CN203439904U - Switch equipment hoisting component - Google Patents

Switch equipment hoisting component Download PDF

Info

Publication number
CN203439904U
CN203439904U CN201320376671.9U CN201320376671U CN203439904U CN 203439904 U CN203439904 U CN 203439904U CN 201320376671 U CN201320376671 U CN 201320376671U CN 203439904 U CN203439904 U CN 203439904U
Authority
CN
China
Prior art keywords
switchgear
lifting rope
hoisting
transverse beam
hanging component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320376671.9U
Other languages
Chinese (zh)
Inventor
周波
吴晓梅
曹乐书
刘欧
汤敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electrical Apparatus Group Co ltd Seac
Original Assignee
SICHUAN ELECTRICAL APPARATUS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN ELECTRICAL APPARATUS CO Ltd filed Critical SICHUAN ELECTRICAL APPARATUS CO Ltd
Priority to CN201320376671.9U priority Critical patent/CN203439904U/en
Application granted granted Critical
Publication of CN203439904U publication Critical patent/CN203439904U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a switch equipment hoisting component which comprises upper hoisting ropes, connecting pieces, a transverse beam component, lower hoisting ropes and hoisting rods, wherein the lower ends of two groups of the upper hoisting ropes are respectively connected with the upper sides of two ends of the transverse beam component through one connecting piece; the lower ends of two ends of the transverse beam component are further respectively connected with two groups of the lower hoisting ropes through the connecting pieces; the lower ends of the lower hoisting ropes are sleeved on the hoisting rods on four corners of a frame base of switch equipment. According to the switch equipment hoisting component, hoisting stress points are changed to the bottom of the frame of the switch equipment, so that damage to the switch equipment in hoisting is effectively avoided, and moreover the hoisting component is high in structural strength and simple and convenient to operate, and can be flexibly assembled and disassembled.

