CN203669098U - Modular building - Google Patents
Modular building Download PDFInfo
- Publication number
- CN203669098U CN203669098U CN201320856593.2U CN201320856593U CN203669098U CN 203669098 U CN203669098 U CN 203669098U CN 201320856593 U CN201320856593 U CN 201320856593U CN 203669098 U CN203669098 U CN 203669098U
- Authority
- CN
- China
- Prior art keywords
- boss
- corner post
- hole
- installing hole
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000011295 pitch Substances 0.000 claims 2
- 238000009434 installation Methods 0.000 description 18
- 238000010276 construction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 230000008878 coupling Effects 0.000 description 2
- 238000010168 coupling process Methods 0.000 description 2
- 238000005859 coupling reaction Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及模块化建筑,尤其与模块化建筑中各建筑单元的快速联接结构有关。The utility model relates to a modular building, in particular to the quick connection structure of each building unit in the modular building.
背景技术Background technique
现有的模块化建筑及其内装部分,一般都是在工厂内加工制作好,然后在现场进行组装和固定。这种建筑形式要求工人必须能够在现场迅速地定位、装配和连接各建筑单元。另外,在需要移动和拆除该建筑的时候,要求工人必须能够对各建筑单元进行快速的拆卸和分解,以便进行运输和重新组装。Existing modular buildings and their interior parts are generally processed and manufactured in factories, and then assembled and fixed on site. This form of construction requires that workers must be able to quickly position, assemble and connect various building units on site. In addition, when the building needs to be moved and dismantled, workers must be able to quickly disassemble and disassemble each building unit for transportation and reassembly.
而现有的建筑单元缺少定位结构,在实际组装建筑单元时需要人为操作对齐各建筑单元,而且容易造成人员伤害。However, the existing building units lack a positioning structure, and it is necessary to manually align each building unit when actually assembling the building units, and it is easy to cause personal injury.
实用新型内容Utility model content
针对现有技术中存在的问题,本实用新型的目的为提供一种具有组装时定位准确、连接可靠快捷且结构简单的连接结构的成本低廉的模块化建筑。Aiming at the problems existing in the prior art, the purpose of the utility model is to provide a low-cost modular building with accurate positioning during assembly, reliable and fast connection and simple structure connection structure.
为实现上述目的,本实用新型的技术方案如下:In order to achieve the above object, the technical scheme of the utility model is as follows:
一种模块化建筑,包括相互左右并联或上下串联的多个建筑单元,每一所述建筑单元均包括上、下平行设置的梁架和空心角柱,所述梁架上设置有第一安装孔,所述角柱两端设置有端板,所述端板上设置有第一连接孔,所述多个建筑单元之间通过快联结构相连,所述快联结构包括连接板和螺栓螺母,所述连接板垫压在相接的建筑单元的所述角柱之间,所述连接板上设置有一个至四个凸台和两个以上第二安装孔,所述凸台向两面凸出且对应所述第一连接孔,所述凸台上设置有导引面,所述第二安装孔对应所述第一安装孔,所述螺柱穿过所述第一安装孔和第二安装孔,并通过所述螺母紧固。A modular building, including a plurality of building units connected in parallel or up and down, each of the building units includes a beam frame and a hollow corner column arranged in parallel up and down, and the beam frame is provided with a first installation hole , the two ends of the corner post are provided with end plates, the end plates are provided with a first connection hole, and the plurality of building units are connected by a quick-connection structure, and the quick-connection structure includes a connection plate and bolts and nuts, so The connecting plate is pressed between the corner columns of the connected building units, and one to four bosses and more than two second installation holes are arranged on the connecting plate, and the bosses protrude to both sides and correspond to In the first connection hole, a guide surface is provided on the boss, the second installation hole corresponds to the first installation hole, the stud passes through the first installation hole and the second installation hole, And fastened by the nut.
进一步,所述第一连接孔为长条孔,所述凸台为长条形凸起,所述两凸台横向间距与两相接的建筑单元上的两所述第一连接孔之间的横向间距相等,所述两凸台纵向间距与两相接的建筑单元上的两所述第一连接孔之间的纵向间距相等。Further, the first connecting hole is a long hole, the boss is a long strip-shaped protrusion, and the lateral distance between the two bosses is the same as the distance between the two first connecting holes on the two connected building units. The transverse spacing is equal, and the longitudinal spacing between the two bosses is equal to the longitudinal spacing between the two first connecting holes on the two adjacent building units.
