CN203490129U - Inner load test device for post-grouting of pile tip - Google Patents

Inner load test device for post-grouting of pile tip Download PDF

Info

Publication number
CN203490129U
CN203490129U CN201320632930.XU CN201320632930U CN203490129U CN 203490129 U CN203490129 U CN 203490129U CN 201320632930 U CN201320632930 U CN 201320632930U CN 203490129 U CN203490129 U CN 203490129U
Authority
CN
China
Prior art keywords
pile
frame
grouting
soil
reaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320632930.XU
Other languages
Chinese (zh)
Inventor
林群仙
李少和
周立强
黄曼
曾焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Iron & Steel Communication Technology Ltd By Share Ltd
Original Assignee
Zhejiang Industry Polytechnic College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Industry Polytechnic College filed Critical Zhejiang Industry Polytechnic College
Priority to CN201320632930.XU priority Critical patent/CN203490129U/en
Application granted granted Critical
Publication of CN203490129U publication Critical patent/CN203490129U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本实用新型涉及一种桩端后注浆室内载荷试验装置,该装置包括载荷箱、反力装置、土体加压装置、桩体加压装置;反力装置包括底盘、连杆和反力架;连杆下端固连在底盘上,连杆的上端与反力架连接,且连杆与反力架之间设有可调节反力架高度的调节结构;载荷箱设置在底盘上,且土体加压装置和桩体加压装置均设置在载荷箱和反力架之间。该装置公开克服了传统不能在室内进行桩端后注浆室内载荷测试的问题。并产生以下有益效果:能在室内实验模拟注浆群桩的受力状况及承载机理,可以模拟单桩及群桩,不同深度和不同间距的桩,适应性强、功能多样。

Figure 201320632930

The utility model relates to a load test device for post grouting at the pile end, which comprises a load box, a reaction force device, a soil pressure device, and a pile body pressure device; the reaction force device comprises a chassis, a connecting rod and a reaction force frame ; The lower end of the connecting rod is fixedly connected to the chassis, and the upper end of the connecting rod is connected to the reaction frame, and an adjustment structure for adjusting the height of the reaction frame is provided between the connecting rod and the reaction frame; the load box is arranged on the chassis, and the soil Both the body pressurizing device and the pile body pressurizing device are arranged between the load box and the reaction force frame. The device discloses and overcomes the traditional problem that the post-grouting indoor load test of pile ends cannot be carried out indoors. And it produces the following beneficial effects: it can simulate the force condition and bearing mechanism of the grouting group piles in the indoor experiment, and can simulate single piles and pile groups, piles of different depths and different distances, and has strong adaptability and multiple functions.

Figure 201320632930

Description

一种桩端后注浆室内载荷试验装置A pile end post-grouting indoor load test device

技术领域technical field

本实用新型涉及一种适于桩端后注浆室内载荷试验,尤其是一种桩端后注浆室内载荷试验装置。The utility model relates to an indoor load test suitable for pile end post grouting, in particular to an indoor load test device for pile end post grouting.

背景技术Background technique

随着建筑业的大力发展,钻孔灌注桩由于其施工方便而在建筑业中得到广泛的应用,但由于钻孔灌注桩桩侧存在泥皮效应和桩端存在沉渣过厚问题制约了该桩型的使用功能。在上个世纪60年代,工程中出现了在该桩型的桩端和桩侧进行后注浆工艺,该工艺弥补了该桩型承载力不足的缺陷,这项技术的应用得到了岩土工程界的普遍认可,且得到了蓬勃发展;但是由于该技术兴起时间较短,虽然在实际工程中做了许多试验,也取得了一定的进展,但许多理论还很不完善,特别是在载荷试验方面,工程中由于试验条件不具备而只是做单桩的静载荷试验,而在实际工程中往往大部分都做的是群桩,注浆单桩和注浆群桩的受力状况和承载机理存在一定的差异,这样其他的研究方法就显得尤为重要;有限元数值计算虽然能模拟工程中无法得到的一些结论,但是在建模上存在很大的差异性,设计参数、建模及边界条件和实际工程中的参数相差甚远,这样导致了模拟出的结果背离实际。因此,许多室内试验就尤显重要,在这种情况下设计该模型进行室内静载荷试验能够分析单桩和群桩在不同受力下的性状,同时可以分析不同桩长,不同桩径,不同桩间距,不同土层和不同浆泡大小情况下的受力。With the vigorous development of the construction industry, bored cast-in-place piles have been widely used in the construction industry due to their convenient construction. type of use function. In the 1960s, the post-grouting process appeared in the pile end and pile side of the pile type, which made up for the insufficient bearing capacity of the pile type, and the application of this technology has been recognized by geotechnical engineering. However, due to the relatively short rise time of this technology, although many experiments have been done in actual engineering and some progress has been made, many theories are still far from perfect, especially in the load test. On the one hand, because the test conditions are not available in the project, only the static load test of the single pile is done, but in the actual project, most of the piles are often done, the force status and bearing mechanism of the grouted single pile and the grouted pile group There are certain differences, so other research methods are particularly important; although finite element numerical calculation can simulate some conclusions that cannot be obtained in engineering, there are great differences in modeling, design parameters, modeling and boundary conditions It is far from the parameters in the actual project, which leads to the simulated results deviate from the reality. Therefore, many indoor tests are particularly important. In this case, the design of the model for indoor static load tests can analyze the behavior of single piles and pile groups under different stresses, and at the same time can analyze different pile lengths, different pile diameters, and different piles. Pile spacing, forces under different soil layers and different sizes of grout bubbles.

发明内容Contents of the invention

本实用新型针对目前的桩静载荷试验的问题,提出了一种能在室内进行桩端后注浆的静载荷试验的室内载荷试验装置。The utility model aims at the problem of the current pile static load test, and proposes an indoor load test device capable of carrying out the static load test of post-grouting of pile ends indoors.

一种桩端后注浆室内载荷试验装置,其特征在于:包括载荷箱、反力装置、土体加压装置、桩体加压装置;所述反力装置包括底盘、若干连杆和反力架;所述若干连杆下端固连在底盘上,所述若干连杆的上端与反力架连接,且所述连杆与反力架之间设有可调节反力架高度的调节结构;所述载荷箱设置在底盘上,且所述土体加压装置和桩体加压装置均设置在载荷箱和反力架之间,并分别顶压在反力架上。载荷箱为上端开口的立方体箱,载荷试验时,在载荷箱内填充土体,土体加压装置用于对载荷箱内的土体进行压力调整以调整土重度,土重度曾称土容重,是单位体积土受的重力;土体中设置至少一根桩体,桩体加压装置施加压力用以测出单根桩体或多根桩体的承载能力。A pile end grouting indoor load test device, characterized in that it includes a load box, a reaction device, a soil pressurization device, and a pile body pressurization device; the reaction device includes a chassis, several connecting rods and a reaction force frame; the lower ends of the plurality of connecting rods are fixedly connected to the chassis, the upper ends of the plurality of connecting rods are connected to the reaction force frame, and an adjustment structure that can adjust the height of the reaction force frame is provided between the connecting rods and the reaction force frame; The load box is arranged on the chassis, and the soil pressurizing device and the pile body pressurizing device are both arranged between the load box and the reaction frame, and press against the reaction frame respectively. The load box is a cubic box with an open upper end. During the load test, soil is filled in the load box. The soil pressure device is used to adjust the pressure of the soil in the load box to adjust the soil weight. The soil weight was once called soil bulk density. It is the gravity per unit volume of soil; at least one pile is set in the soil, and the pile pressure device applies pressure to measure the bearing capacity of a single pile or multiple piles.

所述反力架包括两根呈十字形固连的反力杆,所述反力杆的两端分别设有通孔。The reaction frame includes two cross-shaped reaction rods, and the two ends of the reaction rods are respectively provided with through holes.

