CN203347206U - Ceiling operation platform applied to top frame - Google Patents
Ceiling operation platform applied to top frame Download PDFInfo
- Publication number
- CN203347206U CN203347206U CN 201320336502 CN201320336502U CN203347206U CN 203347206 U CN203347206 U CN 203347206U CN 201320336502 CN201320336502 CN 201320336502 CN 201320336502 U CN201320336502 U CN 201320336502U CN 203347206 U CN203347206 U CN 203347206U
- Authority
- CN
- China
- Prior art keywords
- operating platform
- furred ceiling
- support
- angle steel
- ceiling operating
- Prior art date
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 34
- 239000010959 steel Substances 0.000 claims abstract description 34
- 239000000725 suspensions Substances 0.000 claims description 12
- 239000010410 layers Substances 0.000 claims description 6
- 238000003466 welding Methods 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 5
- 101710043253 KNTC1 Proteins 0.000 description 3
- 239000002131 composite materials Substances 0.000 description 2
- 238000010586 diagrams Methods 0.000 description 2
- 238000005516 engineering processes Methods 0.000 description 2
- 239000000463 materials Substances 0.000 description 2
- 238000000034 methods Methods 0.000 description 2
- 230000003014 reinforcing Effects 0.000 description 2
- 210000001138 Tears Anatomy 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000006243 chemical reactions Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000005755 formation reactions Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reactions Methods 0.000 description 1
- 238000004642 transportation engineering Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Abstract
Description
Technical field
The utility model relates to the building operations technical field of tools, and particularly the operating platform technical field of structures, specifically refer to a kind of furred ceiling operating platform be applied on the support body of top.
Background technology
The radio and television class building interior rooms such as performing in a radio or TV programme the Room that arrange more, the interior decoration complex procedures, and generally be and choose high very high large spatial structure, the ceiling construction operating condition is difficult for creating, and potential safety hazard is more.
The way of traditional ceiling construction mainly contains:
1. start to set up scaffold from the bottom, top is laid scaffold floor and is used to make construction operation platform.Adopt and manually set up shelf, need a large amount of artificial and material and duration longer, taking the process of tearing open has certain potential safety hazard.
2. adopt the gate-type jenny scaffold, material drops into relatively and reduces, but scaffolding height is unsuitable too high, and stability is bad, and need to frequently take and tear open and move.
3. directly lay wooden springboard on the support bodys such as top structure design support body, decorations design lamp grid frame.Wood springboard and support body modulus are not inconsistent, and are prone to the probe plate.
The utility model content
The purpose of this utility model is to have overcome above-mentioned shortcoming of the prior art, provide a kind of making simple, constructing operation is convenient, lighter weight, intensity is higher, safe and reliable, reusable, with low cost, can be used in and choose higher space, be particularly suitable for the furred ceiling operating platform on the support body of top that is applied to used in conjunction with top lamp grid frame.
In order to realize above-mentioned purpose, the furred ceiling operating platform be applied on the support body of top of the present utility model has following formation:
Described top support body comprises from the top of building suspension rod that extend in space downwards, and at least two horizon bars that are fixedly connected on described suspension rod, described furred ceiling operating platform comprises the angle steel housing and is layed in the landing slab in described angle steel housing, this furred ceiling operating platform is arranged on the support body of described top, and described angle steel housing is fixedly connected with described horizon bar.
This is applied to furred ceiling operating platform on the support body of top and comprises and be fixedly connected on described angle steel housing and be arranged at the angle steel crossbeam under described landing slab.
This is applied in the furred ceiling operating platform on the support body of top, and described landing slab is the multi-layer flat platen, and the gross thickness of described multi-layer flat platen is not less than 20mm.
This bottom that is applied to the furred ceiling operating platform on the support body of top is provided with draw-in groove, and described furred ceiling operating platform is by this draw-in groove and described horizon bar clamping.
This is applied to offer several jacks on the furred ceiling operating platform on the support body of top, in described jack, is provided with latch, and described latch and described horizon bar are welded and fixed.
This is applied in the furred ceiling operating platform on the support body of top, and described top support body is lamp grid framves, and this lamp grid frame comprises from the top of building angle steel suspension rod that extend in space downwards and the horizontal channel-section steel that is fixedly connected on this angle steel suspension rod.
Adopted the furred ceiling operating platform on the support body of top that is applied to of this utility model, because it comprises the angle steel housing and is layed in the landing slab in described angle steel housing, thereby can be set up in easily on the horizon bar of top support body, and with horizon bar, be fixedly connected with modes such as welding by clamping.Thereby make the erection construction of furred ceiling operating platform very convenient, and the furred ceiling operating platform be applied on the support body of top of the present utility model, its platform itself is made simple, lighter weight, intensity is higher, safe and reliable, reusable, cost is also quite cheap, can be used in and choose higher space, is particularly suitable for being used in conjunction with top lamp grid frame.
The accompanying drawing explanation
Fig. 1 is the structural representation that is applied to the furred ceiling operating platform on the support body of top of the present utility model.
Fig. 2 is that furred ceiling operating platform of the present utility model is arranged at the assembling schematic diagram on the support body of top.
Fig. 3 be furred ceiling operating platform of the present utility model with the top support body between be fixedly connected with and concern schematic diagram.
The specific embodiment
In order more clearly to understand technology contents of the present utility model, especially exemplified by following examples, describe in detail.
Referring to shown in Fig. 1, is the structural representation that is applied to the furred ceiling operating platform on the support body of top of the present utility model.
As depicted in figs. 1 and 2, described top support body comprises from the top of building suspension rod 1 that extend in space downwards, and at least two horizon bars 2 that are fixedly connected on described suspension rod 1.In one embodiment, described furred ceiling operating platform 9 comprises angle steel housing 3 and is layed in the landing slab 4 in described angle steel housing 3, this furred ceiling operating platform 9 is arranged on the support body of described top, and described angle steel housing 3 is fixedly connected with described horizon bar 2.Described furred ceiling operating platform 9 can also comprise and is fixedly connected on described angle steel housing 3 and is arranged at the angle steel crossbeam 5 under described landing slab 4.Landing slab 4 also can adopt the multi-layer flat platen, and the weight that alleviates each laminate is convenient to install and transportation, and the gross thickness of multi-layer flat platen generally is not less than 20mm, to guarantee whole intensity.
In a preferred embodiment, as shown in Figure 2,3, the bottom of described furred ceiling operating platform 9 is provided with draw-in groove 6, and described furred ceiling operating platform 9 is by this draw-in groove 6 and described horizon bar 2 clampings.Also offer several jack (not shown)s on described furred ceiling operating platform 9, be provided with latch 7 in described jack, described latch 7 is welded and fixed with described horizon bar 2.
In preferred embodiment, described top support body is lamp grid framves, and this lamp grid frame comprises from the top of building angle steel suspension rod 1 that extend in space downwards and the horizontal channel-section steel 2 that is fixedly connected on this angle steel suspension rod.
In actual applications, consider the technological design characteristics of performing in a radio or TV programme the places such as the Room, the lamp grid frame characteristics of top Lighting Design especially, the furred ceiling operating platform be applied on the support body of top of the present utility model has following specific features:
1, adopt angle steel to make landing slab housing (2380 * 500,2580 * 500,2680 * 500 3 kinds of planar dimensions).
2, lay the thick composite board of 20mm in frame as operating platform.
3, the landing slab two ends are by welding reinforcing bar (horizontal direction 40mm is long, and vertical 25mm is long) and T-shaped latch (horizontal direction 30mm is long, and vertical 50mm is long) reliably is connected with lamp grid frame bottom level direction channel-section steel.
The installation process that is applied to the furred ceiling operating platform on the support body of top of the present utility model is as follows:
1, at first landing slab is kept flat to lamp grid frame level to " on [" shape 16a channel-section steel;
2, along long, to direction horizontal sliding 30mm, make reinforcing bar card and channel-section steel frange plate chucking;
3, use T-shaped latch inserts the bight jack, and the landing slab horizontal direction is fixed;
4, laying composite board comes into operation.
