CN203440830U - Device for reserving bolt holes - Google Patents

Device for reserving bolt holes Download PDF

Info

Publication number
CN203440830U
CN203440830U CN201320447460.XU CN201320447460U CN203440830U CN 203440830 U CN203440830 U CN 203440830U CN 201320447460 U CN201320447460 U CN 201320447460U CN 203440830 U CN203440830 U CN 203440830U
Authority
CN
China
Prior art keywords
bolt
bolt box
bolt hole
model
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320447460.XU
Other languages
Chinese (zh)
Inventor
李寒
高美忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201320447460.XU priority Critical patent/CN203440830U/en
Application granted granted Critical
Publication of CN203440830U publication Critical patent/CN203440830U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a device for reserving bolt hole, including a plank sheathing system bolt box, it wraps up the one deck protection film at this plank sheathing system bolt box outer wall, the utility model discloses it is convenient more traditional simple wood system template bolt box ann to tear open, and work efficiency is high, low in labor strength, and the construction progress is fast. The embedded bolt box is simple to manufacture, can be repeatedly used, is easy to disassemble and remove, avoids pollution and ensures quality. Reducing chiseling, being beautiful and practical, being green in construction and saving labor cost. Can be repeatedly used, reduces repeated processing and manufacturing, saves materials and reduces cost.

Description

Device for prepared screw-bolt hole
Technical field
The utility model belongs to industrial construction field, especially a kind of device for prepared screw-bolt hole.
Background technology
Current industrial construction industry equipment Foundations are pre-buried a large amount of bolt all, but for assurance equipment is installed the requirement to bolt installation accuracy, a lot of designs adopt prepared screw-bolt hole, it is to use composite board to make bolt box that traditional prepared screw-bolt hole stays equipment, method, corrugated bushing bolt preformed hole or tailor-made foam block bolt preformed hole etc., in construction, in dismounting and scale removal process, in various degree expose series of problems: 1, the simple cost of wooden form bolt box processed own is lower, but make and remove, need in a large number manually, especially when prepared screw-bolt hole is all darker, can only be with crooked chisel destructive dismounting by force after concrete construction completes, make the concrete local failure of prepared screw-bolt hole top simultaneously, muscle phenomenon is revealed in causing of having, the simple not reproducible utilization of wooden form bolt box processed, and inconvenient dabbing and cleaning in hole in addition, affects secondary and buries bolt and the concrete really power of holding after bolt underground, being affected to uplift force of bolt.2, after the construction of corrugated bushing bolt box, can not take out, cost is higher, increases cost.3, customized foam bolt preformed hole, the process-cycle is long, and cost is high, and dabbing is inconvenient, and in scale removal process, broken foam can not be well controlled, and causes environment pollution.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of device for prepared screw-bolt hole is provided, this apparatus cost is low, peace is torn open conveniently, can reuse, needn't dabbing, cleaning is convenient.
The utility model solves its technical problem and is achieved through the following technical solutions:
For a device for prepared screw-bolt hole, comprise wooden form bolt box processed, it is at this wooden form bolt box outer wall parcel processed layer protecting film.
And described diaphragm tightly wraps on wooden form bolt box outer wall processed by adhesive tape.
And described diaphragm is PE film, PE film thickness is 4.5mm.
And described diaphragm is waterproof film.
And described diaphragm is multilayer complex films.
Advantage of the present utility model and beneficial effect are:
This,, for the device of prepared screw-bolt hole, comprises wooden form bolt box processed, and it is at this wooden form bolt box outer wall parcel processed layer protecting film, and this is simple in structure, cost is low, peace is torn open conveniently, can reuse, needn't dabbing, clear up conveniently.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
The specific embodiment
Below by specific embodiment, the utility model is described in further detail, and following examples are descriptive, is not determinate, can not limit protection domain of the present utility model with this.
For a device for prepared screw-bolt hole, comprise wooden form bolt box 2 processed, it is at this wooden form bolt box outer wall parcel processed layer protecting film 1, and diaphragm can tightly wrap on wooden form bolt box outer wall processed by adhesive tape.Diaphragm can be PE film, and PE film thickness is 4.5mm, and diaphragm can be waterproof film, and diaphragm can be multilayer complex films.
The utility model tightly swathes PE film with adhesive tape on the basis of simple wooden form bolt box processed, uncovered back cover while passing, after installation, clip fixing, after concrete initial set, before final set, extract wooden model bolt box and remove again PE film, by the design bolt preformed hole size customized bolt box of wooden form, with the thick PE film of 4.5mm, wrap up one deck, with adhesive tape, tightly wrap, from bed course life, set bolt box reinforcing bar is taken root fixingly to being wrapped with the bolt box of PE film, with flitch, steel pipe, bolt box is beared down on one fixing.According to the fixing bolt box of appeal method, when removing, only need to remove after bearing down on one and prize a little wooden form bolt box, rock from side to side, just can intactly bolt box be extracted, finally PE film is removed, the tub after use divides model to stack, and convenient have same size bolt box to reuse again.Because PE film is subject to concrete extruding, certain convex-concave can be produced, after bolt hole cleaning, needn't dabbing just good frictional interface can be formed.The more traditional simple wooden form bolt box peace of the utility model is torn open conveniently, and operating efficiency is high, and labour intensity is low, and construction speed is fast.Pre-embedded bolt box is made simple, can reuse, and readily removable removing, avoids polluting, and ensures the quality of products.Reduce dabbing, both artistic and practical, green construction, saves labour cost.Can reuse, reduce and repeat processing and fabricating, save material, reduction expense.