所述调节结构包括穿设在通孔内且与反力杆转动连接的调节螺栓,所述的调节螺栓开设有内螺纹孔,所述连杆上端开设有外螺纹,所述连杆上端的外螺纹与调节螺栓的内螺纹孔配合。The adjustment structure includes an adjustment bolt that is penetrated in the through hole and rotatably connected with the reaction rod. The adjustment bolt is provided with an internal thread hole, and the upper end of the connecting rod is provided with an external thread. The external thread at the upper end of the connecting rod The threads cooperate with the internally threaded holes of the adjusting bolts.

所述调节螺栓包括连接头和定位头,所述的定位头可拆卸连接在连接头内。The adjusting bolt includes a connecting head and a positioning head, and the positioning head is detachably connected in the connecting head.

所述的连接头具有环状的连接部和卡持部,所述卡持部位于连接部的一端且沿径向向外凸起,所述连接部的另一端设有沉头孔;所述的定位头包括具有贯通孔的套筒和位于套筒一端的挡肩,所述套筒的外圆周面上开设有外螺纹,所述沉头孔的孔壁上设有与套筒的外螺纹配合的内螺纹,所述套筒的贯穿孔直径大于所述内螺纹孔的底径。The connecting head has an annular connecting portion and a clamping portion, the clamping portion is located at one end of the connecting portion and protrudes radially outward, and the other end of the connecting portion is provided with a counterbore; the The positioning head includes a sleeve with a through hole and a shoulder at one end of the sleeve. The outer circumference of the sleeve is provided with external threads, and the wall of the counterbore is provided with external threads that are compatible with the sleeve. The diameter of the through hole of the sleeve is larger than the bottom diameter of the internal thread hole.

所述调节螺栓包括连接头和定位环,连接头具有环状的连接部和卡持部,所述卡持部位于连接部的一端且沿径向向外凸起,所述定位环卡接在连接部的另一端。环状的连接部外表面上开设有两个沿轴向方向开设的导向槽和两沿连接部同一周向延伸的环槽,每个导向槽与每条环槽连通,定位环内侧内侧具有两向内凸起的定位块,定位环套设在连接部上时两个定位块能同时设置导向槽内,再转动定位环使定位块固定在环槽内从而使连接头和定位环形成连接。The adjusting bolt includes a connecting head and a positioning ring, the connecting head has an annular connecting portion and a clamping portion, the clamping portion is located at one end of the connecting portion and protrudes radially outward, and the positioning ring is clamped on the the other end of the connection. The outer surface of the ring-shaped connection part is provided with two guide grooves along the axial direction and two ring grooves extending along the same circumferential direction of the connection part. Each guide groove communicates with each ring groove. The positioning block protruding inwards, when the positioning ring is set on the connecting part, the two positioning blocks can be set in the guide groove at the same time, and then the positioning ring is rotated to fix the positioning block in the ring groove so that the connecting head and the positioning ring are connected.

所述连杆上连接有螺母。螺母用于螺紧调节螺栓,让反力杆固定在额定高度上。A nut is connected to the connecting rod. The nut is used to tighten the adjusting bolt, so that the reaction rod is fixed at the rated height.

所述土体加压装置包括加压框、加压格栅和至少两个千斤顶,所述加压格栅滑动设置在加压框的一侧,所述千斤顶固设在加压框的另一侧,且千斤顶顶压在反力架上。The soil pressure device includes a pressure frame, a pressure grid and at least two jacks, the pressure grid is slidably arranged on one side of the pressure frame, and the jack is fixed on the other side of the pressure frame. side, and the jack is pressed against the reaction frame.

所述加压框包括四根呈口字形设置的加压杆,在四根加压杆中至少两根平行设置的加压杆上设有两个平行的滑槽,所述加压格栅包括若干根长条状的压力杆,所述压力杆上设有与滑槽滑动连接的卡扣。加压杆和压力杆的长度根据载荷箱的大小进行设置,在压力杆对土体加压的同时,侧向外挤部分的土体可以通过加压杆被进一步的挤压;本实用新型中的压力杆可为圆柱状、矩形状或其它的形状。口字形的加压框中间用于桩体通过。The pressurizing frame includes four pressurizing rods arranged in the shape of a square, two parallel slide grooves are arranged on at least two parallelly arranged pressurizing rods among the four pressurizing rods, and the pressurizing grid includes A plurality of strip-shaped pressure rods are provided with buckles which are slidably connected with the chute. The length of the pressure rod and the pressure rod is set according to the size of the load box. When the pressure rod pressurizes the soil, the soil in the laterally extruded part can be further squeezed by the pressure rod; in the utility model The pressure rod can be cylindrical, rectangular or other shapes. The middle of the zigzag pressurized frame is used for the passage of the pile body.

所述加压框上设有偶数个千斤顶,所述偶数个千斤顶对称设置在两根加压杆上。An even number of jacks is arranged on the pressurizing frame, and the even number of jacks are arranged symmetrically on the two pressurizing rods.

所述桩体加压装置包括承台和至少一个千斤顶,所述千斤顶固设在承台上,且千斤顶顶压在反力架上。The pile body pressurizing device includes a cap and at least one jack, the jack is fixed on the cap, and the jack is pressed against the reaction frame.

所述千斤顶上设有压力表。The jack is provided with a pressure gauge.

所述反力架与承台之间设有沉降数据显示装置,所述沉降数据显示装置包括一个百分表,所述百分表固设在反力架上,且所述百分表的探头顶压在承台上。A settlement data display device is provided between the reaction force frame and the cap, and the settlement data display device includes a dial indicator, and the dial indicator is fixed on the reaction force frame, and the probe of the dial indicator Press on the platform.

桩端后注浆室内载荷的试验方法,其特征在于,所述试验方法包括以下步骤:The test method of pile end back grouting chamber load is characterized in that, described test method comprises the following steps:

(1)制作桩体;(1) making pile body;

(2)将载荷箱放置在底座上,并在载荷箱内填充土体,土体深度大于1/3载荷箱高度,小于2/3载荷箱高度;(2) Place the load box on the base, and fill the load box with soil. The depth of the soil is greater than 1/3 of the height of the load box and less than 2/3 of the height of the load box;

(3)由水和水泥按一定比例混合的浆液倒入土体中,并将预制的桩体设置在浆液中;(3) Pour the slurry mixed with water and cement in a certain proportion into the soil, and set the prefabricated piles in the slurry;

(4)载荷箱里填充满土体;(4) The load box is filled with soil;

(5)安装土体加压装置、桩体加压装置和反力装置;(5) Install soil pressurization device, pile body pressurization device and reaction force device;

(6)土体加压装置给土体加压,直至土地达到一定的荷载;(6) The soil pressurizing device pressurizes the soil until the land reaches a certain load;

(7)桩体加压装置给桩体加压,直至浆泡被破坏或桩体下沉,记录桩体的受力及沉降情况。(7) The pile body pressurization device pressurizes the pile body until the slurry bubble is destroyed or the pile body sinks, and the stress and settlement of the pile body are recorded.

所述桩体的制作方法,包括如下步骤:The manufacturing method of described pile body, comprises the steps:

①制作桩体成型模:①Make the pile forming mold:

取一根或多根长度比桩体长的空心圆钢管,将圆钢管沿轴线方向切成两个半圆弧状或三个弧状的弧瓣;Take one or more hollow round steel pipes whose length is longer than the pile body, and cut the round steel pipes into two semi-arc or three arc-shaped arc petals along the axis direction;

将弧瓣扣合成一根圆钢管,并通过环扣螺丝将圆钢管两头及中间扣紧;Buckle the arc petals into a round steel pipe, and fasten the two ends and the middle of the round steel pipe with ring screws;

将圆钢管的一端封死,并在该端里面放一层棉纱布,另一端为开口端;Seal one end of the round steel pipe, and put a layer of cotton gauze inside the end, and the other end is the open end;

②制作桩体加强结构:选择细钢筋制作成能放入到圆钢管内的钢筋笼;②Make the pile reinforcement structure: choose thin steel bars to make a steel cage that can be put into the round steel pipe;

③混凝土浇筑:将圆钢管竖直放置,开口端向上;将钢筋笼从开口端放入到圆钢管内,并从圆钢管的开口端倒入混凝土;③Concrete pouring: Place the round steel pipe vertically with the open end up; put the steel cage into the round steel pipe from the open end, and pour concrete from the open end of the round steel pipe;

④在常温状态下放置28至30天;④Store at room temperature for 28 to 30 days;

⑤松开环扣螺丝,取下三块弧瓣,即可看到成型好的桩体。⑤ Loosen the buckle screw, remove the three arc flaps, and you can see the formed pile body.

