CN203514398U - Installation device for tubular pump - Google Patents

Installation device for tubular pump Download PDF

Info

Publication number
CN203514398U
CN203514398U CN201320521587.1U CN201320521587U CN203514398U CN 203514398 U CN203514398 U CN 203514398U CN 201320521587 U CN201320521587 U CN 201320521587U CN 203514398 U CN203514398 U CN 203514398U
Authority
CN
China
Prior art keywords
tubular pump
tubular
installation
wall pipe
installation cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201320521587.1U
Other languages
Chinese (zh)
Inventor
黄学军
詹必友
许荣军
马金星
顾玉中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lanshen Group Co., Ltd.
Original Assignee
NANJING LANSHEN PUMP (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING LANSHEN PUMP (GROUP) CO Ltd filed Critical NANJING LANSHEN PUMP (GROUP) CO Ltd
Priority to CN201320521587.1U priority Critical patent/CN203514398U/en
Application granted granted Critical
Publication of CN203514398U publication Critical patent/CN203514398U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an installation device for a tubular pump. The installation device for the tubular pump comprises an installation base and two through-wall pipe embedded parts embedded in the installation base. An installation cavity of the tubular pump is formed in the middle of the two through-wall pipe embedded parts. The installation device for the tubular pump is characterized in that a guide structure arranged in the axial direction of each through-wall pipe embedded part is arranged at the bottom of the installation cavity and locating structures arranged in the vertical direction of the installation cavity are arranged on the two side walls of the installation cavity. Compared with the prior art, the error of an inlet flange and the error of an outlet flange of the tubular pump are limited within a small range through locating steel channels of the locating structures so that accurate locating and installation can be achieved; the tubular pump is fixed to a trolley support and can move on a guide rail, so that the tubular pump is automatically sealed by an inlet sealing ring through the axial force of the tubular pump when the tubular pump is operated and an outlet gap is sealed. The inlet flange and the outlet flange of the tubular pump are completely identical and the through-wall pipe embedded parts are completely identical, so that when reversed-water-drawing is needed, the tubular pump only needs to be lifted and turned around and use is convenient and rapid.

