Automatic checkout device used for testing transformer of electric energy meter Download PDFInfo
- Publication number
- CN203350436U CN203350436U CN 201320326583 CN201320326583U CN203350436U CN 203350436 U CN203350436 U CN 203350436U CN 201320326583 CN201320326583 CN 201320326583 CN 201320326583 U CN201320326583 U CN 201320326583U CN 203350436 U CN203350436 U CN 203350436U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- energy meter
- testing
- conveying equipment
- thrust unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 30
- 238000001514 detection method Methods 0.000 claims abstract description 20
- 238000004891 communication Methods 0.000 claims abstract description 7
- 230000006698 induction Effects 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 11
- 239000000523 sample Substances 0.000 claims description 7
- 230000005540 biological transmission Effects 0.000 abstract 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000008358 core component Substances 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Images
Landscapes
- Measurement Of Resistance Or Impedance (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The utility model discloses an automatic checkout device used for testing a transformer of an electric energy meter. The device comprises a conveying device and a control device. The conveying device is a transmission belt provided with a sensing device. The sensing device is in communication connection with the control device. The automatic checkout device utilizes automatic assembly line operation instead of the conventional manual detection, so that detection efficiency is raised, labor intensity is reduced, and unqualified products are prevented from being put into qualified products caused by manual operation errors.
Description
Technical field
The utility model relates to electronic applications, and concrete is a kind of for testing the automatic detection device of electric energy meter transformer.
Background technology
The electric energy meter transformer, as one of core component of intelligent electric energy meter product, is electric energy meter product one of most important part in quality control, therefore how to test the electric energy meter transformer whether qualified particularly crucial.At present, electric energy meter is manual test with Insulation test and the electric property test of transformer industry, by manually making transformer contact the corresponding stitch of transformer with the test probe of tester, after tester is judged automatically, by the operative employee, according to the judgement conclusion, place respectively processing.In when test, the displayed value on testing tool by single transformer usually, whether qualified distinguish, and working strength is large, and operating personnel leave the post just to test and stop.Simultaneously, also may cause unacceptable product to put into certified products because of the human operational error, thereby cause electric energy meter defective after the electric energy meter that causes packing into.
The utility model content
The utility model proposes and a kind ofly for testing the automatic detection device of electric energy meter transformer, improved detection efficiency, reduced workman's working strength, also avoided the human operational error to cause unacceptable product to put into certified products simultaneously.
The technical solution of the utility model is achieved in that a kind of for testing the automatic detection device of electric energy meter transformer, comprise conveying equipment and opertaing device, described conveying equipment is feed belt, and described conveying equipment is provided with induction installation, and described induction installation is connected with the opertaing device communication.
Further, described conveying equipment has 5, is respectively LC1, LC2, LC3, LC5, LC6, and LC1 is connected with LC2, and the end of LC3 is connected with the LC2 middle part, and the other end of LC3 is connected with the end of LC5, and the end of LC6 is connected with the LC5 middle part.
Further, also comprise thrust unit, described thrust unit is arranged on the correspondence position of conveying equipment junction.
Further, described thrust unit has 6, is respectively T1, T2, T3, T4, T5, T6, described T1 is over against the LC2 direction, and described T2 is over against the LC3 direction, and described T3 is over against the LC5 direction, described T4 is over against the LC6 direction, and described T5 is separately positioned on the position relative with induction installation with T6.
Further, described thrust unit T5 and T6 are provided with test probe, and described test probe is connected with the opertaing device communication.
Further, described opertaing device adopts the PLC control module.
The beneficial effects of the utility model are: of the present utility model a kind of for testing the automatic detection device of electric energy meter transformer, replaced present manual detection by the streamline automatic job, improved detection efficiency, reduced workman's working strength, also avoided the human operational error to cause unacceptable product to put into certified products simultaneously.
The accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, below will the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The structural representation that Fig. 1 is the utility model embodiment.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Embodiment based in the utility model, those of ordinary skills are not making under the creative work prerequisite the every other embodiment obtained, and all belong to the scope of the utility model protection.
As shown in Figure 1 a kind of comprises conveying equipment and opertaing device for testing the automatic detection device of electric energy meter transformer, and described conveying equipment is feed belt, and described conveying equipment is provided with induction installation, and described induction installation is connected with the opertaing device communication.
As preferably, described conveying equipment has 5, is respectively LC1, LC2, LC3, LC5, LC6, and LC1 is connected with LC2, and the end of LC3 is connected with the LC2 middle part, and the other end of LC3 is connected with the end of LC5, in the middle part of the end of LC6 and LC5, is connected.
As preferably, also comprise thrust unit, described thrust unit is arranged on the correspondence position of conveying equipment junction.
As preferably, described thrust unit has 6, is respectively T1, T2, T3, T4, T5, T6, described T1 is over against the LC2 direction, and described T2 is over against the LC3 direction, and described T3 is over against the LC5 direction, described T4 is over against the LC6 direction, and described T5 is separately positioned on the position relative with induction installation with T6.
As preferably, described thrust unit T5 and T6 are provided with test probe, and described test probe is connected with the opertaing device communication.
As preferably, described opertaing device adopts the PLC control module.
In operating process, transformer is by conveying equipment LC1, arrive induction installation, driving thrust unit T5 by the PLC control module is tested, then arrive assigned address by thrust unit T1, by the PLC control module, carry out data analysis, by thrust unit T3, certified products are entered to the electric property pick-up unit by conveying equipment LC3, unacceptable product is pushed assigned address to by thrust unit T4, waits pending; After entering the electric property pick-up unit, arrive induction installation by conveying equipment LC3, drive thrust unit T3 by the PLC control module and shift product onto position to be measured, then thrust unit T6 drive measuring head is tested, test data is analyzed by the PLC control module, specification product are shifted conveying equipment LC5 onto by thrust unit T3 and are entered next step operation, and substandard product enters conveying equipment LC6 by thrust unit T4, enter assigned address and wait for subsequent treatment.
