CN203224014U - Ice storage control system - Google Patents
Ice storage control system Download PDFInfo
- Publication number
- CN203224014U CN203224014U CN201320254310.7U CN201320254310U CN203224014U CN 203224014 U CN203224014 U CN 203224014U CN 201320254310 U CN201320254310 U CN 201320254310U CN 203224014 U CN203224014 U CN 203224014U
- Authority
- CN
- China
- Prior art keywords
- control valve
- ice storage
- control
- storage tank
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004378 air conditioning Methods 0.000 claims abstract description 24
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 47
- 239000012530 fluid Substances 0.000 claims 1
- 239000007788 liquid Substances 0.000 abstract description 11
- 230000007704 transition Effects 0.000 abstract 1
- 238000001816 cooling Methods 0.000 description 40
- LYCAIKOWRPUZTN-UHFFFAOYSA-N Ethylene glycol Chemical compound OCCO LYCAIKOWRPUZTN-UHFFFAOYSA-N 0.000 description 9
- 238000005057 refrigeration Methods 0.000 description 9
- 230000009977 dual effect Effects 0.000 description 7
- 230000005611 electricity Effects 0.000 description 5
- 238000002844 melting Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 238000004891 communication Methods 0.000 description 4
- 230000008018 melting Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000017525 heat dissipation Effects 0.000 description 3
- WGCNASOHLSPBMP-UHFFFAOYSA-N hydroxyacetaldehyde Natural products OCC=O WGCNASOHLSPBMP-UHFFFAOYSA-N 0.000 description 3
- 238000005457 optimization Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000011217 control strategy Methods 0.000 description 2
- 239000000498 cooling water Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008054 signal transmission Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/14—Thermal energy storage
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种能量转换系统,特别是涉及一种用于制冷的能量转换系统。The utility model relates to an energy conversion system, in particular to an energy conversion system for refrigeration.
背景技术Background technique
在现有建筑的集中空调制冷专业,对电力消耗巨大,往往造成运营成本较高。为了减少供冷系统的峰值用电负荷,和充分利用区域内有关的电力优惠政策与峰谷电差价,减少输变电设备的投资,大幅降低空调的运行费用,会考虑采用带有蓄冰供冷系统的空调供冷系统。如图1所示,受限于设备采购成本,每种设备都需要一组并行工作来保证必要的负荷功率,空调供冷系统包括散热系统、循环系统和供冷系统,基载主机01的冷却侧、一组双工况主机02的冷却侧、一组双工况冷却泵03、一组基载冷却泵04和一组冷却塔05通过水管连接成冷却系统,基载主机01的循环侧、一组基载冷却泵06、集水器07和分水器08通过水管连接成循环系统的基载循环子系统,一组双工况主机02的循环侧、蓄冰槽10、一组板式换热器11的循环侧和一组乙二醇泵09通过水管连接成循环系统的蓄冰循环子系统,一组板式换热器11的冷冻侧、一组双工况冷冻泵12、集水器07和分水器08通过水管连接成供冷系统。在空调供冷系统的各设备的出入水管上安装有电动阀M,工业控制器通过控制各电动阀M的开启,调节散热系统、循环系统和供冷系统的运行功率。The centralized air-conditioning and refrigeration in existing buildings consumes a lot of electricity, which often results in high operating costs. In order to reduce the peak power load of the cooling system, make full use of the relevant regional power preferential policies and the difference in peak and valley power prices, reduce the investment in power transmission and transformation equipment, and greatly reduce the operating costs of air conditioners, it will be considered to use a power supply with ice storage Air-conditioning cooling system for cooling system. As shown in Figure 1, limited by the cost of equipment procurement, each type of equipment needs a group of parallel work to ensure the necessary load power. The air conditioning cooling system includes a heat dissipation system, a circulation system, and a cooling system. side, the cooling side of a set of dual-working-condition
但是现有技术中,对于蓄冰工况控制流程和制冷工况控制流程不能很好地协调,造成系统中的冷却水泵、冷却塔的效率较低,蓄冰槽蓄冷量浪费,双工况主机工作模式单一,设备磨损较大,系统使用寿命缩短。However, in the prior art, the control process of the ice storage condition and the control process of the refrigeration condition cannot be well coordinated, resulting in low efficiency of the cooling water pump and cooling tower in the system, waste of cold storage capacity in the ice storage tank, and double working condition main engine The working mode is single, the equipment wears out, and the service life of the system is shortened.
实用新型内容Utility model content
本实用新型的目的是要提供一种蓄冰控制系统,解决空调供冷系统的蓄冰与供冷工况不易控制,设备易于磨损的技术问题。The purpose of the utility model is to provide an ice storage control system to solve the technical problems that the ice storage and cooling conditions of the air-conditioning cooling system are difficult to control and the equipment is easy to wear.