Description

A kind of switchgear hanging component
Technical field
The utility model relates to a kind of hanging component, relates in particular to a kind of switchgear hanging component.
Background technology
Switchgear is after originating firm assembly and adjustment completes, need shipping to arrive the on-the-spot installation and operation of user, this process relates to the lifting of switchgear, due to various first and second components and parts of switchgear internal configurations, mostly will pack shipping with together with the framework of switchgear, the weight of framework own, will bear larger power during lifting in addition, for preventing toppling in switchgear lifting process, during lifting, require to find accurately center of gravity and lifting steadily.The utility model relates to a kind of new switching equipment hanging component.
Existing switchgear hanging component, comprise the suspension ring cross bar assembly that can hang on crane hook, the chain hook being connected with cross bar, the eyenut, the lifting that are loaded on the frame roof of switchgear hang over the suspension ring of suspension ring cross bar assembly on the hook of crane time, chain hooks the eyenut of the frame roof of switchgear, can switching devices lift operation.
Existing switchgear hanging component is whole for being rigidly connected, and alerting ability is poor; Heave Here is in the frame roof of switchgear, destructible equipment during lifting; When the frame roof structure of switchgear is not the planar structure of standard, eyenut is difficult for installing, and lifts bad putting forth effort, and especially, for the large-scale box type transformation site type switchgear that a large amount of first and second elements are housed, this kind of lifting mode is inapplicable.
Utility model content
The technical assignment of technical problem to be solved in the utility model and proposition is that prior art is improved, a kind of switchgear hanging component is provided, solve switchgear hanging component very flexible used in current technology, Heave Here is in the problem of the frame roof destructible equipment of switchgear.
For solving above technical matters, the technical solution of the utility model is:
A kind of switchgear hanging component, comprise lifting rope, attaching parts, transverse beam assembly, lower lifting rope and vertical loading board, on two groups, the lower end of lifting rope is respectively connected with the upside at transverse beam assembly two ends respectively by an attaching parts, the downside at transverse beam assembly two ends connects lifting rope under two groups by the every end of attaching parts again, and the lower end of lower lifting rope is enclosed within on the vertical loading board of four jiaos of switchgear frame bases.Because vertical loading board is positioned on base, make to lift by crane the bottom that stress point is positioned at switchgear framework, the structural strength of the frame base of switchgear is stronger than top, and in the time of can effectively avoiding lifting, switching devices damages.
Further, attaching parts adopts the shackle of D type, and intensity is high, not fragile, convenient, flexible while also making to load and unload lifting rope and lower lifting rope simultaneously.
Further, upper lifting rope and lower lifting rope adopt wire sling, when guaranteeing to lift intensity, can match wire sling length and guarantee that lifting steadily.In lifting, during switchgear, the switchgear of need slowly slinging is liftoff, and notes observing whether balance of center of gravity, if overbalance, after switchgear is put down, is readjusted length and the acting point of lifting rope and lower lifting rope.
Further, transverse beam assembly adopts channel-section steel dos-à-dos to add steel plate installed-welded and forms, and processing technology is simple, lifts intensity good, long service life simultaneously.
Further, vertical loading board is withdrawable, can be hidden in the base of switchgear after having lifted, and with using with extraction, so neither can affect the attractive in appearance of switchgear, also avoids operating personal touch vertical loading board and fall simultaneously.
Compared with prior art, the utility model advantage is:
Switchgear hanging component described in the utility model has been changed to the acting point of lifting on the base of switchgear framework, because the structural strength of base is large, can effectively avoid switching devices in hoisting process to damage, and this hanging component structural strength is high, can load and unload flexibly, simple to operate, can adjust easily lifting center of gravity, guarantee that lifting is steadily; The utility model is simple in structure, and cost of manufacture is low, is easy to realize, and installs simple, safe and reliable.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is partial side view of the present utility model.
The specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Embodiment based in the utility model, those of ordinary skills are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
The disclosed a kind of switchgear hanging component of the utility model embodiment, take and improve hanging component alerting ability, guarantee that switchgear lifting reliability is object.
Referring to Fig. 1, a kind of switchgear hanging component, comprise lifting rope 1, attaching parts 2, transverse beam assembly 3, lower lifting rope 4 and vertical loading board 5, attaching parts 2 adopts the shackle of D type, intensity is high, easily assembling, and the lower end of lifting rope 1 is respectively connected with the upside at transverse beam assembly 3 two ends respectively by the shackle of a D type on two groups, the lower end that the downside at transverse beam assembly 3 two ends connects lifting rope 4 under 4, four groups of lifting ropes under two groups by the every end of D type shackle is again enclosed within respectively on the vertical loading board 5 of four jiaos of switchgear frame bases.
Upper lifting rope 1 and lower lifting rope 4 adopt wire sling, when guaranteeing to lift intensity, can match wire sling length and guarantee that lifting steadily.Transverse beam assembly 3 adopts channel-section steel dos-à-dos to add steel plate installed-welded and forms, and strengthens lifting intensity.Vertical loading board 5 is withdrawable, can be hidden in the base of switchgear framework after having lifted.
When switchgear need to lift, vertical loading board on it 5 is retracted to end position, the upper lifting rope 1 of transverse beam assembly 3 both sides, upper end is inserted on the hook of crane simultaneously, the lower end of lower lifting rope 4 respectively symmetry packs in vertical loading board 5, the operation crane switchgear of slowly slinging is liftoff, and note to observe whether balance of switchgear center of gravity, if overbalance, after switchgear can being put down, readjust length and the acting point of wire sling, more slowly sling switchgear and move to shipment vehicle or installation site after put down.
Below be only preferred implementation of the present utility model, it should be pointed out that above-mentioned preferred implementation should not be considered as restriction of the present utility model, protection domain of the present utility model should be as the criterion with claim limited range.For those skilled in the art, within not departing from spirit and scope of the present utility model, can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (5)

