CN203415903U - Special tool for replacing strain insulator string on hot line - Google Patents
Special tool for replacing strain insulator string on hot line Download PDFInfo
- Publication number
- CN203415903U CN203415903U CN201320549506.9U CN201320549506U CN203415903U CN 203415903 U CN203415903 U CN 203415903U CN 201320549506 U CN201320549506 U CN 201320549506U CN 203415903 U CN203415903 U CN 203415903U
- Authority
- CN
- China
- Prior art keywords
- card
- plate
- tension insulator
- special tool
- insulating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Insulators (AREA)
Abstract
本实用新型公开了一种带电更换耐张绝缘子串专用工具,包括两根平行设置的绝缘绳,所述绝缘绳前后两端分别连接前卡及后卡,所述前卡左右两端通过直线防扭丝杠与绝缘绳前端连接,所述后卡左右两端与绝缘绳后端连接,两根绝缘绳之间在后卡前方设有中卡,所述中卡左右两端分别设有一根收紧丝杠与后卡连接,所述前卡后侧通过联接板与耐张绝缘子连接,所述后卡前侧通过联接板与耐张绝缘子连接。本实用新型通过前卡、中卡、后卡三种卡具为主体,配上高强度绝缘绳索及前收紧丝杠,实现了导线张力的转移,使绝缘子串松弛,达到更换绝缘子、调整弧垂、处理导线缺陷的目的。
The utility model discloses a special tool for live replacement of tension insulator strings, which comprises two insulating ropes arranged in parallel. The twisted lead screw is connected to the front end of the insulating rope, the left and right ends of the rear card are connected to the rear end of the insulating rope, and a middle card is arranged in front of the rear card between the two insulating ropes, and a receiving card is provided at the left and right ends of the middle card respectively. The lead screw is connected with the rear card, the rear side of the front card is connected with the tension insulator through the connecting plate, and the front side of the rear card is connected with the tension insulator through the connecting plate. The utility model uses three types of fixtures as the main body, the front clamp, the middle clamp, and the rear clamp, and is equipped with a high-strength insulating rope and a front tightening screw to realize the transfer of the tension of the wire, so that the insulator string is loose, and the replacement of the insulator and the adjustment of the arc are achieved. Vertical, the purpose of dealing with wire defects.
Description
技术领域technical field
本实用新型涉及更换耐张绝缘子串专用工具。The utility model relates to a special tool for replacing strain insulator strings.
背景技术Background technique
对于500kV线路更换耐张串绝缘子串常规方法而言,先用机械丝杆或液压紧拉硬质绝缘杆收紧导线,再用绝缘托瓶架或吊瓶勾托吊绝缘子串,使绝缘子串呈松弛状态,然后脱离绝缘子串与导线之间的金具连接,达到更换绝缘子、调整弧垂、处理导线缺陷的目的。For the conventional method of replacing strain string insulator strings on 500kV lines, the wires are first tightened with mechanical screw rods or hydraulically tightened hard insulating rods, and then the insulator strings are lifted by insulating bottle racks or hanging bottle hooks to make the insulator strings look like Relaxed state, and then break away from the metal connection between the insulator string and the wire, to achieve the purpose of replacing insulators, adjusting sag, and dealing with wire defects.
但是现有技术存在如下缺陷:But there is following defective in prior art:
1.硬质绝缘杆和托瓶架庞大笨重,携带搬运受限,塔上带电作业人员高空操作的难度和劳动强度都很高。1. The hard insulating poles and bottle holders are bulky and heavy, and their carrying and transportation are limited. It is very difficult and labor-intensive for live workers to operate at heights on the tower.
2.度固定,通用性差,需要制造多种规格与之配套的工器具。2. The degree is fixed, and the versatility is poor, so it is necessary to manufacture tools and utensils with various specifications.
实用新型内容Utility model content
本实用新型所要解决的技术问题就是提供一种带电更换耐张绝缘子串专用工具,方便使用,通用性好。The technical problem to be solved by the utility model is to provide a special tool for live replacement of tension insulator strings, which is convenient to use and has good versatility.
为解决上述技术问题,本实用新型采用如下技术方案:一种带电更换耐张绝缘子串专用工具,包括两根平行设置的绝缘绳,所述绝缘绳前后两端分别连接前卡及后卡,所述前卡左右两端通过直线防扭丝杠与绝缘绳前端连接,所述后卡左右两端与绝缘绳后端连接,两根绝缘绳之间在后卡前方设有中卡,所述中卡左右两端分别设有一根收紧丝杠与后卡连接,所述前卡后侧通过联接板与耐张绝缘子连接,所述后卡前侧通过联接板与耐张绝缘子连接。In order to solve the above technical problems, the utility model adopts the following technical scheme: a special tool for live replacement of tension insulator strings, including two insulating ropes arranged in parallel, and the front and rear ends of the insulating ropes are respectively connected to the front card and the rear card. The left and right ends of the front card are connected to the front end of the insulating rope through a linear anti-twist screw, the left and right ends of the rear card are connected to the rear end of the insulating rope, and a middle card is provided between the two insulating ropes in front of the rear card. The left and right ends of the card are respectively provided with a tightening lead screw to connect with the rear card, the rear side of the front card is connected to the tension insulator through the connecting plate, and the front side of the rear card is connected to the tension insulator through the connecting plate.
优选的,所述前卡由左右对称设置的两前卡构件通过螺栓进行连接,所述前卡构件包括底板,所述底板上方中部设有一条支撑筋,所述支撑筋顶部设有连接筒,所述底板、支撑筋与连接筒之间设有肋板连接,所述底板底部设有凹槽,所述底板在凹槽两侧设有螺栓孔。Preferably, the front card is connected by two front card members symmetrically arranged left and right through bolts, the front card member includes a bottom plate, a support rib is provided in the middle above the bottom plate, and a connecting cylinder is provided at the top of the support rib. The bottom plate, the support ribs and the connecting cylinder are connected by a rib plate, the bottom of the bottom plate is provided with a groove, and the bottom plate is provided with bolt holes on both sides of the groove.
优选的,所述中卡包括圆弧板状的中卡主体,所述中卡主体上平面中部设有工字形凸台,所述中卡主体后端中部设有U形卡槽与联接板配合安装,所述U形卡槽两侧设有联接板连接孔。Preferably, the middle card includes a circular arc plate-shaped middle card body, an I-shaped boss is provided in the middle of the upper plane of the middle card body, and a U-shaped card slot is provided in the middle of the rear end of the middle card body to cooperate with the connecting plate. For installation, the two sides of the U-shaped slot are provided with connecting holes for connecting plates.
优选的,所述中卡主体左右两端设有收紧丝杠安装孔与收紧丝杠连接,所述U形卡槽延伸至工字形凸台底部。Preferably, tightening screw mounting holes are provided at the left and right ends of the main body of the middle card to connect with the tightening screw, and the U-shaped slot extends to the bottom of the I-shaped boss.
优选的,所述后卡包括拱形板结构的后卡主体,所述后卡主体下方设有支撑板支撑,所述后卡主体左右两侧设有绝缘绳连接孔,所述支撑板左右两侧设有供收紧丝杠通过的收紧丝杠孔,所述后卡主体下方中部设有前后贯通的联接板槽。Preferably, the rear card includes a rear card body with an arched plate structure, a support plate is provided below the rear card body, insulating rope connection holes are provided on the left and right sides of the rear card body, and the left and right sides of the support plate are A tightening screw hole is provided on the side for the tightening screw to pass through, and a connecting plate groove through which the front and rear are connected is arranged in the middle part of the lower part of the rear card main body.
优选的,所述绝缘绳后端通过铝接头与后卡连接。Preferably, the rear end of the insulating rope is connected to the rear card through an aluminum joint.
优选的,所述后卡上平面上设有尼龙滚轮,所述后卡主体上方设有滚轮支架。Preferably, nylon rollers are provided on the upper plane of the rear card, and a roller bracket is provided above the main body of the rear card.
本实用新型通过前卡、中卡、后卡三种卡具为主体,配上高强度绝缘绳索及前收紧丝杠,实现了导线张力的转移,使绝缘子串松弛,达到更换绝缘子、调整弧垂、处理导线缺陷的目的。其优点为:The utility model uses three types of clamps as the main body, the front clamp, the middle clamp, and the rear clamp, and is equipped with a high-strength insulating rope and a front tightening screw to realize the transfer of the tension of the wire, so that the insulator string is loose, and the replacement of the insulator and the adjustment of the arc are achieved. Vertical, the purpose of dealing with wire defects. Its advantages are:
1.该套工具通用性强,能任意组合,满足不同耐张绝缘子结构形式的需要。1. This set of tools has strong versatility and can be combined arbitrarily to meet the needs of different strain insulator structures.
