CN203626051U - Movable plank house and multiple-layer house system - Google Patents

Movable plank house and multiple-layer house system Download PDF

Info

Publication number
CN203626051U
CN203626051U CN201320801367.4U CN201320801367U CN203626051U CN 203626051 U CN203626051 U CN 203626051U CN 201320801367 U CN201320801367 U CN 201320801367U CN 203626051 U CN203626051 U CN 203626051U
Authority
CN
China
Prior art keywords
movable plank
board
plank house
house
plate
Prior art date
Application number
CN201320801367.4U
Other languages
Chinese (zh)
Inventor
刘志刚
宋益峰
王立强
Original Assignee
刘志刚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 刘志刚 filed Critical 刘志刚
Priority to CN201320801367.4U priority Critical patent/CN203626051U/en
Application granted granted Critical
Publication of CN203626051U publication Critical patent/CN203626051U/en

Links

Abstract

A movable plank house and a multiple-layer house system are disclosed. The movable plank house comprises a top board, a base board, side boards, and front and rear wall bodies. Each of the side boards is composed of at least two sub-boards which are connected mutually in a hinged manner and are folded inwards. The upper and lower sides of each of the side boards are respectively connected with the top board and the base board respectively in a hinged manner, and the hinged places are provided with latch assemblies. A flat board extends out from each of the top board and the base board, and supporting rods are arranged between the two flat boards. Each group of supporting rods is composed of at least two straight rods which are connected mutually in a hinged manner and are folded inwards. The hinged places of the straight rods are provided with locking structures. According to the utility model, the requirements of modularized and industrialized production are satisfied; all the main bodies can be manufactured in a factory and mounted rapidly after being transported to a building site; the rapid assembling of the multiple-layer house system can be achieved; and the house and system can be used instantly after power and water are supplied.

Description

A kind of movable plank house and multistoried building system
Technical field
This scheme movable plank house technical field, specifically a kind of movable plank house and multistoried building system.
Background technology
Movable plank house is generally steel-wood structure, and its feature is: arbitrarily dismounting, be convenient to transportation, conveniently moving.Therefore in building site, earthquake relief work, be widely applied.Be divided at present two classes, a kind of is to need the on-the-spot movable plank house of building, and shortcoming is that work consuming consuming time is large, and the second is the movable plank house with folder function, and its advantage is the feature with Fast Installation.
Current movable plank house is still take single building as main, and for example disclosed in Chinese patent 2646261Y is exactly a kind of movable plank house with folding effect, also becomes folding container house, uses but only only limit to individual layer.
And at present in the actual use procedure in building site, be generally bilayer or multi-layer movable board house building, for this reason, the Collapsible house that research can meet the instructions for use of multi-layer movable board house is a kind of important direction.The utility model patent is to carry out for this problem.
Utility model content
In order to solve the deficiencies in the prior art, the utility model provides a kind of movable plank house and multistoried building system, first has folder function, secondly can meet the needs of multi-layer movable board house Fast Installation.
The utility model solves the technical scheme that its technical problem adopts: a kind of movable plank house, comprise top board, base plate, the side plate of both sides and front and back body of wall, every block of side plate be articulated and connected each other by least two and inwardly folding daughter board form, and the both sides up and down of described side plate are connected and are provided with latch assembly in hinge point with top board and base plate hinged respectively, it is characterized in that, a flat board stretches out respectively on described top board and base plate, and described in two, between flat board, be at least provided with two groups of support bars, and every group of support bar is articulated and connected each other by least two and inwardly folding straight-bar form, and the hinge point at described straight-bar is provided with locking mechanism.
Further, on described top board, be provided with hole for hoist, and be provided with the groove coordinating with hole for hoist on described base plate, have the function of location while installation concurrently.
Further, described locking mechanism comprises the bolt hole being arranged on two straight-bars and the securing member that passes two bolts hole and two straight-bars are locked, and support bar can be remained on to upright state by this securing member.
On described side plate, be provided with the bolt hole of fastening use, and fill in rubber stopper in described bolt hole.
Described support bar is provided with installs the fixed part that guardrail is used.
A kind of multistoried building system of utilizing above-mentioned movable plank house to build, comprise movable plank house and stair, it is characterized in that, the placement that some described movable plank houses superpose each other forms multistoried building structure, and between described support bar, guardrail is installed, and between movable plank house adjacent one another are, use securing member to be fastenedly connected, a stair upper end overlap joint is also fixed therein by securing member on the flat board of a movable plank house.
Between movable plank house adjacent panels adjacent one another are, be fastenedly connected by pulling plug.
The beneficial effects of the utility model are: realized the requirement that modularization, batch production are produced, all main body completes making in factory, be transported to building site and can realize Fast Installation, can realize rapid-assembling multi-layer movable board house system, and the multi-layer movable board house of assembling is sturdy and durable, after energising, water flowing, can use.
Accompanying drawing explanation
Fig. 1 is the front and back sectional view of movable plank house main body.
Fig. 2 is the left and right sectional view of movable plank house main body.
Fig. 3 is the spine arrangement figure of base plate.
Fig. 4 is the folded state diagram of movable plank house main body.
Fig. 5 is elevational view after movable plank house main body.
Fig. 6 is elevational view before movable plank house main body.
Fig. 7 is the folding process stereogram (angle one) of movable plank house.
Fig. 8 is the folding process stereogram (angle two) of movable plank house.
Fig. 9 is the unfolding state figure of movable plank house.
Figure 10 is the stereogram of multistoried building system.
In figure: 1 top board, 11 bound edges, 12 holes for hoist, 2 base plates, 21 shaped steel, 22 bolts hole, 3 side plates, 31 daughter boards, 4 front and back bodies of wall, 5 are articulated and connected, 51 latch assemblies, 52 spacing angle bar, 53 sealing joint strips, 6 flat boards, 7 support bars, 71 straight-bars, 5 ' hinge point, 72 pick up the ears, 73 guardrails, 8 stair, 9 securing members.
The specific embodiment
As shown in Figures 1 to 9,
A kind of movable plank house, comprises side plate and the front and back body of wall of top board 1, base plate 2, both sides.The side plate 3 of top board 1 wherein, base plate 2, both sides and front and back body of wall 4 have the building materials of insulation layer in the middle of being all, and are provided with bound edge 11.On top board 1, be provided with hole for hoist 12, and be provided with the groove coordinating with hole for hoist on described base plate 2, this groove and hole for hoist can form location structure in multilayer hoisting process.Because base plate 2 is bearing plates, so be provided with the keel that shaped steel 21 welding form in base plate, improve overall intensity, and be provided with the bolt hole 22 of fastening use at the side on floor.
Every block of side plate 3 of both sides by two be articulated and connected each other 5 and inwardly folding daughter board 31 form, hinged place adopts long row's hinge, and be connected with top board and base plate hinged respectively and be respectively equipped with latch assembly 51 in hinge point and the middle hinge point at upper and lower two places in the both sides up and down of side plate 3, by latch, they are locked in to deployed condition.
For playing good folding effect, be provided with and prevent folded-out spacing angle bar 52 at relevant hinge portion, can play reasonable protective effect to folded seam gap simultaneously, waterproof effect is outstanding.For playing good sealing effectiveness, default sealing joint strip 53 or other seals in folding gap.
A flat board 6 stretches out respectively on top board 1 and base plate 2, form top board or corridor structure, between upper and lower two flat boards 6, be provided with two groups of support bars 7, supporting rod is positioned at the left and right sides, itself and top board 1 and base plate are articulated and connected, and every group of support bar is articulated and connected each other by least two and inwardly folding straight-bar 71 form, can form synchronize folding with side plate like this, and the space taking after folding is also consistent.Locate to be provided with an evagination in the hinge point 5 ' of described straight-bar and pick up the ears 72, be provided with a bolt hole in picking up the ears, and by a bolt, two straight-bar lockings are formed to a locking mechanism, this locking mechanism also can adopt other parts with locking function, as steel turn package.
Upper flat plate uses as awning, and lower flat board uses as corridor.
On side plate, be provided with the bolt hole of fastening use, and fill in rubber stopper in described bolt hole, in the time that needs are fastening, rubber stopper is taken out, use bolt that the movable plank house between adjacent is tightened to one.
Described support bar 7 is provided with installs the fixed part that guardrail is used, and guardrail 73 can be installed, and forms effectively protection, meet the needs in two layers and above house, guardrail can adopt existing any structure, can be realized fast and being installed by several screws, very convenient and quick.
A kind of multistoried building system of utilizing above-mentioned movable plank house to build, as Figure 10, comprise movable plank house and stair 8, the placement that some movable plank houses superpose each other on left and right directions and above-below direction forms multistoried building structure, front and back are to it, similar with existing multi-floor building structure, and guardrail 73 is installed between described support bar, and between movable plank house adjacent one another are, use securing member 9 to be fastenedly connected, the similar existing harrow nail structure of securing member 9, securing member 9 two ends connect respectively two adjacent movable plank houses, realize fixing effect, and intert and fastening pulling plug (utilizing bolt hole hole reserved on side plate) between adjacent movable plank house side plate, realize further fixing between the two, very firm, one stair upper end overlap joint is also fixed therein by U-shaped securing member on the flat board of a movable plank house, this is to be very easy to realize.
A method of utilizing the multistoried building system of above-mentioned movable plank house construction, comprises the steps:
Step 1, first with vehicle, movable plank house is transported to destination, then utilize crane that the top board of described movable plank house is sling, so just realize the variation to deployed condition by folded state, after putting in place, utilize latch by fixing fast between side plate and top board, base plate, use bolt that support bar is fixed up, then install and use latch that front and back body of wall is fixed between top board and base plate fast, completing the installation of a movable plank house monomer.
Step 2, the action of repeating step one successively, and another movable plank house is placed and installed near the movable plank house having launched, and it is fastening between adjacent movable plank house, to use pulling plug and securing member to carry out, form one, and reinforcement oblique pull steel wire is set in building systems periphery, improve overall intensity.
Step 3, overlaps stair upper end be fixed on two layers or more the flat board of one of them movable plank house servant's stair in formation by U-shaped securing member.
Step 4, installs protective guard by the white space between the support bar in outside, corridor, and protective guard can be fully closed, can be also open armrest.
Both can complete the Fast Construction of a multistoried building system by above step, be applicable to the occasions such as building site, army's barracks, earthquake relief work.
Embodiment recited above is described preferred embodiment of the present utility model; not scope of the present utility model is limited; do not departing under the prerequisite of the utility model design spirit; relevant technical staff in the field, to various distortion of the present utility model and improvement, all should expand in protection domain as determined in the utility model claims.

Claims (7)

1. a movable plank house, comprise top board, base plate, the side plate of both sides and front and back body of wall, every block of side plate be articulated and connected each other by least two and inwardly folding daughter board form, and the dual-side up and down of described side plate is connected and is provided with latch assembly in hinge point with top board and base plate hinged respectively, it is characterized in that, a flat board stretches out respectively on described top board and base plate, and described in two, between flat board, be at least provided with two groups of support bars, and every group of support bar is articulated and connected each other by least two and inwardly folding straight-bar form, and the hinge point at described straight-bar is provided with locking mechanism.
2. a kind of movable plank house according to claim 1, is characterized in that, on described top board, is provided with hole for hoist, and is provided with the groove coordinating with hole for hoist on described base plate.
3. a kind of movable plank house according to claim 1, is characterized in that, described locking mechanism comprises the bolt hole being arranged on two straight-bars and the securing member that passes two bolts hole and two straight-bars are locked.
4. a kind of movable plank house according to claim 1, is characterized in that, is provided with the bolt hole of fastening use on described side plate, and fills in rubber stopper in described bolt hole.
5. a kind of movable plank house according to claim 1, is characterized in that, described support bar is provided with installs the fixed part that guardrail is used.
6. one kind is utilized the multistoried building system that in claim 1 to 5, the movable plank house described in any one is built, comprise movable plank house and stair, it is characterized in that, the placement that some described movable plank houses superpose each other forms multistoried building structure, and between described support bar, guardrail is installed, between movable plank house adjacent one another are, use securing member to be fastenedly connected, a stair upper end overlap joint is also fixed therein by securing member on the flat board of a movable plank house.
7. multistoried building system according to claim 6, is characterized in that, between movable plank house adjacent panels adjacent one another are, is fastenedly connected by pulling plug.
CN201320801367.4U 2013-12-09 2013-12-09 Movable plank house and multiple-layer house system CN203626051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320801367.4U CN203626051U (en) 2013-12-09 2013-12-09 Movable plank house and multiple-layer house system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320801367.4U CN203626051U (en) 2013-12-09 2013-12-09 Movable plank house and multiple-layer house system

Publications (1)

Publication Number Publication Date
CN203626051U true CN203626051U (en) 2014-06-04

Family

ID=50812543

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320801367.4U CN203626051U (en) 2013-12-09 2013-12-09 Movable plank house and multiple-layer house system

Country Status (1)

