CN203451114U - Tower crane attaching device for bridge tower construction - Google Patents

Tower crane attaching device for bridge tower construction Download PDF

Info

Publication number
CN203451114U
CN203451114U CN201320484840.0U CN201320484840U CN203451114U CN 203451114 U CN203451114 U CN 203451114U CN 201320484840 U CN201320484840 U CN 201320484840U CN 203451114 U CN203451114 U CN 203451114U
Authority
CN
China
Prior art keywords
tower crane
tower
strut
supporting rod
attaching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320484840.0U
Other languages
Chinese (zh)
Inventor
唐蔚东
薛安青
向继华
王胜利
徐洲
胡健
张晓欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN201320484840.0U priority Critical patent/CN203451114U/en
Application granted granted Critical
Publication of CN203451114U publication Critical patent/CN203451114U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a tower crane attaching device for bridge tower construction. The tower crane attaching device comprises an attaching supporting rod and an attaching framework, wherein the attaching supporting rod comprises a first supporting rod, a second supporting rod, a third supporting rod and more than three beams; one end of the first supporting rod is connected with the attaching framework, the other end of the first supporting rod is connected with one end of each beam, and the other end of each beam is equipped with an anchoring embedded part; one end of the third supporting rod is connected with the attaching framework, and the other end of the third supporting rod is equipped with an anchoring embedded part; one end of the second supporting rod is connected with the attaching framework, and the other end of the second supporting rod is connected with an anchoring embedded part or the beams. The tower crane attaching device for bridge tower construction disclosed by the utility model well solves a tower crane attaching problem under conditions such as limited site, irregular or extremely small tower crane appearance dimension, actual lifting load limitation of the tower crane, limitation of bridge upper structure construction on the crane tower installation position, and position limitation on the tower crane caused by mounting and dismounting of the tower crane, realizes simple, convenient, safe and stable attaching of the tower crane, and saves construction costs.

