CN203401482U - Two-section petroleum pipeline mark belt - Google Patents

Two-section petroleum pipeline mark belt Download PDF

Info

Publication number
CN203401482U
CN203401482U CN201320514722.XU CN201320514722U CN203401482U CN 203401482 U CN203401482 U CN 203401482U CN 201320514722 U CN201320514722 U CN 201320514722U CN 203401482 U CN203401482 U CN 203401482U
Authority
CN
China
Prior art keywords
steel belt
steel
petroleum pipeline
sheet
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320514722.XU
Other languages
Chinese (zh)
Inventor
钮建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI ACC HEAT EXCHANGER Co Ltd
Original Assignee
WUXI ACC HEAT EXCHANGER Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI ACC HEAT EXCHANGER Co Ltd filed Critical WUXI ACC HEAT EXCHANGER Co Ltd
Priority to CN201320514722.XU priority Critical patent/CN203401482U/en
Application granted granted Critical
Publication of CN203401482U publication Critical patent/CN203401482U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a two-section petroleum pipeline mark belt which comprises a steel belt sheet. One end of the steel belt sheet is provided with a rectangular connector, and the center of the rectangular connector is provided with a steel column protruding outwards. The other end, opposite to the rectangular connector, of the steel belt sheet is provided with a locating screw hole. An adjustable steel belt body is arranged outside the steel belt sheet. The surface of the steel belt body is provided with multistage location holes. The two ends of the adjustable steel belt body are provided with a mounting hole and an auxiliary location hole respectively. The steel column is clamped into one of the multistage location holes or into the auxiliary location hole for fixing. The two-section petroleum pipeline mark belt has the advantages of saving both time and labor, being convenient to dismount and connect timely through the arrangement of the adjustable steel belt body and capable of being stabilized on petroleum pipelines with different pipe diameters so as to ensure the parallel and level degree of subsequent cutting, facilitating connecting between a cut pipe section and a new pipe section, and being capable of ensuring that a cutting belt will not move in the whole process of marking a line through the arrangement of two-stage transverse fixed mounts.

Description

A kind of double-joint type petroleum pipeline mark band
Technical field
The utility model relates to a kind of petroleum pipeline and safeguards aid, relates in particular to a kind of double-joint type petroleum pipeline mark band.
Background technology
At present, the pipe fitting that is applied to the industries such as oil, chemical industry, electric power, boats and ships, metallurgy, machinery, weaving, food, building, pharmacy all needs to possess higher intensity, resistance to pressure, corrosion-resistant, resistance to elevated temperatures.In petroleum industry; need to lay longer pipeline and carry out the transportation for oil; but because petroleum pipeline is laid on comparatively in rugged environment mostly, the situation such as therefore usually there will be seepage, break, if damage is little; can directly on pipeline, carry out repair welding; if damage is large and cannot repair welding time, needing to have damaged part to cut down, the pipeline section more renewing; in the process of changing, guarantee to cut the concordant of the mouth of pipe.General operation is manually with astragal, to surround the outer wall of petroleum pipeline now, another person with special-purpose slate pencil along astragal setting-out, then along the line drawing, cut, when caliber is larger, must two people operate just simultaneously and can complete setting-out work, waste of manpower, and often cannot guarantee concordantly owing to lacking line that effective instrument causes drawing, affected last and new being connected and sealing effectiveness of pipeline section.Meanwhile, if adopt aid to be not easy to carry, and be not suitable for the petroleum pipeline of all calibers.Therefore,, for above aspect, need to make rational improvement.
Utility model content
The purpose of this utility model is to provide and a kind ofly improves pipe-line maintenance efficiency, guarantees that cut surface is concordant, can conveniently disconnect, be conducive to reduce the double-joint type petroleum pipeline mark band of labour cost, to solve many deficiencies of prior art.
The purpose of this utility model is carried out specific implementation by the following technical programs:
A kind of double-joint type petroleum pipeline mark band, comprise steel band sheet, described steel band sheet wherein one end is installed a rectangle connector and this rectangle connector center is provided with an outwardly steel column, is positioned at the steel band sheet other end relative with rectangle connector and offers a positioning screw hole; Adjustable steel belt body of described steel band sheet outer setting and band surface arrange multistage locating hole, are positioned at adjustable steel belt body two ends and offer respectively an installing hole, an auxiliary positioning hole; Described steel column snaps in one of them multistage locating hole or auxiliary positioning hole is inner fixing.
Correspondingly, the steel band sheet end that is positioned at steel band sheet middle part and is positioned at positioning screw hole position arranges respectively the first horizontal fixed mount, the second horizontal fixed mount; Multistage locating hole is rearranged by some rectangle jacks.
The beneficial effect of double-joint type petroleum pipeline mark band described in the utility model is:
(1) pass through steel strip winding on pipeline, make it end to end, the different-diameter size of pipeline, make steel column be plugged in applicable locating hole and screw, now stainless steel band is tightly wrapped on pipeline, utilize slate pencil to rule on pipeline along the edge of stainless steel band, then carry out cutting activity;
(2) time saving and energy saving, by adjustable steel belt body is set, be convenient to disconnect in time, can be on the petroleum pipeline of different tube diameters firm, thus the concordant degree of cutting after having guaranteed, being connected between convenient cut pipeline section and new pipeline section, guarantees to connect sealing afterwards;
(3) by the horizontal fixed mount of two-stage is set, can guarantee that cutting belt any movement can not occur in the overall process of setting-out, even need to wait long operation after fixing, also not affect the accuracy of cutting.
Accompanying drawing explanation
According to drawings and embodiments the utility model is described in further detail below.
Fig. 1 is the structure chart of double-joint type petroleum pipeline mark band described in the utility model embodiment.
In figure: 1, steel band sheet; 2, rectangle connector; 3, steel column; 4, multistage locating hole; 5, the first horizontal fixed mount; 6, positioning screw hole; 7, the second horizontal fixed mount; 8, auxiliary positioning hole; 9, installing hole.
The specific embodiment
As shown in Figure 1, double-joint type petroleum pipeline mark band described in the utility model embodiment, comprise steel band sheet 1, described steel band sheet 1 wherein one end is installed a rectangle connector 2 and this rectangle connector 2 centers are provided with an outwardly steel column 3, and being positioned at steel band sheet 1 other end relative with rectangle connector 2, to offer the aperture of a positioning screw hole 6 and this positioning screw hole 6 identical with the bottom surface diameter of steel column 3; Steel band sheet 1 end that is positioned at steel band sheet 1 middle part and is positioned at positioning screw hole 6 positions arranges respectively first horizontal fixed mount the 5, second horizontal fixed mount 7, thereby can guarantee that cutting belt any movement can not occur in the overall process of setting-out;
Adjustable steel belt body of described steel band sheet 1 outer setting and the multistage locating hole 4 being rearranged by some rectangle jacks with surface setting, be positioned at adjustable steel belt body two ends and offer respectively an installing hole 9, an auxiliary positioning hole 8, installing hole 9 wherein aligns with positioning screw hole 6 and overlaps and by double-screw bolt, steel band sheet 1 be fixedly connected with adjustable steel belt body;
Described steel column 3 snaps in one of them multistage locating hole 4 or an only auxiliary positioning hole 8 is inner fixing.