Adopted the furred ceiling operating platform on the support body of top that is applied to of this utility model, because it comprises the angle steel housing and is layed in the landing slab in described angle steel housing, thereby can be set up in easily on the horizon bar of top support body, and with horizon bar, be fixedly connected with modes such as welding by clamping.Thereby make the erection construction of furred ceiling operating platform very convenient, and the furred ceiling operating platform be applied on the support body of top of the present utility model, its platform itself is made simple, lighter weight, intensity is higher, safe and reliable, reusable, cost is also quite cheap, can be used in and choose higher space, is particularly suitable for being used in conjunction with top lamp grid frame.
In this manual, the utility model is described with reference to its specific embodiment.But, still can make various modifications and conversion obviously and not deviate from spirit and scope of the present utility model.Therefore, manual and accompanying drawing are regarded in an illustrative, rather than a restrictive.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320336502 CN203347206U (en) | 2013-06-09 | 2013-06-09 | Ceiling operation platform applied to top frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320336502 CN203347206U (en) | 2013-06-09 | 2013-06-09 | Ceiling operation platform applied to top frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203347206U true CN203347206U (en) | 2013-12-18 |
Family
ID=49747119
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320336502 CN203347206U (en) | 2013-06-09 | 2013-06-09 | Ceiling operation platform applied to top frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203347206U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104878867A (en) * | 2015-05-21 | 2015-09-02 | 中国建筑第二工程局有限公司 | Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof |
-
2013
- 2013-06-09 CN CN 201320336502 patent/CN203347206U/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104878867A (en) * | 2015-05-21 | 2015-09-02 | 中国建筑第二工程局有限公司 | Ceiling joist and double-layer construction platform integrated structure and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2011115137A (en) | Construction having a lot of levels and method for its establishment | |
CN203684776U (en) | Plus/minus 800 kV extra-high voltage direct-current transmission line shoe plate connecting structure | |
CN103276891A (en) | Aluminum template system for building | |
CN204960122U (en) | Prefabricated integrated PVC line box SIP wall body | |
CN203430059U (en) | Temporary fixing device used for installing large-span steel structure roof primary truss | |
EP3075922B1 (en) | Modular flooring | |
CN103590491A (en) | Novel detachable foldable container type prefabricated house | |
CN202370253U (en) | Assembly type single-row vertical rod machining shed for building construction site | |
CN103104092A (en) | Support composite structure of beam and slab | |
CN207260338U (en) | Pseudo-classic architecture wood sets of brackets on top of the columns roofing and concrete main body frame connecting structure | |
CN202866120U (en) | Novel assembly wallboard | |
CN202577571U (en) | Structure of inner barrel-outer frame clip-shaped steel framework building | |
CN201695660U (en) | Miniature multi-functional interior decoration scaffold | |
CN102852345B (en) | Foldable trailer coach | |
CN204475921U (en) | The dismountable firm structural construction factory building of a kind of safety | |
CN203877109U (en) | Lifting storage rack for building prefabricated composite floor slabs | |
CN203654859U (en) | Light car roof tent | |
CN203333143U (en) | Building construction basket | |
CN202064634U (en) | Formwork supporting structure for square concrete cap | |
CN205577188U (en) | Collect heat preservation, decorative layer and template in exterior wall cladding of an organic whole system | |
CN203475608U (en) | Novel container-type portable house capable of being folded and detached | |
CN206015895U (en) | Prefabricated assembled detachable one off houses | |
CN201962844U (en) | Hollow composition board internally provided with steel pipes and steel plates | |
CN205000518U (en) | Take combination formula floor board in stair hole | |
CN203201140U (en) | Beam slab support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131218 Termination date: 20190609 |
|
CF01 | Termination of patent right due to non-payment of annual fee |