进一步,所述凸台为一两面均凸出所述连接板的凸块,所述凸块与所述连接板之间焊接固定。Further, the boss is a bump protruding from the connecting plate on both sides, and the bump is fixed to the connecting plate by welding.
进一步,所述凸台一体形成在所述连接板上。Further, the boss is integrally formed on the connecting plate.
进一步,所述导引面为斜面或弧面。Further, the guide surface is a slope or an arc.
进一步,所述上下串联的建筑单元的两所述梁架之间通过螺栓螺母穿过所述第一安装孔进行连接固定。Further, the two beam frames of the building units connected in series up and down are connected and fixed through the first installation holes through bolts and nuts.
进一步,所述角柱为“凹”字形,所述角柱外侧面上加工有第三安装孔,所述左右并联的建筑单元的所述角柱之间通过螺栓螺母穿过所述第三安装孔进行连接固定。Further, the corner post is in the shape of "concave", and a third installation hole is processed on the outer surface of the corner post, and the corner posts of the left and right parallel building units are connected through the third installation hole through bolts and nuts fixed.
本实用新型的有益效果在于,本实用新型与现有技术相比,本实用新型采用连接板连接各建筑单元,可靠方便,凸台对各相连的建筑单元进行定位,定位可靠准确,采用螺栓螺母进行连接紧固,简单可靠,而且便于装拆,可方便重复利用建筑单元,最后本实用新型结构简单、制造成本低,有利于推广使用。The beneficial effect of the utility model is that, compared with the prior art, the utility model adopts connecting plates to connect each building unit, which is reliable and convenient, and the boss positions each connected building unit, and the positioning is reliable and accurate. The connection and fastening is simple and reliable, and it is convenient to assemble and disassemble, and the building unit can be reused conveniently. Finally, the utility model has a simple structure and low manufacturing cost, which is beneficial to popularization and use.
附图说明Description of drawings
下面结合附图对本实用新型作进一步详细说明:Below in conjunction with accompanying drawing, the utility model is described in further detail:
图1为本实用新型的模块化建筑结构示意图;Fig. 1 is a schematic diagram of a modular building structure of the present utility model;
图2为本实用新型的模块化建筑中连接板结构示图;Fig. 2 is a schematic diagram of the connecting plate structure in the modular building of the present invention;
图3为本实用新型的模块化建筑中快联结构分解示意图;Fig. 3 is the exploded schematic view of the quick coupling structure in the modular building of the present invention;
图4为本实用新型的模块化建筑中快联结构示意图;Fig. 4 is a schematic diagram of the fast coupling structure in the modular building of the present invention;
图5为本实用新型的模块化建筑中建筑单元连接结构示意图。Fig. 5 is a schematic diagram of the connection structure of building units in the modular building of the present invention.
具体实施方式Detailed ways
体现本实用新型特征与优点的典型实施例将在以下的说明中详细叙述。应理解的是本实用新型能够在不同的实施例上具有各种的变化,其皆不脱离本实用新型的范围,且其中的说明及附图在本质上是当作说明之用,而非用以限制本实用新型。Typical embodiments embodying the features and advantages of the present invention will be described in detail in the following description. It should be understood that the utility model can have various changes in different embodiments, all of which do not depart from the scope of the utility model, and the description and drawings therein are used for illustration in essence, not for reference. To limit the utility model.