此桩体制作接近实际工程,试验结果比较准确。The pile body is made close to the actual project, and the test results are relatively accurate.

桩体的另一种制作方法:准备一根或多根钢筋,在钢筋表面涂抹水泥砂浆,常温状态下待水泥砂浆硬化即成为桩体。钢筋的大小及载荷能力根据土体和浆泡的情况可进行调整。本试验装置是测桩间土体、桩端浆泡的承载机理,设计时要求桩体不能破坏;在实际工程中因为桩体强度可以控制,所以一般往往也是地基土体破坏,桩体不被破坏。所以在简易测试时也可以选择此种方式制作桩体。Another production method of the pile body: prepare one or more steel bars, apply cement mortar on the surface of the steel bars, and wait for the cement mortar to harden at room temperature to become a pile body. The size and load capacity of steel bars can be adjusted according to the conditions of soil and slurry bubbles. This test device is used to test the bearing mechanism of the soil between piles and the slurry bubble at the pile tip. The pile body must not be damaged during design. In actual engineering, because the strength of the pile body can be controlled, the foundation soil is usually damaged, and the pile body is not damaged. destroy. Therefore, you can also choose this method to make piles during simple tests.

所述步骤(3)中水和水泥按1∶0.5~0.65的重量混合后倒入土体中凝固形成浆泡。In the step (3), water and cement are mixed according to the weight of 1:0.5-0.65, and then poured into the soil body to solidify to form slurry bubbles.

所述浆泡的直径为桩体直径的两至三倍,且所述浆泡的深度为桩体直径的两至三倍。粘性土的浆泡直径为桩体的两倍直径,浆泡的深度为桩体直径的两倍;砂类土体的浆泡直径为桩体的三倍直径,浆泡的深度为桩体直径的三倍。同时浆液沿着桩体轴向爬升一定高度,这个高度为4-7倍桩体的直径。The diameter of the slurry bubble is two to three times the diameter of the pile body, and the depth of the slurry bubble is two to three times the diameter of the pile body. The diameter of the slurry bubble of cohesive soil is twice the diameter of the pile body, and the depth of the slurry bubble is twice the diameter of the pile body; the diameter of the slurry bubble of sandy soil is three times the diameter of the pile body, and the depth of the slurry bubble is the diameter of the pile body three times. At the same time, the grout climbs to a certain height along the axial direction of the pile body, which is 4-7 times the diameter of the pile body.

所述步骤(4)完成后需在常温状态下放置28至35天。保证形成的浆泡满足实际工程合适的硬度要求。After the step (4) is completed, it needs to be placed at room temperature for 28 to 35 days. Ensure that the formed pulp bubbles meet the appropriate hardness requirements for actual engineering.

所述土体加压装置给土体加压时,千斤顶同时给加压框加压。此设置保证土体受压均匀。When the soil mass pressurizing device pressurizes the soil mass, the jack simultaneously pressurizes the pressurizing frame. This setting ensures that the soil is evenly compressed.

本桩端后注浆室内载荷试验装置的有益效果是:The beneficial effects of the pile end post grouting indoor load test device are:

(1)格栅的间距可以调节、反力架的高度可以调节、土地的压力可以调节、注浆可以调节,因此该装置能模拟单桩、群桩、不同的桩长、不同桩间距、不同土层下注浆后桩的性状研究,试验适用范围较广;(1) The grid spacing can be adjusted, the height of the reaction frame can be adjusted, the pressure of the land can be adjusted, and the grouting can be adjusted. Therefore, the device can simulate single piles, group piles, different pile lengths, different pile spacing, different Research on the properties of the pile after grouting under the soil layer, the test has a wide range of application;

(2)土重度可以通过千斤顶上的压力表及载荷箱的容积检测反应,而桩体的承压能力可以通过压力表和百分表直观显示,因此该装置测试直观、清晰;(2) The soil weight can be detected and reflected by the pressure gauge on the jack and the volume of the load box, and the pressure bearing capacity of the pile body can be directly displayed by the pressure gauge and dial indicator, so the test of the device is intuitive and clear;

(3)反力架的高度可以根据土体和/或桩体的高度进行调节,因此该桩端后注浆室内载荷试验装置安装操作方便、检测省力。(3) The height of the reaction force frame can be adjusted according to the height of the soil body and/or the pile body, so the load test device in the post grouting chamber of the pile end is easy to install and operate, and the detection is labor-saving.

本桩端后注浆室内载荷的试验方法的有益效果是:The beneficial effect of the test method of the post grouting indoor load of the pile end is:

(1)该试验方法可以将实际工程中的桩体、土体按比例折算后进行载荷测试,从而保证了实际建筑的稳定性和牢固性;(1) This test method can convert the piles and soils in the actual project in proportion to carry out the load test, thus ensuring the stability and firmness of the actual building;

(2)运用本实用新型中的桩端后注浆室内载荷试验装置进行测试,本试验方法可以在室内进行测试,测试方便、省力,且可以随意放置测试位置,应用范围广。(2) Use the post-grouting indoor load test device at the pile tip in the utility model to test. This test method can be tested indoors. The test is convenient and labor-saving, and the test position can be placed arbitrarily, and the application range is wide.

附图说明Description of drawings

图1为本实用新型的试验装置的俯视图。Fig. 1 is the plan view of the test device of the present utility model.

图2为图1的A-A处的剖面结构示意图。FIG. 2 is a schematic cross-sectional structure diagram at A-A of FIG. 1 .

图3为图1的B-B处的剖面结构示意图。FIG. 3 is a schematic cross-sectional structure diagram at B-B of FIG. 1 .

图4为本实用新型的调节结构的剖面示意图。Fig. 4 is a schematic cross-sectional view of the adjustment structure of the present invention.

图5为本实用新型另一种结构连接头的示意图。Fig. 5 is a schematic diagram of another structural connector of the present invention.

图6为与图5配合的定位环的示意图。Fig. 6 is a schematic diagram of a positioning ring matched with Fig. 5 .

图中,载荷箱1、反力装置2、底盘201、连杆202、反力架203、调节结构204、连接头20a、连接部20c、沉头孔20d、卡持部20e、定位头20b、套筒20f、挡肩20g、定位环20h、定位块20i、导向槽20j、环槽20k、反力杆205、通孔206、调节螺栓207、内螺纹孔208、外螺纹209、螺母210、土体加压装置3、加压框301、加压杆302、滑槽303加压格栅304、压力杆305、卡扣306、桩体加压装置4、承台401、千斤顶5、压力表6、百分表7、土体8、浆泡9、桩体10。In the figure, the load box 1, the reaction device 2, the chassis 201, the connecting rod 202, the reaction frame 203, the adjustment structure 204, the connection head 20a, the connection part 20c, the counterbore 20d, the clamping part 20e, the positioning head 20b, Sleeve 20f, retaining shoulder 20g, positioning ring 20h, positioning block 20i, guide groove 20j, ring groove 20k, reaction force rod 205, through hole 206, adjusting bolt 207, internal threaded hole 208, external thread 209, nut 210, soil Body pressure device 3, pressure frame 301, pressure rod 302, chute 303 pressure grid 304, pressure rod 305, buckle 306, pile body pressure device 4, cap 401, jack 5, pressure gauge 6 , dial indicator 7, soil body 8, slurry bubble 9, pile body 10.