Description

A kind of erecting device of tubular through flow pump
Technical field
The utility model relates to a kind of mounting structure, specifically a kind of submersed three-flow pump deep-well erecting device.
Background technology
Submersed three-flow pump is a kind of large flow low-lift horizontal pump type, adopts pump coaxial structure.Its runner is straight, in the situation that lift is identical with specific revolution, than submersible axial flow pump, has higher unit efficiency.Adopt horizontal type structure, axial dimension is compact, can reduce foundation excavation amount, reduces pump house height and simplifies hydraulic architecture structure.So more and more applied under low lift and large flow rate operating mode.But existing several tubular through flow pump mounting means is generally on-the-spot fixed installation, need at the bottom of pump sump, to install under field personnel, installation workload is large, action required space is large, can not turn around oppositely to draw water or the workload that turns around large.
The present invention can solve above problem: whole Transporting is to on-the-spot after factory's assembling test completes for tubular through flow pump, and on-the-spot needs welding location channel-section steel and light rail, and integral body turns around simple to operation.
Summary of the invention
Technical problem to be solved in the utility model is for above-mentioned the deficiencies in the prior art, and a kind of convenient tubular through flow pump erecting device of installing and lifting by crane is provided, and the utility model can be realized the rapid installation of tubular through flow pump, lifting, and integral body turns around oppositely to draw water.
For solving the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of erecting device of tubular through flow pump, comprise mount pad and be embedded in two wall pipe built-in fittings in mount pad, in the middle of two wall pipe built-in fittings, it is the installation cavity of tubular through flow pump, it is characterized in that, in the bottom of described installation cavity, be provided with along the axial guide frame of described wall pipe built-in fitting, on two sidewalls of described installation cavity, be provided with along the vertical location structure of described installation cavity.
In described installation cavity, be also provided with position limiting structure.
Described guide frame is light rail or guide rail, and its middle guide is that i iron, channel-section steel or angle steel are made, and described location structure is two location channel-section steels that are arranged in parallel, location angle steel or location i iron.
Described position limiting structure is spacing steel plate or spacing angle steel.
The utility model tubular through flow pump erecting device, mount pad, location channel-section steel, spacing steel plate, guide rail and the wall pipe built-in fitting etc. that comprise concreting, in the civil engineering stage, carry out in advance location channel-section steel, spacing steel plate, the installation of guide rail and wall pipe built-in fitting etc., treats that civil engineering completes, submersible type tubular through flow pump is slided along location channel-section steel, realize and installing from lotus root.
Compared with prior art, advantage of the present utility model is as follows:
1. with the location channel-section steel of location structure, tubular through flow pump is imported and exported to flange and be limited in very little error, realize accurate location and installation.
2. tubular through flow pump is fixed on little kickstand and can on guide rail, moves, and makes tubular through flow pump when operation, utilize its axial force automatically to realize the sealing of inlet seal circle, outlet gap sealing.
3. it is identical with built-in fitting that tubular through flow pump of the present utility model is imported and exported flange, thus when needs oppositely draw water, only tubular through flow pump need be sling and turned around, convenient and swift.
4. the spacing steel plate of position limiting structure can guarantee that pump arrives installation site smoothly.
Accompanying drawing explanation
Fig. 1 is the structural representation of the embodiment of the present invention.
Fig. 2 is location channel-section steel sectional view.
Fig. 3 is light rail sectional view.
Fig. 4 is spacing steel plate schematic diagram.
In figure: 1-locates channel-section steel, 2-wall pipe built-in fitting, the spacing steel plate of 3-, 4-guide rail, 5-mount pad, 6-installs cavity, and 7, tubular through flow pump.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is elaborated:
As shown in Figure 1, erecting device of the present invention comprises the mount pad 5 of concreting, in mount pad 5, be embedded with two wall pipe built-in fittings 2, it between two wall pipe built-in fittings in mount pad 5, is tubular through flow pump installation cavity 6 from top to bottom, two sides of cavity being installed at this are welded with location structure, location structure can adopt simple location channel-section steel 1 to realize, the one-sided location channel-section steels 1 that two vertical layouts are set of cavity are being installed, the spacing of two location channel-section steels 1 just in time matches with the flange diameter at tubular through flow pump two ends, as shown in Figure 2.In the lower end that cavity is installed, be fixedly welded with the guide rail 4 of guiding device, see Fig. 3.In order to make tubular through flow pump slide into installation site 1 time along location channel-section steel, in being installed, cavity is also welded with the spacing steel plate of position limiting structure, referring to Fig. 4.
The concrete applying step of the utility model erecting device is as follows:
1. in the civil engineering stage, reinforcing bar in pre-embedded steel slab and first phase concrete is connected firmly, wall pipe built-in fitting is pre-buried good on request;
2. tubular through flow pump install before by location channel-section steel 1 and light rail 4 in accordance with regulations size and required precision be welded on pre-embedded steel slab, spacing steel plate 3 is welded on wall pipe built-in fitting flange;
3. with row, hang or mobile crane is lifted into tubular through flow pump in channel-section steel limited range, along channel-section steel slow decreasing to tubular through flow pump wheel, drop on light rail, confirm that tubular through flow pump can move left and right, arrange and fix cable, the debugging of just can starting shooting.
If 4. need oppositely draw water, closed shutter, hangs out pump sump hole by tubular through flow pump, repeats 3. step after turning around again.

Claims (4)

