CN203602264U - Rapid self-mounting tower crane - Google Patents
Rapid self-mounting tower crane Download PDFInfo
- Publication number
- CN203602264U CN203602264U CN201320764576.6U CN201320764576U CN203602264U CN 203602264 U CN203602264 U CN 203602264U CN 201320764576 U CN201320764576 U CN 201320764576U CN 203602264 U CN203602264 U CN 203602264U
- Authority
- CN
- China
- Prior art keywords
- tower
- tower body
- crane
- cap
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a rapid self-mounting tower crane which comprises a metal structure, a driving structure, a safety protection device, a hydraulic jacking system and an electric control system, wherein the metal structure comprises a bottom rack, a tower body, a pulling trailer, a turntable, a tower cap, a lifting arm and a balancing arm; the bottom rack is fixed at the bottom of the tower body; one side of the tower body is hinged to the end of the pulling trailer; the bottom rack is contacted with the ground when the tower body is lifted; the bottom rack is transversely arranged on the pulling trailer after the tower body is put down; the turntable is fixed on the top of the tower body; the tower cap is fixed above the turntable; the lifting arm and the balancing arm are respectively hinged to two sides of the turntable; the lifting arm is connected with the tower cap through a front pull rod; the balancing arm is connected with the tower cap through a rear pull rod. The rapid self-mounting tower crane has the beneficial effects that the tower crane is safe, reliable, simple in operation, rapid in detachment, convenient to transport and wide in application range, is automatically mounted and is conveniently transferred on the construction site.
Description
Technical field
This utility model relates to a kind of tower crane, and particularly a kind of tower crane that can certainly install fast, belong to hoisting crane manufacturing technology field.
Background technology
Tower crane (tower crane) is called for short tower machine, also claims tower crane, and its crane arm is contained in the rotary crane on towering tower body top.Working space is large, is mainly used in the installation of vertical and horizontal feed and the building element of material in housing construction.Formed by metal construction, operating mechanism and electric system three parts.Metal construction comprises tower body, crane arm and base etc.Operating mechanism hoists, luffing, revolution and walking four parts.Electric system comprises electrical motor, controller, electric power distribution cabinet, connection line, signal and illumination equipment etc.
In recent years, three layers and with storied building, residential building, in the small building constructions such as low layer industrial building, adopts universal building tower crane more, installs, transportation and conversion building site inconvenience, and construction cost is high, and operating efficiency is lower.Particularly in the time that new countryside construction is constructed, the restriction that is subject to transporting road conditions and conversion building site is more, and the more efficient mechanical equipment of one, for completing better project under construction, is also being sought by construction operation unit.
Summary of the invention
Goal of the invention: the purpose of this utility model is to provide a kind of safe and reliable, simple to operate, fast assembling-disassembling, convenient transportation, be applicable to 3 layers and with storied building, residential building, the small building engineerings such as low layer industrial building, are particularly suitable for the quick from tower crane is installed of new countryside construction.
Technical scheme: a kind of fast from tower crane is installed, comprise metal construction, driver train, safety guard, hydraulic jacking system and electric control system, described metal construction comprises underframe, tower body, cocked trailer, rotating disk, tower cap, crane arm and equilibrium arm, described underframe is fixed on the bottom of tower body, tower body one side is articulated with the end of cocked trailer, when tower body is holded up, underframe contacts with ground, and after tower body falls, the liftoff tower body of underframe was horizontal on cocked trailer; Described rotating disk is fixed and tower body top, and described tower cap is fixed on rotating disk top, and described crane arm and equilibrium arm are articulated with respectively rotating disk both sides, between crane arm and tower cap, are connected by front tension bar, between equilibrium arm and tower cap, are connected by back stay; Described tower cap and rotating disk fixed form are the mode that the hinged opposite side of a side locks by bearing pin, the hinged side of described tower cap and equilibrium arm the same side, and the hinge-point of equilibrium arm is positioned at the below of tower cap hinge-point.The metal construction of complete machine volume maximum in the time of transportation operating mode is divided into two parts, all folding being placed on cocked trailer of miscellaneous part except crane arm, and crane arm transports separately; Transport in order to facilitate the transportation of crane arm crane arm can be disassembled into multiple independently unit.When complete machine is transported to work place, installation steps are first to overturn and fixed tower cap, and then cocked tower body, underframe are fixed, installed equilibrium arm, crane arm is installed successively, finally require promote tower body height and be fixed according to sling height.
In order to adapt to the requirement of various sling heights, described tower body is telescopic structure.After complete engine set installation completes, improve the height of tower body by hydraulic jacking system, tower body comprises at least two joint stretching structures, locks, to improve the safe reliability of complete machine in the time that stretching puts in place by limitation locking mechanism.
Preference, in order to improve the safe reliability of complete machine, described underframe is ballast formula rood beam structure.
Preference, in order to facilitate the upset of tower body, is provided with overturning oil cylinder between described tower body and cocked trailer.Realize the upset of tower body and fold by the flexible of overturning oil cylinder.