具体实施方式Detailed ways

下面结合附图进一步说明本实用新型。Further illustrate the utility model below in conjunction with accompanying drawing.

实施例一:Embodiment one:

参照图1至图4,本桩端后注浆室内载荷试验装置,包括载荷箱1、反力装置2、土体加压装置3、桩体加压装置4。Referring to Fig. 1 to Fig. 4, the load test device in the post-grouting chamber of the pile end includes a load box 1, a reaction force device 2, a soil pressure device 3, and a pile body pressure device 4.

本实用新型中的反力装置2包括底盘201、四根连杆202、反力架203和调节结构204。反力架203包括两根呈十字形设置且中部固连的反力杆205,反力杆205具有两平行的上、下平面,且在每根反力杆205的两端分别设有一个贯穿上、下平面的通孔206。四根连杆202的下端设有外螺纹209,并通过螺母210固连在底盘201上;四根连杆202的上端通过调节结构204与反力架203连接,调节结构204能调节反力架203在连杆202上的高度。本调节结构204包括穿设在通孔206内且与反力杆205转动连接的调节螺栓207,所述调节螺栓207包括连接头20a和定位头20b,所述的定位头20b可拆卸连接在连接头20a内;所述的连接头20a具有环状的连接部20c和卡持部20e,所述内螺纹孔208开设在连接部20c的一通及卡持部20e上,所述卡持部20e位于连接部20c的一端且沿径向向外凸起,所述连接部20c的另一端设有沉头孔20d,;所述的定位头20b包括具有贯通孔206的套筒20f和位于套筒20f一端的挡肩20g,所述套筒20f的外圆周面上开设有外螺纹209,所述沉头孔20d的孔壁上设有与套筒20f的外螺纹209配合的内螺纹,所述套筒20f的贯穿孔直径大于所述连接部20c的内螺纹孔208的底径,即连接头20a与连杆202的上端连接,定位头20b与连接头20a可拆卸连接。The counter force device 2 in the utility model includes a chassis 201 , four connecting rods 202 , a counter force frame 203 and an adjustment structure 204 . The reaction force frame 203 includes two reaction force rods 205 arranged in a cross shape and fixed in the middle. The reaction force rods 205 have two parallel upper and lower planes, and two ends of each reaction force rod 205 are respectively provided with a through The through holes 206 on the upper and lower planes. The lower ends of the four connecting rods 202 are provided with external threads 209, and are fixedly connected to the chassis 201 by nuts 210; the upper ends of the four connecting rods 202 are connected with the reaction force frame 203 through the adjustment structure 204, and the adjustment structure 204 can adjust the reaction force frame 203 on the height of the connecting rod 202. The adjustment structure 204 includes an adjustment bolt 207 that is penetrated in the through hole 206 and is rotatably connected with the reaction rod 205. The adjustment bolt 207 includes a connection head 20a and a positioning head 20b, and the positioning head 20b is detachably connected to the connection. Inside the head 20a; the connecting head 20a has a ring-shaped connecting portion 20c and a holding portion 20e, the internal thread hole 208 is opened on a pass of the connecting portion 20c and the holding portion 20e, and the holding portion 20e is located One end of the connecting portion 20c protrudes radially outward, and the other end of the connecting portion 20c is provided with a counterbore 20d; the positioning head 20b includes a sleeve 20f having a through hole 206 and a sleeve 20f The shoulder 20g at one end, the outer circumferential surface of the sleeve 20f is provided with an external thread 209, and the hole wall of the counterbore 20d is provided with an internal thread that matches the external thread 209 of the sleeve 20f. The diameter of the through hole of the barrel 20f is larger than the bottom diameter of the internal threaded hole 208 of the connecting portion 20c, that is, the connecting head 20a is connected to the upper end of the connecting rod 202, and the positioning head 20b is detachably connected to the connecting head 20a.

在连杆202上端开设有外螺纹209,连杆202上端的外螺纹209与调节螺栓207的内螺纹孔208配合;通过连接头20a上的卡接部20e和定位头20b上的挡肩20g能防止调节螺栓207滑出反力杆205,同时卡持部20e和挡肩20g上设有方便工具旋拧调节螺栓207用的卡持结构、以及微调用的基准线,在反力杆205上沿通孔206的一周设有刻度线,基准线与刻度线对照使微调结果更直观、清晰。卡持结构如外六角结构、卡槽结构等。An external thread 209 is provided at the upper end of the connecting rod 202, and the external thread 209 at the upper end of the connecting rod 202 cooperates with the internal threaded hole 208 of the adjusting bolt 207; Prevent the adjustment bolt 207 from slipping out of the reaction force rod 205, while the clamping portion 20e and the shoulder 20g are provided with a clamping structure for convenient tools to screw the adjustment bolt 207, and a reference line for fine-tuning. A circle of the through hole 206 is provided with a scale line, and the reference line is compared with the scale line to make the fine-tuning result more intuitive and clear. Clamping structure such as hexagonal structure, card slot structure, etc.

所述连杆202上连接有螺母210,用于调节螺栓207调节后,使调节螺栓207被固定在连杆202的额定高度上,即反力架203被固定在额定在高度上。The connecting rod 202 is connected with a nut 210 for adjusting the adjusting bolt 207 so that the adjusting bolt 207 is fixed at the rated height of the connecting rod 202, that is, the reaction force frame 203 is fixed at the rated height.

所述载荷箱1设置在底盘201上,且所述土体加压装置3和桩体加压装置4均设置在载荷箱1和反力架203之间,并分别顶压在反力架203上。载荷箱1为上端开口的立方体箱,在载荷箱1内部标注有高度标识;载荷试验时,在载荷箱1内填充土体8,土体8的量可以通过高度标识直观看到;土体加压装置3用于对载荷箱1内的土体8进行压力调整以调整土体8的土重度;土体8中设置至少一根桩体10,桩体加压装置4施加压力用以测出单根桩体10或多根桩体10的承载能力。The load box 1 is arranged on the chassis 201, and the soil pressurizing device 3 and the pile pressurizing device 4 are both arranged between the load box 1 and the reaction force frame 203, and press against the reaction force frame 203 respectively superior. The load box 1 is a cubic box with an upper end opening, and a height mark is marked inside the load box 1; during the load test, the soil body 8 is filled in the load box 1, and the amount of the soil body 8 can be visually seen through the height mark; The pressure device 3 is used to adjust the pressure of the soil body 8 in the load box 1 to adjust the soil weight of the soil body 8; at least one pile body 10 is arranged in the soil body 8, and the pile body pressure device 4 applies pressure to measure The bearing capacity of a single pile body 10 or a plurality of pile bodies 10 .

土体加压装置3包括加压框301、加压格栅304和两个千斤顶5。加压框301包括四根呈口字形设置的加压杆302,口字形的加压框301中间用于供桩体10通过,在四根加压杆302中两根平行设置的加压杆302上分别设有两个平行的滑槽303;加压格栅304包括若干根长条状的压力杆305,压力杆305的长度根据载荷箱1的大小进行设置,能放置到载荷箱1内,在压力杆305上设有卡扣306,卡扣306与滑槽303滑动连接;所述千斤顶5固设在加压框301的另一侧,且千斤顶5顶压在反力架203上。为方便安装,可将口字形的加压框301设计成直接套在连杆202上,与连杆202滑动连接的结构,即在口字形的加压框四个角上开设四个与连杆202配合的通孔。The soil pressing device 3 includes a pressing frame 301 , a pressing grid 304 and two jacks 5 . The pressurizing frame 301 includes four pressurizing rods 302 arranged in a square shape, the middle of the square-shaped pressurizing frame 301 is used for the passage of the pile body 10, and two of the four pressurizing rods 302 are parallelly arranged. There are two parallel chutes 303 respectively; the pressure grid 304 includes several strip-shaped pressure rods 305, the length of the pressure rods 305 is set according to the size of the load box 1, and can be placed in the load box 1, A buckle 306 is provided on the pressure rod 305 , and the buckle 306 is slidably connected with the chute 303 ; For the convenience of installation, the square-shaped pressurizing frame 301 can be designed to be directly sleeved on the connecting rod 202, and is slidably connected with the connecting rod 202, that is, four corners of the square-shaped pressurizing frame are provided to connect with the connecting rod. 202 fit through holes.