Country Link
CN (1) CN203626051U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652605A (en) * 2015-02-13 2015-05-27 淮南虎龙钢结构有限公司 Multi-layer one-piece combined folding container house
CN105317114A (en) * 2015-10-27 2016-02-10 重庆光煦科技有限公司 board house having corridor structure
CN105971122A (en) * 2016-07-21 2016-09-28 江苏标龙建设集团有限公司 Folding box-type board room capable of being overlapped
CN106320523A (en) * 2016-08-29 2017-01-11 广州电力机车有限公司 Interior-type modular house
CN108252413A (en) * 2016-12-29 2018-07-06 苏州天地智造环境科技有限公司 A kind of integrated house splicing structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652605A (en) * 2015-02-13 2015-05-27 淮南虎龙钢结构有限公司 Multi-layer one-piece combined folding container house
CN105317114A (en) * 2015-10-27 2016-02-10 重庆光煦科技有限公司 board house having corridor structure
CN105971122A (en) * 2016-07-21 2016-09-28 江苏标龙建设集团有限公司 Folding box-type board room capable of being overlapped
CN106320523A (en) * 2016-08-29 2017-01-11 广州电力机车有限公司 Interior-type modular house
CN106320523B (en) * 2016-08-29 2019-01-08 广州电力机车有限公司 A kind of built-in type modularized house
CN108252413A (en) * 2016-12-29 2018-07-06 苏州天地智造环境科技有限公司 A kind of integrated house splicing structure

Similar Documents

Publication Publication Date Title
AU2018232936B2 (en) Modular Building
AU2018204197B2 (en) Modular building units, and methods of constructing and transporting same
JP5643205B2 (en) Unit building system
DE69434694T2 (en) Foundation element for buildings
JP4658115B2 (en) Transportable modular building and construction method thereof
CN204753896U (en) Multilayer assembled concrete panel structure system
CN102433955B (en) Assembling prefabricated light steel composite load-bearing wall panel
CN102587693B (en) Two-storey modular villa building and construction method thereof
CN105863067B (en) A kind of modularization low layer assembled Special-Shaped Column steel house system
CA2929913C (en) A shelter, a curved element and a use of a shelter
CA2868656C (en) Improved folding building system
US9593487B2 (en) Modular building system
CN103015623B (en) A kind of fixed installation structure of precast plate
CN201245909Y (en) Back hanging anchor bolt type stone curtain wall structure with waterproof layer
RU2014102264A (en) Power concrete structures and methods for producing them
CN206438536U (en) Overlap assembled underground pipe gallery
JP2007536447A (en) Bidirectional building structure system and module support member
US20190078321A1 (en) Connector for a modular building
CN204627053U (en) A kind of multiple field steel work ITS
US8707634B2 (en) Collapsible modular building with canvas seams
CN102099265A (en) Transportable, modular, self contained shipping container building
CN101265724B (en) Run-through steel plate type square steel tube concrete column and axle i-beam node
DE212016000202U1 (en) Integrated composite building with steel structure
CN101418592A (en) Combined light steel structure house and mounting method thereof
CN201972269U (en) Prefabricated reinforcing steel bar concrete shear wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20150508

Address after: The intersection of 309 road and Baochang road 262400 Shandong city of Weifang province Changle County Development Zone Industrial Park Chang green house

Patentee after: Weifang jinweida Steel Structure Engineering Co. Ltd.

Address before: 262400 Shandong city of Weifang province Changle County, 309 State Road and Baochang Road intersection northwest close Park East

Patentee before: Liu Zhigang

Effective date of registration: 20150508

Address after: The intersection of 309 road and Baochang road 262400 Shandong city of Weifang province Changle County Development Zone Industrial Park Chang green house

Patentee after: Weifang jinweida Steel Structure Engineering Co. Ltd.

Address before: 262400 Shandong city of Weifang province Changle County, 309 State Road and Baochang Road intersection northwest close Park East

Patentee before: Liu Zhigang

C41 Transfer of patent application or patent right or utility model
ASS Succession or assignment of patent right

Owner name: WEIFANG JINWEIDA STEEL STRUCTURE ENGINEERING CO.,

Free format text: FORMER OWNER: LIU ZHIGANG

Effective date: 20150508

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201217

Address after: 262400 the intersection of national highway 309 and Baochang Road, Changle County, Weifang City, Shandong Province

Patentee after: Liu Zhigang

Address before: 262400 Weichang green house industrial park at the intersection of 309 National Road and Baochang Road, Changle County Development Zone, Weifang City, Shandong Province

Patentee before: Weifang jinweida Steel Structure Engineering Co.,Ltd.