Preference, in order to realize the installation certainly of complete machine, the dismounting of described metal construction coordinates the different windings of steel rope to realize Fast Installation and the dismounting of metallic magnetism by driver train.
Beneficial effect: the utility model is safe and reliable, simple to operate, fast assembling-disassembling, convenient transportation.From installation, facilitate building site to shift, applied widely.The utility model can utilize overturning oil cylinder to realize vertical, sleeping tower body, utilizes hydraulic climbing mechanism telescopic tower; Shared lifting mechanism is realized the cocked installation of equilibrium arm, crane arm lifting and cocked installation.Utilizing same mechanism's reverse operating, can complete dismounting, is transportation operating mode by work change working.Cocked and the jack-up system of hydraulic pressure and electric control system complete work, installation and the field-strip of tower machine jointly.Adopt ground remote control to handle each mechanism action, processing ease, easy to maintenance.Design meets or is better than national standard completely.
Accompanying drawing explanation
Structural representation when Fig. 1 is the utility model work operating mode;
Structural representation when Fig. 2 is the utility model transportation operating mode;
Fig. 3 is the structural representation after the utility model upset tower cap;
Fig. 4 is the structural representation after the vertical tower body of the utility model;
Fig. 5 is the structural representation after the utility model fixed frame;
Fig. 6 is the structural representation after the installation of the utility model equilibrium arm;
Fig. 7 is the structural representation of the utility model crane arm and rotating disk articulated procedures;
Fig. 8 is the structural representation of the utility model crane arm and tower cap connection procedure.
The specific embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 1,, a kind of fast from tower crane is installed, comprise metal construction, driver train, safety guard, hydraulic jacking system and electric control system, described metal construction comprises underframe 1, tower body 2, cocked trailer 3, rotating disk 4, tower cap 5, crane arm 6 and equilibrium arm 7, described underframe 1 is fixed on the bottom of tower body 2, tower body 2 one sides are articulated with the end of cocked trailer 3, when tower body 2 is holded up, underframe 1 contacts with ground, and after tower body 2 falls, the liftoff tower body 2 of underframe 1 was horizontal on cocked trailer 3; Described rotating disk 4 is fixed and tower body 2 tops, and described tower cap 5 is fixed on rotating disk 4 tops, and described crane arm 6 and equilibrium arm 7 are articulated with respectively rotating disk 4 both sides, between crane arm 6 and tower cap 5, are connected by front tension bar 8, between equilibrium arm 7 and tower cap 5, are connected by back stay 9; Described tower cap 5 is the mode that the hinged opposite side of a side locks by bearing pin with rotating disk 4 fixed forms, the hinged side of described tower cap 5 and equilibrium arm 7 the same sides, and the hinge-point of equilibrium arm 7 is positioned at the below of tower cap 5 hinge-points.Described tower body 2 is telescopic structure, has three joints.Described underframe 1 is ballast formula rood beam structure.Between described tower body 2 and cocked trailer 3, be provided with overturning oil cylinder 10.
As shown in Figure 2, for the utility model tower body 2 shrinks folding horizontal structural representation on cocked trailer 3, hinge-point by tower body 2 and cocked trailer 3 under the effect of overturning oil cylinder 10 tower body 2 accumbency on cocked trailer 3, equilibrium arm 7 upsets are shelved on tower body 2, and 5 upsets of tower cap are shelved on equilibrium arm 7.
Fig. 3 to Fig. 8 is the process schematic diagram that the utility model is installed, and the dismounting of described metal construction coordinates the different windings of steel rope to realize Fast Installation and the dismounting of metallic magnetism by driver train.
As shown in Figure 3, described tower cap 5 is the mode that the hinged opposite side of a side locks by bearing pin with rotating disk 4 fixed forms, upset fixed tower cap 2.
As shown in Figure 4, control overturning oil cylinder 10 and stretch out, tower body 2 is overturn, in the time that tower body 2 turn to certain angle, need to place weight with cocked trailer 3 lack of equilibrium perks in preventing switching process in cocked trailer 3 one end.
As shown in Figure 5, underframe 1 adopts ballast formula rood beam structure, in the time of tower body 2 standing, underframe 1 is fixed.
As shown in Figure 6, equilibrium arm 7 one end and rotating disk 4 one sides are hinged, and equilibrium arm 7 other ends are connected with tower cap 5 by back stay 9.When installation, driver train pulls back stay 9 one end by steel rope, and because back stay 9 other ends are connected with equilibrium arm 7, under the traction of steel rope, equilibrium arm 7 rotates around hinge-point, in the time that equilibrium arm 7 forwards desired location to, is fixed.
As shown in Figure 7, by one end of rope traction crane arm 6, while being drawn to relevant position, realize the hinged of crane arm 6 and rotating disk 4 by bearing pin.
As shown in Figure 8, crane arm 6 and rotating disk 4 complete hinged after, change the winding of steel rope, to realize the traction to front tension bar 8, by the traction of front tension bar 8 being realized to being connected of crane arm 6 and tower cap 5, the other end perk of while crane arm 6.Finally can realize by hydraulic jacking system the lifting of tower body 2, become the work structuring shown in Fig. 1.