桩体加压装置4包括承台401和一个千斤顶5。承台401顶压在桩体10上,千斤顶5固设在承台401上;当桩体10只有一个时,千斤顶5直接正对桩体10加压;当桩体10有多个时,千斤顶5位于多个桩体10的之间同时给多个桩体10加压;千斤顶5顶压在反力架203上,通过反力架203的反作用于使桩体10受压。The pile body pressurizing device 4 includes a platform 401 and a jack 5 . The cap 401 is pressed against the pile body 10, and the jack 5 is fixed on the cap 401; when there is only one pile body 10, the jack 5 directly presses the pile body 10; when there are multiple pile bodies 10, the jack 5 5 is located between multiple pile bodies 10 and pressurizes multiple pile bodies 10 at the same time; the jack 5 presses on the reaction force frame 203, and the pile body 10 is pressed by the reaction of the reaction force frame 203.

在土体加压装置3和桩体加压装置4的千斤顶5上设有压力表6,用于检测土体加压装置3给土地加压时的力,及用于检测桩体加压装置4给桩体10加压的力。A pressure gauge 6 is provided on the jack 5 of the soil body pressurizing device 3 and the pile body pressurizing device 4, which is used to detect the force when the soil body pressurizing device 3 pressurizes the land, and is used to detect the pile body pressurizing device 4. The power to pressurize the pile body 10.

在反力架203与承台401之间还设有沉降数据显示装置,该沉降数据显示装置包括一个百分表7,百分表7的上端通过固定座固设在反力架203上,百分表7下端的探头顶压在承台401上。初始状态时百分表7的探头受压,百分表7具有初始值,当桩体10受压下移后,百分表7会显示一个当前值,此时初始值和当前值的差值即为桩体10的沉降量。A settlement data display device is also provided between the reaction force frame 203 and the bearing platform 401. The settlement data display device includes a dial indicator 7, and the upper end of the dial indicator 7 is fixed on the reaction force frame 203 through a fixing seat. The probe at the lower end of the sub-meter 7 presses against the platform 401. In the initial state, the probe of the dial gauge 7 is under pressure, and the dial gauge 7 has an initial value. When the pile body 10 is moved down under pressure, the dial gauge 7 will display a current value. At this time, the difference between the initial value and the current value That is, the settlement of the pile body 10 .

本桩端后注浆室内载荷试验装置工作原理是:先给土体加压装置3加压到一定压力后停止加压;再给桩体加压装置4加压,桩体加压装置4通过反力架203将力传给承台401并传给桩体10,直至浆泡9破坏或土体8沉降,在加压的同时观察压力表6和百分表7的数值变化,记录每次加压的沉降变形结果和加压荷载。试验时通过土体加压装置3压力的大小改变土体8中的应力以改变土体8的深度,从而达到改变桩体10的长度;通过改变加压格栅304的间距改变桩体10的桩径大小、桩体10的间距以及桩体10的根数;通过在桩体10的底端按照设计要求设计浆泡9的大小,以模仿正常施工中的灌注桩桩端扩孔部的性能;载荷箱1中放置的土体8可以根据需要进行调整成无粘性土、粘性土或饱和土体。因此,通过该装置能够测试桩端注浆后桩体10承载力的大小性状的研究,包括研究单桩、群桩、不同桩径大小,不同桩长,桩端注浆浆泡9大小、不同持力层下桩端注浆、不同深度土层的模拟研究,应用范围广,测试方便。The working principle of the load test device in the pile end post-grouting chamber is: first pressurize the soil body pressurization device 3 to a certain pressure and then stop pressurization; then pressurize the pile body pressurization device 4, and the pile body pressurization device 4 passes The reaction force frame 203 transmits the force to the cap 401 and to the pile body 10 until the slurry bubble 9 is destroyed or the soil body 8 settles. Observe the numerical changes of the pressure gauge 6 and the dial indicator 7 while pressurizing, and record each time Pressurized settlement deformation results and pressurized loads. During the test, the stress in the soil 8 is changed by the pressure of the soil pressurizing device 3 to change the depth of the soil 8, so as to change the length of the pile body 10; The size of the pile diameter, the distance between the pile body 10 and the number of the pile body 10; by designing the size of the slurry bubble 9 at the bottom of the pile body 10 according to the design requirements, to imitate the performance of the pile end reaming part of the cast-in-place pile in normal construction ; The soil body 8 placed in the load box 1 can be adjusted as cohesionless soil, cohesive soil or saturated soil body as required. Therefore, by this device, the research on the size and shape of the pile body 10 bearing capacity after pile tip grouting can be tested, including the study of single pile, pile group, different pile diameters, different pile lengths, pile tip grouting bubbles 9 sizes, different Simulation research on pile tip grouting and soil layers with different depths under the bearing layer has a wide range of applications and is convenient for testing.

本桩端后注浆室内载荷试验装置试验时包括如下步骤:The following steps are included in the test of the pile end post-grouting indoor load test device:

第一步,制作桩体10。The first step is to make the pile body 10 .

先制作桩体10成型模:取一根或多根长度比桩体10长的空心圆钢管,将圆钢管沿轴线方向切成两个半圆弧状或三个弧状的弧瓣;将弧瓣扣合成一根圆钢管,并通过环扣螺丝将圆钢管两头及中间扣紧;将圆钢管的一端封死,并在该端里面放一层棉纱布,另一端为开口端。制作桩体10加强结构:选择细钢筋制作成能放入到圆钢管内的钢筋笼;将圆钢管竖直放置,开口端向上;将钢筋笼从开口端放入到圆钢管内,并从圆钢管的开口端倒入混凝土。将灌注了混凝土的圆钢管在常温状态下放置28至30天,实际中为28天。待混凝土变硬后,松开环扣螺丝,取下三块弧瓣,即可看到成型好的桩体10。为使试验时承台401设置比较平稳、桩体10受力均衡,通常将桩体10露出土体这一端端面制作成一平面。Make the pile body 10 forming mold first: take one or more hollow round steel pipes whose length is longer than the pile body 10, cut the round steel pipes into two semi-arc or three arc-shaped arc petals along the axis direction; buckle the arc petals into A round steel pipe, and the two ends and the middle of the round steel pipe are fastened by ring screws; one end of the round steel pipe is sealed, and a layer of cotton gauze is placed inside the end, and the other end is an open end. Make the pile body 10 reinforcement structure: select the thin steel bar to make it into a reinforcement cage that can be put into the round steel pipe; place the round steel pipe vertically with the open end up; put the reinforcement cage into the round steel pipe from the open end, The open end of the steel pipe is poured into concrete. Place the round steel pipe filled with concrete for 28 to 30 days at normal temperature, actually 28 days. After the concrete is hardened, loosen the buckle screw, take off the three arc flaps, and you can see the formed pile body 10 . In order to make the setting of the cap 401 relatively stable during the test and to balance the stress on the pile body 10, the end surface of the pile body 10 exposed to the soil is usually made into a plane.

桩体10的另一种制作方法:准备一根或多根钢筋,在钢筋表面涂抹水泥砂浆,常温状态下待水泥砂浆硬化即成为桩体。钢筋的大小及载荷能力根据土体和浆泡的情况可进行调整。本试验装置是测桩间土体8、桩端浆泡的承载机理,设计时要求桩体10不能破坏;在实际工程中因为桩身强度可以控制,所以一般往往也是地基土体8破坏,桩体10不被破坏。所以在简易测试时也可以选择此种方式制作桩体10。Another manufacturing method of the pile body 10: prepare one or more steel bars, apply cement mortar on the surface of the steel bars, and wait for the cement mortar to harden under normal temperature to form a pile body. The size and load capacity of steel bars can be adjusted according to the conditions of soil and slurry bubbles. This test device is to measure the load-bearing mechanism of the soil 8 between the piles and the slurry bubble at the pile end, and the pile body 10 is required not to be damaged during design; in actual engineering, because the strength of the pile body can be controlled, the foundation soil 8 is usually damaged, and the pile Body 10 is not destroyed. Therefore, this method can also be selected to make the pile body 10 during a simple test.

