bridge body
bridge
maintenance
pedestal
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320864356.0U
Other languages
Chinese (zh)
Inventor
赵远庆
曾霖
黎海龙
许世荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of CTCE Group
Original Assignee
Fifth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of CTCE Group filed Critical Fifth Engineering Co Ltd of CTCE Group
Priority to CN201320864356.0U priority Critical patent/CN203650677U/en
Application granted granted Critical
Publication of CN203650677U publication Critical patent/CN203650677U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge body maintenance spray device. The bridge body maintenance spray device comprises a pedestal embedded pipeline, wherein the pedestal embedded pipeline is connected with a main pipeline through a branch pipe, the main pipeline is connected with a water tank for the construction, the pedestal embedded pipeline is provided with a four-way pipe connector, two sides of the four-way pipe connector are connected with a U-shaped pipe through a detachable hose, two ends of the U-shaped pipe are respectively connected with an upper nozzle and a lower nozzle, and the U-shaped pipe is fixed on the upper end side surface of a maintenance bridge body through a suspension buckle. By adopting the bridge body maintenance spray device, the problems of the conventional spray maintenance system that the occupied floor area is large, the repair rate is high, the bridge body cannot be maintained adequately, and the bridge body is inconvenient to repair can be solved, the construction field of the bridge can be effectively reduced, the standardized construction effect of the bridge field can be improved, the bridge field can be beautified, the repairing rate can be maximally reduced, more simplicity and easiness in repairing can be realized, the bridge body is uniform to maintain, and the quality of the bridge body can be improved.

Description

A kind of bridge beam body maintenance spray equipment
Technical field
The utility model relates to a kind of bridge beam body maintenance spray equipment.
Background technology
Along with the fast-developing and construction of China's capital construction; the particularly requirement of land resource protection and environmental protection; the proportion of road construction Bridge is increasing; the construction quality of bridge superstructure plays a decisive role to integral bridge quality; and being girder construction later strength, the maintenance of beam body can reach the main link of designing requirement; the maintenance of current most beam bodies adopts traditional sprinkling curing system, and this kind of curing system exists that floor space is large, maintenance rate is high, maintenance is inconvenient, beam is recuperated protects the drawbacks such as not in place.
Utility model content
Its object of the utility model is just to provide a kind of bridge beam body maintenance spray equipment, solve that conventional sprinkling curing system floor space is large, maintenance rate is high, maintenance is inconvenient, beam is recuperated protects problem not in place, to effectively reduce beam fabricating yard construction land used, improve beam field Standardization Construction effect and beautify Liang Chang, can reduce to a great extent maintenance rate simultaneously, make maintenance more simple and easy to do, beam is recuperated and is protected evenly.
The technical scheme that realizes above-mentioned purpose and take, comprise pre-buried pipeline in pedestal, in pedestal, pre-buried pipeline connects main pipeline through branched pipe, main pipeline connects construction water water tank, in described pedestal, pre-buried pipeline is provided with four-way union, four-way union both sides connect U-shaped pipe through removable hose, and U-shaped pipe two ends connect respectively upper nozzle and lower nozzle, and described U-shaped pipe is fixed on maintenance bridge beam body upper side through hanging vertical button.
Compared with prior art the utlity model has following advantage:
1, this device can improve maintenance efficiency greatly, ensures the quality of beam body;
2, this device is reduction beam fabricating yard construction land used effectively, improves beam field Standardization Construction effect and beautifies Liang Chang, can reduce to a great extent maintenance rate simultaneously, makes maintenance more simple and easy to do.
3, this device material therefor is simple, easy and simple to handle.
Brief description of the drawings
Fig. 1 is this unit layout schematic diagram;
Fig. 2 is this device schematic cross-sectional view.
Detailed description of the invention
This device comprises pre-buried pipeline 1 in pedestal, in pedestal, pre-buried pipeline 1 connects main pipeline 5 through branched pipe 7, main pipeline 5 connects construction water water tank, as shown in Figure 1 and Figure 2, in described pedestal, pre-buried pipeline 1 is provided with four-way union 8, four-way union 8 both sides connect U-shaped pipe 4 through removable hose 2, and U-shaped pipe 4 two ends connect respectively upper nozzle 9 and lower nozzle 11, and described U-shaped pipe 4 is fixed on maintenance bridge beam body 10 upper side through hanging vertical button 3.
In pedestal, on pre-buried pipeline 1, be provided with a four-way union 8 at interval of one meter.
In described pedestal, pre-buried pipeline 1 can have multiple lines and multiple rows.
Described branched pipe 7 is provided with spray switch 6.
Embodiment
This device comprises that in pedestal, pre-buried pipeline 1 is Φ 32PPR pipe, main pipeline 5 is Φ 50PPR pipe, between two pedestals, branched pipe 7 is Φ 50PPR pipe, four-way union 8 four-way Φ 32PPR pipes become Φ 25PPR pipe, removable hose 2, U-shaped pipe 4 is U-shaped pvc pipe, upper nozzle 9, lower nozzle 11, Φ 50PPR main pipeline 5 in pedestal beyond pre-buried pipeline 1 connects construction water water tank and draws water, Φ 50PPR main pipeline 5 adopts Φ 50PPR pipe to connect Φ 50PPR branched pipe 7 between two pedestals, between two pedestals, Φ 50PPR branched pipe 7 connects the four-way union 8 four-way Φ 32PPR pipe change Φ 25PPR pipe removable hose 2 of pre-buried pipeline 1 each meter Yi Dao in spray system Φ 32PPR pedestal, removable hose 2 connects U-shaped pipe 4 and sprays up and down, 4 two outlets of U-shaped pipe respectively connect a shower nozzle, upper nozzle 9 can surrounding rotary spray maintenance top board position, lower nozzle 11 can surrounding rotary spray maintenance wing plate bottom surface and web position ensure that maintenance is even.

Claims (4)

1. a bridge beam body maintenance spray equipment, comprise pre-buried pipeline (1) in pedestal, in pedestal, pre-buried pipeline (1) connects main pipeline (5) through branched pipe (7), main pipeline (5) connects construction water water tank, it is characterized in that, in described pedestal, pre-buried pipeline (1) is provided with four-way union (8), four-way union (8) both sides connect U-shaped pipe (4) through removable hose (2), U-shaped pipe (4) two ends connect respectively upper nozzle (9) and lower nozzle (11), described U-shaped pipe (4) is fixed on maintenance bridge beam body (10) upper side through hanging vertical button (3).
2. a kind of bridge beam body maintenance spray equipment according to claim 1, is characterized in that, in pedestal, pre-buried pipeline (1) is upper is provided with a four-way union (8) at interval of one meter.
3. a kind of bridge beam body maintenance spray equipment according to claim 1 and 2, is characterized in that, in described pedestal, pre-buried pipeline (1) can have multiple lines and multiple rows.
4. a kind of bridge beam body maintenance spray equipment according to claim 1, is characterized in that, described branched pipe (7) is provided with spray switch (6).
CN201320864356.0U 2013-12-26 2013-12-26 Bridge body maintenance spray device Expired - Lifetime CN203650677U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320864356.0U CN203650677U (en) 2013-12-26 2013-12-26 Bridge body maintenance spray device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320864356.0U CN203650677U (en) 2013-12-26 2013-12-26 Bridge body maintenance spray device

Publications (1)

Publication Number Publication Date
CN203650677U true CN203650677U (en) 2014-06-18

Family

ID=50917112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320864356.0U Expired - Lifetime CN203650677U (en) 2013-12-26 2013-12-26 Bridge body maintenance spray device

Country Status (1)

Country Link
CN (1) CN203650677U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104260194A (en) * 2014-09-25 2015-01-07 山西建筑工程(集团)总公司 Concrete water spray maintenance system and use method thereof
CN105856403A (en) * 2016-06-10 2016-08-17 于永飞 Double-side spraying and maintaining device and method for high-speed rail precast bridge
CN105856406A (en) * 2016-06-10 2016-08-17 朱凤玲 Double-side humidifying device and method for high-speed rail precast bridge
CN105856405B (en) * 2016-06-10 2018-07-27 朱子毅 A kind of two-sided curing means and method of high ferro precast bridge
CN105856404B (en) * 2016-06-10 2018-07-27 朱红英 A kind of two-sided spray equipment and method of high ferro precast bridge
CN113021608A (en) * 2021-03-10 2021-06-25 中铁二十局集团第六工程有限公司 Intelligent precast beam field

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104260194A (en) * 2014-09-25 2015-01-07 山西建筑工程(集团)总公司 Concrete water spray maintenance system and use method thereof
CN105856403A (en) * 2016-06-10 2016-08-17 于永飞 Double-side spraying and maintaining device and method for high-speed rail precast bridge
CN105856406A (en) * 2016-06-10 2016-08-17 朱凤玲 Double-side humidifying device and method for high-speed rail precast bridge
CN105856406B (en) * 2016-06-10 2018-07-27 朱凤玲 A kind of two-sided humidification apparatus and method of high ferro precast bridge
CN105856405B (en) * 2016-06-10 2018-07-27 朱子毅 A kind of two-sided curing means and method of high ferro precast bridge
CN105856404B (en) * 2016-06-10 2018-07-27 朱红英 A kind of two-sided spray equipment and method of high ferro precast bridge
CN105856403B (en) * 2016-06-10 2018-08-10 于永飞 A kind of two-sided spray maintenance device and method of high ferro prefabricated case beam
CN113021608A (en) * 2021-03-10 2021-06-25 中铁二十局集团第六工程有限公司 Intelligent precast beam field

Similar Documents

Publication Publication Date Title
CN203650677U (en) Bridge body maintenance spray device
CN203876026U (en) High speed railway precast box beam maintenance device
CN204482595U (en) A kind of humidity detection irrigation installation
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN203945479U (en) A kind of mortar leakage prevention T girder prefabricated pedestal
CN202646981U (en) Universal flange plate connected with transformer fuel outlet valve
CN205397881U (en) Truss structure girder
CN204645511U (en) A kind of Novel assembled floor
CN204815834U (en) An octal mushroom head bonding mouthful formula water -locator
CN203100878U (en) Framework for truck scale
CN206154492U (en) Bury shower nozzle intelligence maintenance system
CN204717330U (en) A kind of backing plate of architecture advances
CN206555221U (en) A kind of pig house fence connector
CN207200181U (en) A kind of fire-type crane span structure
CN204815835U (en) First flange formula water -locator of octal mushroom
CN105148651A (en) Workshop dust removal device
CN204112188U (en) A kind of disjunctor pavior brick
CN203583314U (en) Floor tile
CN203854094U (en) Beam plate maintenance spraying system
CN204627633U (en) The very heavy support in Full Automatic Liquid hydraulic trolley basis
CN204151691U (en) A kind of prefabricated case beam or T beam maintenance trolley
CN204867296U (en) Water glass section bar module spray set
CN205259636U (en) Combined pavilion
CN202611094U (en) Structure capable of processing intersection of light pipe and pipeline in prestressed hollow slab
CN203905513U (en) PCCP protective layer watering and maintenance device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140618