Claims (3)

1. a double-joint type petroleum pipeline mark band, comprises steel band sheet, it is characterized in that:
Described steel band sheet wherein one end is installed a rectangle connector and this rectangle connector center is provided with an outwardly steel column, is positioned at the steel band sheet other end relative with rectangle connector and offers a positioning screw hole;
Adjustable steel belt body of described steel band sheet outer setting and band surface arrange multistage locating hole, are positioned at adjustable steel belt body two ends and offer respectively an installing hole, an auxiliary positioning hole; Described steel column snaps in one of them multistage locating hole or auxiliary positioning hole is inner fixing.
2. a kind of double-joint type petroleum pipeline mark band as claimed in claim 1, is characterized in that: the steel band sheet end that is positioned at steel band sheet middle part and is positioned at positioning screw hole position arranges respectively the first horizontal fixed mount, the second horizontal fixed mount.
3. a kind of double-joint type petroleum pipeline mark band as claimed in claim 1, is characterized in that: described multistage locating hole is rearranged by some rectangle jacks.
CN201320514722.XU 2013-08-22 2013-08-22 Two-section petroleum pipeline mark belt Expired - Fee Related CN203401482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320514722.XU CN203401482U (en) 2013-08-22 2013-08-22 Two-section petroleum pipeline mark belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320514722.XU CN203401482U (en) 2013-08-22 2013-08-22 Two-section petroleum pipeline mark belt

Publications (1)

Publication Number Publication Date
CN203401482U true CN203401482U (en) 2014-01-22

Family

ID=49937424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320514722.XU Expired - Fee Related CN203401482U (en) 2013-08-22 2013-08-22 Two-section petroleum pipeline mark belt

Country Status (1)

Country Link
CN (1) CN203401482U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103406893A (en) * 2013-08-22 2013-11-27 无锡爱科换热器有限公司 Double-section marking belt for petroleum pipelines

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103406893A (en) * 2013-08-22 2013-11-27 无锡爱科换热器有限公司 Double-section marking belt for petroleum pipelines
CN103406893B (en) * 2013-08-22 2016-06-15 江苏高博智融科技有限公司 A kind of double-joint type petroleum pipeline mark band

Similar Documents

Publication Publication Date Title
CN102366950A (en) Cutting belt of petroleum pipeline
CN203401482U (en) Two-section petroleum pipeline mark belt
CN203409762U (en) Cross-shaped petroleum pipeline cutting identification strip
CN203409760U (en) Portable petroleum pipeline cutting marking tape
CN203404551U (en) Petroleum pipeline fixing band with adjustable transverse length
CN203401481U (en) Petroleum pipeline cutting fixing belt
CN203404550U (en) Petroleum pipeline cutting marking belt
CN203418533U (en) Pipeline mark belt of double-fixed-head structure
CN203427015U (en) Petroleum pipeline elastic force mark belt
CN203404549U (en) Pipeline marking strip facilitating transverse fixation
CN203409765U (en) Novel elastic cutting fixing band for petroleum pipeline
CN203427023U (en) Novel petroleum pipeline cutting marking strip
CN203427024U (en) Multifunctional cutting identification strip of petroleum pipelines
CN203427016U (en) Novel petroleum pipeline outside seal marking belt
CN203427022U (en) Petroleum pipeline cutting mark tool
CN203427025U (en) Petroleum pipeline cutting mark belt capable of being fixed to ground
CN203409766U (en) Marking tool for petroleum pipeline cutting
CN203409763U (en) Petroleum pipeline bandsaw with warning label
CN203409768U (en) Petroleum pipeline bandsaw with guidance label
CN103481271B (en) A kind of cutting belt of petroleum pipeline with warning labeling
CN103481267A (en) Petroleum pipeline cutting line tool
CN203409764U (en) Marking tool for petroleum pipeline cutting
CN103411086B (en) A kind of petroleum pipeline cutting mark band
CN103406893A (en) Double-section marking belt for petroleum pipelines
CN103481266A (en) Novel petroleum pipeline cutting marking strip

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140122

Termination date: 20140822

EXPY Termination of patent right or utility model