CN203429634U - Engineering pile conduit fixing clamp structure - Google Patents

Engineering pile conduit fixing clamp structure Download PDF

Info

Publication number
CN203429634U
CN203429634U CN201320529785.2U CN201320529785U CN203429634U CN 203429634 U CN203429634 U CN 203429634U CN 201320529785 U CN201320529785 U CN 201320529785U CN 203429634 U CN203429634 U CN 203429634U
Authority
CN
China
Prior art keywords
steel
fixing clamp
engineering pile
clamp structure
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320529785.2U
Other languages
Chinese (zh)
Inventor
陈春来
姚烨
黄大文
王挺
余剑英
蒋吉清
丁玉琴
朱萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201320529785.2U priority Critical patent/CN203429634U/en
Application granted granted Critical
Publication of CN203429634U publication Critical patent/CN203429634U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a building engineering part structure, in particular to an engineering pile conduit fixing clamp structure. The engineering pile conduit fixing clamp structure is composed of steel channel and steel tubes. The two steel tubes are arranged on the steel channel in a parallel and erected mode, the steel channel and the steel tubes are arranged in an intersection mode, and the inner side of each steel tube is connected with an arc-shaped angle cleat. The engineering pile conduit fixing clamp structure has the advantages of being reasonable in design, low in construction cost, good in hole-forming quality and the like, and hole collapse does not occur easily.

Description

Engineering pile catheter fixing clamp structure
Technical field
The utility model relates to a kind of construction work design of part, especially relates to a kind of engineering pile catheter fixing clamp structure.
Background technology
Constructing skill of self-sealed under super-large diameter engineering pile high-performance water, complicated construction technique, CCP is many, involves a wide range of knowledge, and difficulty of construction is large.High for ubiquitous cost in self-compact concrete in construction under present super-large diameter engineering pile high-performance water, work efficiency is poor, speed is slow, the situations such as difficult quality control, especially excessive at some underground water water percolating capacities, cannot precipitation or can not the regional Construction of Engineering Pile of precipitation in, adopt the concrete technology of underwater casting.In concreting process, along with hole inner concrete constantly increases, continual lifting conduit, must make discharging opening be embedded in the certain depth in concrete.
Summary of the invention
The utility model is mainly that construction cost is higher for the existing complex structure of prior art, easily occurs collapse hole, the technical problem of the poor grade of hole quality, provides a kind of simple in structure, and construction cost is lower, be not prone to collapse hole, the good engineering pile catheter fixing clamp of hole quality structure.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: engineering pile catheter fixing clamp structure consists of channel-section steel and steel pipe, article two, steel pipe parallel shelf is placed on channel-section steel, channel-section steel and steel pipe square crossing are arranged, every steel pipe inner side is connected with angle clip, and angle clip becomes arcuation.
As preferably, steel pipe is fixed on channel-section steel by angle steel.
Therefore, the utlity model has the features such as design is more reasonable, and construction cost is lower, is not prone to collapse hole, and hole quality is better.
Accompanying drawing explanation
Accompanying drawing 1 is overall structure schematic diagram of the present utility model.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: engineering pile catheter fixing clamp structure consists of channel-section steel and steel pipe, and two steel pipe 2 parallel shelfs are placed on channel-section steel 1, channel-section steel 1 and steel pipe 2 square crossings layouts, and every steel pipe 2 inner sides are connected with angle clip 3,3 one-tenth arcuations of angle clip.Steel pipe 2 is fixed on (as shown in Figure 1) on channel-section steel 1 by angle steel 4.

Claims (2)

1. an engineering pile catheter fixing clamp structure, by channel-section steel and steel pipe, formed, it is characterized in that described two steel pipes (2) parallel shelf is placed on channel-section steel (1), channel-section steel (1) and steel pipe (2) square crossing are arranged, every steel pipe (2) inner side is connected with angle clip (3), and angle clip (3) becomes arcuation.
2. engineering pile catheter fixing clamp structure according to claim 1, is characterized in that described steel pipe (2) is fixed on channel-section steel (1) by angle steel (4).
CN201320529785.2U 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure Expired - Fee Related CN203429634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320529785.2U CN203429634U (en) 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320529785.2U CN203429634U (en) 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure

Publications (1)

Publication Number Publication Date
CN203429634U true CN203429634U (en) 2014-02-12

Family

ID=50058682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320529785.2U Expired - Fee Related CN203429634U (en) 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure

Country Status (1)

Country Link
CN (1) CN203429634U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN104278677B (en) * 2014-10-16 2016-01-20 葛洲坝集团基础工程有限公司 A kind of device and method for A/C in antiseepage wall chase section casting process
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering
CN108842801B (en) * 2018-08-08 2020-09-22 东阳市琰安建筑工程有限公司 Pile foundation fixing device for civil engineering

Similar Documents

Publication Publication Date Title
CN203429634U (en) Engineering pile conduit fixing clamp structure
CN203373735U (en) Prefabricated concrete tubular pile with external longitudinal webs
CN204456068U (en) Box-shaped steel plate occlusion diaphragm wall
CN203569588U (en) Communication base station with tree-shaped pile
CN203961150U (en) A kind of siphon rain water collecting system
CN203757176U (en) Non-excavation-type pipeline replacement device
CN206971725U (en) Hang the erecting device of mould
CN204855128U (en) Portable wedge is used to wind -tunnel wind field stimulation
CN204080798U (en) PHC tubular pile connecting structure
CN204001214U (en) High accuracy capital embedded board
CN202492929U (en) Overflowing hole device of concrete filled steel tube
CN208533512U (en) Ground pile and its construction tool
CN203175615U (en) Tunnel rain sewage drainage system
CN203174598U (en) Pile sinking structure of tubular pile
CN206256476U (en) A kind of use W-shaped steel plate control immersed segment and the on the bank structure of section differential settlement
CN204001369U (en) Aerated bricks
CN204175312U (en) The thixotropic slurry filling system of big cross section rectangular top pipe pipeline
CN202627473U (en) Steel tripod support device in reinforced concrete hyperbolic curve cooling tower construction
CN203855330U (en) Combined tower crane wall-attaching device in special-shaped structure
CN203176543U (en) Novel fixing part for concrete and pump pipe
CN203514252U (en) Ecological-type river channel bank
CN203429635U (en) Full-protection-casing raking pile guide pipe guide structure
CN202611094U (en) Structure capable of processing intersection of light pipe and pipeline in prestressed hollow slab
CN203066079U (en) Two-way adjustable integrated cross joint node for steel pipe supporting
CN204153375U (en) Pipeline structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20150827

EXPY Termination of patent right or utility model