如图1所示,模块化建筑的建筑单元的连接方式包括上下串联和左右并联两种方式,其中101和102、103和104之间都属于并联,而101与104之间、102与103之间都属于串联。每个建筑单元都包括上梁11、下梁12(上梁11和下梁12都是梁架)、角柱13和外壳14,上梁11通常为四个首尾相接的梁柱,下梁12通常也为四个首尾相接的梁柱,上梁11所在平面与下梁12平面相互平行。角柱13为空心设置,是竖直设置的棱边,位于四个角部,上下分别与上梁11和下梁12相接。As shown in Figure 1, the connection mode of the building units of the modular building includes two ways of up and down series connection and left and right parallel connection, among which 101 and 102, 103 and 104 are all connected in parallel, and between 101 and 104, between 102 and 103 All are connected in series. Each building unit includes an
如图3所示,角柱13上部设置有顶板131,下部设置有底板132(顶板131和底板132均为端板),上述连接方式通常通过焊接方式完成。在角柱13的顶板131和底板132上均加工有第一连接孔16,顶板131和底板132上的第一连接孔16形状尺寸均相同,且位置相互对应。在上梁11和下梁12上加工有第一安装孔15。As shown in FIG. 3 , the upper part of the
多个建筑单元之间通过快联结构相连,快联结构包括连接板2和螺栓4、螺母5(请参考图5)。连接板2垫压在相接的建筑单元的角柱13之间,连接板2的结构如图2所示,在连接板2上设置有凸台3,凸台3凸出于连接板2的两面。凸台3在建筑单元组装时插入第一连接孔16中,以承载一定弯矩。凸台3的两端部上设置有导引面31,该导引面31为斜面或弧面,以在建筑单元对接时起到定位和引导的作用。凸台3可与连接板2通过铸造的方式一体形成,也可是凸台3本身是一个独立部件,即凸台3为一两面均凸出连接板的凸块,该凸块与连接板2之间通过焊接固定。Multiple building units are connected through a quick-connect structure, which includes a connecting
在凸台3作为单独部件设置时,连接板2上设置有一个至四个第二连接孔21,第二连接孔21的数量与凸台3的数量相等,也就是与该连接板2所需连接的并联的建筑单元的数量相同,第二连接孔21对应第一连接孔16,且第二连接孔21与第一连接孔16形状尺寸相同,均为长条孔。另外,两凸台3横向间距与两相接的建筑单元上的两第一连接孔16之间的横向间距相等,两凸台3纵向间距与两相接的建筑单元上的两第一连接孔16之间的纵向间距相等,以保证装配关系。When the
在连接板2上还加工有两个以上第二安装孔22(通常为2个,左右对称加工设置,以达到紧固连接的作用),第二安装孔22对应第一安装孔15。该第二安装孔22可以是光孔,也可以是螺纹孔。Two or more second mounting holes 22 (usually 2, left and right symmetrically processed to achieve fast connection) are also processed on the connecting
螺柱4穿过第一安装孔15和第二安装孔22,并通过螺母5紧固。其安装过程如图3所示,(凸台3为单独设置部件时)先将连接板2上的第二连接孔21对应下部建筑单元的第一连接孔16,将凸块3插入第二连接孔21中,并使其外露的下部插入第一连接孔16中,上部外露的端部上还具有导引面31,然后焊接固定在连接板2上,吊装上部建筑单元至下部建筑的上方,在导引面31的导引下叠压在下部建筑单元上,再使用螺栓4穿过上部建筑单元第一安装孔15、连接板2上的第二安装孔22和下部建筑单元的第一安装孔15,套配上螺母4并进行紧固,最后完成连接,该过程快速简单、定位准确。安装后的结构如图4所示。为加强连接强度,还可使用平垫、弹垫和双螺母结构。The
如图4和图5所示,在实际的建筑单元组装过程中,除了角柱13部分通过上述快联结构进行连接外,上下串联的建筑单元的上梁11与下梁12之间通常通过螺栓4螺母5穿过两对应的第一安装孔15进行连接固定,以使上下建筑单元之间的上梁和下梁连接起来。As shown in Figure 4 and Figure 5, in the actual building unit assembly process, except that the
另外,如图5所示,为进一步加强连接强度,左右并联的建筑单元的角柱13之间也可以通过螺栓4螺母5穿过第三安装孔(图中未示出)进行连接固定,这样就可以加强并联的连接强度。此时,该角柱为“凹”字形,在该角柱外侧面上加工第三安装孔。In addition, as shown in Figure 5, in order to further strengthen the connection strength, the
本实用新型的有益效果在于,本实用新型与现有技术相比,本实用新型采用连接板2连接各建筑单元,可靠方便,采用凸台3对各相连的建筑单元进行定位,定位可靠准确,采用螺栓4螺母5进行连接紧固,简单可靠,而且便于装拆,可方便重复利用建筑单元,最后本实用新型结构简单、制造成本低,有利于推广使用。The beneficial effect of the utility model is that, compared with the prior art, the utility model adopts the connecting
本实用新型的技术方案已由优选实施例揭示如上。本领域技术人员应当意识到在不脱离本实用新型所附的权利要求所揭示的本实用新型的范围和精神的情况下所作的更动与润饰,均属本实用新型的权利要求的保护范围之内。The technical scheme of the utility model has been disclosed as above by the preferred embodiment. Those skilled in the art should realize that changes and modifications made without departing from the scope and spirit of the utility model disclosed in the appended claims of the utility model all belong to the protection scope of the claims of the utility model Inside.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320856593.2U CN203669098U (en) | 2013-12-23 | 2013-12-23 | Modular building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320856593.2U CN203669098U (en) | 2013-12-23 | 2013-12-23 | Modular building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203669098U true CN203669098U (en) | 2014-06-25 |
Family
ID=50965414
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320856593.2U Expired - Lifetime CN203669098U (en) | 2013-12-23 | 2013-12-23 | Modular building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203669098U (en) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104179254A (en) * | 2014-08-11 | 2014-12-03 | 国绿空间模块装备(天津)有限公司 | Coincidence automatic location system of module type construction module and mounting method of coincidence automatic location system |