1. the erecting device of a tubular through flow pump, comprise mount pad and be embedded in two wall pipe built-in fittings in mount pad, in the middle of two wall pipe built-in fittings, it is the installation cavity of tubular through flow pump, it is characterized in that, in the bottom of described installation cavity, be provided with along the axial guide frame of described wall pipe built-in fitting, on two sidewalls of described installation cavity, be provided with along the vertical location structure of described installation cavity.
2. the erecting device of tubular through flow pump according to claim 1, is characterized in that: in described installation cavity, be also provided with position limiting structure.
3. the erecting device of tubular through flow pump according to claim 1, is characterized in that: described guide frame is light rail or guide rail, and its middle guide is that i iron, channel-section steel or angle steel are made; Described location structure is two location channel-section steels that are arranged in parallel, location angle steel or location i iron.
4. the erecting device of tubular through flow pump according to claim 2, is characterized in that: described position limiting structure is spacing steel plate or spacing angle steel.
CN201320521587.1U 2013-08-26 2013-08-26 Installation device for tubular pump Active CN203514398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320521587.1U CN203514398U (en) 2013-08-26 2013-08-26 Installation device for tubular pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320521587.1U CN203514398U (en) 2013-08-26 2013-08-26 Installation device for tubular pump

Publications (1)

Publication Number Publication Date
CN203514398U true CN203514398U (en) 2014-04-02

Family

ID=50373353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320521587.1U Active CN203514398U (en) 2013-08-26 2013-08-26 Installation device for tubular pump

Country Status (1)

Country Link
CN (1) CN203514398U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105179324A (en) * 2015-10-19 2015-12-23 天津甘泉集团有限公司 Horizontal type tubular pump device adopting voltage buildup gap installation
CN112283507A (en) * 2020-10-20 2021-01-29 中国建筑第八工程局有限公司 High-precision pre-embedding installation method for flange of group flow-making pump in special-shaped concrete structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105179324A (en) * 2015-10-19 2015-12-23 天津甘泉集团有限公司 Horizontal type tubular pump device adopting voltage buildup gap installation
CN112283507A (en) * 2020-10-20 2021-01-29 中国建筑第八工程局有限公司 High-precision pre-embedding installation method for flange of group flow-making pump in special-shaped concrete structure
CN112283507B (en) * 2020-10-20 2022-03-01 中国建筑第八工程局有限公司 High-precision pre-embedding installation method for flange of group flow-making pump in special-shaped concrete structure

Similar Documents

Publication Publication Date Title
CN201417657Y (en) Installation device of indoor transformer
CN104631338B (en) A kind of steel lifted trunk and positioning construction method
CN203514398U (en) Installation device for tubular pump
CN206538783U (en) Jacking prefabricated box culvert
CN202927262U (en) Pipeline installation pillar in oil/gas pipeline tunnel
CN204167849U (en) Cable trough and cover plate thereof
CN202299574U (en) Plug-in type communication base station lifting tower
CN201224661Y (en) Apparatus for mounting indoor large-sized apparatus in small space
CN205479706U (en) Push pipe work jing ding advances structure
CN110282557A (en) Assist mounting platform and the method with high vacant duct in bridge crane installation workshop
CN210482379U (en) Highway underpass pipe gallery structure
CN111593763B (en) Fixing device for mounting underground pipe gallery and using method thereof
CN202347884U (en) Overhaul platform for water turbine
CN204983096U (en) Prefabricated pump station of formula of burying
CN106013234A (en) Construction method for underground comprehensive pipe rack
CN203594051U (en) Steel pipe pillar positioner supporting frame device used for cover and cut top-down method
CN202380447U (en) Plane steel gate hydraulic hoist
CN203730824U (en) Efficient pumping and irrigating automatic converter
CN203404486U (en) Hydraulic pipeline installation machine
KR20110011444A (en) A prefabricated house construction method and the construction device
CN209368880U (en) The electric integrated piping lane F type push pipe of pre-buried channel flow formula
CN212045305U (en) Prefabricated utility tunnel outer wall steel bar location structure of burst formula
CN205065143U (en) Assemble device in big shaped steel bifurcated pipe hole
CN101775825B (en) Structure used for let-off pipe of water pump to penetrate through top plate and construction method thereof
CN204850009U (en) Modularization drainage pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: LANSHEN GROUP CO., LTD.

Free format text: FORMER NAME: NANJING LANSHEN PUMP (GROUP) CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 211500 Nanjing Province, Liuhe District, East Road, No.

Patentee after: Lanshen Group Co., Ltd.

Address before: 211500 Nanjing Province, Liuhe District, East Road, No.

Patentee before: Nanjing Lanshen Pump (Group) Co.,Ltd.