- Publication number
- CN203412082U CN203412082U CN201320545497.6U CN201320545497U CN203412082U CN 203412082 U CN203412082 U CN 203412082U CN 201320545497 U CN201320545497 U CN 201320545497U CN 203412082 U CN203412082 U CN 203412082U
- Authority
- CN
- China
- Prior art keywords
- rainwater
- pipe
- valve
- float chamber
- initial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及一种初期雨水弃流装置,属于排水工程领域,特别涉及初期雨水分离的排水构筑物。 The utility model relates to an initial rainwater abandonment device, which belongs to the field of drainage engineering, in particular to a drainage structure for separating initial rainwater.
背景技术 Background technique
城市雨水排放一般都是有组织排水,地面的雨水通过径流汇集排至雨水管道,再通过雨水管道系统排入自然水体。由于降雨初期,雨水溶解了空气中的大量酸性气体、汽车尾气、工厂废气等污染性气体,降落地面后,又由于冲刷沥青油毡屋面、沥青混凝土道路、建筑工地等,使得初期雨水中含有大量的有机物、病原体、重金属、油脂、悬浮固体等污染物质,因此,初期雨水的污染程度较高,通常超过了普通的城市污水的污染程度。为了有效地保护环境,必须对初期雨水进行分离,将降雨初期的雨水分离出来排至污水管道,送至污水处理厂进行处理。经过一定的降雨过程,地面的污染物经雨水冲刷,降雨后期污染程度大幅度降低,再通过雨水管道排入自然水体,有效的保护自然水体的水质。目前国内大部分城市都未进行初期雨水分离处理,而是将初期雨水和后期雨水一同直接排入自然水体,将会对水体造成污染。 Urban rainwater drainage is generally organized drainage. The rainwater on the ground is collected and discharged to the rainwater pipe through the runoff, and then discharged into the natural water body through the rainwater pipe system. In the early stage of rainfall, the rainwater dissolved a large amount of polluting gases such as acid gas, automobile exhaust, and factory exhaust gas in the air. Organic matter, pathogens, heavy metals, grease, suspended solids and other pollutants. Therefore, the pollution level of the initial rainwater is relatively high, usually exceeding the pollution level of ordinary urban sewage. In order to effectively protect the environment, the initial rainwater must be separated, and the rainwater at the initial stage of rainfall is separated and discharged to the sewage pipe, and then sent to the sewage treatment plant for treatment. After a certain rainfall process, the pollutants on the ground are washed away by the rainwater, and the pollution level in the later period of the rainfall is greatly reduced, and then discharged into the natural water body through the rainwater pipeline, effectively protecting the water quality of the natural water body. At present, most cities in China do not carry out initial rainwater separation treatment, but discharge the initial rainwater and later rainwater directly into natural water bodies, which will cause pollution to water bodies.
雨水是一种宝贵资源,雨水收集利用越来越多地受到人们的重视。雨水收集利用主要是将雨水储存在蓄水池内,经过适当处理后用于景观用水、喷洒路面、绿化灌溉等。在雨水收集利用领域,将降雨开始的初期雨水弃之不用,而将后期的雨水收集起来的做法称之初期雨水弃流。现有技术在雨水进入蓄水池前设置初期雨水弃流装置,将初期雨水分离出来排放掉,而将后期雨水收集储存在蓄水池内。现行的国家标准图《雨水综合利用》10SS705初期雨水的分离,是通过分流井、弃流控制器完成的,根据降雨时间、雨量等因素采用电动阀控制后期雨水进入蓄水池。 Rainwater is a precious resource, and more and more people pay attention to rainwater collection and utilization. Rainwater collection and utilization is mainly to store rainwater in the reservoir, and after proper treatment, it can be used for landscape water, spraying road surface, greening irrigation, etc. In the field of rainwater harvesting and utilization, the practice of discarding the initial rainwater at the beginning of rainfall and collecting the later rainwater is called initial rainwater abandonment. In the prior art, an initial rainwater discarding device is installed before the rainwater enters the storage tank, and the initial rainwater is separated and discharged, while the late rainwater is collected and stored in the storage tank. The current national standard map "Rainwater Comprehensive Utilization" 10SS705 separates the initial rainwater through the diversion well and the waste flow controller. According to the rainfall time, rainfall and other factors, the electric valve is used to control the later rainwater to enter the storage tank.
上述两种初期雨水分离的用途不同,但同样涉及到初期雨水弃流装置。前者的是将污染严重的初期雨水分离出来送入污水处理厂进行处理,较洁净的后期雨水排入自然水体,是从环境保护的角度出发,达到控制面源污染、保护水体水质的目的,初期雨水弃流装置是每隔一定距离分布在雨水管道上的。后者是将污染严重的初期雨水弃流,将后期雨水收集到蓄水池,是从雨水利用的角度出发,达到减少雨水利用水质处理工序和处理成本的目的,是布置在雨水利用蓄水池前的。 The purposes of the above two kinds of initial rainwater separation are different, but they also involve the initial rainwater abandonment device. The former is to separate the heavily polluted early rainwater and send it to the sewage treatment plant for treatment, and the cleaner later rainwater is discharged into the natural water body. From the perspective of environmental protection, it achieves the purpose of controlling non-point source pollution and protecting water quality. Rainwater abandonment devices are distributed on rainwater pipes at regular intervals. The latter is to discard the heavily polluted initial rainwater and collect the later rainwater into the storage tank. From the perspective of rainwater utilization, it achieves the purpose of reducing the water quality treatment process and treatment cost of rainwater utilization. It is arranged in the rainwater utilization storage tank. before.
用于雨水收集利用的初期雨水弃流装置,大多采用成套设备,管径较小,流量小。如国家标准图《雨水综合利用》10SS705中的雨量型初期雨水弃流装置,产品规格为DN100、DN150、DN200、DN250,只能用于雨水收集利用,而不适用于控制面源污染、保护水体水质的初期雨水分离。目前,初期雨水分离的方案很多,大部分是用于雨水收集利用的,有些资料介绍的初期雨水弃流装置原理上可行,但是管路及分离构造复杂,水力条件差,水头损失大,在大流量的雨水管道中采用,不但影响排水性能,而且易在强大水流的冲击下损坏,有些方案还需要采用电力驱动,在应用于控制初期雨水污染的雨水管道工程上缺乏使用价值。 Most of the initial rainwater abandonment devices used for rainwater collection and utilization are complete sets of equipment with small pipe diameters and low flow rates. For example, the rainfall-type initial rainwater discarding device in the national standard map "Rainwater Comprehensive Utilization" 10SS705 has product specifications of DN100, DN150, DN200, and DN250, which can only be used for rainwater collection and utilization, and are not suitable for controlling non-point source pollution and protecting water bodies. Water quality for incipient rainwater separation. At present, there are many schemes for initial rainwater separation, most of which are used for rainwater collection and utilization. The initial rainwater abandonment device introduced by some materials is theoretically feasible, but the pipeline and separation structure are complicated, the hydraulic conditions are poor, and the head loss is large. The use of high-flow rainwater pipelines not only affects drainage performance, but is also easily damaged under the impact of strong water flow. Some schemes also need to be driven by electricity, which is of little use value in rainwater pipeline projects used to control initial rainwater pollution.
发明内容 Contents of the invention
本发明的目的是:提供一种初期雨水弃流装置,适用于控制面源污染、保护水体水质的初期雨水分离。其有益效果为管路平滑顺畅,水力条件好,水头损失小,水流对管件的冲击小,适用于各种管径。初期雨水分离量可调,工况切换可靠,无需电力驱动。 The purpose of the present invention is to provide an initial rainwater abandonment device, which is suitable for the initial rainwater separation for controlling non-point source pollution and protecting water quality. The beneficial effect is that the pipeline is smooth and smooth, the hydraulic condition is good, the water head loss is small, the impact of the water flow on the pipe fittings is small, and it is suitable for various pipe diameters. The amount of initial rainwater separation is adjustable, the switching of working conditions is reliable, and no electric drive is required.
