CN203653057U - Special hanging tool of unballasted track plate - Google Patents
Special hanging tool of unballasted track plate Download PDFInfo
- Publication number
- CN203653057U CN203653057U CN201320849735.2U CN201320849735U CN203653057U CN 203653057 U CN203653057 U CN 203653057U CN 201320849735 U CN201320849735 U CN 201320849735U CN 203653057 U CN203653057 U CN 203653057U
- Authority
- CN
- China
- Prior art keywords
- fragment
- track slab
- free track
- base plate
- built
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000003466 welding Methods 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 abstract description 9
- 239000002965 rope Substances 0.000 abstract description 9
- 239000010959 steel Substances 0.000 abstract description 9
- 238000010276 construction Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 210000004279 Orbit Anatomy 0.000 description 1
- 210000001138 Tears Anatomy 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Abstract
The utility model relates to a special hanging tool of an unballasted track plate. The special hanging tool is formed by four hanging members, eight pre-embedded threaded sleeves and eight connecting bolts. By adopting the special hanging tool of the unballasted track plate, the hanging members are connected on the pre-embedded threaded sleeves via the connecting bolts and are connected with a steel wire rope, and then the unballasted track plate is hung for construction operations through the steel wire rope and the hanging members by a truck crane. The special hanging tool of the unballasted track plate solves the problem of inconvenience in use of a traditional hanging tool in the construction operations of the unballasted track plate and ensures safe and rapid hanging of the unballasted track plate.
Description
Technical field
The utility model relates to a kind of hoisting tooling, particularly relates to the fragment-free track slab special hanger for handling plate-type ballastless track plate in a kind of high ferro engineering.
Background technology
CRTS I type track plates is all special rail guidance tapes in very large high ferro engineering of weight and area.When dispatching from the factory, on transport vehicle, placed by traditional special hanger by gauntry crane CRTS I type track plates.The handling of CRTS I type track plates in high ferro engineering construction scene, deposit and install and also undertaken by conventional dedicated suspender by wheel crane.Traditional hoisting device for track slab complicated structure, before handling, very inconvenient in the time that the installation of carrying out suspender on track plates connects, bothersome mistaking, incurs loss through delay the duration.In camp site, sometimes directly use steel rope binding fragment-free track slab for this reason, by steel rope, track plates is carried out to lifting operation.Steel rope can destroy, the outward appearance corner angle of the track plates that weares and teares.
Utility model content
The purpose of this utility model be to provide a kind of simple to operate, easy to connect with track plates, speed is fast, time saving and energy saving, can not produce the fragment-free track slab special hanger of damage to track plates.
The purpose of this utility model can realize.The utility model fragment-free track slab special hanger is characterised in that: described fragment-free track slab special hanger hangs connection member by four, eight built-in turnbuckles and eight tie bolts constitute, the described connection member that hangs is by a rectangular base plate, a boatswain chair of base plate lateral centre welding, leg-of-mutton reinforcements edition of each welding between two sides at boatswain chair two ends place and base plate, base plate respectively has a bolt hole the centerline symmetry of boatswain chair both sides, on two bolts hole, each tie bolt of pegging graft forms, described eight built-in turnbuckles are embedded in every two by one group on the line of centers at four angles place of two sides of fragment-free track slab length direction.
The utility model fragment-free track slab special hanger, the spacing of wherein said two built-in turnbuckles that are embedded on fragment-free track slab one group equates with the bolt hole spacing of two tie bolts of having pegged graft on described base plate.
The utility model fragment-free track slab special hanger, wherein said tie bolt and the described built-in turnbuckle cooperating pair that becomes to be threaded.
The utility model fragment-free track slab special hanger difference from prior art is that the utility model fragment-free track slab special hanger has designed a simple in structure connection member that hangs, be connected on the built-in turnbuckle in fragment-free track slab hanging connection member by tie bolt, hang and on connection member, be connected with steel rope, by wheel crane, by steel rope and hang connection member, the fragment-free track slab of slinging carries out construction operation.The utility model actv. has solved the awkward problem of traditional suspender in fragments-free track slab construction operation, has guaranteed that fragment-free track slab energy safety, fast speed carry out handling.
Below in conjunction with accompanying drawing, fragment-free track slab special hanger of the present utility model is described further.
Accompanying drawing explanation
Fig. 1 is that the structure master who hangs connection member in the utility model fragment-free track slab special hanger looks schematic diagram.
Fig. 2 is the structure schematic side view of hanging connection member in the utility model fragment-free track slab special hanger.
Fig. 3 is the structure schematic top plan view of hanging connection member in the utility model fragment-free track slab special hanger.
Fig. 4 is the use view of fragment-free track slab special hanger on fragment-free track slab.
Fig. 5 is one group and hangs the scheme of installation of connection member on non-fragment orbit board plane.
Fig. 6 is one group and hangs the scheme of installation of connection member on fragment-free track slab side.
Fig. 7 is the structure connection diagram of tie bolt and built-in turnbuckle.
The specific embodiment
As shown in Figure 4, the utility model fragment-free track slab special hanger hangs connection member, eight built-in turnbuckles 7 and eight tie bolts 4 by four and constitutes.