Claims (5)
1. one kind tower crane is installed fast certainly, comprise metal construction, driver train, safety guard, hydraulic jacking system and electric control system, it is characterized in that: described metal construction comprises underframe (1), tower body (2), cocked trailer (3), rotating disk (4), tower cap (5), crane arm (6) and equilibrium arm (7), described underframe (1) is fixed on the bottom of tower body (2), tower body (2) one sides are articulated with the end of cocked trailer (3), when tower body (2) is holded up, underframe (1) contacts with ground, after tower body (2) falls, the liftoff tower body of underframe (1) (2) was horizontal on cocked trailer (3), described rotating disk (4) is fixed and tower body (2) top, described tower cap (5) is fixed on rotating disk (4) top, described crane arm (6) and equilibrium arm (7) are articulated with respectively rotating disk (4) both sides, between crane arm (6) and tower cap (5), be connected by front tension bar (8), between equilibrium arm (7) and tower cap (5), be connected by back stay (9), described tower cap (5) is the mode that the hinged opposite side of a side locks by bearing pin with rotating disk (4) fixed form, the hinged side of described tower cap (5) and equilibrium arm (7) the same side, and the hinge-point of equilibrium arm (7) is positioned at the below of tower cap (5) hinge-point.
2. according to claim 1 fast from tower crane is installed, it is characterized in that: described tower body (2) is telescopic structure.
3. according to claim 1 fast from tower crane is installed, it is characterized in that: described underframe (1) is ballast formula rood beam structure.
4. according to claim 1 fast from tower crane is installed, it is characterized in that: between described tower body (2) and cocked trailer (3), be provided with overturning oil cylinder (10).
5. according to claim 1 fast from tower crane is installed, it is characterized in that: the dismounting of described metal construction coordinates the different windings of steel rope to realize Fast Installation and the dismounting of metallic magnetism by driver train.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320764576.6U CN203602264U (en) | 2013-11-29 | 2013-11-29 | Rapid self-mounting tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320764576.6U CN203602264U (en) | 2013-11-29 | 2013-11-29 | Rapid self-mounting tower crane |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203602264U true CN203602264U (en) | 2014-05-21 |
Family
ID=50714951
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320764576.6U Expired - Fee Related CN203602264U (en) | 2013-11-29 | 2013-11-29 | Rapid self-mounting tower crane |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203602264U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103663183A (en) * | 2013-11-29 | 2014-03-26 | 江苏大通重工有限公司 | Fast self-mounting tower crane |
CN105236278A (en) * | 2014-05-29 | 2016-01-13 | 江苏大通重工有限公司 | Small tower crane pulling-up trailer |
CN105293316A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane |
-
2013
- 2013-11-29 CN CN201320764576.6U patent/CN203602264U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103663183A (en) * | 2013-11-29 | 2014-03-26 | 江苏大通重工有限公司 | Fast self-mounting tower crane |
CN105236278A (en) * | 2014-05-29 | 2016-01-13 | 江苏大通重工有限公司 | Small tower crane pulling-up trailer |
CN105293316A (en) * | 2015-11-25 | 2016-02-03 | 镇海建设集团有限公司 | Windproof tower crane |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203685052U (en) | Hoisting derrick special for coiled tubing equipment | |
CN201534755U (en) | Micro crane | |
CN106938824B (en) | Lifting device for electric equipment maintenance | |
CN206858005U (en) | A kind of lorry movable small crane | |
CN104326376B (en) | A kind of anti-storm wind the design of available mechanism can topple over the harbour jenny of transfer | |
CN203602264U (en) | Rapid self-mounting tower crane | |
CN103663183A (en) | Fast self-mounting tower crane | |
CN207406014U (en) | A kind of wallboard machine | |
CN207524853U (en) | A kind of gate folding-jib lorry-mounted crane | |
CN107758579A (en) | A kind of Multifunctional aloft-work platform | |
CN201338910Y (en) | Simple movable type traveling crane | |
CN202545121U (en) | Wind generating set with crane | |
CN203474311U (en) | Insulating boom hoist | |
CN202729637U (en) | Mounting machinery of large span workpieces | |
CN211226069U (en) | Hoisting machinery for pipeline construction | |
CN201687218U (en) | Installation device of steel shaft well | |
CN204552759U (en) | A kind of tunnel construction trolley horizontal mobile device | |
CN204251234U (en) | For the Multifunctional aloft-work hoisting crane of wind-power electricity generation machine overhauling, maintenance | |
CN204040598U (en) | The two rocker pole of a kind of remote control hydraulic | |
CN105692458B (en) | The wind-proof device of large-sized gantry and port gantry crane | |
CN206955487U (en) | It is exclusively used in lifting steel pipes and the crane device of welding | |
CN205857675U (en) | Collapsible material platform on construction scaffold | |
CN202729736U (en) | Movable type double-column aerial work platform | |
CN103318810A (en) | Portable transformer lifting machine | |
CN204265419U (en) | A kind of upset of the Novel hanging for circuit breaker car |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140521 Termination date: 20181129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |