CN203499065U - Connecting structure for upright post of curtain wall and post-installed embedded part and curtain wall - Google Patents
Connecting structure for upright post of curtain wall and post-installed embedded part and curtain wall Download PDFInfo
- Publication number
- CN203499065U CN203499065U CN201320550115.9U CN201320550115U CN203499065U CN 203499065 U CN203499065 U CN 203499065U CN 201320550115 U CN201320550115 U CN 201320550115U CN 203499065 U CN203499065 U CN 203499065U
- Authority
- CN
- China
- Prior art keywords
- post
- install
- connector
- column
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000126 substance Substances 0.000 claims abstract description 21
- 238000003466 welding Methods 0.000 claims abstract description 11
- 238000009413 insulation Methods 0.000 claims description 5
- 125000006850 spacer group Chemical group 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000007598 dipping method Methods 0.000 description 2
- 239000003814 drug Substances 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000005246 galvanizing Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000007634 remodeling Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002918 waste heat Substances 0.000 description 1
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model provides a connecting structure for an upright post of a curtain wall and a post-installed embedded part and the curtain wall. The connecting structure comprises the post-installed embedded part, chemical anchor bolts, a connecting piece and the upright post, wherein the post-installed embedded part is fixedly arranged on a civil engineering structure through the chemical anchor bolts; the connecting piece is fixedly arranged on the post-installed embedded part; the upright post is fixedly arranged on the connecting piece; at least two studs are fixedly arranged on the post-installed embedded part; through holes matched with the studs are formed in the connecting piece; the studs are positioned in the through holes, and fix the connecting piece through nuts. According to the connecting structure for the upright post of the curtain wall and the post-installed embedded part, the studs are fixedly arranged on the post-installed embedded part, and the welding of the connecting piece after the post-installed embedded part is fixedly arranged on the civil engineering structure is avoided, so that the uplift resistance reduction, caused by welding, of the chemical anchor bolts is avoided, influence on the safety and the reliability of connection between the upright post of the curtain wall and the civil engineering structure is further avoided, and the engineering quality is ensured.
Description
Technical field
The utility model belongs to outer decoration technical field, the curtain wall that is specifically related to the syndeton of a kind of curtain-wall stand-column and post-install and has this syndeton.
Background technology
Curtain wall is generally used in building external structure, can meet on the one hand the decorative effect of the building of building, can guarantee on the other hand to building be incubated, sealing, daylighting, waterproof and sound insulation.
The syndeton of curtain-wall stand-column of the prior art and post-install, is normally fixed on post-install on the civil engineering structure of building by chemical anchor bolts, afterwards the connector that connects column is welded on rearmounted steel plate.Because bonding area is large, the waste heat producing during welding makes the local high temperature that produces of post-install, high temperature can make the chemical anchoring medicine decomposition failure of chemical anchor bolts, reduce the uplift resistance of chemical anchor bolts, thereby the security reliability that curtain-wall stand-column is connected with civil engineering structure impacts; Post-install is fixed on after the civil engineering structure of building simultaneously, then connector is welded on post-install, and welding difficulty is large, and welding quality is difficult for guaranteeing.
Summary of the invention
The utility model, for problems of the prior art, provides the syndeton of a kind of curtain-wall stand-column and post-install, the security reliability that curtain-wall stand-column is connected with civil engineering structure, and workmanship is high.
For reaching above-mentioned technical purpose, the utility model is realized by the following technical solutions:
The syndeton of a kind of curtain-wall stand-column and post-install, comprise post-install, chemical anchor bolts, connector, column, described post-install is fixed on civil engineering structure by chemical anchor bolts, described connector is fixed on described post-install, described column is fixed on described connector, is fixed with at least two double-screw bolts on described post-install, has the through hole matching with described double-screw bolt on described connector, described double-screw bolt is positioned at described through hole, and described double-screw bolt is fixed described connector by nut.
For connector fixing firmly, on described double-screw bolt, also there is pad, described pad is between described connector and nut.
Further, on described post-install, be fixed with four double-screw bolts.
Further, on described post-install, offer circular hole, described stud welding is in described circular hole.。
Further, on described post-install, offer screwed hole, described double-screw bolt is fixed in described screwed hole.
Further, described chemical anchor bolts are fixed on the post-install that is fixed with double-screw bolt on civil engineering structure.
Further, described connector is two, lays respectively at the both sides of described column.
Further, described column is fixed on described connector by screw bolt and nut.
Further, between described column and described connector, be provided with insulation spacer.
Further, between the bolt head of described bolt and described connector, be provided with square washer, between described nut and described connector, be also provided with square washer.