Claims (5)

1. for a device for prepared screw-bolt hole, comprise wooden form bolt box processed, it is characterized in that: at this wooden form bolt box outer wall parcel processed layer protecting film.
2. the device for prepared screw-bolt hole according to claim 1, is characterized in that: described diaphragm tightly wraps on wooden form bolt box outer wall processed by adhesive tape.
3. the device for prepared screw-bolt hole according to claim 1, is characterized in that: described diaphragm is PE film, and PE film thickness is 4.5mm.
4. the device for prepared screw-bolt hole according to claim 1, is characterized in that: described diaphragm is waterproof film.
5. the device for prepared screw-bolt hole according to claim 1, is characterized in that: described diaphragm is multilayer complex films.
CN201320447460.XU 2013-07-25 2013-07-25 Device for reserving bolt holes Expired - Lifetime CN203440830U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320447460.XU CN203440830U (en) 2013-07-25 2013-07-25 Device for reserving bolt holes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320447460.XU CN203440830U (en) 2013-07-25 2013-07-25 Device for reserving bolt holes

Publications (1)

Publication Number Publication Date
CN203440830U true CN203440830U (en) 2014-02-19

Family

ID=50091895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320447460.XU Expired - Lifetime CN203440830U (en) 2013-07-25 2013-07-25 Device for reserving bolt holes

Country Status (1)

Country Link
CN (1) CN203440830U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106760512A (en) * 2016-11-03 2017-05-31 中国建筑股份有限公司 A kind of pipe drawing device of small-sized preformed hole, template connecting structure and its construction method
CN107190996A (en) * 2017-06-12 2017-09-22 中冶天工集团天津有限公司 A kind of protection device and its guard method for anti-brushing High-strength bolt hole
CN107542220A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Large-scale variable cross-section concrete column upper strata vertical reinforcement construction method
CN109318382A (en) * 2018-12-04 2019-02-12 长沙远大住宅工业(江苏)有限公司 A kind of reserved tooling and its application method to perforation of wallboard
CN111636903A (en) * 2020-06-02 2020-09-08 中铁十二局集团有限公司 Construction method for protecting embedded part and reserving holes

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542220A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Large-scale variable cross-section concrete column upper strata vertical reinforcement construction method
CN107542220B (en) * 2016-06-24 2019-09-13 中国二十冶集团有限公司 Construction Method of Vertical Reinforcement on the Upper Floor of Large Variable Cross-section Concrete Column
CN106760512A (en) * 2016-11-03 2017-05-31 中国建筑股份有限公司 A kind of pipe drawing device of small-sized preformed hole, template connecting structure and its construction method
CN106760512B (en) * 2016-11-03 2019-06-07 中国建筑股份有限公司 A kind of pipe drawing device, template connecting structure and its construction method of small-sized preformed hole
CN107190996A (en) * 2017-06-12 2017-09-22 中冶天工集团天津有限公司 A kind of protection device and its guard method for anti-brushing High-strength bolt hole
CN107190996B (en) * 2017-06-12 2022-07-05 中冶天工集团天津有限公司 Protection device and protection method for preventing high-strength bolt hole from being brushed
CN109318382A (en) * 2018-12-04 2019-02-12 长沙远大住宅工业(江苏)有限公司 A kind of reserved tooling and its application method to perforation of wallboard
CN111636903A (en) * 2020-06-02 2020-09-08 中铁十二局集团有限公司 Construction method for protecting embedded part and reserving holes

Similar Documents

Publication Publication Date Title
CN203440830U (en) Device for reserving bolt holes
WO2008057273A3 (en) Panel smoothing process and apparatus for forming a smooth continuous surface on fiber-reinforced structural cement panels
MX2009011779A (en) Method for smoothing cementitious slurry in the production of structural cementitious panels.
CN204826614U (en) Exempt from to tear open precast concrete wall form
CN203487777U (en) Reinforcing system, in which split screws do not penetrate through templates, for large shear wall
CN202144665U (en) Regeneration building mould plate
CN201106282Y (en) Post-irrigating band, construction joint plate side module
CN204850426U (en) Building templates is stupefied with back of body
CN201539094U (en) Composite wooden formwork
CN202810211U (en) Template removing tool
CN204238544U (en) A kind of large overall template of iron sheet parcel
CN202787983U (en) Split bolt
CN206428966U (en) Deformation joint template of shear wall structure
CN207048314U (en) A kind of shaping type stair wooden model board component
CN203995002U (en) Aluminium base stripping machine
CN202248883U (en) Template eyelet plugging device
CN206537633U (en) A kind of undersized log flat pallet for logistics operation
CN204040457U (en) Wood frame plastic formwork system
CN202391120U (en) Conveniently-loaded type waterproof counter screw rod of wall body
CN202440721U (en) Water-poof and pollution-prevention drawing
CN203129597U (en) Connection structure of building wood formworks
CN201896446U (en) Composite timber sleeper for supporting reinforced concrete component
CN201843337U (en) Concrete wall internal corner moulding plate structure
CN202706528U (en) Building plastic formwork
CN205312861U (en) Handling and draw prefabricated hollow for concrete pipe pile auxiliary device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140219

CX01 Expiry of patent term