Of the present utility model a kind of for testing the automatic detection device of electric energy meter transformer, replaced present manual detection by the streamline automatic job, improved detection efficiency, reduced workman's working strength, also avoided the human operational error to cause unacceptable product to put into certified products simultaneously.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.
Claims (6)
1. one kind for testing the automatic detection device of electric energy meter transformer, and it is characterized in that: comprise conveying equipment and opertaing device, described conveying equipment is feed belt, and described conveying equipment is provided with induction installation, and described induction installation is connected with the opertaing device communication.
2. according to claim 1 a kind of for testing the automatic detection device of electric energy meter transformer, it is characterized in that: described conveying equipment has 5, be respectively LC1, LC2, LC3, LC5, LC6, LC1 is connected with LC2, the end of LC3 is connected with the LC2 middle part, the other end of LC3 is connected with the end of LC5, and the end of LC6 is connected with the LC5 middle part.
3. according to claim 2 a kind of for testing the automatic detection device of electric energy meter transformer, it is characterized in that: also comprise thrust unit, described thrust unit is arranged on the correspondence position of conveying equipment junction.
4. according to claim 3 a kind of for testing the automatic detection device of electric energy meter transformer, it is characterized in that: described thrust unit has 6, be respectively T1, T2, T3, T4, T5, T6, described T1 is over against the LC2 direction, described T2 is over against the LC3 direction, described T3 is over against the LC5 direction, and described T4 is over against the LC6 direction, and described T5 is separately positioned on the position relative with induction installation with T6.
5. according to claim 4 a kind of for testing the automatic detection device of electric energy meter transformer, it is characterized in that: described thrust unit T5 and T6 are provided with test probe, and described test probe is connected with the opertaing device communication.
6. according to claim 1 a kind of for testing the automatic detection device of electric energy meter transformer, it is characterized in that: described opertaing device adopts the PLC control module.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320326583 CN203350436U (en) | 2013-06-06 | 2013-06-06 | Automatic checkout device used for testing transformer of electric energy meter |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320326583 CN203350436U (en) | 2013-06-06 | 2013-06-06 | Automatic checkout device used for testing transformer of electric energy meter |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203350436U true CN203350436U (en) | 2013-12-18 |
Family
ID=49750318
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201320326583 Expired - Lifetime CN203350436U (en) | 2013-06-06 | 2013-06-06 | Automatic checkout device used for testing transformer of electric energy meter |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203350436U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103809151A (en) * | 2014-02-19 | 2014-05-21 | 青岛乾程电子科技有限公司 | Multi-meter-position parameter automatic setting and detecting device |
| CN105277827A (en) * | 2015-10-26 | 2016-01-27 | 德州信平电子有限公司 | High-frequency transformer assembly line test system |
-
2013
- 2013-06-06 CN CN 201320326583 patent/CN203350436U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103809151A (en) * | 2014-02-19 | 2014-05-21 | 青岛乾程电子科技有限公司 | Multi-meter-position parameter automatic setting and detecting device |
| CN103809151B (en) * | 2014-02-19 | 2016-05-04 | 青岛乾程科技股份有限公司 | A kind of multi-epitope parameter Lookup protocol and checkout gear |
| CN105277827A (en) * | 2015-10-26 | 2016-01-27 | 德州信平电子有限公司 | High-frequency transformer assembly line test system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201333449Y (en) | Automatic detecting control system of energy-saving lamp | |
| CN104407043B (en) | On-line detection device and detection method for steel cord defects based on electromagnetic induction | |
| CN201069707Y (en) | Automatic detection device for electronic transformer coil | |
| CN103412237B (en) | Intelligent tester for transformer coil turn-to-turn short circuit | |
| CN105091829A (en) | Automobile component pipe internal diameter detection apparatus | |
| CN203350436U (en) | Automatic checkout device used for testing transformer of electric energy meter | |
| CN102901904B (en) | A kind of Multifunctional intelligent detection device for circuit board | |
| CN201359562Y (en) | Workstation for detecting shifter assembly | |
| CN105067866B (en) | A kind of common voltage test device | |
| CN203187036U (en) | Steel rope core conveyor belt inner core breakpoint detecting device with marking function | |
| CN213149076U (en) | Power test system for assembly line display | |
| CN104764429A (en) | Device for detecting overall length of automotive part pipe | |
| CN204649175U (en) | The pick-up unit of machine examined automatically entirely by safe automobile air bag pipe fitting | |
| CN207832924U (en) | The short-circuit detecting and voltage detecting system of pcb board on a kind of assembly line | |
| CN205091416U (en) | Many car wiring harness detection device | |
| CN205353256U (en) | An ATE test cabinet with short circuit test function | |
| CN202356322U (en) | Comprehensive workpiece quality judging and sorting device | |
| CN204194316U (en) | A kind of checkout equipment for pcb board | |
| CN112114195A (en) | Power test system and method for pipeline display | |
| CN204649179U (en) | Auto parts and components bore pick-up unit | |
| CN204649176U (en) | Auto parts and components pipe overall length pick-up unit | |
| CN104656054A (en) | Automatic slag brushing and testing device and automatic slag brushing and testing method for veneer of electricity meter | |
| CN201130216Y (en) | Apparatus for automatically detecting voltage essential resistance | |
| CN204638578U (en) | Auto parts and components pipe end chamfer detecting device | |
| CN202815156U (en) | Fluorescent tube withstanding voltage automatic detection device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20131218 |
|
| CX01 | Expiry of patent term |