feature of the present utility model is not limited to this, any those skilled in the art is in field of the present utility model, and the variation of doing or modification are all encompassed among the scope of the claims of the present utility model.
Claims (3)
1. a high strength road construction temporary construction fence mechanism, comprise brickwork (1), the bottom that it is characterized in that described brickwork (1) has drain hole (2), on brickwork, be vertically fixed with two vertical steel tubes (3), on vertical steel tube, be fixed with horizontal steel pipe (4), vertical steel tube, laterally on the support of steel pipe composition, be welded with color steel (5), a side of color steel is fixed with latch closure (6) that can cross-under steel pipe, and latch closure is oblique setting.
2. a kind of high strength road construction temporary construction fence according to claim 1 mechanism, the upper surface that it is characterized in that described color steel (5) has mounting groove (7), in mounting groove, slidably connect wedge fixed block (8), wedge fixed block is fixed with direction board (9), and direction board and color steel are orthogonal to be set up.
3. a kind of high strength road construction temporary construction fence according to claim 1 and 2 mechanism, is characterized in that the upper surface of described color steel (5) is provided with some warning lamps (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320879490.8U CN203669500U (en) | 2013-12-30 | 2013-12-30 | High-strength road construction temporary fencing mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320879490.8U CN203669500U (en) | 2013-12-30 | 2013-12-30 | High-strength road construction temporary fencing mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203669500U true CN203669500U (en) | 2014-06-25 |
Family
ID=50965815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320879490.8U Expired - Fee Related CN203669500U (en) | 2013-12-30 | 2013-12-30 | High-strength road construction temporary fencing mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203669500U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366428A (en) * | 2017-06-23 | 2017-11-21 | 安徽新兴翼凌机电发展有限公司 | A kind of construction protective baffle plate |
-
2013
- 2013-12-30 CN CN201320879490.8U patent/CN203669500U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366428A (en) * | 2017-06-23 | 2017-11-21 | 安徽新兴翼凌机电发展有限公司 | A kind of construction protective baffle plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110486068B (en) | Tunnel advanced support type foot locking anchor rod structure and construction method thereof | |
CN206957257U (en) | Spigot-and-socket edge protection column | |
CN203669500U (en) | High-strength road construction temporary fencing mechanism | |
CN204081485U (en) | Beam bottom mother plate bracing frame | |
CN206071096U (en) | The underpinning device of load bearing wall in brick mix structure | |
CN205348963U (en) | A security fence for building site | |
CN210684727U (en) | Construction safety supporting construction | |
CN201952899U (en) | Beam column connecting node of detachable board house | |
CN206635780U (en) | A kind of soil nailed wall retaining structure | |
CN211736673U (en) | Prefabricated assembled type temporary building combined enclosing wall | |
CN202672790U (en) | Octagonal pavilion | |
CN203583874U (en) | Prefabricated column mould | |
CN210918333U (en) | Building reinforcing upright post | |
CN203066043U (en) | Diversion tunnel top arch concrete lining steel formwork support | |
CN210598156U (en) | Steel shotcrete demolishs auxiliary device | |
CN103967332A (en) | Construction method of building site barrier | |
CN104164889A (en) | Demountable tower crane foundation | |
CN202152561U (en) | Multifunctional light wall | |
CN210369025U (en) | Floor-free tower crane foundation construction structure with steel structure | |
CN202559746U (en) | Continuing device for upper-lower-layer shear wall during pouring | |
CN204311446U (en) | A kind of fully prestressed concrete solid square pile end plate | |
CN206720611U (en) | A kind of rearmounted tower crane steel construction lattice column foundation actuating system | |
CN201053226Y (en) | Prefabricated combination wall | |
CN204781871U (en) | Scaffold | |
CN209585096U (en) | A kind of assembled type base for power transmission line iron tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140625 Termination date: 20211230 |