As shown in Figure 1, Figure 2, Figure 3 shows, hang connection member by a rectangular base plate 1, a boatswain chair 3 of base plate 1 lateral centre welding, leg-of-mutton reinforcements of each welding editions 2 between two sides at boatswain chair 3 two ends places and base plate 1, base plate 1 is respectively opened by a bolt hole the centerline symmetry of boatswain chair 3 both sides, and on two bolts hole, each tie bolt 4 of pegging graft forms.
As shown in Figure 4, Figure 5, eight built-in turnbuckles 7 are embedded in every two by one group on the line of centers at four angles place of fragment-free track slab 5 two sides of length direction.The spacing that is embedded on fragment-free track slab two built-in turnbuckles 7 of a group equates with the bolt hole spacing of two tie bolts 4 of having pegged graft on base plate 1.
As shown in Fig. 5, Fig. 6, Fig. 7, tie bolt 4 and 7 one-tenth of the built-in turnbuckles cooperating pair that is threaded.
Four of can collude with from the standard of multiple use of the utility model hang connection member and prefabricated fragment-free track slab 5 is connected to eight built-in turnbuckles 7 in four groups of 5 two sides of fragment-free track slab by eight tie bolts 4, steel lifting rope 6 is connected with fragment-free track slab special hanger, the suspension hook of crane just can be connected and lift by crane with steel lifting rope 6 so again.
Above-described embodiment is described preferred implementation of the present utility model; not scope of the present utility model is limited; do not departing under the prerequisite of the utility model design spirit; various distortion and improvement that those of ordinary skills make the technical solution of the utility model, all should fall in the definite protection domain of the utility model claims.
Claims (3)
1. a fragment-free track slab special hanger, it is characterized in that: fragment-free track slab special hanger hangs connection member by four, eight built-in turnbuckles (7) and eight tie bolts (4) constitute, the described connection member that hangs is by a rectangular base plate (1), base plate (1) lateral centre boatswain chair of welding (3), a leg-of-mutton brace panel of each welding (2) between two sides at boatswain chair (3) two ends place and base plate (1), base plate (1) respectively has a bolt hole the centerline symmetry of boatswain chair (3) both sides, on two bolts hole, each tie bolt (4) of pegging graft forms, described eight built-in turnbuckles (7) are embedded in every two by one group on the line of centers at four angles place of two sides of fragment-free track slab (5) length direction.
2. fragment-free track slab special hanger according to claim 1, is characterized in that: described in be embedded on fragment-free track slab two built-in turnbuckles (7) of a group spacing equate with the bolt hole spacing of two pegged graft tie bolt (4) on described base plate (1).
3. fragment-free track slab special hanger according to claim 1 and 2, is characterized in that: described tie bolt (4) and described built-in turnbuckle (7) the cooperating pair that becomes to be threaded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320849735.2U CN203653057U (en) | 2013-12-23 | 2013-12-23 | Special hanging tool of unballasted track plate |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320849735.2U CN203653057U (en) | 2013-12-23 | 2013-12-23 | Special hanging tool of unballasted track plate |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203653057U true CN203653057U (en) | 2014-06-18 |
Family
ID=50919470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320849735.2U Active CN203653057U (en) | 2013-12-23 | 2013-12-23 | Special hanging tool of unballasted track plate |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203653057U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190599A (en) * | 2017-06-27 | 2017-09-22 | 天津银龙高科新材料研究院有限公司 | A kind of track plates hanging apparatus |
-
2013
- 2013-12-23 CN CN201320849735.2U patent/CN203653057U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107190599A (en) * | 2017-06-27 | 2017-09-22 | 天津银龙高科新材料研究院有限公司 | A kind of track plates hanging apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201495027U (en) | Hoisting tool for mill housing | |
CN203653057U (en) | Special hanging tool of unballasted track plate | |
CN201777781U (en) | Flange suspension apparatus | |
CN204823667U (en) | Steel sheet lifts by crane with couple | |
CN205442405U (en) | Anchor clamps play to put in a position | |
CN206308702U (en) | A kind of portable basis of derrick crane | |
CN206376561U (en) | A kind of cladding glass transporting device | |
CN204980822U (en) | Whole hoist of superimposed sheet | |
CN204846898U (en) | Mainboard container | |
CN203715136U (en) | Tool for hoisting lifting hole cover plate in nuclear power plant | |
CN204737588U (en) | Compensating beam for bridge crane | |
CN204822701U (en) | Post container | |
CN204324743U (en) | A kind of transfer crane being applicable to the long shape article of handling | |
CN203295022U (en) | Assembling and hoisting device for radiator chamber of locomotive | |
CN205772882U (en) | A kind of electric block hangs dolly partially | |
CN204822700U (en) | Roof beam container | |
CN205034948U (en) | Rack formula hanging beam device | |
CN205114861U (en) | Hoist and mount lacing device | |
CN204980842U (en) | Crane girder hoist and mount special lifting device | |
CN204150923U (en) | A kind of track lifting appliance | |
CN204281077U (en) | Steel structure on the case beam navigating car weight-lifting equipment | |
CN201808744U (en) | Section bar returnable frame | |
CN203475320U (en) | Steel anchor beam lifting sling | |
CN202717494U (en) | Plate clamp for lifting H-shaped steel structural column | |
CN105035565A (en) | Column container |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |