CN203393606U - 一种顶进框构桥线路加固滚动支座 - Google Patents

一种顶进框构桥线路加固滚动支座 Download PDF

Info

Publication number
CN203393606U
CN203393606U CN201320433873.2U CN201320433873U CN203393606U CN 203393606 U CN203393606 U CN 203393606U CN 201320433873 U CN201320433873 U CN 201320433873U CN 203393606 U CN203393606 U CN 203393606U
Authority
CN
China
Prior art keywords
bridge
roller support
frame
jacking
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320433873.2U
Other languages
English (en)
Inventor
崔贵宾
孟方歧
李鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201320433873.2U priority Critical patent/CN203393606U/zh
Application granted granted Critical
Publication of CN203393606U publication Critical patent/CN203393606U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型涉及一种顶进框构桥线路加固滚动支座,包括铁制方框,所述铁制方框一侧为凹槽,铁制方框边璧上对称设有若干轴孔,轴孔内穿设有滚动轴,所述凹槽内通过所述滚动轴固定有圆柱形滚轮。本实用新型的有益效果为:结构简单,较轻巧,便于携带移动;滚动支座滚轴面置于框构桥顶部与加固工字钢之间,当框构桥顶进时,滚轴滚动,以减少加固工字钢与桥体之间摩擦阻力,避免了加固工字钢对桥体的损坏,防止线路加固体系受桥体顶力影响而失效,保证铁路线路不受桥体顶力影响而移位。

Description

一种顶进框构桥线路加固滚动支座
技术领域
本实用新型涉及一种顶进框构桥线路加固滚动支座。
背景技术
框构桥顶进过程中线路加固直接关系到铁路行车安全,是顶进施工的重中之重。当框构桥顶至到线路下面时,铁路及加固体系的支撑作用便转移到框构桥顶部。框构桥顶进过程中需进行线路加固,若直接与桥顶面摩擦,会增加加固工字钢与桥体之间的阻力,造成加固工字钢对桥体的损坏,线路加固体系受桥体顶力影响有可能会失效,进而导致铁路线路受桥体顶力影响而移位。
实用新型内容
本实用新型的目的是提供一种顶进框构桥线路加固滚动支座,以克服目前现有技术存在的上述不足。
本实用新型的目的是通过以下技术方案来实现:
一种顶进框构桥线路加固滚动支座,包括铁制方框,所述铁制方框一侧为凹槽,铁制方框边璧上对称设有若干轴孔,轴孔内穿设有滚动轴,滚动轴上固定有圆柱形滚轮。
进一步的,所述滚动轴与所述铁制方框之间设有过渡坡台。
进一步的,所述圆柱形滚轮的外表面突出于所述铁制方框。
本实用新型的有益效果为:结构简单,较轻巧,便于携带移动;滚动支座滚轴面置于框构桥顶部与加固工字钢之间,当框构桥顶进时,滚轴滚动,以减少加固工字钢与桥体之间摩擦阻力,避免了加固工字钢对桥体的损坏,防止线路加固体系受桥体顶力影响而失效,保证铁路线路不受桥体顶力影响而移位。
附图说明
下面根据附图对本实用新型作进一步详细说明。
图1是本实用新型实施例所述顶进框构桥线路加固滚动支座的结构示意图;
图2是本实用新型实施例所述顶进框构桥线路加固滚动支座的使用状态参考图。
图中:
1、铁制方框;2、凹槽;3、轴孔;4、滚动轴;5、圆柱形滚轮;6、过渡坡台;7、木楔;8、工字钢。
具体实施方式
如图1-2所示,本实用新型实施例所述的顶进框构桥线路加固滚动支座,包括铁制方框1,所述铁制方框1一侧为凹槽2,铁制方框1边璧上对称设有若干轴孔3,轴孔3内穿设有滚动轴4,所述凹槽2内通过所述滚动轴4固定有圆柱形滚轮5;所述滚动轴4与所述铁制方框1之间设有过渡坡台6;所述圆柱形滚轮6的外表面突出于所述铁制方框1。
具体使用时,当框构桥顶进至线路下面时,将滚动支座间隔布置在加固纵向工字钢8的下方,圆柱形滚轮6朝下平置于框构桥顶面与加固工字钢8之间,铁制方框1面朝上。采用木楔7将滚动支座与加固工字钢8之间的空隙填满,使滚动支座固定牢固。当框构桥顶进施工时,圆柱形滚轮6滚动,以减少加固工字钢8与桥体之间摩擦阻力,避免了加固工字钢8对桥体的损坏,防止线路加固体系受桥体顶力影响而失效,保证铁路线路不受桥体顶力影响而移位。
框构桥体顶进过程中,桥体顶面标高及坡度会不断变化,因此要随着桥体顶面标高不断变化,逐步调整木楔7的松紧,防止顶桥影响线路及加固体系的标高变化。
本实用新型不局限于上述最佳实施方式,任何人在本实用新型的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本实用新型的保护范围之内。

Claims (3)

1.一种顶进框构桥线路加固滚动支座,包括铁制方框(1),其特征在于:铁制方框(1)边璧上对称设有若干轴孔(3),相对应的轴孔(3)内穿设有滚动轴(4);所述铁制方框(1)一侧为凹槽(2),所述凹槽(2)内通过所述滚动轴(4)固定有圆柱形滚轮(5)。
2.根据权利要求1所述的顶进框构桥线路加固滚动支座,其特征在于:所述滚动轴(4)与所述铁制方框(1)之间设有过渡坡台(6)。
3.根据权利要求2所述的顶进框构桥线路加固滚动支座,其特征在于:所述圆柱形滚轮(6)的外表面突出于所述铁制方框(1)。
CN201320433873.2U 2013-07-22 2013-07-22 一种顶进框构桥线路加固滚动支座 Expired - Fee Related CN203393606U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320433873.2U CN203393606U (zh) 2013-07-22 2013-07-22 一种顶进框构桥线路加固滚动支座

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320433873.2U CN203393606U (zh) 2013-07-22 2013-07-22 一种顶进框构桥线路加固滚动支座

Publications (1)

Publication Number Publication Date
CN203393606U true CN203393606U (zh) 2014-01-15

Family

ID=49905149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320433873.2U Expired - Fee Related CN203393606U (zh) 2013-07-22 2013-07-22 一种顶进框构桥线路加固滚动支座

Country Status (1)

Country Link
CN (1) CN203393606U (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178176A (zh) * 2015-09-13 2015-12-23 宁波大学 一种盆式滑动摩擦-滚轴滚动摩擦组合隔震支座
CN107217588A (zh) * 2017-07-03 2017-09-29 东南大学 一种悬索桥加劲梁施工期支座
CN107237268A (zh) * 2017-07-03 2017-10-10 东南大学 一种悬索桥施工期梁端纵向大位移支座
CN108611960A (zh) * 2018-04-09 2018-10-02 国核电力规划设计研究院有限公司 输煤栈桥节点
CN109797667A (zh) * 2019-01-14 2019-05-24 中铁二十一局集团第五工程有限公司 一种多功能涵洞及其预制方法、施工方法
CN110939065A (zh) * 2019-12-05 2020-03-31 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种利用临时钢支座辅助框构桥顶进的方法
CN112302186A (zh) * 2020-09-16 2021-02-02 北京工业大学 一种用于地下地铁车站支撑柱的圆弧凹槽滚轴摩擦支座
CN114318979A (zh) * 2021-12-31 2022-04-12 中铁六局集团石家庄铁路建设有限公司 框构桥顶进线路加固工字钢自动穿拔系统及方法
CN115338598A (zh) * 2022-07-15 2022-11-15 中国华冶科工集团有限公司 热风炉烟气管道滚动支座的制作方法

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178176A (zh) * 2015-09-13 2015-12-23 宁波大学 一种盆式滑动摩擦-滚轴滚动摩擦组合隔震支座
CN107217588A (zh) * 2017-07-03 2017-09-29 东南大学 一种悬索桥加劲梁施工期支座
CN107237268A (zh) * 2017-07-03 2017-10-10 东南大学 一种悬索桥施工期梁端纵向大位移支座
CN108611960A (zh) * 2018-04-09 2018-10-02 国核电力规划设计研究院有限公司 输煤栈桥节点
CN109797667A (zh) * 2019-01-14 2019-05-24 中铁二十一局集团第五工程有限公司 一种多功能涵洞及其预制方法、施工方法
CN110939065A (zh) * 2019-12-05 2020-03-31 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种利用临时钢支座辅助框构桥顶进的方法
CN110939065B (zh) * 2019-12-05 2021-12-17 中铁二十二局哈尔滨铁路建设集团有限责任公司 一种利用临时钢支座辅助框构桥顶进的方法
CN112302186A (zh) * 2020-09-16 2021-02-02 北京工业大学 一种用于地下地铁车站支撑柱的圆弧凹槽滚轴摩擦支座
CN114318979A (zh) * 2021-12-31 2022-04-12 中铁六局集团石家庄铁路建设有限公司 框构桥顶进线路加固工字钢自动穿拔系统及方法
CN114318979B (zh) * 2021-12-31 2023-08-18 中铁六局集团石家庄铁路建设有限公司 框构桥顶进线路加固工字钢自动穿拔系统及方法
CN115338598A (zh) * 2022-07-15 2022-11-15 中国华冶科工集团有限公司 热风炉烟气管道滚动支座的制作方法
CN115338598B (zh) * 2022-07-15 2024-02-02 中国华冶科工集团有限公司 热风炉烟气管道滚动支座的制作方法

Similar Documents

Publication Publication Date Title
CN203393606U (zh) 一种顶进框构桥线路加固滚动支座
CN103758159B (zh) 一种模型桩基所受载荷模拟实验装置
CN202609800U (zh) 一种起重机圆管拖缆小车装置
CN204689396U (zh) 一种卷板起吊吊钩
CN203998646U (zh) 行走式塔式起重机行走机构
CN102373674A (zh) 三角挂篮行走装置
CN202831000U (zh) 固定式塔吊整体迁移机构
CN203948785U (zh) 输油管道支撑装置
CN203498743U (zh) 一种基于平推法实施的铁路混凝土连续梁
CN203455183U (zh) 一种底垫板可移动的反力架平台
CN203006067U (zh) 电力施工绝缘柱弧形支撑架
CN203648995U (zh) 液压缸上置式极片轧压装置
CN203904840U (zh) 新型框架桥顶进小滑车
CN204387497U (zh) 管道支座用万向辊轮装置
CN203998793U (zh) 用于飞机维修或改装的高可靠性轮轴千斤顶
CN201693004U (zh) 一种大型钢丝放线装置
CN202101811U (zh) 一种版辊平衡检验装置
CN205555903U (zh) 一种桥式起重机
CN203553621U (zh) 变电构架格构梁滑动支座
CN204714341U (zh) 一种桥式起重机主梁与端梁连接结构
CN203667817U (zh) 一种防爬器
CN204019458U (zh) 一种基于转子制动闸板安装、拆卸的工具
CN203668835U (zh) 直行重物移运器
CN204150469U (zh) 一种用于热轧钢卷的支架
CN204587968U (zh) 支承装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140115