Description

Attachment device of tower crane for bridge tower construction
Technical field
The utility model relates to bridge tower technical field of construction, refers to particularly the attachment device of tower crane for bridge tower construction.
Background technology
Fast development along with China's construction industry, bridge construction is increasing, the use of adhesion tower-crane is also more and more, when tower crane uses highly over unattached height, be the free height that reduces tower crane itself, keep the stability of tower crane, reduce tower crane internal force, improve load-carrying ability, need to use attachment device that tower crane is connected with bridge tower, tower crane could be elevated to corresponding construction height to meet the demand of site operation.
Common more satisfactory adhering mode has two kinds, N-type and M type, N-type adhering mode adopts the mode of Anchored Bar " three bar coplanars ", as shown in Figure 1, 2, for guaranteeing the stability of tower crane 2, its brace bar attached 4(comprises the first strut 41, the second strut 42, the 3rd strut 43) with adhesion frame 3 on towards angle a1, a2, the a3 of bridge tower 1 one sides, all need to meet the requirement of 30 °~75 °; M type adhering mode adopts the mode of brace bar attached " four bar coplanars ", as shown in Figure 3,4, is the stability that guarantees tower crane, its brace bar attached 4 with adhesion frame 3 on towards angle b1, b2, b3, the b4 of bridge tower one side, need meet the requirement of 10 °~120 °.
But in practice of construction, owing to being subject to the restriction of the conditions such as the installation and removal of place, camp site, bridge tower structural shape, the actual lift heavy of tower crane, tower crane requires, tower crane usually needs to take some unconventional adherence methods to meet construction requirement.Example as shown in Figure 5, the tower crane 2 using in certain engineering, model is S315K16, installation boom length is 45m, because place, camp site is limited, bridge tower 1 oad is less, the conditional requests such as position limitation of the superstructure of bridge tower 1 construction to the installation and removal tower crane 2 of the restriction of tower crane 2 installation sites, tower crane 2, tower crane 2 can only be in bridge tower 1 cushion cap side, and can not be over against bridge tower 1 cushion cap, according to " three bar coplanars " adhering mode of routine, brace bar attached 4 with adhesion frame 3 on towards the angle of bridge tower 1 one sides, exceeded 70 °; Or according to " four bar coplanars " adhering mode of routine, as shown in Figure 6, brace bar attached 4 with adhesion frame 3 on towards the angle of bridge tower 1 one sides, exceeded 120 °, so " three bar coplanars " all cannot adopt with " four bar coplanars " adhering mode, the structure that need to improve attachment device solves tower crane attachment issue.
Summary of the invention
The purpose of this utility model is to overcome conventional attachment device in prior art cannot meet the defect that conditional bridge tower and tower crane adhere to, and a kind of attachment device of tower crane for bridge tower construction that can meet various extraordinary circumstances is provided.
For achieving the above object, the attachment device of tower crane for bridge tower construction that the utility model is designed, comprise brace bar attached and adhesion frame, described brace bar attached first strut that comprises, the second strut, the 3rd strut, 3 above booms, one end of described the first strut is connected with adhesion frame, the other end is connected with one end of described boom, the other end of described boom is provided with anchoring embedded part, one end of described the 3rd strut is connected with adhesion frame, the other end is provided with anchoring embedded part, one end of described the second strut is connected with adhesion frame, the other end is connected with anchoring embedded part or is connected with boom.
Preferably, described boom one end is all connected on a boom connecting panel, by described boom connecting panel, is connected with the other end of the first strut.
Preferably, the point of connection that one end of described the second strut is connected with adhesion frame is positioned at described the 3rd strut and adhesion frame connecting place, and the other end is connected with boom;
Or the point of connection that one end of described the second strut is connected with adhesion frame is positioned at described the first strut and adhesion frame connecting place, the other end is connected with the anchoring embedded part of the other end of the 3rd strut.
Preferably, described anchoring embedded part comprises anchor slab, and described anchor slab one side is provided with four above dowels, and opposite side is provided with the supporting plate vertical with anchor slab plate face, and supporting plate has stiffener, and described stiffener extends on anchor slab, engages with anchor slab.
The beneficial effects of the utility model:
By arranging, many booms have solved for the tower crane of bridge tower construction because place, camp site is limited, bridge tower oad is irregular or too small well, the actual lift heavy restriction of tower crane, superstructure construction to the installation and removal of the restriction of tower crane installation site, tower crane the attachment issue to tower crane in the situations such as position limitation of tower crane, realize easy, safe, stable that tower crane adheres to, compare the input that adopts large-scale mode of adhering to truss can reduce attachment material, save executive cost.
Accompanying drawing explanation
Fig. 1 is the sectional structure schematic diagram at adhesion frame place when tower crane adopts " N-type " adhering mode to be attached on bridge tower in prior art.
Fig. 2 is the structure for amplifying schematic diagram of tower crane and adhesion frame in Fig. 1.
Fig. 3 is the sectional structure schematic diagram at adhesion frame place when tower crane adopts " M type " adhering mode to be attached on bridge tower in prior art.
Fig. 4 is the sectional structure schematic diagram at adhesion frame place when tower crane adopts another kind of " M type " adhering mode to be attached on bridge tower in prior art.
The sectional structure schematic diagram at adhesion frame place when Fig. 5 is conditional bridge tower and tower crane employing existing " N-type " adhering mode.
The sectional structure schematic diagram at adhesion frame place when Fig. 6 is conditional bridge tower and tower crane employing existing " M type " adhering mode.
Fig. 7 structural representation under use state that is the utility model for the attachment device of tower crane of bridge tower construction.
Fig. 8 sectional structure schematic diagram at adhesion frame place that is the utility model shown in Fig. 7 for the attachment device of tower crane of bridge tower construction.
Fig. 9 is that another kind of embodiment of the present utility model is at the sectional structure schematic diagram at adhesion frame place.
Figure 10 is the structural representation of anchoring embedded part.
Figure 11 is the sectional structure schematic diagram of A-A in Figure 10.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Shown in Fig. 1 ~ 6, attachment device of tower crane of the prior art illustrates in background technology, does not repeat herein.
As shown in Fig. 7,8,10,11, attachment device of tower crane for bridge tower construction, comprise brace bar attached 4 with adhesion frame 3, brace bar attached the first strut 41, the second strut 42,43,3 above booms 6 of the 3rd strut of comprising, one end of the first strut 41 is connected with adhesion frame 3, the other end is connected with one end of boom 6, the other end of boom 6 is provided with anchoring embedded part 5, one end of the 3rd strut 43 is connected with adhesion frame 3, the other end is provided with anchoring embedded part 5, one end of the second strut 42 is connected with adhesion frame 3, and the other end is connected with anchoring embedded part 5 or is connected with boom 6.Anchoring embedded part 5 should be embedded on bridge tower 1 in advance.
As shown in Figure 8, boom 6 one end are all connected on a boom connecting panel 7, by boom connecting panel 7, are connected with the other end of the first strut 41.One end of boom 6 and anchoring embedded part 5 are welded and fixed, and the other end and truss connecting panel 7 are welded and fixed, and also can adopt bearing pin to be connected and fixed.
The point of connection that one end of the second strut 42 is connected with adhesion frame 3 is positioned at the 3rd strut 43 and adhesion frame 3 connecting places, and the other end is connected with boom 6;
The first strut 41, the second strut 42 can be fixed by the bearing pin pin joint (not shown) of otic placode and adhesion frame 3 is set in its end, and the other end and truss connecting panel 7 are welded and fixed, and also can adopt bearing pin to be connected and fixed.The 3rd strut 43 can be by the bearing pin pin joint of otic placode and adhesion frame 3 near one end of tower crane 2, and the other end and anchoring embedded part 5 are welded and fixed, and also can adopt bearing pin to be connected and fixed.
As shown in Figure 10,11, anchoring embedded part 5 comprises anchor slab 51, and anchor slab 51 1 sides are provided with four above dowels 54, and opposite side is provided with the supporting plate 52 vertical with anchor slab 51 plate faces, supporting plate 52 has stiffener 53, and stiffener 53 extends on anchor slab 51, engages with anchor slab 51.Dowel 54 utilizes tapered cup nut 55, screw mandrel 56 and nut 57 to be fixed on anchor slab 51, for this area common technology means, does not elaborate herein.
Again as shown in Figure 7, a plurality of attachment device of tower cranes for bridge tower construction can be set on a tower crane 2 from top to bottom, all be connected to a fixed with bridge tower 1, play the effect of stabilization and reinforcement.
While using the attachment device of tower crane of constructing for bridge tower, before king-post 1 concreting, tapered cup nut 55 and dowel 54 are connected, and according to position corresponding to anchor slab 51 bolts hole, carry out pre-buriedly, wherein embedded conical nut 55 has four and be distributed on pre-embedded steel slab at least.Supporting plate 52, stiffener 53 are welded on anchor slab 51 in advance, while adhering to construction, anchor slab 51 and pre-buried tapered cup nut 55 are linked together by screw mandrel 56 and nut 57.
Embodiment 2
As shown in Figure 9, a kind of attachment device of tower crane for bridge tower construction, structure shown in fundamental sum embodiment 1 is identical, difference is that the point of connection that one end of the second strut 42 is connected with adhesion frame 3 is positioned at the first strut 41 and adhesion frame 3 connecting places, and the other end is connected with the anchoring embedded part 5 of the other end of the 3rd strut 43.
It should be noted that, the attachment device of tower crane for bridge tower construction of the present utility model, is not limited to use the situation at " three bar coplanars ", only need increase the quantity of strut again, and after simple transformation, the situation of " four bar coplanars " is applicable equally.

