CN203429634U - Engineering pile conduit fixing clamp structure - Google Patents

Engineering pile conduit fixing clamp structure Download PDF

Info

Publication number
CN203429634U
CN203429634U CN201320529785.2U CN201320529785U CN203429634U CN 203429634 U CN203429634 U CN 203429634U CN 201320529785 U CN201320529785 U CN 201320529785U CN 203429634 U CN203429634 U CN 203429634U
Authority
CN
China
Prior art keywords
steel
engineering pile
fixing clamp
steel pipe
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320529785.2U
Other languages
Chinese (zh)
Inventor
陈春来
姚烨
黄大文
王挺
余剑英
蒋吉清
丁玉琴
朱萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou City University
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201320529785.2U priority Critical patent/CN203429634U/en
Application granted granted Critical
Publication of CN203429634U publication Critical patent/CN203429634U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

本实用新型涉及一种建筑工程零件结构,尤其是涉及一种工程桩导管固定夹结构。工程桩导管固定夹结构由槽钢和钢管构成,两条钢管平行架放在槽钢上,槽钢和钢管垂直交叉布置,每条钢管内侧连接有角钢夹板,角钢夹板成弧状。本实用新型具有设计较合理,施工成本较低,不易出现塌孔,成孔质量较好等特点。

Figure 201320529785

The utility model relates to a construction engineering part structure, in particular to an engineering pile conduit fixing clip structure. The fixing clip structure of engineering pile conduit is composed of channel steel and steel pipe. Two steel pipes are placed on the channel steel in parallel. The utility model has the characteristics of reasonable design, low construction cost, less prone to hole collapse, better hole forming quality and the like.

Figure 201320529785

Description

Engineering pile catheter fixing clamp structure
Technical field
The utility model relates to a kind of construction work design of part, especially relates to a kind of engineering pile catheter fixing clamp structure.
Background technology
Constructing skill of self-sealed under super-large diameter engineering pile high-performance water, complicated construction technique, CCP is many, involves a wide range of knowledge, and difficulty of construction is large.High for ubiquitous cost in self-compact concrete in construction under present super-large diameter engineering pile high-performance water, work efficiency is poor, speed is slow, the situations such as difficult quality control, especially excessive at some underground water water percolating capacities, cannot precipitation or can not the regional Construction of Engineering Pile of precipitation in, adopt the concrete technology of underwater casting.In concreting process, along with hole inner concrete constantly increases, continual lifting conduit, must make discharging opening be embedded in the certain depth in concrete.
Summary of the invention
The utility model is mainly that construction cost is higher for the existing complex structure of prior art, easily occurs collapse hole, the technical problem of the poor grade of hole quality, provides a kind of simple in structure, and construction cost is lower, be not prone to collapse hole, the good engineering pile catheter fixing clamp of hole quality structure.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals: engineering pile catheter fixing clamp structure consists of channel-section steel and steel pipe, article two, steel pipe parallel shelf is placed on channel-section steel, channel-section steel and steel pipe square crossing are arranged, every steel pipe inner side is connected with angle clip, and angle clip becomes arcuation.
As preferably, steel pipe is fixed on channel-section steel by angle steel.
Therefore, the utlity model has the features such as design is more reasonable, and construction cost is lower, is not prone to collapse hole, and hole quality is better.
Accompanying drawing explanation
Accompanying drawing 1 is overall structure schematic diagram of the present utility model.
The specific embodiment
Below by embodiment, and by reference to the accompanying drawings, the technical solution of the utility model is described in further detail.
Embodiment 1: engineering pile catheter fixing clamp structure consists of channel-section steel and steel pipe, and two steel pipe 2 parallel shelfs are placed on channel-section steel 1, channel-section steel 1 and steel pipe 2 square crossings layouts, and every steel pipe 2 inner sides are connected with angle clip 3,3 one-tenth arcuations of angle clip.Steel pipe 2 is fixed on (as shown in Figure 1) on channel-section steel 1 by angle steel 4.