1. a switchgear hanging component, it is characterized in that, comprise lifting rope (1), attaching parts (2), transverse beam assembly (3), lower lifting rope (4) and vertical loading board (5), the lower end of lifting rope on two groups (1) is respectively connected with the upside at transverse beam assembly (3) two ends respectively by an attaching parts (2), the downside at transverse beam assembly (3) two ends connects lifting rope under two groups (4) by the every end of attaching parts (2) again, and the lower end of lower lifting rope (4) is enclosed within on the vertical loading board (5) of four jiaos of frame bases of switchgear.
2. switchgear hanging component according to claim 1, is characterized in that, described attaching parts (2) adopts the shackle of D type.
3. switchgear hanging component according to claim 2, is characterized in that, described upper lifting rope (1) and lower lifting rope (4) adopt wire sling.
4. switchgear hanging component according to claim 1, is characterized in that, described transverse beam assembly (3) adopts channel-section steel dos-à-dos to add steel plate installed-welded and forms.
5. switchgear hanging component according to claim 1, is characterized in that, described vertical loading board (5) is withdrawable, can be hidden in the frame base of switchgear after having lifted.
CN201320376671.9U 2013-06-27 2013-06-27 Switch equipment hoisting component Expired - Fee Related CN203439904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320376671.9U CN203439904U (en) 2013-06-27 2013-06-27 Switch equipment hoisting component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320376671.9U CN203439904U (en) 2013-06-27 2013-06-27 Switch equipment hoisting component

Publications (1)

Publication Number Publication Date
CN203439904U true CN203439904U (en) 2014-02-19

Family

ID=50090972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320376671.9U Expired - Fee Related CN203439904U (en) 2013-06-27 2013-06-27 Switch equipment hoisting component

Country Status (1)

Country Link
CN (1) CN203439904U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282534A (en) * 2019-06-26 2019-09-27 北京航天发射技术研究所 A kind of cabinet hanging apparatus and hanging method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110282534A (en) * 2019-06-26 2019-09-27 北京航天发射技术研究所 A kind of cabinet hanging apparatus and hanging method

Similar Documents

Publication Publication Date Title
CN201439475U (en) Multifunctional balance hanging beam
CN204342250U (en) A kind of multi-state hoisting balance beam
CN201390592Y (en) Special lifting tool of breaker
CN203439904U (en) Switch equipment hoisting component
CN204752012U (en) Wall -hanging miniature hoist
CN203667798U (en) Light-weight high-strength cross beam lifting appliance
CN207170926U (en) Engine cylinder-body suspended core fixture
CN202321962U (en) Lifting appliance for switch cabinet
CN104724623B (en) Packaged type debris peculiar to vessel is hung
CN202687766U (en) Overturn lifting appliance for oversized section cube type component
CN204237422U (en) A kind of switch cubicle hoisting mechanism
CN203255932U (en) Hoisted iron frame forklift hoisting arm device
CN201458512U (en) Balance hanger
CN201914830U (en) Rope separator of tower hoist
CN212024545U (en) Multipurpose lifting appliance
CN102009908A (en) Hoisting tool
CN201395469Y (en) Sling for palletized goods
CN201140967Y (en) Special shoulder pole sling for transformer device swing
CN202671018U (en) Welding waste material transportation cableway bucket
CN204096893U (en) The diesel powerplant suspender of diesel locomotive
CN203806948U (en) Hoisting tool for high-low voltage prefabricated substation equipment
CN201458513U (en) Double-hook balance lifting appliance
CN203451047U (en) Balance weight lifting and mounting structure
CN203062177U (en) Diverter with box-shaped structure
CN202245697U (en) Steel lifting appliance for steel column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201021

Address after: 610000 No. 5 West core road, hi tech Zone, Chengdu, Sichuan

Patentee after: SICHUAN ELECTRICAL APPARATUS GROUP Co.,Ltd. (SEAC)

Address before: 611733, No. 107, South Street, Tang Chang, Pixian, Sichuan, Chengdu

Patentee before: SICHUAN ELECTRICAL APPARATUS Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140219

Termination date: 20210627

CF01 Termination of patent right due to non-payment of annual fee