本实用新型是通过以下技术实现的:所述的初期雨水弃流装置主要包括进水管1、出水管2、活门3、废水池4、弃流管5、旁通管6、浮子室7。活门3位于进水管1和出水管2之间,活门3的下部为废水池4。未下雨时初始工况活门3是开启的,降雨开始初期雨水通过活门3排入废水池4,废水池4与弃流管5相通,初期雨水通过弃流管5排入污水管道。进水管1的一侧设有旁通管6,旁通管6与浮子室7相通,在旁通管6与浮子室7之间设有控制闸11,控制闸11由闸板15、闸槽16、定位孔17、锁定销18组成,闸板15可在闸槽16内上下移动,由定位孔17和锁定销18固定,闸板15用以调节旁通管6流入浮子室7的流量。初期雨水排入废水池4的同时,一部分水通过旁通管6进入浮子室7。浮子室7内设有浮子8,浮子8通过连杆9与转轴10连接,转轴10与活门3连接,降雨初期浮子室7内无水,随着降雨历时的增加,浮子室7内的水位不断上升,浮子8通过连杆9带动转轴10转动,从而带动活门3关闭,雨水从进水管1直接流到出水管2,不再流入废水池4内,完成了初期雨水到后期雨水的工况转换。转轴10上设有调节板19,调节板19上有弧形槽20,连杆9可通过固定钮21调整在弧形槽20上的位置,用于调节浮子8在活门3完全关闭的水位。废水池4与浮子室7之间的下部设有泄水孔22联通,降雨停止后,浮子室7的水慢慢地通过泄水孔22流到废水池4,浮子8随之下落,活门3打开,再次降雨时重复上述过程。在浮子室7的一侧泄水孔22外设置有过滤网23,防止泄水孔22堵塞,在废水池4的一侧泄水孔22的出口端设有球阀26,可控制浮子室7的放空时间。
The utility model is realized through the following technologies: the initial rainwater discarding device mainly includes a
本实用新型安装在雨水管道沿线,每隔一定距离设置一个,将其汇水面积内的初期雨水分离排入污水管道,送入污水处理厂进行处理,后期雨水再通过雨水管道排入水体,有效地控制面源污染,保护水体的水质。 The utility model is installed along the rainwater pipeline, and one is set at a certain distance, and the initial rainwater in the catchment area is separated and discharged into the sewage pipeline, and sent to the sewage treatment plant for treatment, and the later rainwater is discharged into the water body through the rainwater pipeline, effectively Control non-point source pollution and protect water quality.
附图说明 Description of drawings
图1为本实用新型平面图; Fig. 1 is a plan view of the utility model;
图2为本实用新型初期雨水工况纵剖面图; Fig. 2 is the longitudinal sectional view of the rainwater working condition in the initial stage of the utility model;
图3为本实用新型初期雨水工况横剖面图; Fig. 3 is a cross-sectional view of the rainwater working condition in the initial stage of the utility model;
图4为本实用新型后期雨水工况纵剖面图; Fig. 4 is a longitudinal section view of the rainwater working condition in the latter stage of the utility model;
图5为本实用新型后期雨水工况横剖面图; Figure 5 is a cross-sectional view of the rainwater working condition in the latter stage of the utility model;
图6为控制闸示意图; Fig. 6 is a schematic diagram of the control gate;
图7为浮球调节示意图; Figure 7 is a schematic diagram of floating ball adjustment;
图8为泄水孔示意图。 Figure 8 is a schematic diagram of the weep hole.
图中:1-进水管,2-出水管,3-活门,4-废水池,5-弃流管,6-旁通管,7-浮子室,8-浮子,9-连杆,10-转轴,11-控制闸,12-井体,13-检查口,14-工作台,15-闸板,16-闸槽,17-定位孔,18-锁定销,19-调节板,20-弧形槽,21-固定钮,22-泄水孔,23-过滤网,24-过滤网底座,25-过滤网固定架,26-球阀。 In the figure: 1-inlet pipe, 2-outlet pipe, 3-valve, 4-wastewater tank, 5-disposal flow pipe, 6-bypass pipe, 7-float chamber, 8-float, 9-connecting rod, 10- Rotary shaft, 11-control gate, 12-well body, 13-inspection port, 14-worktable, 15-gate, 16-gate groove, 17-positioning hole, 18-lock pin, 19-adjusting plate, 20-arc Shaped groove, 21-fixed button, 22-drain hole, 23-filter screen, 24-filter screen base, 25-filter screen fixed frame, 26-ball valve.