Curtain-wall stand-column based on above-mentioned and the syndeton of post-install, the utility model also provides a kind of curtain wall, has above-mentioned syndeton, makes safety partition reliable.
A curtain wall, has the syndeton of above-mentioned curtain-wall stand-column and post-install.
Compared with prior art, advantage of the present utility model and good effect are: the curtain-wall stand-column that the utility model provides and the syndeton of post-install, employing is fixed bolt on post-install, and on connector, offer through hole, by nut and double-screw bolt, connector is fixed on post-install, column is fixed on connector, thereby realized the fixing of curtain-wall stand-column, avoided post-install to be fixed to the welding of civil engineering structure rear connectors, so avoided welding to cause the uplift resistance that reduces chemical anchor bolts, and then avoided the security reliability that curtain-wall stand-column is connected with civil engineering structure to impact, guaranteed workmanship.
Accompanying drawing explanation
Fig. 1 is the lateral cross section structural representation of an embodiment of the syndeton of the curtain-wall stand-column that proposes of the utility model and post-install;
Fig. 2 is the vertical cross-section structural representation of an embodiment of the syndeton of the curtain-wall stand-column that proposes of the utility model and post-install;
Fig. 3 is the structural representation of connector and post-install in Fig. 2;
Fig. 4 is the structural representation of post-install and double-screw bolt in Fig. 3.
The specific embodiment
For making object, technical scheme and the advantage of the utility model embodiment clearer, below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described.
Consult Fig. 1-4, an embodiment of the syndeton of the curtain-wall stand-column that proposes of the utility model and post-install, the syndeton of curtain-wall stand-column and post-install, comprise post-install 1, chemical anchor bolts 7, connector 5, column 10, post-install 1 is fixed on civil engineering structure by chemical anchor bolts 7, connector 5 is fixed on post-install 1, and column 10 is fixed on connector 5.
On post-install 1, be fixed with four double-screw bolts 2, have the through hole 51 matching with double-screw bolt 2 on connector 5, double-screw bolt 2 is through after through hole 51, and it is fixing that the end of double-screw bolt 2 has nut 4.
By fixed bolt 2 on post-install 1, and on connector 5, offer through hole 51, double-screw bolt 2 utilizes nut 4 to screw through through hole 51, and connector 5 is fixed to post-install 1, and column 1 is fixing with connector 5, so realized the fixing of column 10; Avoided post-install 1 to be fixed to after civil engineering structure the welding with connector 5, thus avoided welding to cause the uplift resistance that reduces chemical anchor bolts 7, and then avoided the security reliability that curtain-wall stand-column is connected with civil engineering structure to impact, guaranteed workmanship.
In the present embodiment, post-install 1 adopts the rearmounted steel plate of galvanizing by dipping, and column 10 adopts aluminum alloy materials, and connector 5 adopts galvanizing by dipping corner fittings.
For connector 5 fixing firmly, on double-screw bolt 2, also there is pad 3, pad 3 is between connector 5 and nut 4.
The fixed form of double-screw bolt 2 and post-install 1 has multiple, for example, can on post-install 1, offer screwed hole, and double-screw bolt 2 is fixed in screwed hole.In the present embodiment, double-screw bolt 2 is fixing with post-install 1, is on post-install 1, to offer four circular holes 11, and double-screw bolt 2 is welded in hole 11; Afterwards the post-install that is welded with double-screw bolt 2 is fixed on civil engineering structure by chemical anchor bolts 7, shown in Fig. 3 and Fig. 4.
Consult Fig. 2, for column 10 fixing firmly, connector 5 is two, and lays respectively at the both sides of column 10, in the present embodiment, has two through holes 51 on each connector 5.Four double-screw bolts fixing on post-install 1 pass respectively corresponding through hole 51, and fix by nut.
Consult Fig. 1 and Fig. 2, column 10 is fixed on connector 5 by bolt 6 and nut 61, on connector 5 and column 10, offers the hole that bolt 6 can pass.For connector 5 and column 10 fixing firmly, between column 10 and the connector 5 of column 10 both sides, be all provided with insulation spacer 9, while also further having avoided thering is electric current in body of wall, prevented that electric current from entering outside curtain wall, causes accident.
For connector 5 and column 10 fixing further firmly, between the bolt head of bolt 6 and connector 5, be provided with square washer 8, between nut 61 and connector 5, be also provided with square washer 8.
Consult Fig. 1-4, the work progress of the syndeton of curtain-wall stand-column and post-install in the present embodiment be described:
A, on post-install 1, process four strip holes and four circular holes 11, the double-screw bolt of four M12X36 2 is filled in circular hole 11 and welded; On civil engineering structure, open the circular hole that four diameters are 16mm, dark 100mm, after hole is cleaned out, chemical anchor bolts medicament is screwed in drill bit, fill in afterwards the screw rod of chemical anchor bolts 7, placement, according to after desired hardening time under condition of different temperatures, is connected to post-install 1 on civil engineering structure by strip hole on chemical anchor bolts 2, and utilizes pad, nut to fix.
B, on connector 5, offer through hole 51; At column 10 and connector 5, offer the hole that bolt 6 can pass, in the both sides of column 10, place insulation spacer 9, afterwards connector 5 is pressed in to the both sides of column 10; By bolt 6, through the hole on column 10 and connector 5, the end of bolt 6 is fixing with nut 61.
C, the connector 5 that is fixed with column 10 in step B is fixed on the double-screw bolt 2 on post-install 1, double-screw bolt 2 is through the through hole 51 on connector 5; Afterwards, pad 3 is installed on double-screw bolt 2 and is screwed in nut 4, connector 5 is fixing, thus column 10 is fixed on post-install 1 by connector 5, realize being connected of column 10 and civil engineering structure.
The above, it is only preferred embodiment of the present utility model, be not the utility model to be done to the restriction of other form, any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equivalent variations.But every technical solutions of the utility model content that do not depart from, any simple modification, equivalent variations and the remodeling above embodiment done according to technical spirit of the present utility model, still belong to the protection domain of technical solutions of the utility model.
Claims (10)
1. the syndeton of a curtain-wall stand-column and post-install, comprise post-install, chemical anchor bolts, connector, column, described post-install is fixed on civil engineering structure by chemical anchor bolts, described connector is fixed on described post-install, described column is fixed on described connector, it is characterized in that, on described post-install, be fixed with at least two double-screw bolts, on described connector, there is the through hole matching with described double-screw bolt, described double-screw bolt is positioned at described through hole, and described double-screw bolt is fixed described connector by nut.
2. syndeton according to claim 1, is characterized in that, also has pad on described double-screw bolt, and described pad is between described connector and nut.
3. syndeton according to claim 1, is characterized in that, is fixed with four double-screw bolts on described post-install.
4. syndeton according to claim 1, is characterized in that, on described post-install, offers circular hole, and described stud welding is in described circular hole.
5. according to the syndeton of claim 1, it is characterized in that, on described post-install, offer screwed hole, described double-screw bolt is fixed in described screwed hole.
6. according to the arbitrary described syndeton of claim 1 to 5, it is characterized in that, described chemical anchor bolts are fixed on the post-install that is fixed with double-screw bolt on civil engineering structure.
7. according to the arbitrary described syndeton of claim 1 to 5, it is characterized in that, described connector is two, lays respectively at the both sides of described column.
8. syndeton according to claim 7, is characterized in that, described column is fixed on described connector by screw bolt and nut.
9. syndeton according to claim 7, is characterized in that, between described column and described connector, is provided with insulation spacer.
10. a curtain wall, is characterized in that, described curtain wall has the arbitrary described curtain-wall stand-column of claim 1 to 9 and the syndeton of post-install.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320550115.9U CN203499065U (en) | 2013-09-05 | 2013-09-05 | Connecting structure for upright post of curtain wall and post-installed embedded part and curtain wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320550115.9U CN203499065U (en) | 2013-09-05 | 2013-09-05 | Connecting structure for upright post of curtain wall and post-installed embedded part and curtain wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203499065U true CN203499065U (en) | 2014-03-26 |
Family
ID=50330057
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320550115.9U Expired - Fee Related CN203499065U (en) | 2013-09-05 | 2013-09-05 | Connecting structure for upright post of curtain wall and post-installed embedded part and curtain wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203499065U (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104164931A (en) * | 2014-09-03 | 2014-11-26 | 深圳瑞和建筑装饰股份有限公司 | Multi-angle curtain wall upright column mounting device and method |
| CN104196159A (en) * | 2014-09-26 | 2014-12-10 | 李红龙 | Rear-mounted embedding part for curtain wall |
| CN106121097A (en) * | 2016-08-15 | 2016-11-16 | 中山市春兴建筑科技有限公司 | A weld-free multi-directional adjustable rear embedded part |
| CN108128715A (en) * | 2018-01-17 | 2018-06-08 | 中国建筑第二工程局有限公司 | Swing arm tower crane footing transition section |
| CN109025355A (en) * | 2018-08-31 | 2018-12-18 | 中国建筑第五工程局有限公司 | A kind of construction of the Curtain Wall post-install on old brick wall |
| CN113601690A (en) * | 2021-07-06 | 2021-11-05 | 福建群峰机械有限公司 | Curing kiln |
| CN113682749A (en) * | 2021-07-06 | 2021-11-23 | 福建群峰机械有限公司 | Rail electricity taking vehicle |
| CN115233836A (en) * | 2022-09-05 | 2022-10-25 | 中国十七冶集团有限公司 | Construction method of curtain wall steel upright post node |
-
2013
- 2013-09-05 CN CN201320550115.9U patent/CN203499065U/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104164931A (en) * | 2014-09-03 | 2014-11-26 | 深圳瑞和建筑装饰股份有限公司 | Multi-angle curtain wall upright column mounting device and method |
| CN104196159A (en) * | 2014-09-26 | 2014-12-10 | 李红龙 | Rear-mounted embedding part for curtain wall |
| CN106121097A (en) * | 2016-08-15 | 2016-11-16 | 中山市春兴建筑科技有限公司 | A weld-free multi-directional adjustable rear embedded part |
| CN108128715A (en) * | 2018-01-17 | 2018-06-08 | 中国建筑第二工程局有限公司 | Swing arm tower crane footing transition section |
| CN109025355A (en) * | 2018-08-31 | 2018-12-18 | 中国建筑第五工程局有限公司 | A kind of construction of the Curtain Wall post-install on old brick wall |
| CN113601690A (en) * | 2021-07-06 | 2021-11-05 | 福建群峰机械有限公司 | Curing kiln |
| CN113682749A (en) * | 2021-07-06 | 2021-11-23 | 福建群峰机械有限公司 | Rail electricity taking vehicle |
| CN115233836A (en) * | 2022-09-05 | 2022-10-25 | 中国十七冶集团有限公司 | Construction method of curtain wall steel upright post node |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204098253U (en) | A kind of modified air-entrained concrete building block exterior wall insulated structure | |
| CN203742075U (en) | Building material of steel-wood composite structure | |
| WO2014035926A3 (en) | Improved composite concrete and framing system and method for building construction | |
| CN105275222A (en) | Immature soil coil-filling type traditional folk house wall reinforcing structure and reinforcing method | |
| CN202755656U (en) | Split bolt fixing structure for double-layer steel plate shearing wall | |
| CN206800791U (en) | A kind of multi-cavity steel tube concrete post with tie hoop and pull bar | |
| JP2019512626A (en) | Hot melt anchor head | |
| CN206279656U (en) | Prefabricated assembled steel silo concrete structure sandwich heat preservation combined wall and connector | |
| CN204804080U (en) | A anchor assembly for fixing building heated board | |
| CN202324271U (en) | Point hanging device of stone curtain wall | |
| CN204826211U (en) | Outer wall hanging plate connecting device of precast concrete | |
| CN203546991U (en) | Fixing anchor bolt structure for outer wall stone curtain wall | |
| CN201649686U (en) | A New Type of Seismic Reinforcement Column | |
| CN103758256A (en) | Decorative heat preservation composite wall and manufacturing method thereof | |
| CN208858055U (en) | Steel construction Fabricated balcony column bridge cut-off node | |
| CN107489146A (en) | A kind of tool-type annular anti-float anchor rod reinforcing bar setting tool | |
| CN206918422U (en) | A kind of Novel civil air defense engineering tubular construction through walls | |
| CN105604213B (en) | The shockproof noise reduction beam column of steel structure steel mesh wall construction technology of damping | |
| CN203066303U (en) | Fireproof heat-insulation heat-preservation building external wall board | |
| CN204850142U (en) | Outer wall body drawknot device | |
| CN203808557U (en) | Camping house | |
| CN203961126U (en) | A kind of side welding column | |
| CN205875413U (en) | A connection structure between curtain wall columns and rear embedded parts | |
| CN107130706A (en) | A kind of assembled combined steel plate storehouse concrete structure outer heat preservation system | |
| CN214739533U (en) | Building outer wall board mounting structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20171226 Address after: The 3 District Ligezhuang Town Industrial Park, Jiaozhou city 266300 Shandong city of Qingdao Province Patentee after: Qingdao Decai tech new material Co. Ltd. Address before: 266000 Shandong city of Qingdao province Qingdao city Hongkong Road No. 169 Patentee before: QINGDAO DECAI DECORATION CO., LTD. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140326 Termination date: 20200905 |