本实用新型的蓄冰控制系统,包括控制器,其中:还包括与所述控制器信号连接的控制阀,所述控制阀安装于空调供冷系统的循环系统管路上,用于控制空调供冷系统的循环系统中循环液体的流向和流量。The ice storage control system of the utility model includes a controller, wherein: it also includes a control valve connected to the controller signal, and the control valve is installed on the circulation system pipeline of the air-conditioning cooling system for controlling the air-conditioning cooling system. The flow direction and flow rate of the circulating liquid in the circulation system of the system.
所述控制阀包括第一控制阀、第二控制阀、第三控制阀和第四控制阀,在蓄冰槽的进水管与出水管之间设置第一连通支管,在蓄冰槽的出水管与乙二醇泵的进水管之间设置第二连通支管,在蓄冰槽的进水管上安装第二控制阀,在第一连通支管上安装第一控制阀,在第二连通支管上安装第三控制阀,在蓄冰槽的出水管与板式换热器间的水管上安装第四控制阀。The control valve includes a first control valve, a second control valve, a third control valve and a fourth control valve, a first connecting branch pipe is set between the water inlet pipe and the water outlet pipe of the ice storage tank, and the water outlet pipe of the ice storage tank The second connecting branch pipe is set between the water inlet pipe of the glycol pump, the second control valve is installed on the water inlet pipe of the ice storage tank, the first control valve is installed on the first connecting branch pipe, and the second connecting branch pipe is installed on the second connecting branch pipe. Three control valves, the fourth control valve is installed on the water pipe between the water outlet pipe of the ice storage tank and the plate heat exchanger.
本实用新型的蓄冰控制系统,可以使空调供冷系统在单融冰供冷或单主机供冷工况不能满足系统负荷要求的情况下,系统将制冰、制冷工况转换,进而实现“优化控制”运行模式,使供冷功率峰值可以灵活调整。The ice storage control system of the utility model can make the air-conditioning cooling system switch between the ice making and refrigeration working conditions when the cooling condition of the ice melting alone or the cooling supply of the main engine cannot meet the system load requirements, and then realize " Optimal control" mode of operation, so that the cooling power peak value can be adjusted flexibly.
在电价高峰时段和电价平谷时段分别采用融冰优先和主机优先两种优化控制控制策略,充分利用峰、平电价,节省运行费用。During the peak period of electricity price and the period of flat valley of electricity price, two optimization control strategies are adopted, namely ice-melting priority and host priority, to make full use of peak and flat electricity prices and save operating costs.
下面结合附图对本实用新型的实施例作进一步说明。Embodiments of the utility model will be further described below in conjunction with the accompanying drawings.
附图说明Description of drawings
图1为现有技术中空调供冷系统的结构示意图;Fig. 1 is the structural representation of the air-conditioning cooling system in the prior art;
图2为本实用新型蓄冰控制系统的结构示意图;Fig. 2 is a structural schematic diagram of the ice storage control system of the present invention;
图3为本实用新型蓄冰控制系统的控制阀布设位置示意图;Fig. 3 is a schematic diagram of the layout position of the control valve of the ice storage control system of the present invention;
图4为本实用新型蓄冰控制系统的传感器布设位置示意图。Fig. 4 is a schematic diagram of the layout position of the sensors of the ice storage control system of the present invention.
具体实施方式Detailed ways
如图2所示,本实用新型的蓄冰控制系统包括控制器20、管路温度传感器21、压力传感器22、流量传感器23、液位传感器24、环境温度传感器25、控制阀V和电动阀M,As shown in Figure 2, the ice storage control system of the present invention includes a
控制器20,采用S7-300系列控制器,用于接收各传感器采集的状态信号,根据内置控制策略生成相应的设备联动控制信号,控制各电动阀和控制阀的开启状态;The
管路温度传感器21,用于采集水管中的循环液体的温度变化;The
压力传感器22,用于采集水管中的循环液体的压力变化;The
流量传感器23,用于采集水管中的循环液体的流量变化;The
液位传感器24,用于采集蓄冰槽内的液面高度变化;The
环境温度传感器25,用于采集空调供冷系统用户侧的环境温度变化;
电动阀M,用于控制空调供冷系统的各设备的出入水管开关状态;The electric valve M is used to control the switch status of the water inlet and outlet pipes of each equipment in the air-conditioning and cooling system;
控制阀V,安装于空调供冷系统的循环系统管路上,用于控制空调供冷系统的循环系统中循环液体的流向和流量;The control valve V is installed on the circulation system pipeline of the air-conditioning and cooling system, and is used to control the flow direction and flow rate of the circulating liquid in the circulation system of the air-conditioning and cooling system;
各传感器和电动阀M、控制阀V通过信号传输线路与控制器连接,完成控制信号和状态采集信号的传递。Each sensor, electric valve M, and control valve V are connected to the controller through signal transmission lines to complete the transmission of control signals and state acquisition signals.