2.该套工具作业方法简便,轻便灵活,极大减轻了塔上带电作业人员的工作量。2. The operation method of this set of tools is simple, light and flexible, which greatly reduces the workload of live working personnel on the tower.
3.该套工具采用了“绳索化”的作业工具,采用高强度绝缘绳替代了紧线绝缘拉杆。3. This set of tools adopts "rope-like" working tools, and uses high-strength insulating ropes instead of tight-wire insulating pull rods.
4.该套工具使得作业效率得到大幅度提高,进一步明确了带电线路上各项典型带电作业的工作流程、作业方法和危险点预控措施,优化了部分带电作业方式和作业方法。4. This set of tools has greatly improved the operating efficiency, further clarified the workflow, operation methods and pre-control measures of dangerous points of various typical live operations on live lines, and optimized some live operation methods and methods.
5.该套工具也提高了超高压带电作业水平,进一步健全了500kV线路带电作业工器具管理体系,为进一步开展输电线路的带电作业,改进带电作业方法的研究做出了贡献,大大提高了电网的安全经济运行水平。5. This set of tools has also improved the level of ultra-high voltage live work, further improved the management system of live work tools for 500kV lines, made contributions to the further development of live work on transmission lines, and improved research on live work methods, greatly improving the power grid. level of safe and economical operation.
附图说明Description of drawings
下面结合附图和具体实施方式对本实用新型作进一步描述:Below in conjunction with accompanying drawing and specific embodiment the utility model is further described:
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为联接板与绝缘子配合结构示意图;Figure 2 is a schematic diagram of the cooperation structure between the connecting plate and the insulator;
图3为前卡构件的结构示意图;Fig. 3 is a structural schematic diagram of the front card member;
图4为中卡的结构示意图;Fig. 4 is a structural schematic diagram of the middle card;
图5为后卡的结构示意图。FIG. 5 is a schematic structural diagram of the rear card.
具体实施方式Detailed ways
图1至图5示出了本实用新型带电更换耐张绝缘子串专用工具的具体结构,其包括两根平行设置的绝缘绳4,所述绝缘绳4前后两端分别连接前卡1及后卡3,所述前卡1左右两端通过直线防扭丝杠10与绝缘绳前端连接,所述后卡3左右两端与绝缘绳4后端连接,两根绝缘绳之间在后卡前方设有中卡2,所述中卡2左右两端分别设有一根收紧丝杠29与后卡连接,所述前卡1后侧通过联接板5与耐张绝缘子6连接,所述后卡3前侧通过联接板5与耐张绝缘子6连接,这样耐张绝缘子串两端的耐张绝缘子6与该带电更换耐张绝缘子串专用工具实现连接。Figures 1 to 5 show the specific structure of the special tool for live replacement of tension insulator strings according to the utility model, which includes two insulating ropes 4 arranged in parallel, and the front and rear ends of the insulating ropes 4 are respectively connected to the front card 1 and the rear card 3. The left and right ends of the front card 1 are connected to the front end of the insulating rope through the linear
所述前卡1由左右对称设置的两前卡构件通过螺栓进行连接,所述前卡构件包括底板11,所述底板上方中部设有一条支撑筋12,所述支撑筋顶部设有连接筒13,所述底板、支撑筋与连接筒之间设有肋板14连接,所述底板底部设有凹槽15,所述底板在凹槽两侧设有螺栓孔。两底板对接并通过螺栓孔实现螺栓连接。连接筒13供直线防扭丝杠10通过。The front card 1 is connected by two front card members symmetrically arranged left and right through bolts, the front card member includes a
所述中卡2包括圆弧板状的中卡主体20,所述中卡主体上平面中部设有工字形凸台21,所述中卡主体后端中部设有U形卡槽23与联接板配合安装,所述U形卡槽两侧设有联接板连接孔24。所述中卡主体左右两端设有收紧丝杠安装孔22与收紧丝杠连接,所述U形卡槽延伸至工字形凸台21底部。The middle card 2 includes a circular-arc plate-shaped
所述后卡3包括拱形板结构的后卡主体30,所述后卡主体下方设有支撑板支撑,所述后卡主体左右两侧设有绝缘绳连接孔32,所述支撑板左右两侧设有供收紧丝杠通过的收紧丝杠孔33,所述后卡主体下方中部设有前后贯通的联接板槽34。所述绝缘绳后端通过铝接头40与后卡连接。所述后卡上平面上设有尼龙滚轮41,所述后卡主体上方设有滚轮支架31。铝接头40能做360度旋转,以达到释放高强度绝缘绳索受力后产生的扭力。Described back card 3 comprises the back card
另外,所述前卡1及后卡3侧方还可以通过中间板50连接侧联接板51,而侧联接板51再与耐张绝缘子6连接,以此可实现多个耐张绝缘子6的更换。In addition, the sides of the front card 1 and the rear card 3 can also be connected to the