第二步,将载荷箱1放置在底座上,并在载荷箱1内填充土体8,土体8深度大于1/3载荷箱1高度,小于2/3载荷箱1高度;本实施例将土体8填到1/2载荷箱1高度。In the second step, the load box 1 is placed on the base, and the soil body 8 is filled in the load box 1. The depth of the soil body 8 is greater than 1/3 of the height of the load box 1 and less than 2/3 of the height of the load box 1; this embodiment will The soil body 8 is filled to 1/2 load box 1 height.

第三步,作为优选的方案,将水和水泥按1∶0.6的重量均匀混合后的浆液倒入土体8上,并将预制的桩体10竖直设置在浆液中;由水和水泥混合的浆液倒入土体中凝固后形成浆泡9,将预制的桩体10设置在浆泡9中;本实施例中设置三个浆泡9位置,并在每个浆泡9位置竖直设置一根桩体10;浆泡9的直径为桩体10直径的两至三倍,且所述浆泡9的深度为桩体直径的两至三倍,粘性土的浆泡直径为桩体10的两倍直径,浆泡的深度为桩体直径的两倍;砂类土体的浆泡直径为桩体的三倍直径,浆泡的深度为桩体直径的三倍。同时浆液沿着桩体轴向爬升一定高度,这个高度为2-7倍桩体的直径。制作浆泡用的水和水泥可按1∶0.5的重量混合,也可按1∶0.65的重量混合。In the third step, as a preferred solution, water and cement are poured into the soil body 8 after water and cement are evenly mixed in a weight of 1:0.6, and the prefabricated pile body 10 is vertically arranged in the slurry; mixed by water and cement The slurry is poured into the soil and solidified to form a slurry bubble 9, and the prefabricated pile body 10 is arranged in the slurry bubble 9; in the present embodiment, three slurry bubbles 9 positions are set, and each slurry bubble 9 position is vertically arranged A pile body 10; the diameter of slurry bubble 9 is two to three times of pile body 10 diameters, and the depth of described slurry bubble 9 is two to three times of pile body diameter, and the slurry bubble diameter of cohesive soil is pile body 10 times. twice the diameter of the pile body, the depth of the slurry bubble is twice the diameter of the pile body; the diameter of the slurry bubble of the sandy soil is three times the diameter of the pile body, and the depth of the slurry bubble is three times the diameter of the pile body. At the same time, the grout climbs to a certain height along the axial direction of the pile body, which is 2-7 times the diameter of the pile body. The water and cement used to make the slurry bubble can be mixed by weight of 1:0.5, or by weight of 1:0.65.

第四步,继续往载荷箱1里填充土体8,直至填满整个载荷箱1,此步骤后需在常温状态下放置28天,待浆泡9变硬后再进行测试。The fourth step is to continue to fill the load box 1 with the soil body 8 until the entire load box 1 is filled. After this step, it needs to be placed at room temperature for 28 days, and the slurry bubble 9 is hardened before testing.

第五步,安装土体加压装置3,将压力杆305根据桩体10的分布进行设置,未设置桩体10处密布压力杆305,并使压力杆305放置在载荷箱1内,千斤顶5对称设置在两根平行的加压杆302上;此时桩体10从四根加压杆302中间升出,且桩体10的高度高于加压杆302。安装桩体加压装置4,使承台401直接顶压在桩体10上,千斤顶5顶压中中间的桩体10上。安装反力装置2,将定位头20b、反力架203、连接头20a依次从下到上套设到连杆202上,因定位头20b和连杆202之间为套接关系,所以在轴向上可以任意移动,而连接头20a需要旋转拧到连杆202上,待连接头20a拧到合适高度时,将四个定位头20b从下往上与连接头20a螺纹连接,使反力架203被定位在合适高度上;此时反力架203与千斤顶5接触,百分表7连接在反力架203和承台401之间;若需要对反力架203高度进行调节,可以将定位头20b松开后进行调节。The fifth step is to install the soil pressurizing device 3, and set the pressure rods 305 according to the distribution of the pile body 10. The pressure rods 305 are densely distributed at the pile body 10, and the pressure rods 305 are placed in the load box 1, and the jack 5 Symmetrically arranged on two parallel pressure rods 302 ; at this time, the pile body 10 rises from the middle of the four pressure rods 302 , and the height of the pile body 10 is higher than the pressure rods 302 . The pile body pressurizing device 4 is installed so that the cap 401 is directly pressed against the pile body 10, and the jack 5 is pressed against the pile body 10 in the middle. Install the reaction force device 2, set the positioning head 20b, the reaction force frame 203, and the connecting head 20a on the connecting rod 202 from bottom to top in sequence. It can be moved upward arbitrarily, but the connecting head 20a needs to be rotated and screwed to the connecting rod 202. When the connecting head 20a is screwed to a suitable height, the four positioning heads 20b are screwed to the connecting head 20a from bottom to top, so that the reaction force frame 203 is positioned at a suitable height; at this time, the reaction force frame 203 is in contact with the jack 5, and the dial indicator 7 is connected between the reaction force frame 203 and the platform 401; if the height of the reaction force frame 203 needs to be adjusted, the positioning The adjustment is performed after the head 20b is released.

第六步,土体加压装置3给土体8加压,千斤顶5作用在反力架203上,反作用力给加压框301的两根加压杆302,加压格栅304的压力杆305给土体8作用力,直至土地达到一定的荷载。一定的荷载是指实验时模拟用的土体的密度,即实际工程中土体的密度,该密度用环刀法测得。通过此试验方法,可以求得土体的厚度,具体可以通过公式h=q/r计算所得,h为土体的厚度,q为土体加压装置3给土体加压的压力,r为土重度。土重度为通过环刀检测得到土的密度乘以9.8。如给土体施加100kpa的压力,在填完土后,通过环刀测定其土的密度,并乘以9.8计算出土的重度是20kN/m3,这样就可以通过上述公式计算出在100kpa压力下,桩体和浆泡设置在5米深度的土体中。In the sixth step, the soil body pressurizing device 3 pressurizes the soil body 8, the jack 5 acts on the reaction force frame 203, and the reaction force is given to the two pressure rods 302 of the pressure frame 301 and the pressure rods of the pressure grid 304 305 exerts force on the soil body 8 until the land reaches a certain load. A certain load refers to the density of the soil used for simulation in the experiment, that is, the density of the soil in the actual project, which is measured by the ring knife method. By this test method, the thickness of the soil body can be obtained, which can be calculated by the formula h=q/r specifically, where h is the thickness of the soil body, q is the pressure applied by the soil body pressurizing device 3 to the soil body, and r is Soil weight. The soil weight is obtained by multiplying the density of the soil by ring knife detection by 9.8. For example, if a pressure of 100kpa is applied to the soil, after filling the soil, measure the density of the soil with a ring knife, and multiply it by 9.8 to calculate the weight of the soil is 20kN/m3, so that it can be calculated by the above formula under the pressure of 100kpa, The piles and slurry bubbles are set in the soil at a depth of 5 meters.

