CN203533086U - In-situ protection structure for pipelines above foundation pit - Google Patents

In-situ protection structure for pipelines above foundation pit Download PDF

Info

Publication number
CN203533086U
CN203533086U CN201320641507.6U CN201320641507U CN203533086U CN 203533086 U CN203533086 U CN 203533086U CN 201320641507 U CN201320641507 U CN 201320641507U CN 203533086 U CN203533086 U CN 203533086U
Authority
CN
China
Prior art keywords
truss
bearing beam
foundation pit
pipeline
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320641507.6U
Other languages
Chinese (zh)
Inventor
柴艳飞
安文河
任富芝
徐利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201320641507.6U priority Critical patent/CN203533086U/en
Application granted granted Critical
Publication of CN203533086U publication Critical patent/CN203533086U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Sewage (AREA)

Abstract

The utility model discloses an in-situ protection structure for pipelines above a foundation pit. The in-situ protection structure comprises a truss, steel vertical columns, upper template beams, lower template beams, a wrapping barrel, chain blocks and steep wire ropes. The truss stretches across a pipeline box culvert and is horizontally arranged, the steel vertical columns are arranged at both ends of the truss, the upper template beams are transversely supported by the top of the truss, the upper template beams and the lower template beams correspond to each other one to one, the lower template beams are supported by the bottom of the wrapping barrel, the wrapping barrel wraps the periphery of the pipeline box culvert, and the lower template beams and the lower template beams are connected with the steel wire ropes through the chain blocks. According to the in-situ protection structure, settlement deformation of the pipeline box culvert in the construction process of the foundation pit can be avoided, and therefore in-situ protection of the pipelines is achieved. It can be guaranteed that the settlement deformation value of important pipelines without moving and modifying conditions within the construction range of the foundation pit is not more than an allowable value, and the influences on a foundation pit support structure and a main structure are within a controllable range.

Description

The in-situ conservation structure of foundation ditch top pipeline
Technical field
The utility model relates to a kind of in-situ conservation structure of pipeline, particularly relates to the in-situ conservation structure of a kind of foundation ditch top pipeline.
Background technique
At present, in carrying out the foundation pit construction process of track traffic and building construction, city proper can run into a large amount of shallow embedding municipal pipelines, these municipal pipeline buried depths are generally in 2m left and right, can affect the construction of foundation pit enclosure structure, earth excavation and agent structure, at present mainly taking to move the method changing solves, temporarily pipeline is changed and adjourned construction area from construction infection region, after foundation pit construction all completes, then pipeline is moved and changes back original position.But at foundation ditch narrow field or pipeline is extremely important and do not possess the situation of moving the condition of changing to distortion sedimentation is very responsive etc. around, just need to carry out in-situ conservation to pipeline.Take which kind of structural type can guarantee that pipe settlement distortion meets the demands, can accomplish economical rationality again, easy construction, does not also have ripe technological scheme at present.
Summary of the invention
The utility model provides the in-situ conservation structure of a kind of foundation ditch top pipeline for solving the technical problem existing in known technology.
The technological scheme that the utility model is taked for the technical problem existing in solution known technology is: the in-situ conservation structure of a kind of foundation ditch top pipeline, comprise truss, steel column, top bearing beam, bottom bearing beam, parcel cylinder, jack and wire rope, described truss is across on pipeline box culvert and horizontal arrangement, the two ends of described truss are equipped with described steel column, the top cross-arm of described truss has described top bearing beam, described top bearing beam is relative one by one with described bottom bearing beam, described bottom bearing beam is supported on the bottom of described parcel cylinder, described parcel cylinder is wrapped in the surrounding of pipeline box culvert, described bottom bearing beam is connected with wire rope by jack with described top bearing beam.
The two ends of described truss are respectively provided with two described steel columns, have set up middle part bearing beam on these two described steel columns, and described erection of truss is on two relative described middle part bearing beams.
Described truss two ends bottom welding has pressure-bearing steel plate.
Advantage and the good effect that the utlity model has are: adopt steel column sub-truss; the structure that truss suspends protected pipeline box culvert in midair by wire rope and jack; can avoid pipeline box culvert generation sedimentation and deformation in foundation pit construction process, thereby realize the in-situ conservation of pipeline.Can guarantee not possess within the scope of foundation pit construction the important pipe settlement deformation values that moves the condition of changing and be no more than permitted value; and the impact of foundation pit enclosure structure and agent structure, in controlled range, is applicable to the in-situ conservation of top pipeline in the foundation pit construction processes such as underground station, construction of underground structure, building construction.
Accompanying drawing explanation
Fig. 1 is planimetric map of the present utility model;
Fig. 2 is elevation of the present utility model;
Fig. 3 is the side view of Fig. 2.
In figure: 1, pressure-bearing steel plate, 2, top bearing beam, 3, truss, 4, middle part bearing beam, 5, steel column, 6, wire rope, 7, bottom bearing beam, 8, pipeline box culvert, 9, parcel cylinder, 10, jack.
Embodiment
For further understanding summary of the invention of the present utility model, Characteristic, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Refer to Fig. 1~Fig. 3, the in-situ conservation structure of a kind of foundation ditch top pipeline, comprise truss 3, steel column 5, top bearing beam 2, bottom bearing beam 7, parcel cylinder 9, jack 10 and wire rope 6, described truss 3 is across on pipeline box culvert 8 and horizontal arrangement, the two ends of described truss are equipped with described steel column 5, the top cross-arm of described truss 3 has described top bearing beam 2, described top bearing beam 2 is relative one by one with described bottom bearing beam 7, described bottom bearing beam 7 is supported on the bottom of described parcel cylinder 9, described parcel cylinder 9 is wrapped in the surrounding of pipeline box culvert 8, described bottom bearing beam 7 is connected with wire rope 6 by jack 10 with described top bearing beam 2.
In the present embodiment, in order to guarantee the stable of Steel Truss integral body, be respectively provided with two described steel columns 5 at the two ends of described truss 3, set up middle part bearing beam 4 on these two described steel columns 5, described truss 3 is erected on two relative described middle part bearing beams 4.In order to improve the local anti-pressure ability of truss, at described truss two ends, bottom welding has pressure-bearing steel plate 1.
After foundation pit construction completes, should carry out in time soil body backfill and the recovery of pipeline box culvert.After the backfill of pipeline box culvert completes, remove the members such as above-mentioned truss 3 and steel column 5.
Although by reference to the accompanying drawings preferred embodiment of the present utility model is described above; but the utility model is not limited to above-mentioned embodiment; above-mentioned embodiment is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not departing from the scope situation that the utility model aim and claim protect, can also make a lot of forms, within these all belong to protection domain of the present utility model.

