CN203403582U - Hanger rod fixing device - Google Patents

Hanger rod fixing device Download PDF

Info

Publication number
CN203403582U
CN203403582U CN201320516696.4U CN201320516696U CN203403582U CN 203403582 U CN203403582 U CN 203403582U CN 201320516696 U CN201320516696 U CN 201320516696U CN 203403582 U CN203403582 U CN 203403582U
Authority
CN
China
Prior art keywords
vertical rod
pole
construction
fixing device
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320516696.4U
Other languages
Chinese (zh)
Inventor
吴文杰
曲立锋
杨云华
王泽栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201320516696.4U priority Critical patent/CN203403582U/en
Application granted granted Critical
Publication of CN203403582U publication Critical patent/CN203403582U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

一种吊杆固定装置,包括主立杆和调节立杆,主立杆为空心管,调节立杆套装在主立杆内,调节立杆上设置有高度刻度线,主立杆下端设置有把手,所述主立杆与调节立杆之间通过锁紧装置锁紧;调节立杆上部设置内置六角扳手;调节立杆下部设置有圆孔固定片。本实用新型吊杆固定装置,结构合理、安全系数高、操作方便;节约搭设架子或人字梯材料,降低资金投入;减少人工,降低人工费;提高工效,缩短施工时间,从而缩短了工期;可操作性强,制造安装简单,单人即可操作完成施工;安全可靠,避免高空作业,保障施工安全;适应当前建筑市场,无污染,降低施工成本。

Figure 201320516696

A boom fixing device, comprising a main pole and an adjustment pole, the main pole is a hollow tube, the adjustment pole is set inside the main pole, a height scale line is arranged on the adjustment pole, and a handle is arranged at the lower end of the main pole , the main pole and the adjustment pole are locked by a locking device; the upper part of the adjustment pole is provided with a built-in hexagonal wrench; the lower part of the adjustment pole is provided with a round hole fixing piece. The utility model boom fixing device has reasonable structure, high safety factor, and convenient operation; it saves materials for erecting shelves or ladders, reduces capital investment; reduces labor and labor costs; improves work efficiency and shortens construction time, thereby shortening the construction period; It has strong operability, simple manufacturing and installation, and can be operated by a single person to complete the construction; it is safe and reliable, avoids high-altitude operations, and ensures construction safety; adapts to the current construction market, is pollution-free, and reduces construction costs.

Figure 201320516696

Description

吊杆固定装置Boom Fixtures

技术领域 technical field

本实用新型涉及一种安装工具,具体的说,是涉及一种吊杆固定装置。 The utility model relates to an installation tool, in particular to a suspender fixing device.

背景技术 Background technique

传统的吊顶施工中,吊杆的固定需搭设架子或人字梯,人在高空用扳手旋转膨胀螺栓的螺母以达到固定吊杆的目的;传统的吊杆固定施工存在较大的安全隐患,一个吊杆固定好后需移动架子或人字梯进行下一个螺杆固定工作,且施工工期较长,浪费人力,难以满足工程进度要求。 In the traditional ceiling construction, a shelf or a ladder is required to fix the suspender, and a person uses a wrench to rotate the nut of the expansion bolt at high altitude to achieve the purpose of fixing the suspender; the traditional suspender fixing construction has a large safety hazard, a After the suspender is fixed, it is necessary to move the shelf or the ladder to carry out the next screw fixing work, and the construction period is long, which wastes manpower and is difficult to meet the project progress requirements.

实用新型内容 Utility model content

针对上述现有技术中的不足,本实用新型,而提供一种结构合理、操作方便,安全、快速固定吊杆的吊杆固定装置。 Aiming at the deficiencies in the prior art above, the utility model provides a suspender fixing device with reasonable structure, convenient operation, safe and fast fixing of the suspender.

本实用新型所采取的技术方案是: The technical scheme that the utility model takes is:

一种吊杆固定装置,包括主立杆和调节立杆,主立杆为空心管,调节立杆套装在主立杆内,调节立杆上设置有高度刻度线,主立杆下端设置有把手,所述主立杆与调节立杆之间通过锁紧装置锁紧;调节立杆上部设置内置六角扳手;调节立杆下部设置有圆孔固定片。 A boom fixing device, comprising a main pole and an adjustment pole, the main pole is a hollow tube, the adjustment pole is set inside the main pole, a height scale line is arranged on the adjustment pole, and a handle is arranged at the lower end of the main pole , the main pole and the adjustment pole are locked by a locking device; the upper part of the adjustment pole is provided with a built-in hexagonal wrench; the lower part of the adjustment pole is provided with a round hole fixing piece.

所述圆孔固定片一端与调节立杆固定,中部设置有圆孔;圆孔固定片为两个沿调节立杆长度方向设置。 One end of the circular hole fixing piece is fixed with the adjusting vertical rod, and a circular hole is arranged in the middle; two circular hole fixing pieces are arranged along the length direction of the adjusting vertical rod.

所述主立杆下部设置有转动把手,转动把手为空心管,空心管内设置有滚动轴承,滚动轴承套装在主立杆外侧。 The lower part of the main vertical rod is provided with a rotating handle, which is a hollow tube, and a rolling bearing is arranged in the hollow tube, and the rolling bearing is sleeved on the outside of the main vertical rod.

所述锁紧装置由上下设置的两个锁紧螺钉构成。。 The locking device is composed of two locking screws arranged up and down. .

本实用新型相对现有技术的有益效果: The utility model has the beneficial effects relative to the prior art:

本实用新型吊杆固定装置,结构合理、安全系数高、操作方便;节约搭设架子或人字梯材料,降低资金投入;减少人工,降低人工费;提高工效,缩短施工时间,从而缩短了工期;可操作性强,制造安装简单,单人即可操作完成施工;安全可靠,避免高空作业,保障施工安全;适应当前建筑市场,无污染,降低施工成本。 The utility model boom fixing device has the advantages of reasonable structure, high safety factor and convenient operation; saves materials for erecting shelves or ladders, reduces capital investment; reduces labor and labor costs; improves work efficiency and shortens construction time, thereby shortening the construction period; It has strong operability, simple manufacturing and installation, and can be operated by a single person to complete the construction; it is safe and reliable, avoiding high-altitude operations and ensuring construction safety; it adapts to the current construction market, is pollution-free, and reduces construction costs.

附图说明 Description of drawings

图1是本实用新型吊杆固定装置使用状态结构示意图。 Fig. 1 is a structural schematic diagram of the use state of the utility model suspension rod fixing device.

附图中主要部件符号说明: Explanation of symbols of main components in the accompanying drawings:

图中:  In the picture:

1、主立杆                 2 、调节立杆 1. Main pole 2. Adjustment pole

3 、把手                  4 、转动把手 3. Handle 4. Turn the handle

5 、锁紧螺钉              6、圆孔固定片 5. Locking screw 6. Round hole fixing piece

7、上固定片               8、下固定钢片 7. Upper fixing piece 8. Lower fixing steel piece

9、内置六角扳手           10、吊杆 9. Built-in hex wrench 10. Suspension rod

11、膨胀螺栓              12、螺母。 11. Expansion bolts 12. Nuts.

具体实施方式 Detailed ways

以下参照附图及实施例对本实用新型进行详细的说明: The utility model is described in detail below with reference to accompanying drawing and embodiment:

附图1可知,一种吊杆固定装置,包括主立杆1和调节立杆2,主立杆1为空心管,调节立杆2套装在主立杆1内,调节立杆2上设置有高度刻度线,主立杆1下端设置有把手3,所述主立杆1与调节立杆2之间通过锁紧装置锁紧;调节立杆2上部设置内置六角扳手9;内置六角扳手9可以焊接在调节立杆2上也可以通过固定在调节立杆2上的上固定片7和下固定片8以及固定螺钉可拆卸地固定在调节立杆2上,调节立杆2下部设置有圆孔固定片6;所述圆孔固定片6一端与调节立杆2固定,中部设置有圆孔;圆孔固定片6为两个沿调节立杆2长度方向设置;所述主立杆1下部设置有转动把手4,转动把手4为空心管,空心管内设置有滚动轴承,滚动轴承套装在主立杆1外侧;所述锁紧装置由上下设置的两个锁紧螺钉5构成。圆孔固定片是用来约束吊杆长端,防止旋转工具时吊杆左右晃动。 Accompanying drawing 1 shows, a kind of suspender fixing device comprises main vertical rod 1 and adjusting vertical rod 2, and main vertical rod 1 is a hollow tube, and adjusting vertical rod 2 is sleeved in main vertical rod 1, and adjusting vertical rod 2 is provided with Height scale line, the lower end of the main pole 1 is provided with a handle 3, the main pole 1 and the adjustment pole 2 are locked by a locking device; the upper part of the adjustment pole 2 is provided with a built-in hexagonal wrench 9; the built-in hexagonal wrench 9 can Welding on the adjustment pole 2 can also be detachably fixed on the adjustment pole 2 by the upper fixing piece 7 and the lower fixing piece 8 fixed on the adjustment pole 2 and the fixing screws, and the lower part of the adjustment pole 2 is provided with a round hole Fixed sheet 6; one end of the circular hole fixed sheet 6 is fixed to the adjustment pole 2, and a circular hole is arranged in the middle; two circular hole fixed sheets 6 are arranged along the length direction of the adjustment vertical pole 2; the lower part of the main vertical pole 1 is arranged There is a rotating handle 4, which is a hollow tube, and a rolling bearing is arranged in the hollow tube, and the rolling bearing is set on the outside of the main pole 1; the locking device is composed of two locking screws 5 arranged up and down. The round hole fixing piece is used to constrain the long end of the boom to prevent the boom from shaking left and right when the tool is rotated.

本实用新型吊杆固定装置,结构合理、安全系数高、操作方便;节约搭设架子或人字梯材料,降低资金投入;减少人工,降低人工费;提高工效,缩短施工时间,从而缩短了工期;可操作性强,制造安装简单,单人即可操作完成施工;安全,避免高空作业,保障施工安全;适应当前建筑市场,无污染,降低施工成本。 The utility model boom fixing device has the advantages of reasonable structure, high safety factor and convenient operation; saves materials for erecting shelves or ladders, reduces capital investment; reduces labor and labor costs; improves work efficiency and shortens construction time, thereby shortening the construction period; It has strong operability, simple manufacturing and installation, and can be operated by a single person to complete the construction; it is safe, avoids high-altitude operations, and ensures construction safety; adapts to the current construction market, is pollution-free, and reduces construction costs.

本实用新型吊杆固定装置使用说明: Instructions for use of the utility model boom fixing device:

1、首先根据吊顶工程设计,了解用于固定吊杆的膨胀螺栓的规格型号,选取与螺母规格相匹配的可更换内置六角扳手; 1. First, according to the design of the ceiling project, understand the specifications and models of the expansion bolts used to fix the boom, and select a replaceable built-in hex wrench that matches the specifications of the nuts;

2、根据吊顶楼层层高和施工人员身高调节调节立杆长度; 2. Adjust the length of the pole according to the height of the ceiling floor and the height of the construction personnel;

3、把吊顶吊杆膨胀螺栓的螺母安装好后,穿入可更换内置扳手和圆孔固定片的圆孔内; 3. After installing the nut of the expansion bolt of the ceiling boom, penetrate it into the round hole of the replaceable built-in wrench and the round hole fixing piece;

4、把安装好膨胀螺丝的吊杆插入预留孔内。施工人员一手握住转动把手,另一手握住底端把手逆时针旋转给力,通过此实用新型工具传力使其膨胀螺丝受力达到固定吊杆的目的。 4. Insert the boom with the expansion screw installed into the reserved hole. The construction personnel hold the rotating handle with one hand, and hold the bottom handle with the other hand to rotate counterclockwise to give force. Through the force transmission of this utility model, the expansion screw is forced to achieve the purpose of fixing the boom.

