CN203233120U - Suspension bracket apparatus for all insulation copper pipe buses - Google Patents
Suspension bracket apparatus for all insulation copper pipe buses Download PDFInfo
- Publication number
- CN203233120U CN203233120U CN 201320225248 CN201320225248U CN203233120U CN 203233120 U CN203233120 U CN 203233120U CN 201320225248 CN201320225248 CN 201320225248 CN 201320225248 U CN201320225248 U CN 201320225248U CN 203233120 U CN203233120 U CN 203233120U
- Authority
- CN
- China
- Prior art keywords
- copper pipe
- insulation copper
- buses
- suspension bracket
- suspenders
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000725 suspension Substances 0.000 title claims abstract description 26
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 title claims abstract description 23
- 229910052802 copper Inorganic materials 0.000 title claims abstract description 23
- 239000010949 copper Substances 0.000 title claims abstract description 23
- 238000009413 insulation Methods 0.000 title claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 239000011229 interlayer Substances 0.000 abstract description 5
- 239000004020 conductor Substances 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 abstract 1
- 238000003466 welding Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 241000272165 Charadriidae Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
Images
Landscapes
- Installation Of Bus-Bars (AREA)
Abstract
The utility model discloses a suspension bracket apparatus for all insulation copper pipe buses, comprising a connection bodies and suspenders. The cross section of the connection body is groove-shaped. One end of the connection body is fixed on a bottom of a building and the other end of the connection body is connected to the top of the suspender. A transverse rod connects bottom ends of every two adjacent suspenders, and the suspenders and the transverse rod form a space which is in a shape of a Chinese character 'ao'. The suspension bracket apparatus for all insulation copper pipe buses installs connection bodies on a beam bottom of a cable interlayer to connect the suspenders and the transverse rod to form the space in a shape of a Chinese character 'ao'. In the process of construction, the full insulation copper tube buses pass through the space which is in the shape of the Chinese character 'ao' and are introduced to a bottom of a switch cabinet and is connected to the switch cabinet. The suspension bracket apparatus for all insulation copper pipe buses can not only satisfy relatively large conductor transmission capacity, but also can reduce the length of a distribution room when the indoor story height is limited so as to save substantial interior space. The all insulation copper tube buses are introduced to the underground to prevent loss of power and electric power and financial resource caused by accidentally bumping and damaging the conductor in the process of maintenance.
Description
Technical field
The utility model relates to a kind of fixture of power equipment, is specifically related to a kind of hanger device of all insulation copper pipe bus.
Background technology
Present indoor electric substation is provided with cable interlayer more, and the connected mode between transformer chamber and the switch cubicle mainly contains two kinds: naked copper row and copper pipe bus adopt the mode of the built on stilts inlet wire of switch cubicle, the mode that cable adopts inlet wire under the switch cubicle.Bus bridge or naked copper row need be installed in the switch cubicle chamber in original design, and suspension bracket is installed, bus bridge and the copper bar installed in transformer chamber and the switchgear house occupy very big space, naked copper row exposes in external operation and maintenance process and is easily bumped and damage by workmen's mistake, has certain potential safety hazard.
The utility model content
Goal of the invention: in order to overcome the deficiencies in the prior art, the utility model provides a kind of hanger device of all insulation copper pipe bus.
Technical scheme: for solving the problems of the technologies described above, the hanger device of a kind of all insulation copper pipe bus of the present utility model, comprise connector, suspension rod, described connector cross section is fluted body, connector one side is fixed in the building bottom, opposite side is connected with the suspension rod top, and per two suspension rods are connected with cross bar between the bottom, and forming cross section between suspension rod and the cross bar is the space of " recessed " font structure.
As preferably, be connected by bolt between described suspension rod and the cross bar, also can adopt integrated design or welding to wait other connected modes, adopt screw or welding to wait its connected mode between suspension rod and the connector.
As preferably, described connector, suspension rod and cross bar can be selected angle steel, channel-section steel for use, also can select round steel for use.
Beneficial effect: the hanger device of a kind of all insulation copper pipe bus of the present utility model, by connector is installed suspension rod and cross bar are combined into the space that a cross section is " recessed " font structure at the bottom of the beam of cable interlayer, in the work progress, only need copper pipe bus is passed the below of this " recessed " font space insertion switch cabinet, be connected with switch cubicle again, not only can satisfy bigger conductor transmission capacity, and when indoor floor height is restricted, can reduce the height of switchgear house, save a large amount of interior spaces, and all insulation copper pipe bus is introduced the underground cable interlayer, can also rationally utilize cable interlayer, avoid bumping mistake because of mistake and decrease conductor and cause the loss of certain electric power financial resources.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is use state diagram of the present utility model.
Embodiment
Below in conjunction with accompanying drawing the utility model is done further explanation.
As depicted in figs. 1 and 2, the hanger device of a kind of all insulation copper pipe bus of the present utility model, comprise connector 5, suspension rod 2, described connector 5 cross sections are fluted body, connector 5 one sides are fixed in the building bottom, opposite side is connected with suspension rod 2 tops, is connected with cross bar 4 between per two suspension rod 2 bottoms, and forming cross section between suspension rod 2 and the cross bar 4 is the space of concave structure.
In the present embodiment, be connected by bolt 3 between described suspension rod 2 and the cross bar 4, also can adopt integrated design or welding to wait other connected modes, adopt screw 1 or welding to wait its connected mode between suspension rod 2 and the connector 5; Described connector 5, suspension rod 2 and cross bar 4 can be selected angle steel, channel-section steel for use, also can select round steel for use.
In work progress, directly copper pipe bus 6 is passed hanger device, introduce switchgear house below access switch cubicle and get final product.
The above only is preferred implementation of the present utility model; be noted that for those skilled in the art; under the prerequisite that does not break away from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection range of the present utility model.
Claims (3)
1. the hanger device of an all insulation copper pipe bus, it is characterized in that: comprise connector (5) and suspension rod (2), described connector (5) cross section is fluted body, connector (5) one sides are fixed in the building bottom, opposite side is connected with suspension rod (2) top, per two suspension rods (2) are connected with cross bar (4) between the bottom, and forming cross section between suspension rod (2) and the cross bar (4) is the space of " recessed " font structure.
2. the hanger device of all insulation copper pipe bus according to claim 1 is characterized in that: be connected by bolt (3) between described suspension rod (2) and the cross bar (4), be connected by screw (1) between suspension rod (2) and the connector (5).
3. the hanger device of all insulation copper pipe bus according to claim 1 is characterized in that: the connector of described connector (5) for being made by channel-section steel or angle steel.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320225248 CN203233120U (en) | 2013-04-27 | 2013-04-27 | Suspension bracket apparatus for all insulation copper pipe buses |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320225248 CN203233120U (en) | 2013-04-27 | 2013-04-27 | Suspension bracket apparatus for all insulation copper pipe buses |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203233120U true CN203233120U (en) | 2013-10-09 |
Family
ID=49289224
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201320225248 Expired - Lifetime CN203233120U (en) | 2013-04-27 | 2013-04-27 | Suspension bracket apparatus for all insulation copper pipe buses |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203233120U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103683085A (en) * | 2013-12-06 | 2014-03-26 | 镇江西门子母线有限公司 | Busway angle steel hanging bracket |
| CN104779533A (en) * | 2015-03-30 | 2015-07-15 | 中国能源建设集团浙江省电力设计院有限公司 | Rack mounting structure for indoor power distribution equipment and rack mounting method |
-
2013
- 2013-04-27 CN CN 201320225248 patent/CN203233120U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103683085A (en) * | 2013-12-06 | 2014-03-26 | 镇江西门子母线有限公司 | Busway angle steel hanging bracket |
| CN104779533A (en) * | 2015-03-30 | 2015-07-15 | 中国能源建设集团浙江省电力设计院有限公司 | Rack mounting structure for indoor power distribution equipment and rack mounting method |
| CN104779533B (en) * | 2015-03-30 | 2017-03-08 | 中国能源建设集团浙江省电力设计院有限公司 | A kind of rack mounting structure of indoor distribution and installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106159559A (en) | A kind of busbar transfiguration linkage structure | |
| CN204960467U (en) | Communication angle -steel tower | |
| CN204167694U (en) | Switch cubicle secondary line routing device | |
| CN203387132U (en) | Connecting structure of converter station valve hall wall bushing and tubular bus-bar and connecting fitting thereof | |
| CN209625964U (en) | A kind of transformer connection mechanism | |
| CN203895633U (en) | Short circuit grounding wire suitable for box transformer substation and electricity distribution room | |
| CN203398357U (en) | Grounding device for 10kV cable branch box, ring main unit and ring main box | |
| CN201910609U (en) | High-voltage cable branch box | |
| CN206353611U (en) | The high-low pressure clamp for ground wire of direction self adjusting | |
| CN203674523U (en) | Connection bus used for connecting connection cabinet with switch cabinet | |
| CN204571449U (en) | A kind of EHV transmission steel tube tower cross-arm | |
| CN104538850A (en) | Three-phase tube bus vertical structure of 1000 kV transformer substation | |
| CN205159803U (en) | 220 outdoor GIS of formula arrangement structure that is qualified for next round of competitions is united to kilovolt sail | |
| CN205304128U (en) | Tower crane cable fixed bolster | |
| CN203800384U (en) | Low-voltage distribution board supporting frame | |
| CN208352856U (en) | Power distribution live-wire on-load drainage thread hanging rod | |
| CN204012219U (en) | Low-tension switch cabinet vertical bus clamp | |
| CN210127694U (en) | Cable terminal pole for breaking one cable in double-circuit same-pole parallel power transmission line | |
| CN202797761U (en) | Auxiliary device for live working | |
| CN206135347U (en) | Horizontal cross elbow of cross | |
| CN208282452U (en) | The evaporator of end socket easy to disassemble | |
| CN207677284U (en) | Armored mid-set metal closed switch cabinet | |
| CN206250581U (en) | One kind is used for substation cable interlayer | |
| CN206506159U (en) | A kind of high-tension switch cabinet wiring construction | |
| CN204835425U (en) | Modular antidetonation bus duct |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 210016 No. 311-1 Shandong Road, Xuanwu District, Nanjing City, Jiangsu Province Patentee after: Ziquan Energy Technology Co.,Ltd. Address before: 210000 Jiangsu province Nanjing city Zhongshan Road No. 311-1 East Building, Nanjing Electric Power Design Consulting Co., Ltd. Ziquan Patentee before: ZIQUAN ELECTRIC POWER DESIGN DESIGN |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20131009 |