Claims (3)

1. the in-situ conservation structure of foundation ditch top pipeline, it is characterized in that, comprise truss, steel column, top bearing beam, bottom bearing beam, parcel cylinder, jack and wire rope, described truss is across on pipeline box culvert and horizontal arrangement, the two ends of described truss are equipped with described steel column, the top cross-arm of described truss has described top bearing beam, described top bearing beam is relative one by one with described bottom bearing beam, described bottom bearing beam is supported on the bottom of described parcel cylinder, described parcel cylinder is wrapped in the surrounding of pipeline box culvert, described bottom bearing beam is connected with wire rope by jack with described top bearing beam.
2. the in-situ conservation structure of foundation ditch according to claim 1 top pipeline; it is characterized in that; the two ends of described truss are respectively provided with two described steel columns, have set up middle part bearing beam on these two described steel columns, and described erection of truss is on two relative described middle part bearing beams.
3. the in-situ conservation structure of foundation ditch according to claim 1 top pipeline, is characterized in that, described truss two ends bottom welding has pressure-bearing steel plate.
CN201320641507.6U 2013-10-17 2013-10-17 In-situ protection structure for pipelines above foundation pit Expired - Fee Related CN203533086U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320641507.6U CN203533086U (en) 2013-10-17 2013-10-17 In-situ protection structure for pipelines above foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320641507.6U CN203533086U (en) 2013-10-17 2013-10-17 In-situ protection structure for pipelines above foundation pit

Publications (1)

Publication Number Publication Date
CN203533086U true CN203533086U (en) 2014-04-09

Family

ID=50419291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320641507.6U Expired - Fee Related CN203533086U (en) 2013-10-17 2013-10-17 In-situ protection structure for pipelines above foundation pit

Country Status (1)

Country Link
CN (1) CN203533086U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755754A (en) * 2018-06-01 2018-11-06 江北建设有限公司 A kind of rainwater box culvert passes through underground utilities protective device
CN111270681A (en) * 2020-03-18 2020-06-12 长江勘测规划设计研究有限责任公司 Construction method and structure of support structure suitable for crossing foundation pit pipeline group

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755754A (en) * 2018-06-01 2018-11-06 江北建设有限公司 A kind of rainwater box culvert passes through underground utilities protective device
CN111270681A (en) * 2020-03-18 2020-06-12 长江勘测规划设计研究有限责任公司 Construction method and structure of support structure suitable for crossing foundation pit pipeline group

Similar Documents

Publication Publication Date Title
CN103486403A (en) In-situ protection construction method of pipeline above foundation pit
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN104863597A (en) Transverse tunnel cover method for shallow-buried underground excavation large underground space construction
CN203533086U (en) In-situ protection structure for pipelines above foundation pit
CN104518473A (en) Suspension protection structure and method of cable box culvert pipeline
CN104532849A (en) Excavation method for foundation pit above operation railway tunnel
CN204282388U (en) A kind of pile foundation reinforcement structure adopting compound pile to construct
CN201991009U (en) Deep foundation pit shoring system using poured slope-supporting piles and anchor ropes
CN202500096U (en) Rain water box culvert crossing underground pipeline protection device
CN103388311B (en) Jacking method performing deviation correction at deflecting end through steel supports during oblique crossing jacking
CN105220704A (en) A kind of transformer station's ground of settlement by soaking soil
CN104631465A (en) Deep foundation pit excavation construction method adopted under pebble bed red sandstone geological condition
CN209891746U (en) Large-span construction shielding camouflage device
CN203978442U (en) A kind of public iron is built submerged tunnel jointly
CN203782745U (en) Structure of earth-retaining wall at high embankment of steep slope at multi-track railway station
CN203113361U (en) Deep foundation pit sealing precipitation device
CN107630459A (en) A kind of soft base of pipe gallery supports and its construction method
CN106638668A (en) Underpinning system between underground connection passage and power pipeline and construction method of underpinning system
CN205242463U (en) Subway station foundation pit retaining structure ground is construction monitoring structure of wall even
CN210368589U (en) Suspended combined bridge for in-situ protection of cable set above foundation pit
CN104088288A (en) Manufacturing method and application of container caisson
CN103526763A (en) Cast-in-place pile, root pile and jet grouting pile composite-type foundation pit supporting method
CN103967316A (en) Novel iron tower suitable for terrain with gradient within 10 degrees
CN204662346U (en) Shallowly above a kind of shield tunnel cover bed stabilization structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20151017

EXPY Termination of patent right or utility model