CN203429634U - Engineering pile conduit fixing clamp structure - Google Patents
Engineering pile conduit fixing clamp structure Download PDFInfo
- Publication number
- CN203429634U CN203429634U CN201320529785.2U CN201320529785U CN203429634U CN 203429634 U CN203429634 U CN 203429634U CN 201320529785 U CN201320529785 U CN 201320529785U CN 203429634 U CN203429634 U CN 203429634U
- Authority
- CN
- China
- Prior art keywords
- steel
- fixing clamp
- engineering pile
- clamp structure
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a building engineering part structure, in particular to an engineering pile conduit fixing clamp structure. The engineering pile conduit fixing clamp structure is composed of steel channel and steel tubes. The two steel tubes are arranged on the steel channel in a parallel and erected mode, the steel channel and the steel tubes are arranged in an intersection mode, and the inner side of each steel tube is connected with an arc-shaped angle cleat. The engineering pile conduit fixing clamp structure has the advantages of being reasonable in design, low in construction cost, good in hole-forming quality and the like, and hole collapse does not occur easily.
Description
Technical field
The utility model relates to a kind of construction work design of part, especially relates to a kind of engineering pile catheter fixing clamp structure.
Background technology
Constructing skill of self-sealed under super-large diameter engineering pile high-performance water, complicated construction technique, CCP is many, involves a wide range of knowledge, and difficulty of construction is large.High for ubiquitous cost in self-compact concrete in construction under present super-large diameter engineering pile high-performance water, work efficiency is poor, speed is slow, the situations such as difficult quality control, especially excessive at some underground water water percolating capacities, cannot precipitation or can not the regional Construction of Engineering Pile of precipitation in, adopt the concrete technology of underwater casting.In concreting process, along with hole inner concrete constantly increases, continual lifting conduit, must make discharging opening be embedded in the certain depth in concrete.
Summary of the invention
The utility model is mainly that construction cost is higher for the existing complex structure of prior art, easily occurs collapse hole, the technical problem of the poor grade of hole quality, provides a kind of simple in structure, and construction cost is lower, be not prone to collapse hole, the good engineering pile catheter fixing clamp of hole quality structure.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: engineering pile catheter fixing clamp structure consists of channel-section steel and steel pipe, article two, steel pipe parallel shelf is placed on channel-section steel, channel-section steel and steel pipe square crossing are arranged, every steel pipe inner side is connected with angle clip, and angle clip becomes arcuation.
As preferably, steel pipe is fixed on channel-section steel by angle steel.
Therefore, the utlity model has the features such as design is more reasonable, and construction cost is lower, is not prone to collapse hole, and hole quality is better.
Accompanying drawing explanation
Accompanying drawing 1 is overall structure schematic diagram of the present utility model.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: engineering pile catheter fixing clamp structure consists of channel-section steel and steel pipe, and two steel pipe 2 parallel shelfs are placed on channel-section steel 1, channel-section steel 1 and steel pipe 2 square crossings layouts, and every steel pipe 2 inner sides are connected with angle clip 3,3 one-tenth arcuations of angle clip.Steel pipe 2 is fixed on (as shown in Figure 1) on channel-section steel 1 by angle steel 4.
Claims (2)
1. an engineering pile catheter fixing clamp structure, by channel-section steel and steel pipe, formed, it is characterized in that described two steel pipes (2) parallel shelf is placed on channel-section steel (1), channel-section steel (1) and steel pipe (2) square crossing are arranged, every steel pipe (2) inner side is connected with angle clip (3), and angle clip (3) becomes arcuation.
2. engineering pile catheter fixing clamp structure according to claim 1, is characterized in that described steel pipe (2) is fixed on channel-section steel (1) by angle steel (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320529785.2U CN203429634U (en) | 2013-08-27 | 2013-08-27 | Engineering pile conduit fixing clamp structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320529785.2U CN203429634U (en) | 2013-08-27 | 2013-08-27 | Engineering pile conduit fixing clamp structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203429634U true CN203429634U (en) | 2014-02-12 |
Family
ID=50058682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320529785.2U Expired - Fee Related CN203429634U (en) | 2013-08-27 | 2013-08-27 | Engineering pile conduit fixing clamp structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203429634U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278677A (en) * | 2014-10-16 | 2015-01-14 | 葛洲坝集团基础工程有限公司 | Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring |
CN108842801A (en) * | 2018-08-08 | 2018-11-20 | 河南沪江电缆有限公司 | The fixed device of pile foundation for civil engineering |
-
2013
- 2013-08-27 CN CN201320529785.2U patent/CN203429634U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104278677A (en) * | 2014-10-16 | 2015-01-14 | 葛洲坝集团基础工程有限公司 | Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring |
CN104278677B (en) * | 2014-10-16 | 2016-01-20 | 葛洲坝集团基础工程有限公司 | A kind of device and method for A/C in antiseepage wall chase section casting process |
CN108842801A (en) * | 2018-08-08 | 2018-11-20 | 河南沪江电缆有限公司 | The fixed device of pile foundation for civil engineering |
CN108842801B (en) * | 2018-08-08 | 2020-09-22 | 东阳市琰安建筑工程有限公司 | Pile foundation fixing device for civil engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203429634U (en) | Engineering pile conduit fixing clamp structure | |
CN203373735U (en) | Prefabricated concrete tubular pile with external longitudinal webs | |
CN204456068U (en) | Box-shaped steel plate occlusion diaphragm wall | |
CN203569588U (en) | Communication base station with tree-shaped pile | |
CN203961150U (en) | A kind of siphon rain water collecting system | |
CN203757176U (en) | Non-excavation-type pipeline replacement device | |
CN206971725U (en) | Hang the erecting device of mould | |
CN204855128U (en) | Portable wedge is used to wind -tunnel wind field stimulation | |
CN204080798U (en) | PHC tubular pile connecting structure | |
CN204001214U (en) | High accuracy capital embedded board | |
CN202492929U (en) | Overflowing hole device of concrete filled steel tube | |
CN208533512U (en) | Ground pile and its construction tool | |
CN203175615U (en) | Tunnel rain sewage drainage system | |
CN203174598U (en) | Pile sinking structure of tubular pile | |
CN206256476U (en) | A kind of use W-shaped steel plate control immersed segment and the on the bank structure of section differential settlement | |
CN204001369U (en) | Aerated bricks | |
CN204175312U (en) | The thixotropic slurry filling system of big cross section rectangular top pipe pipeline | |
CN202627473U (en) | Steel tripod support device in reinforced concrete hyperbolic curve cooling tower construction | |
CN203855330U (en) | Combined tower crane wall-attaching device in special-shaped structure | |
CN203176543U (en) | Novel fixing part for concrete and pump pipe | |
CN203514252U (en) | Ecological-type river channel bank | |
CN203429635U (en) | Full-protection-casing raking pile guide pipe guide structure | |
CN202611094U (en) | Structure capable of processing intersection of light pipe and pipeline in prestressed hollow slab | |
CN203066079U (en) | Two-way adjustable integrated cross joint node for steel pipe supporting | |
CN204153375U (en) | Pipeline structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140212 Termination date: 20150827 |
|
EXPY | Termination of patent right or utility model |