Claims (5)

1. the attachment device of tower crane for bridge tower construction, comprise brace bar attached (4) and adhesion frame (3), described brace bar attached the first strut (41) that comprises, the second strut (42), the 3rd strut (43), it is characterized in that: the described brace bar attached 3 above booms (6) that also comprise, one end of described the first strut (41) is connected with adhesion frame (3), the other end is connected with the one end of described boom (6), the other end of described boom (6) is provided with anchoring embedded part (5), one end of described the 3rd strut (43) is connected with adhesion frame (3), the other end is provided with anchoring embedded part (5), one end of described the second strut (42) is connected with adhesion frame (3), the other end is connected with anchoring embedded part (5) or is connected with boom (6).
2. according to claim 1 for the attachment device of tower crane of bridge tower construction, it is characterized in that: it is upper that described boom (6) one end is all connected to a boom connecting panel (7), by described boom connecting panel (7), is connected with the other end of the first strut (41).
3. according to the attachment device of tower crane of constructing for bridge tower described in claim 1 or 2, it is characterized in that: the point of connection that one end of described the second strut (42) is connected with adhesion frame (3) is positioned at described the 3rd strut (43) and adhesion frame (3) connecting place, and the other end is connected with boom (6);
Or the point of connection that is connected with adhesion frame (3) of one end of described the second strut (42) is positioned at described the first strut (41) and adhesion frame (3) connecting place, the other end is connected with the anchoring embedded part (5) of the other end of the 3rd strut (43).
4. according to the attachment device of tower crane of constructing for bridge tower described in claim 1 or 2, it is characterized in that: described anchoring embedded part (5) comprises anchor slab (51), described anchor slab (51) one sides are provided with four above dowels (54), opposite side is provided with the supporting plate (52) vertical with anchor slab (51) plate face, supporting plate (52) has stiffener (53), and described stiffener (53) extends on anchor slab (51), engages with anchor slab (51).
5. the attachment device of tower crane of constructing for bridge tower according to claim 3, it is characterized in that: described anchoring embedded part (5) comprises anchor slab (51), described anchor slab (51) one sides are provided with four above dowels (54), opposite side is provided with the supporting plate (52) vertical with anchor slab (51) plate face, supporting plate (52) has stiffener (53), and described stiffener (53) extends on anchor slab (51), engages with anchor slab (51).
CN201320484840.0U 2013-08-09 2013-08-09 Tower crane attaching device for bridge tower construction Expired - Fee Related CN203451114U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320484840.0U CN203451114U (en) 2013-08-09 2013-08-09 Tower crane attaching device for bridge tower construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320484840.0U CN203451114U (en) 2013-08-09 2013-08-09 Tower crane attaching device for bridge tower construction