Claims (2)

1.一种工程桩导管固定夹结构,由槽钢和钢管构成,其特征在于所述两条钢管(2)平行架放在槽钢(1)上,槽钢(1)和钢管(2)垂直交叉布置,每条钢管(2)内侧连接有角钢夹板(3),角钢夹板(3)成弧状。1. An engineering pile conduit fixing clip structure is made of channel steel and steel pipe, and it is characterized in that described two steel pipes (2) parallel frame is placed on channel steel (1), channel steel (1) and steel pipe (2) Arranged vertically and intersecting, the inside of each steel pipe (2) is connected with an angle steel splint (3), and the angle steel splint (3) is arc-shaped. 2.根据权利要求1所述的工程桩导管固定夹结构,其特征在于所述钢管(2)通过角钢(4)固定在槽钢(1)上。2. The fixing clamp structure of engineering pile conduit according to claim 1, characterized in that the steel pipe (2) is fixed on the channel steel (1) through an angle steel (4).
CN201320529785.2U 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure Expired - Fee Related CN203429634U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320529785.2U CN203429634U (en) 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320529785.2U CN203429634U (en) 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure

Publications (1)

Publication Number Publication Date
CN203429634U true CN203429634U (en) 2014-02-12

Family

ID=50058682

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320529785.2U Expired - Fee Related CN203429634U (en) 2013-08-27 2013-08-27 Engineering pile conduit fixing clamp structure

Country Status (1)

Country Link
CN (1) CN203429634U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104278677A (en) * 2014-10-16 2015-01-14 葛洲坝集团基础工程有限公司 Guide pipe fixing device and guide pipe fixing method during diaphragm wall groove section pouring
CN104278677B (en) * 2014-10-16 2016-01-20 葛洲坝集团基础工程有限公司 A kind of device and method for A/C in antiseepage wall chase section casting process
CN108842801A (en) * 2018-08-08 2018-11-20 河南沪江电缆有限公司 The fixed device of pile foundation for civil engineering
CN108842801B (en) * 2018-08-08 2020-09-22 东阳市琰安建筑工程有限公司 Pile foundation fixing device for civil engineering

Similar Documents

Publication Publication Date Title
CN203429634U (en) Engineering pile conduit fixing clamp structure
CN102852915A (en) Part for bending mounting plate
CN204226857U (en) A kind of pipeline installation rack being convenient to regulate
CN203477608U (en) Fixing pipe clamp used for pipeline
CN204024065U (en) Large-volume concrete construction joint surface structure
CN203924492U (en) Be easy to the shear wall steel mesh reinforcement of automated production and the shear wall of formation
CN203202468U (en) Reducing connecting flange
CN203641682U (en) Reinforcing support of prefabricated directly-buried insulating pipe alarming line
CN204585528U (en) A kind of hook connecting production for building aerating sheet material
CN203404538U (en) Three-way pipe with fixing devices
CN203175615U (en) Tunnel rain sewage drainage system
CN203421299U (en) Heat insulation structure at position of air-conditioning water pipeline support hanger
CN204001369U (en) Aerated bricks
CN203421404U (en) Buffering type cement pipe connector
CN203176543U (en) Novel fixing part for concrete and pump pipe
CN203808512U (en) Steel support embedded part structure
CN203349970U (en) Wire vibrating anchor cable dynamometer
CN203441898U (en) Crossing rod clamping assembly
CN203517282U (en) H-shaped steel
CN204152185U (en) A kind of adjustable steel support top
CN202571048U (en) Improved pulled expansion head
CN204346173U (en) A kind of welding stock column cap
CN204068068U (en) A kind of threading apparatus seeker and the threading apparatus made
CN204151801U (en) A kind of water-stop sheet of hydraulic engineering construction
CN203963352U (en) A kind of threeway welded tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20150827

EXPY Termination of patent right or utility model