本实用新型通过丝杠实现了导线张力的转移,使绝缘子串松弛,进而可以更换绝缘子。The utility model realizes the transfer of the wire tension through the lead screw, so that the insulator strings are loosened, and the insulators can be replaced.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320549506.9U CN203415903U (en) | 2013-09-05 | 2013-09-05 | Special tool for replacing strain insulator string on hot line |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320549506.9U CN203415903U (en) | 2013-09-05 | 2013-09-05 | Special tool for replacing strain insulator string on hot line |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203415903U true CN203415903U (en) | 2014-01-29 |
Family
ID=49978762
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320549506.9U Expired - Fee Related CN203415903U (en) | 2013-09-05 | 2013-09-05 | Special tool for replacing strain insulator string on hot line |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203415903U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103500961A (en) * | 2013-09-05 | 2014-01-08 | 国家电网公司 | A special tool for live replacement of tension insulator strings |
-
2013
- 2013-09-05 CN CN201320549506.9U patent/CN203415903U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103500961A (en) * | 2013-09-05 | 2014-01-08 | 国家电网公司 | A special tool for live replacement of tension insulator strings |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102231492B (en) | Hanging insulator string cross-arm side fittings replacement jig | |
| CN103500961B (en) | A special tool for live replacement of tension insulator strings | |
| CN102882157B (en) | Portable shockproof hammer tool for replacing tension wire in power cut | |
| CN104505766A (en) | Tool and method for live replacement of 500kV strain insulator strings in substations | |
| CN202586171U (en) | Supporting plate device of special hook card for live line replacement linear horizontal double-division insulator | |
| CN104253394B (en) | A kind of replacing instrument of strain insulator string | |
| CN104362544A (en) | Pulley type tower head clamp | |
| CN203312700U (en) | Tension tower wire end LF-type yoke plate fixing clamp | |
| CN203491598U (en) | Upturned pulley for replacing tension insulator | |
| CN203415903U (en) | Special tool for replacing strain insulator string on hot line | |
| CN204809744U (en) | Wire end broadsword type load support fixture and insulator chain change device | |
| CN202014055U (en) | Overhauling device of V-shaped double-string insulator for +-660KV direct current transmission line | |
| CN203859448U (en) | Special tool for righting two-gang board during live working on double bundle conductor | |
| CN203813330U (en) | Tool for live replacement of 500kV tension insulator string | |
| CN204651789U (en) | The special hanger of hot-line insulator string replacement | |
| CN206148847U (en) | A jig for replacing tension-resistant single-string insulators while live | |
| CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
| CN203942212U (en) | wire stretcher special safety clip | |
| CN105119193B (en) | A kind of power line tension insulator string replacing options and instrument | |
| CN202930836U (en) | Tension Insulator Replacement Tool | |
| CN105977860A (en) | Composite cross-arm insulator device and method for replacing overhead transmission line | |
| CN205195138U (en) | A sharp shoulder pole card for changing sharp insulator chain that singly goes here and there | |
| CN206432624U (en) | Transmission line tangent tower first insulator changes instrument | |
| CN204967124U (en) | G5 turriform overhead earth wire lifting mechanism and link fitting change device | |
| CN104201602A (en) | Charged replacement method for whole string of insulators of ultra-high-voltage transmission line, and hardware fitting thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140129 Termination date: 20190905 |