Publications (1)

Publication Number Publication Date
CN203451114U true CN203451114U (en) 2014-02-26

Family

ID=50131011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320484840.0U Expired - Fee Related CN203451114U (en) 2013-08-09 2013-08-09 Tower crane attaching device for bridge tower construction

Country Status (1)

Country Link
CN (1) CN203451114U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103863954A (en) * 2014-03-03 2014-06-18 中联重科股份有限公司 Tower crane, attached frame mounting structure and attached frame mounting method
CN103979438A (en) * 2014-06-05 2014-08-13 南通市达欣工程股份有限公司 Auxiliary device for disassembling tower crane attachment bracket
CN105439014A (en) * 2015-11-17 2016-03-30 徐州建机工程机械有限公司 Wedge block type attached frame inclined strut structure
CN105565181A (en) * 2015-12-22 2016-05-11 上海庞源机械租赁有限公司 Soft-attaching wall-attached frame for tower cranes
CN105752864A (en) * 2016-04-14 2016-07-13 成都市第二建筑工程公司 Tower crane attachment joint and construction method thereof
CN113321136A (en) * 2021-06-10 2021-08-31 中建八局西北建设有限公司 Attachment frame for fixing tower crane to bridge tower and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103863954A (en) * 2014-03-03 2014-06-18 中联重科股份有限公司 Tower crane, attached frame mounting structure and attached frame mounting method
CN103863954B (en) * 2014-03-03 2015-12-09 中联重科股份有限公司 Tower crane and attachment frame mounting structure thereof and attachment frame installation method
CN103979438A (en) * 2014-06-05 2014-08-13 南通市达欣工程股份有限公司 Auxiliary device for disassembling tower crane attachment bracket
CN105439014A (en) * 2015-11-17 2016-03-30 徐州建机工程机械有限公司 Wedge block type attached frame inclined strut structure
CN105565181A (en) * 2015-12-22 2016-05-11 上海庞源机械租赁有限公司 Soft-attaching wall-attached frame for tower cranes
CN105752864A (en) * 2016-04-14 2016-07-13 成都市第二建筑工程公司 Tower crane attachment joint and construction method thereof
CN105752864B (en) * 2016-04-14 2017-11-03 成都建筑工程集团总公司 Derrick crane adheres to node and its construction method
CN113321136A (en) * 2021-06-10 2021-08-31 中建八局西北建设有限公司 Attachment frame for fixing tower crane to bridge tower and construction method thereof

Similar Documents

Publication Publication Date Title
CN203451114U (en) Tower crane attaching device for bridge tower construction
CN201850498U (en) Steel trestle in water
CN203223003U (en) Detachable triangular jig frame for steel truss assembling
CN202658873U (en) Upward pulling cantilever heavy frame of scaffolding
CN101503908A (en) Construction method for spacing suspension cable structural template support platform
CN206646835U (en) It is a kind of from hoisting type steel structure slipping measure support
CN201999655U (en) Conversion device connecting tower crane and self-jacking construction platform
CN203173749U (en) Assembled integral type vertical self-jacking device of hydraulic double-type crane tower
CN104846750A (en) Underpinning method for prestress friction type massive pillar girders with seams
CN103410101A (en) Tower crane conversion method for construction of parabola-shaped ultrahigh pier
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN203006792U (en) Single-attachment-point tower crane wall attaching device
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN205153504U (en) Detachable cantilever frame body base
CN203451109U (en) I-shaped steel truss device for tower crane attachment
CN208884770U (en) A kind of steel plate shear force wall anchor bolt fixing bracket system
CN202000266U (en) Supporting structure of bridge coping template
CN113860189A (en) Pin shaft type climbing beam of non-turnover internal climbing tower crane and use method thereof
CN204173802U (en) Adhesion type mast-up
CN204454362U (en) Tower crane attachment supporting seat
CN107939135B (en) A kind of contignation structural form with restorability after shake
CN206529707U (en) A kind of Hanging Basket for building
CN210134358U (en) Cast-in-place roof beam side span construction bracket
CN201704698U (en) Detachable tower footing
CN204225464U (en) A kind of regularization hanging feet hand structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140226

Termination date: 20210809