第七步,桩体加压装置4给桩体10加压,直至浆泡9被破坏或土体8下降,记录桩体10的受力及沉降情况。并将破坏的浆泡挖出后进行扫描电镜分析;同时,在实验室用相同的水灰比制备浆泡,只是这个浆泡没有经过受压,放置和上述桩端浆泡相同时间后放在万能机上进行单轴抗压强度试验,分析被破坏的浆泡与直接在万能机上进行单轴抗压强度试验的浆泡两者不同的不同之处,再应用于实际工程中。In the seventh step, the pile body pressurizing device 4 pressurizes the pile body 10 until the slurry bubble 9 is destroyed or the soil body 8 descends, and the stress and settlement of the pile body 10 are recorded. Excavate the damaged slurry bubbles and conduct scanning electron microscope analysis; at the same time, prepare slurry bubbles in the laboratory with the same water-cement ratio, but this slurry bubble has not been compressed, and placed in the same time as the pile end slurry bubble The uniaxial compressive strength test is carried out on the universal machine, and the difference between the destroyed pulp bubble and the pulp bubble directly tested on the universal machine is analyzed, and then applied to the actual project.

由此可见,本实用新型可以研究不同浆泡大小、不同浆泡模量下是浆泡破坏还是土体破坏,如果浆泡模量很小的情况下土体下沉很大就说明在该土层中慎用注浆,因为没有达到提高承载力和减小沉降的目的,测试结果可以指导实际工程的应用。浆泡模量为土的压缩模量,即浆泡在完全侧限的条件下竖向应力增量与相应的应变量的比值。It can be seen that the utility model can study whether the pulp bubble damage or the soil damage under different pulp bubble sizes and different pulp bubble moduli. Grouting should be used with caution in layers, because the purpose of improving bearing capacity and reducing settlement has not been achieved, and the test results can guide the application of actual engineering. The modulus of the slurry bubble is the compressive modulus of the soil, that is, the ratio of the vertical stress increment to the corresponding strain of the slurry bubble under the condition of complete confinement.

实施例二:Embodiment two:

参照图5和图6所示,本实施例与实施例一不同之处在于,调节螺栓207包括连接头20a和定位环20h,连接头20a具有环状的连接部20c和卡持部20e,所述内螺纹孔208贯穿连接部20c和卡接部20e;所述卡持部20e位于连接部20c的一端且沿径向向外凸起,所述定位环20h卡接在连接部20c的另一端。具体是:环状的连接部20c外表面上开设有两个沿轴向方向开设的导向槽20j和两沿连接部20c同一周向延伸的环槽20k,一条导向槽20j与一条环槽20k连通,定位环20h内侧具有两向内凸起的定位块20i,定位环套设在连接部20c上时两个定位块20i能同时设置导向槽20j内,再转动定位环使定位块20i固定在环槽20k内从而使连接头20a和定位环20h形成连接。5 and 6, the difference between this embodiment and the first embodiment is that the adjusting bolt 207 includes a connecting head 20a and a positioning ring 20h, and the connecting head 20a has an annular connecting portion 20c and a clamping portion 20e, so The internal threaded hole 208 runs through the connecting portion 20c and the clamping portion 20e; the clamping portion 20e is located at one end of the connecting portion 20c and protrudes radially outward, and the positioning ring 20h is clamped at the other end of the connecting portion 20c . Specifically: the outer surface of the annular connecting portion 20c is provided with two guide grooves 20j along the axial direction and two annular grooves 20k extending along the same circumferential direction of the connecting portion 20c, one guide groove 20j communicates with one annular groove 20k The inside of the positioning ring 20h has two positioning blocks 20i protruding inward. When the positioning ring is sleeved on the connecting part 20c, the two positioning blocks 20i can be set in the guide groove 20j at the same time, and then the positioning ring is rotated to fix the positioning blocks 20i on the ring. The connecting head 20a and the positioning ring 20h form a connection in the groove 20k.

本说明书实施例所述的内容仅仅是对实用新型构思的实现形式的列举,本实用新型的保护范围的不应当被视为仅限于实施例所陈述的具体形式,本实用新型的保护范围也及于本领域技术人员根据本实用新型构思所能够想到的等同技术手段。The content described in the embodiments of this specification is only an enumeration of the realization forms of the utility model concept, and the protection scope of the utility model should not be regarded as being limited to the specific forms stated in the embodiments, and the protection scope of the utility model also includes Equivalent technical means that those skilled in the art can think of according to the concept of the utility model.

Claims (10)

1.一种桩端后注浆室内载荷试验装置,其特征在于:包括载荷箱、反力装置、土体加压装置、桩体加压装置;所述反力装置包括底盘、若干连杆和反力架;所述若干连杆下端固连在底盘上,所述若干连杆的上端与反力架连接,且所述连杆与反力架之间设有可调节反力架高度的调节结构;所述载荷箱设置在底盘上,所述土体加压装置和桩体加压装置均设置在载荷箱和反力架之间并分别顶压在反力架上。1. A load test device in the back grouting chamber of a pile end, is characterized in that: comprise load box, reaction force device, soil mass pressurization device, pile body pressurization device; Described reaction force device comprises chassis, some connecting rods and Reaction frame; the lower ends of the plurality of connecting rods are fixedly connected to the chassis, the upper ends of the plurality of connecting rods are connected with the reaction frame, and there is an adjustable height adjustment mechanism between the connecting rods and the reaction frame. Structure; the load box is arranged on the chassis, and the soil pressurization device and the pile body pressurization device are both arranged between the load box and the reaction frame and press against the reaction frame respectively. 2.如权利要求1所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述反力架包括两根呈十字形固连的反力杆,所述反力杆的两端分别设有通孔。2. The indoor load test device for post-grouting at a pile end as claimed in claim 1, wherein the reaction frame comprises two reaction rods fixedly connected in a cross shape, and the two reaction rods are The ends are respectively provided with through holes. 3.如权利要求2所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述调节结构包括穿设在通孔内且与反力杆转动连接的调节螺栓,所述的调节螺栓开设有内螺纹孔,所述连杆上端开设有外螺纹,所述连杆上端的外螺纹与调节螺栓的内螺纹孔配合。3. A load test device for post grouting at pile ends as claimed in claim 2, characterized in that: the adjustment structure includes an adjustment bolt that is penetrated in the through hole and is rotatably connected with the reaction bar, and the The adjusting bolt is provided with an internal thread hole, and the upper end of the connecting rod is provided with an external thread, and the external thread at the upper end of the connecting rod cooperates with the internal thread hole of the adjusting bolt. 4.如权利要求3所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述调节螺栓包括连接头和定位头,所述的定位头可拆卸连接在连接头内;所述的连接头具有环状的连接部和卡持部,所述卡持部位于连接部的一端且沿径向向外凸起,所述连接部的另一端设有沉头孔;所述的定位头包括具有贯通孔的套筒和位于套筒一端的挡肩,所述套筒的外圆周面上开设有外螺纹,所述沉头孔的孔壁上设有与套筒的外螺纹配合的内螺纹,所述套筒的贯穿孔直径大于所述内螺纹孔的底径。4. a kind of post-grouting chamber load test device of pile end as claimed in claim 3 is characterized in that: described adjusting bolt comprises connecting head and locating head, and described locating head is detachably connected in the connecting head; The connecting head has an annular connecting part and a clamping part, the clamping part is located at one end of the connecting part and protrudes radially outward, and the other end of the connecting part is provided with a counterbore; the described The positioning head includes a sleeve with a through hole and a shoulder at one end of the sleeve, an external thread is provided on the outer circumference of the sleeve, and the wall of the counterbore hole is provided with an external thread that matches the sleeve. The diameter of the through hole of the sleeve is larger than the bottom diameter of the inner threaded hole. 5.如权利要求3所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述调节螺栓包括连接头和定位环,连接头具有环状的连接部和卡持部,所述卡持部位于连接部的一端且沿径向向外凸起,所述定位环卡接在连接部的另一端。5. a kind of post-pile grouting chamber load test device as claimed in claim 3, it is characterized in that: described adjustment bolt comprises connector and positioning ring, and connector has ring-shaped connection part and clamping part, so The clamping part is located at one end of the connecting part and protrudes radially outward, and the positioning ring is clamped at the other end of the connecting part. 6.如权利要求1至5任意一项所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述土体加压装置包括加压框、加压格栅和至少两个千斤顶,所述加压格栅滑动设置在加压框的一侧,所述千斤顶固设在加压框的另一侧,且千斤顶顶压在反力架上。6. A load test device for pile end post-grouting chamber according to any one of claims 1 to 5, characterized in that: the soil pressurization device comprises a pressurization frame, a pressurization grid and at least two A jack, the pressurization grid is slidably arranged on one side of the pressurization frame, the jack is fixed on the other side of the pressurization frame, and the jack is pressed against the reaction force frame. 7.如权利要求6所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述加压框包括四根呈口字形设置的四根加压杆,在四根加压杆中至少两根平行设置的加压杆上设有两个平行的滑槽,所述加压格栅包括若干根长条状的压力杆,所述压力杆上设有与滑槽滑动连接的卡扣;所述加压框上设有偶数个千斤顶,所述偶数个千斤顶对称设置在两根加压杆上。7. A load test device for post-grouting pile ends as claimed in claim 6, characterized in that: said pressurizing frame comprises four four pressurizing rods arranged in the shape of a square, and the four pressurizing rods There are two parallel chutes on at least two pressure rods arranged in parallel, and the pressure grid includes several elongated pressure rods, and the pressure rods are provided with clips that are slidably connected to the chute. buckle; an even number of jacks is arranged on the pressurizing frame, and the even number of jacks are arranged symmetrically on the two pressurizing rods. 8.如权利要求1至5任意一项所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述桩体加压装置包括承台和至少一个千斤顶,所述千斤顶固设在承台上,且千斤顶顶压在反力架上。8. The post-grouting indoor load test device for pile ends according to any one of claims 1 to 5, wherein the pile pressurizing device includes a cap and at least one jack, and the jack is fixed On the bearing platform, and the jack is pressed on the reaction frame. 9.如权利要求8所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述千斤顶上设有压力表。9 . The indoor load test device for post grouting at the pile end as claimed in claim 8 , wherein the jack is provided with a pressure gauge. 10 . 10.如权利要求8所述的一种桩端后注浆室内载荷试验装置,其特征在于:所述反力架与承台之间设有沉降数据显示装置,所述沉降数据显示装置包括一个百分表,所述百分表固设在反力架上,且所述百分表的探头顶压在承台上。10. A load test device for post grouting at pile ends as claimed in claim 8, characterized in that: a settlement data display device is provided between the reaction force frame and the cap, and the settlement data display device includes a A dial gauge, the dial gauge is fixed on the reaction frame, and the probe of the dial gauge presses against the platform.
CN201320632930.XU 2013-10-01 2013-10-01 Inner load test device for post-grouting of pile tip Expired - Fee Related CN203490129U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320632930.XU CN203490129U (en) 2013-10-01 2013-10-01 Inner load test device for post-grouting of pile tip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320632930.XU CN203490129U (en) 2013-10-01 2013-10-01 Inner load test device for post-grouting of pile tip