Claims (4)

1. a suspension rod fixing device, it is characterized in that: comprise main vertical rod and regulate vertical rod, main vertical rod is hollow section, regulate vertical rod sleeve to be contained in main vertical rod, regulate in vertical rod and be provided with altitude scale line, main vertical rod lower end is provided with handle, between described main vertical rod and adjusting vertical rod, by locking device, locks; Regulate vertical rod top that built-in die nut is set; Regulate vertical rod bottom to be provided with circular hole stator.
2. suspension rod fixing device according to claim 1, is characterized in that: described circular hole stator one end is fixed with regulating vertical rod, and middle part is provided with circular hole; Circular hole stator is that two edges regulate the setting of vertical rod length direction.
3. suspension rod fixing device according to claim 1, is characterized in that: described main vertical rod bottom is provided with swing handle, and swing handle is hollow section, is provided with rolling bearing in hollow section, and rolling bearing is sleeved on main vertical rod outside.
4. suspension rod fixing device according to claim 1, is characterized in that: described locking device consists of two lock-screws setting up and down.
CN201320516696.4U 2013-08-23 2013-08-23 Hanger rod fixing device Expired - Fee Related CN203403582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320516696.4U CN203403582U (en) 2013-08-23 2013-08-23 Hanger rod fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320516696.4U CN203403582U (en) 2013-08-23 2013-08-23 Hanger rod fixing device

Publications (1)

Publication Number Publication Date
CN203403582U true CN203403582U (en) 2014-01-22

Family

ID=49939521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320516696.4U Expired - Fee Related CN203403582U (en) 2013-08-23 2013-08-23 Hanger rod fixing device

Country Status (1)

Country Link
CN (1) CN203403582U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612410A (en) * 2015-02-18 2015-05-13 中建五局蚌埠建筑工程有限公司 Strip-shaped section bar lifting device
CN108747999A (en) * 2018-07-31 2018-11-06 唐山曹妃甸二十二冶工程技术有限公司 Suspension rod fixing device and fixing means

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612410A (en) * 2015-02-18 2015-05-13 中建五局蚌埠建筑工程有限公司 Strip-shaped section bar lifting device
CN108747999A (en) * 2018-07-31 2018-11-06 唐山曹妃甸二十二冶工程技术有限公司 Suspension rod fixing device and fixing means

Similar Documents

Publication Publication Date Title
CN104785818A (en) Roof hanging steel bar installation tool assembly and climbing-free hanging steel bar installation method using same
CN204876508U (en) Portable height -adjustable scaffold
CN203403582U (en) Hanger rod fixing device
CN106761363A (en) A kind of steel tube tower in electric transmission line aids in climbing tool
CN204238570U (en) The spiral adjuster of absolute altitude of frame ball node is installed
CN204209170U (en) Portable electric drill telescope support
CN204001643U (en) A kind of indoor suspended ceiling hangs muscle erecting device
CN205617778U (en) Outer wall scaffold frame is wall structure even
CN204621156U (en) A kind of arm extending type percussion drill
CN203541623U (en) Novel punching frame
CN204716141U (en) Movable expanding drilling operation platform
CN204092878U (en) A safety belt suspension device that is convenient for quick erection
CN205254869U (en) A New Straight Rod Rotating Device for Tightening the Expansion Bolts of Ceiling Rods
CN204676756U (en) The fastener of top board furred ceiling
CN203956804U (en) A kind of suspension rod quick-mounting instrument
CN206513039U (en) A kind of simple support for installing suspension rod and top plate expansion bolt
CN203703539U (en) Adjustable support special for decentralized wellhead
CN202622700U (en) Hanger rod installation tool
CN203925304U (en) A kind of drilling bracket device
CN206308991U (en) A kind of auxiliary support apparatus for mine development end scope of operation scaffold
CN204357095U (en) The scaffold that a kind of novel high is adjustable
CN104358467A (en) Auxiliary mounting tool for concrete pole cross arm
CN204673526U (en) A kind of screw fastening device of adjustable-length
CN204024000U (en) Telescopic boom bolt erecting tools
CN204238567U (en) Hanger erection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140122

CF01 Termination of patent right due to non-payment of annual fee