CN203583856U - Construction operation platform in elevator shaft - Google Patents
Construction operation platform in elevator shaft Download PDFInfo
- Publication number
- CN203583856U CN203583856U CN201320727081.6U CN201320727081U CN203583856U CN 203583856 U CN203583856 U CN 203583856U CN 201320727081 U CN201320727081 U CN 201320727081U CN 203583856 U CN203583856 U CN 203583856U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- construction operation
- turnoverplatform
- elevator shaft
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model relates to a construction operation platform in an elevator shaft. The construction operation platform comprises a construction operation platform body, a material turnover platform, a steel tube and a shearing wall, wherein the construction operation platform body is composed of a reinforcement rib and a plywood, the reinforcement rib is arranged on the plywood, the construction operation platform body is arranged on the shearing wall through the steel tube, the material turnover platform is fixedly arranged on the shearing wall and positioned on one side of the construction operation platform body, a material clamping device is arranged on the material turnover platform, limit steel tubes are arranged at two ends of the steel tube, and protective guards are arranged on the construction operation platform body. The construction operation platform in the elevator shaft is simple in structure, convenient to use and install, easy to operate, capable of saving labor, safe in construction, firm and reliable, wide in application range, long in service life, and safe and reliable.
Description
Technical field
The utility model relates to construction operation platform in a kind of elevator shaft.
Background technology
Along with the more and more shortage of developing rapidly of China's building cause, particularly land resources, increasing engineering has all adopted little high level, high level, or even Super High.In Superstructure Construction process, in order to guarantee that in floor, a large amount of steel pipes, fastener and large form etc. have enough to meet the need equipment and materials smoothly in time to top transmission, traditional way is, at every layer, the material turnover steel platform of encorbelmenting is set.Traditional steel platform of encorbelmenting is arranged on exterior wall scaffold, is connected with agent structure, from great, and while moving to last layer, all needs tower crane to lift at every turn, and potential safety hazard is larger, can not meet construction needs.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of simple in structure, uses, easy for installation, simple to operate, laborsaving, and construction safety, solid and reliable, applied widely, long service life, has construction operation platform in the elevator shaft of safe and reliable effect.
For addressing the above problem, the utility model adopts following technical scheme: construction operation platform in a kind of elevator shaft, comprise construction operation platform, material Turnoverplatform, steel pipe and shear wall, described construction operation platform is comprised of reinforcing rib and veneer, described reinforcing rib is arranged on veneer, described construction operation platform by penstock installation on shear wall, described material Turnoverplatform is fixedly mounted on shear wall, described material Turnoverplatform is arranged on construction operation platform one side, described material Turnoverplatform is provided with material binding clasp, the two ends of described steel pipe are provided with spacing steel pipe, described construction operation platform is provided with protective guard.
As preferably, described material Turnoverplatform adopts bolt to be fixedly connected with shear wall.
As preferably, described spacing steel pipe adopts the mode of welding to be fixedly connected with steel pipe.
When the utility model is used, by set material Turnoverplatform, material can be changed on material Turnoverplatform, to reach the best use location of user, by set material binding clasp, material can be fixed on material Turnoverplatform firmly, preventing that it from coming off causes the accident, and by set protective guard, can increase the safety of constructor when construction, spacing steel pipe by set, can reduce its distortion and shift length.It is simple in structure, use, easy for installation, simple to operate, laborsaving, and construction safety, solid and reliable, applied widely, long service life, has safe and reliable effect.
Accompanying drawing explanation
Fig. 1 is the structural representation of construction operation platform in a kind of elevator shaft of the utility model;
Fig. 2 is the material Turnoverplatform structural representation of construction operation platform in a kind of elevator shaft of the utility model.
The specific embodiment
Consult construction operation platform in a kind of elevator shaft shown in Fig. 1 and Fig. 2, comprise construction operation platform 1, material Turnoverplatform 2, steel pipe 3 and shear wall 4, described construction operation platform 1 is comprised of reinforcing rib 5 and veneer 6, described reinforcing rib 5 is arranged on veneer 6, described construction operation platform 1 is arranged on shear wall 4 by steel pipe 3, described material Turnoverplatform 2 is fixedly mounted on shear wall 4, described material Turnoverplatform 2 is arranged on construction operation platform 1 one sides, described material Turnoverplatform 2 is provided with material binding clasp 7, the two ends of described steel pipe 3 are provided with spacing steel pipe 8, described construction operation platform 1 is provided with protective guard 9.
It should be noted that described material Turnoverplatform 2 adopts bolt (not shown) to be fixedly connected with shear wall 4.
It should be noted that described spacing steel pipe 8 adopts the mode of welding to be fixedly connected with steel pipe 3.
The utility model is by set material Turnoverplatform, material can be changed on material Turnoverplatform, to reach the best use location of user, by set material binding clasp, material can be fixed on material Turnoverplatform firmly, prevent from that it from coming off to cause the accident, by set protective guard, can increase the safety of constructor when construction, the spacing steel pipe by set, can reduce its distortion and shift length.It is simple in structure, use, easy for installation, simple to operate, laborsaving, and construction safety, solid and reliable, applied widely, long service life, has safe and reliable effect.
More than show and described basic principle of the present utility model, principal character and advantage of the present utility model.The technician of the industry should understand; the utility model is not restricted to the described embodiments; that in above-described embodiment and manual, describes just illustrates principle of the present utility model; do not departing under the prerequisite of the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall within the scope of claimed the utility model.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (3)
1. construction operation platform in an elevator shaft, it is characterized in that: comprise construction operation platform (1), material Turnoverplatform (2), steel pipe (3) and shear wall (4), described construction operation platform (1) is comprised of reinforcing rib (5) and veneer (6), described reinforcing rib (5) is arranged on veneer (6), described construction operation platform (1) is arranged on shear wall (4) by steel pipe (3), described material Turnoverplatform (2) is fixedly mounted on shear wall (4), described material Turnoverplatform (2) is arranged on construction operation platform (1) one side, described material Turnoverplatform (2) is provided with material binding clasp (7), the two ends of described steel pipe (3) are provided with spacing steel pipe (8), described construction operation platform (1) is provided with protective guard (9).
2. construction operation platform in elevator shaft according to claim 1, is characterized in that: described material Turnoverplatform (2) adopts bolt to be fixedly connected with shear wall (4).
3. construction operation platform in elevator shaft according to claim 1, is characterized in that: described spacing steel pipe (8) adopts the mode of welding to be fixedly connected with steel pipe (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320727081.6U CN203583856U (en) | 2013-11-18 | 2013-11-18 | Construction operation platform in elevator shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320727081.6U CN203583856U (en) | 2013-11-18 | 2013-11-18 | Construction operation platform in elevator shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203583856U true CN203583856U (en) | 2014-05-07 |
Family
ID=50581796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320727081.6U Expired - Fee Related CN203583856U (en) | 2013-11-18 | 2013-11-18 | Construction operation platform in elevator shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203583856U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106892320A (en) * | 2017-04-20 | 2017-06-27 | 中国冶集团有限公司 | A kind of device and method for improving hoistway cage guide installation safety |
-
2013
- 2013-11-18 CN CN201320727081.6U patent/CN203583856U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106892320A (en) * | 2017-04-20 | 2017-06-27 | 中国冶集团有限公司 | A kind of device and method for improving hoistway cage guide installation safety |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204675672U (en) | A kind of spliced tower crane service platform | |
CN202829273U (en) | Lifting tool of reinforcement cage | |
CN203583856U (en) | Construction operation platform in elevator shaft | |
CN203593556U (en) | High safety tower crane | |
CN204566390U (en) | Just cement mixer is moved | |
CN202324567U (en) | Moving type large-scale operation platform | |
CN204001930U (en) | The main material bracing means of electric power tower | |
CN207160536U (en) | A kind of renovation of building construction platform | |
CN207192584U (en) | A kind of boom hoisting of torsion-bending ratio | |
CN205870843U (en) | Big tip footpath prestressing force cement electric pole tensioning equipment | |
CN204126237U (en) | A kind of elevator hoistway construction platform | |
CN204917674U (en) | Hoist girder | |
CN202954551U (en) | Simple steel reinforcement cage for high-altitude welding | |
CN203781713U (en) | High slope support material transport device | |
CN203514918U (en) | Concrete pole tower with ladder stand device | |
CN201778498U (en) | Safe escape device for super-high-rise building core wall construction | |
CN203486809U (en) | Falling protector of tower crane vertical ladder | |
CN203271105U (en) | Auxiliary device of building hoist wall attaching frame | |
CN203412276U (en) | Plastic composite material scaffold | |
CN204310718U (en) | Single girder gantry crane | |
CN206360382U (en) | A kind of new discharging platform | |
CN202001022U (en) | Movable lining arch center formwork | |
CN206928683U (en) | A kind of lifeline standing rigging | |
CN204060733U (en) | One is applicable to embedded portal section of jurisdiction, shield construction tunnel plucking device | |
CN204691205U (en) | Elevator shaft mouth sizing steel plate operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140507 Termination date: 20161118 |
|