Publications (1)

Publication Number Publication Date
CN203490129U true CN203490129U (en) 2014-03-19

Family

ID=50260951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320632930.XU Expired - Fee Related CN203490129U (en) 2013-10-01 2013-10-01 Inner load test device for post-grouting of pile tip

Country Status (1)

Country Link
CN (1) CN203490129U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499492A (en) * 2013-10-01 2014-01-08 浙江工业职业技术学院 Device and method for testing load in pile-end post-grouting chamber
CN103926383B (en) * 2014-04-30 2015-08-05 山东大学 Tunnel gushing water is dashed forward mud and Grouting three-dimensional model pilot system and test method thereof
CN107268691A (en) * 2017-07-04 2017-10-20 山东大学 A kind of test model and test method that lifting bearing capacity of pile foundation is starched suitable for after-teeming
CN108593463A (en) * 2018-08-02 2018-09-28 中南大学 A kind of pile-soil interface shearing mechanics characteristic test device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499492A (en) * 2013-10-01 2014-01-08 浙江工业职业技术学院 Device and method for testing load in pile-end post-grouting chamber
CN103926383B (en) * 2014-04-30 2015-08-05 山东大学 Tunnel gushing water is dashed forward mud and Grouting three-dimensional model pilot system and test method thereof
CN107268691A (en) * 2017-07-04 2017-10-20 山东大学 A kind of test model and test method that lifting bearing capacity of pile foundation is starched suitable for after-teeming
CN107268691B (en) * 2017-07-04 2019-03-26 山东大学 It is a kind of to starch the test model and test method for promoting bearing capacity of pile foundation suitable for after-teeming
CN108593463A (en) * 2018-08-02 2018-09-28 中南大学 A kind of pile-soil interface shearing mechanics characteristic test device
CN108593463B (en) * 2018-08-02 2020-06-16 中南大学 Pile-soil contact surface shearing mechanical property testing device

Similar Documents

Publication Publication Date Title
CN103499492B (en) Indoor load test device for post-grouting of pile ends
CN109163985B (en) In-situ testing device and method for testing shear strength and long-term creep deformation of rock sample
CN104074210B (en) Pile foundation side friction shop experiment device and test method thereof
CN103884561B (en) The devices and methods therefor of artificial preparation structural original soft clay test soil sample
CN104807706A (en) Portable soft and weak layer in-situ direct shear tester and testing method thereof
CN206862755U (en) A kind of embedding rock friction pile experimental rig of the confining pressure of measurement in real time
CN103645061B (en) A kind of Framed Anchor Technique large-scale physical model test method
CN203490129U (en) Inner load test device for post-grouting of pile tip
CN106351268B (en) A kind of lateral loading stake soil dynamic response model test box
CN203551406U (en) Soil-rock mass in-situ direct shear test device with automatic data acquisition system
CN205188924U (en) Soil body subsides measuring device suitable for indoor mold box is experimental
CN115165699A (en) Device and method for visually measuring seepage effect of magnetic mortar in rock fracture plugging at multiple angles
CN204575465U (en) Portable soft layer in-situ direct shear tester
CN103195042A (en) Deeply-loadable spiral plate load test device and method thereof
CN207019989U (en) A kind of general planar material tension, strain and deflection test device
CN104328810A (en) Improved method for detecting bearing capacity of precast pipe-pile single-pile foundation
CN205941118U (en) A kind device is hit in remolded soil layering
CN215296993U (en) Multi-connected rock-soil in-situ shear testing device for full-stress path tracking
CN205280456U (en) Soil sample compaction test makes instrument on coarse soil furface layer
CN110132714B (en) A device and testing method for testing the deformation parameters of irregular rock mass samples
CN109138008A (en) The pilot system of embedded rock pile bearer properties in analog composite rock stratum
CN210315475U (en) Measure model box of static soil pressure coefficient
Elsamny et al. Experimental evaluation of bearing capacity and behaviour of single pile and pile group in cohesionless soil
CN102605757A (en) Device and method for in-situ test of embankment pile
Lin et al. Characterizing interfacial behavior of structurally cemented granular material using a large three-dimensional contact surface testing machine and a mesoscale bond model in DEM

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151203

Address after: Hangzhou City, Zhejiang province 310000 Shangcheng District Qiutao Road No. 18 room 1003

Patentee after: ZHEJIANG HUATIE COMMUNICATION TECHNOLOGY CO., LTD.

Address before: 312000 Jinghu New District, Zhejiang, Shaoxing, Zhejiang Industry Polytechnic College

Patentee before: Zhejiang Industry Polytechnic College

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Hangzhou City, Zhejiang province 310000 Shangcheng District Qiutao Road No. 18 room 1003

Patentee after: Zhejiang Iron & Steel communication technology Limited by Share Ltd

Address before: Hangzhou City, Zhejiang province 310000 Shangcheng District Qiutao Road No. 18 room 1003

Patentee before: ZHEJIANG HUATIE COMMUNICATION TECHNOLOGY CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140319

Termination date: 20201001