| CN106516475A (en) * | 2016-11-17 | 2017-03-22 | 扬州润扬物流装备有限公司 | Connecting assembly and modular building with same |
| CN106759923A (en) * | 2017-01-24 | 2017-05-31 | 江苏海陆科技股份有限公司 | Externally picking tyoe bilayer fast-assembling container house |
| CN106939648A (en) * | 2017-03-08 | 2017-07-11 | 国住人居工程顾问有限公司 | A kind of container house intermodule tie point structure being accurately positioned and connection method |
| CN107503440A (en) * | 2017-08-07 | 2017-12-22 | 苏州智绿建筑工程有限公司 | For 3-dimensional boxlike structure with assembled lightweight steel multi-module structure and its connected mode |
| CN107989172A (en) * | 2017-12-28 | 2018-05-04 | 河北卓秋实业有限公司 | Corner fittings connects light body plate structure house |
| WO2019057162A1 (en) * | 2017-09-22 | 2019-03-28 | 中集模块化建筑投资有限公司 | Connecting method for building module |
| CN110777943A (en) * | 2019-11-27 | 2020-02-11 | 长沙远大住宅工业集团股份有限公司 | A building module, a modular building, and a construction method for the modular building |
| CN110984363A (en) * | 2019-12-06 | 2020-04-10 | 长沙远大住宅工业集团股份有限公司 | A building module, modular building and construction method thereof |
| CN111827486A (en) * | 2020-06-08 | 2020-10-27 | 中建集成建筑有限公司 | Steel structure module, system and construction method |
| CN111827488A (en) * | 2020-06-08 | 2020-10-27 | 中建集成建筑有限公司 | Module structure, system and construction method |
| WO2021016672A1 (en) * | 2019-07-31 | 2021-02-04 | Iron Matrix Pty Ltd | "a method and apparatus for stiffening a framework module for use in modular building construction" |
| CN117107915A (en) * | 2023-08-29 | 2023-11-24 | 桂林理工大学 | A building stacked box structure and its modular integrated composite building |
-
2013
- 2013-12-23 CN CN201320856593.2U patent/CN203669098U/en not_active Expired - Lifetime
Cited By (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104179254B (en) * | 2014-08-11 | 2017-01-11 | 国绿空间模块装备(天津)有限公司 | Coincidence automatic location system of module type construction module and mounting method of coincidence automatic location system |
| CN104179254A (en) * | 2014-08-11 | 2014-12-03 | 国绿空间模块装备(天津)有限公司 | Coincidence automatic location system of module type construction module and mounting method of coincidence automatic location system |
| CN106516475A (en) * | 2016-11-17 | 2017-03-22 | 扬州润扬物流装备有限公司 | Connecting assembly and modular building with same |
| CN106759923A (en) * | 2017-01-24 | 2017-05-31 | 江苏海陆科技股份有限公司 | Externally picking tyoe bilayer fast-assembling container house |
| CN106939648A (en) * | 2017-03-08 | 2017-07-11 | 国住人居工程顾问有限公司 | A kind of container house intermodule tie point structure being accurately positioned and connection method |
| CN107503440A (en) * | 2017-08-07 | 2017-12-22 | 苏州智绿建筑工程有限公司 | For 3-dimensional boxlike structure with assembled lightweight steel multi-module structure and its connected mode |
| WO2019057149A1 (en) * | 2017-09-22 | 2019-03-28 | 中集模块化建筑投资有限公司 | Positioning system for building modules |
| WO2019057162A1 (en) * | 2017-09-22 | 2019-03-28 | 中集模块化建筑投资有限公司 | Connecting method for building module |
| CN107989172A (en) * | 2017-12-28 | 2018-05-04 | 河北卓秋实业有限公司 | Corner fittings connects light body plate structure house |
| WO2021016672A1 (en) * | 2019-07-31 | 2021-02-04 | Iron Matrix Pty Ltd | "a method and apparatus for stiffening a framework module for use in modular building construction" |
| CN110777943A (en) * | 2019-11-27 | 2020-02-11 | 长沙远大住宅工业集团股份有限公司 | A building module, a modular building, and a construction method for the modular building |
| CN110984363A (en) * | 2019-12-06 | 2020-04-10 | 长沙远大住宅工业集团股份有限公司 | A building module, modular building and construction method thereof |
| CN111827486A (en) * | 2020-06-08 | 2020-10-27 | 中建集成建筑有限公司 | Steel structure module, system and construction method |
| CN111827488A (en) * | 2020-06-08 | 2020-10-27 | 中建集成建筑有限公司 | Module structure, system and construction method |
| CN117107915A (en) * | 2023-08-29 | 2023-11-24 | 桂林理工大学 | A building stacked box structure and its modular integrated composite building |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203669098U (en) | Modular building | |
| KR101233559B1 (en) | Connection structure of modular unit | |
| CN203594213U (en) | Flexible assembling and disassembling bearing truss | |
| CN204282228U (en) | A kind of box steel arch beam Integral horizontal type group is to jig frame special | |
| CN205057364U (en) | Truss assemble bed -jig | |
| CN104264792B (en) | A kind of bean column node of layered assembling type steel structure | |
| CN207892023U (en) | Connecting device for I-shaped steel column and steel structure beam | |
| CN213539287U (en) | Assembled steel material connection structure | |
| CN204326259U (en) | A kind of steel column connector | |
| CN205822471U (en) | Timber truss node purlin combined connection component | |
| CN206885754U (en) | Assembled alley and Steel bar rack | |
| CN109838034B (en) | A roof structure for assembling a house | |
| CN204983722U (en) | Steel structural member consolidates interim spelling positioner | |
| CN210086476U (en) | A prefabricated steel frame structure supporting node and its connecting device | |
| CN207331982U (en) | A kind of joint structure suitable for low layer steel construction assembled-type house | |
| CN205348414U (en) | Steel structure connecting piece | |
| CN104234188A (en) | Combined steel structure of prefabricated house | |
| CN212053705U (en) | Horizontal truss corner male connector | |
| CN211312837U (en) | Detachable positioning mechanism for connecting steel beams | |
| CN211646016U (en) | A bracket-assembled pier body supporting wall device | |
| CN205935715U (en) | Prefabricated assembled concrete member positioner | |
| CN205804601U (en) | The Moveable roof truss of repeatable utilization and the connection node of column | |
| CN218148943U (en) | Connecting device with steel structural member | |
| CN203669362U (en) | Connecting device for connecting main truss of bailey frame and jacking stand column | |
| CN203603471U (en) | Combined stair step formwork supporting device for hoisting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20171204 Address after: 116600 Dalian Free Trade Zone, Liaoning, IIIB-2 Co-patentee after: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. Patentee after: DALIAN CIMC SPECIAL LOGISTICS EQUIPMENT Co.,Ltd. Co-patentee after: CIMC CONTAINERS HOLDING Co.,Ltd. Co-patentee after: DALIAN CIMC LOGISTICS EQUIPMENT Co.,Ltd. Address before: 116600 Dalian Free Trade Zone, Dalian, Liaoning Province, IIIB-2 Co-patentee before: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. Patentee before: DALIAN CIMC LOGISTICS EQUIPMENT Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20180410 Address after: Harbour Road Shekou Industrial District of Shenzhen City, Guangdong province 518067 No. 2 CIMC R & D Center Co-patentee after: CIMC CONTAINERS HOLDING Co.,Ltd. Patentee after: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. Address before: 116600 Dalian Free Trade Zone, Liaoning, IIIB-2 Co-patentee before: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. Patentee before: DALIAN CIMC SPECIAL LOGISTICS EQUIPMENT Co.,Ltd. Co-patentee before: CIMC CONTAINERS HOLDING Co.,Ltd. Co-patentee before: DALIAN CIMC LOGISTICS EQUIPMENT Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20190812 Address after: 116600 Dalian Free Trade Zone, Liaoning, IIIB-2 Co-patentee after: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. Patentee after: DALIAN CIMC SPECIAL LOGISTICS EQUIPMENT Co.,Ltd. Co-patentee after: CIMC CONTAINERS HOLDING Co.,Ltd. Address before: Harbour Road Shekou Industrial District of Shenzhen City, Guangdong province 518067 No. 2 CIMC R & D Center Co-patentee before: CIMC CONTAINERS HOLDING Co.,Ltd. Patentee before: CHINA INTERNATIONAL MARINE CONTAINERS (GROUP) Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20140625 |