具体实施方式 Detailed ways
本实用新型采用HDPE高密度聚乙烯材料制作,外壁设置加强肋增加整体刚度,可制作成各种常用管径的管件。进水管1和出水管2的管径一致,在进水管1和出水管2的管底设置活门3,活门3的下部为与废水池4,废水池4连接弃流管5,初期雨水通过弃流管5排入污水管道,弃流管5分左、右出水两种规格,以适应不同出水方向的需要。进水管1的一侧设有旁通管6,旁通管6与浮子室7相通,在旁通管6与浮子室7之间设有控制闸11。浮子室7内设有浮子8,浮子8通过连杆9与转轴10连接,转轴10与活门3连接,浮子8的升降可带动活门3启闭。浮子8采用HDPE高密度聚乙烯材料制作外壳,内部填充发泡塑料,连杆9和转轴10采用不锈钢材料制作。
The utility model is made of HDPE high-density polyethylene material, and the outer wall is provided with reinforcing ribs to increase the overall rigidity, and can be made into pipe fittings of various common pipe diameters. The pipe diameters of the
将管件砌筑在井体12内,井体12上部设置检查口13,井内设置工作台14以便于检修。本实用新型安装平面图见图1。
The pipe fittings are built in the
未降雨时浮子室7内无水,浮子8下落至最低位置,通过连杆9、转轴10带动活门3完全开启。降雨初期,地面汇流夹带着污染物的初期雨水经过雨水管道汇集流入初期雨水弃流装置,在从进水管1流向出水管2的时候由于活门3是开启的,初期雨水从活门3流入废水池4,再通过弃流管5排至污水管道。此时为初期雨水工况,见图2、图3。
When there is no rain, there is no water in the
初期雨水排入废水池4的同时,一部分水通过旁通管6进入浮子室7,随着降雨历时的增加,浮子室7内的水位不断上升,浮子8随之上升,浮子8通过连杆9、转轴10带动活门3逐渐关闭,雨水从进水管1直接流到出水管2,不再流入废水池4内。浮子室7内的水位继续上升,浮子8受到很大的力使活门3紧闭。此时为后期雨水工况,见图4、图5。
While the initial rainwater is discharged into the
初期雨水量的控制,根据该级弃流装置汇水面积3~5mm厚度的地面径流量计算。安装在旁通管6和浮子室7之间的控制闸11可以调节旁通管6流入浮子室7的流量。控制闸11由闸板15、闸槽16、定位孔17、锁定销18组成,闸板15可在闸槽16内上下移动,由定位孔17和锁定销18固定。转轴10上设有调节板19,调节板19上有弧形槽20,连杆9可通过固定钮21调整在弧形槽20上的位置,用于调节浮子8在活门3完全关闭时的水位。这两个机构都可以达到调节初期雨水弃流量的目的。控制闸示意图见图6,浮球调节示意图见图7。
The control of the initial rainfall is calculated according to the ground runoff with a thickness of 3-5mm in the catchment area of the waste flow device at this level. The control gate 11 installed between the
废水池4与浮子室7之间的下部设有泄水孔22联通,降雨停止后,浮子室7的水慢慢地通过泄水孔22流到废水池4,浮子8随之下落,活门3打开,在废水池4的一侧泄水孔22出口端,安装有球阀26,可控制浮子室7的放空时间。调节球阀26使活门3开启时间约十二小时,小于开启时间的两次降雨间隔很少产生地面污染,不执行初期雨水弃流工况。如活门3刚开启不久还未完全开启,有半天左右的时间产生的少量污染,少量的初期雨水被弃流,由于此时浮子室的水位还较高,活门3很快就会被关闭。降雨完全停止后,浮子室7内的水放空,恢复初始状态,再次降雨时重复上述过程。在浮子室7的一侧泄水孔22外设置有过滤网23,防止泄水孔22堵塞,过滤网23安装在过滤网底座24上,采用过滤网固定架25固定。
The lower part between the
在实际运用中,应在初期雨水弃流装置前设置沉砂井和格栅,沉淀颗粒较大的泥砂和过滤较大的漂浮物,减少初期雨水弃流装置的维护工作量。 In practical application, grit wells and grids should be installed in front of the initial rainwater abandonment device to settle the sand with larger particles and filter larger floating objects, so as to reduce the maintenance workload of the initial rainwater abandonment device.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320545497.6U CN203412082U (en) | 2013-09-04 | 2013-09-04 | Initial rainwater abandonment device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320545497.6U CN203412082U (en) | 2013-09-04 | 2013-09-04 | Initial rainwater abandonment device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203412082U true CN203412082U (en) | 2014-01-29 |
Family
ID=49974979
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320545497.6U Expired - Fee Related CN203412082U (en) | 2013-09-04 | 2013-09-04 | Initial rainwater abandonment device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203412082U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104763037A (en) * | 2015-04-27 | 2015-07-08 | 刘建华 | Primary stormwater jettison gullies |
| CN106284589A (en) * | 2016-09-19 | 2017-01-04 | 天津大学 | An automatic control initial rainwater abandonment device |
| CN106400928A (en) * | 2016-11-17 | 2017-02-15 | 泰州晟禾水处理设备制造有限公司 | Initial rainwater abandoning system of rainwater and sewage confluence pipe and use method thereof |
| CN108396850A (en) * | 2018-03-13 | 2018-08-14 | 广东中科华冉智网科技有限公司 | The intelligence that interception ratio is adjustable to prevent excessive rainwater from entering sewage pipe cuts dirty well |
| CN113073719A (en) * | 2021-05-06 | 2021-07-06 | 重庆大学 | Automatic diverging device of initial stage rainwater |
| CN114876034A (en) * | 2022-03-24 | 2022-08-09 | 上海中韩杜科泵业制造有限公司 | Rainwater and sewage diversion intercepting well |
-
2013
- 2013-09-04 CN CN201320545497.6U patent/CN203412082U/en not_active Expired - Fee Related
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104763037A (en) * | 2015-04-27 | 2015-07-08 | 刘建华 | Primary stormwater jettison gullies |
| CN106284589A (en) * | 2016-09-19 | 2017-01-04 | 天津大学 | An automatic control initial rainwater abandonment device |
| CN106284589B (en) * | 2016-09-19 | 2018-09-11 | 天津大学 | Automatic initial rainwater of control abandons a class device |
| CN106400928A (en) * | 2016-11-17 | 2017-02-15 | 泰州晟禾水处理设备制造有限公司 | Initial rainwater abandoning system of rainwater and sewage confluence pipe and use method thereof |
| CN106400928B (en) * | 2016-11-17 | 2019-03-05 | 泰州晟禾水处理设备制造有限公司 | An initial rainwater abandonment system for a rainwater-sewage confluence pipe and a method of using the same |
| CN108396850A (en) * | 2018-03-13 | 2018-08-14 | 广东中科华冉智网科技有限公司 | The intelligence that interception ratio is adjustable to prevent excessive rainwater from entering sewage pipe cuts dirty well |
| CN113073719A (en) * | 2021-05-06 | 2021-07-06 | 重庆大学 | Automatic diverging device of initial stage rainwater |
| CN114876034A (en) * | 2022-03-24 | 2022-08-09 | 上海中韩杜科泵业制造有限公司 | Rainwater and sewage diversion intercepting well |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN105317103B (en) | With the rainwater regulating pondage system from abatement functions | |
| CN104174191B (en) | Integrated grit chamber for treating rainwater and treatment method | |
| CN204570904U (en) | Turnover plate type sewage intercepting chamber | |
| CN202000395U (en) | Initial rain discarded flow amount-adjustable water tank | |
| CN206233333U (en) | Initial rainwater filtering, precipitating, discarding and collecting treatment system | |
| CN205636879U (en) | System's device is collected, is purified and utilize to overpass rainwater | |
| CN103046632A (en) | A Municipal Rainwater Regulation and Storage System | |
| CN206308779U (en) | A kind of band helps the sewerage system of row function | |
| CN103726570A (en) | Spiral-flow type hydraulically controlled rainwater intercepting and abandoning switch well system | |
| CN202689170U (en) | Automatic flow dividing device for front-stage rain and middle-back-stage rain flow division | |
| CN203755424U (en) | Spiral-flow type hydraulic control rainwater intercepting and abandoning switching well system | |
| CN207405728U (en) | A kind of reverse-filling shunting well | |
| CN204212254U (en) | A kind of environmentally-friendly gutter inlet primary purifying structure | |
| CN203334416U (en) | Multifunctional sewage intercepting device | |
| CN209353440U (en) | Road rain water suitable for sponge city stores heat-extraction system | |
| CN205369377U (en) | Integrated rainwater collection system with automatic abandonment, water storage and overflow | |
| CN106400887A (en) | Automatic rainwater discarding, collecting and washing device and operating method thereof | |
| CN107059989A (en) | The rain collector and its method of work of automatic flow abandoning contaminative early-stage rainwater | |
| CN203989972U (en) | Integrated grit chamber for treating rainwater | |
| CN107618484A (en) | The collection rain car washer for being purified and being automatically replenished based on automatic control | |
| CN206385597U (en) | A kind of rainwater-collecting processing unit | |
| CN110005145A (en) | A rainwater collection and ecological utilization system for buildings | |
| CN206616616U (en) | The rain collector of automatic flow abandoning contaminative early-stage rainwater | |
| CN221760867U (en) | A diversion well for rainwater and sewage diversion transformation | |
| CN103215985A (en) | Community rainwater utilization system based on secondary split-flow of rainwater and sewage |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140129 Termination date: 20160904 |