本实用新型的蓄冰控制系统通过采集空调供冷系统中各循环子系统的管路状态参数,控制控制阀V的开启状态,改变空调供冷系统的循环系统中循环液体的流向和流量;使得双工况主机02可以在电价便宜时为蓄冰槽制冰存储制冷量,在用电高峰时,部分或全部替代双工况主机02制冷,减少电力消耗,或与双工况主机02协调工作,提高峰值制冷效率。The ice storage control system of the utility model controls the opening state of the control valve V by collecting the pipeline state parameters of each circulation subsystem in the air-conditioning cooling system, and changes the flow direction and flow rate of the circulating liquid in the circulation system of the air-conditioning cooling system; The dual-working-
如图3所示,在蓄冰循环子系统中,在蓄冰槽10的进水管与出水管之间设置第一连通支管L1,在蓄冰槽的出水管与乙二醇泵09的进水管之间设置第二连通支管L2,在蓄冰槽10的进水管上安装第二控制阀V2,在第一连通支管L1上安装第一控制阀V1,在第二连通支管L2上安装第三控制阀V3,在蓄冰槽的出水管与板式换热器11间的水管上安装第四控制阀V4。As shown in Figure 3, in the ice storage circulation subsystem, the first connecting branch pipe L1 is set between the water inlet pipe and the water outlet pipe of the
当控制器20控制第一控制阀V1关闭,第二控制阀V2开启,第三控制阀V3关闭,第四控制阀V4开启,可以改变工况程序,实现双工况主机蓄冰;When the
当控制器20控制第一控制阀V1开启,第二控制阀V2关闭,第三控制阀V3开启,第四控制阀V4关闭,可以改变工况程序,实现双工况主机单独制冷;When the
当控制器20控制第一控制阀V1、第二控制阀V2、第三控制阀V3和第四控制阀V4的开启状态、角度,可以改变工况程序,实现蓄冰槽单独供冷;When the
当控制器20控制第一控制阀V1、第二控制阀V2、第三控制阀V3和第四控制阀V4的开启状态、角度,可以改变工况程序,实现蓄冰槽与双工况主机优化控制。When the
如图4所示,在空调供冷系统的散热系统中,冷却塔05的进水管、出水管上,基载主机01和双工况主机02的出水管上安装有管路温度传感器21;As shown in Figure 4, in the heat dissipation system of the air-conditioning cooling system, a
在空调供冷系统的循环系统中,蓄冰槽10与双工况主机02间的水管上安装有管路温度传感器21、压力传感器22,蓄冰槽10的出水管上安装管路温度传感器21,第一连通支管L1与第二连通支管L2间的水管上安装管路温度传感器21、压力传感器22、流量传感器23,乙二醇泵09与第二连通支管L2间的水管上安装管路温度传感器21、压力传感器22,在第二连通支管L2与板式换热器11间的水管上安装管路温度传感器21,基载冷冻泵06与分水器08间的水管上安装管路温度传感器21、流量传感器23,蓄冰槽10中安装液位传感器24;In the circulation system of the air-conditioning cooling system, a
在空调供冷系统的供冷系统中,板式换热器11与双工况冷冻器12间的水管上安装管路温度传感器21,板式换热器11与集水器07间的水管上安装管路温度传感器21,分水器08与集水器07与用户侧的负荷13间的水管上安装压力传感器22,用户侧的负荷13上安装环境温度传感器25。In the cooling system of the air-conditioning cooling system, a
通过各传感器采集空调供冷系统各管路的温度、压力、流量信号,可以使得控制器20得到精确的控制反馈信号,使生成的控制信号精度提高,可以精确控制电动阀和控制阀的开合状态。配合控制器20对设备的联动控制,实现灵活的制冷、制冰控制过程。The temperature, pressure, and flow signals of each pipeline in the air-conditioning and cooling system can be collected by each sensor, so that the
根据各传感器信号,控制器调整设备工况参数,实现设备运行顺序的优化,降低单一设备的磨损。According to the signals of each sensor, the controller adjusts the operating parameters of the equipment to optimize the operation sequence of the equipment and reduce the wear and tear of a single equipment.
融冰优先时,最大速率融冰,根据负荷需求,控制器控制双工况主机的开启台数,并根据优化策略控制双工况主机出口温度设定值,同时通过控制第三控制阀V3、第四控制阀V4,补充调节控制冷冻供回水温度满足末端要求,保证主机负荷率在40%以上。主机优先时,优先开启双工况主机并在最大功率下运行,在两台双工况主机全部开启不能满足末端负荷要求时,控制器调节第一控制阀V1和第二控制阀V2的开度,进行融冰并控制冰槽的融冰速率,保证末端负荷的需要。When the ice melting is prioritized, the maximum rate of ice melting, according to the load demand, the controller controls the number of hosts with dual working conditions, and controls the set value of the outlet temperature of the dual working condition hosts according to the optimization strategy, and at the same time controls the third control valve V3, the first Four control valves V4, supplementary adjustment control the temperature of the refrigerated supply and return water to meet the end requirements, and ensure that the load rate of the main engine is above 40%. When the main engine is prioritized, the dual-working condition main engine is first turned on and runs at the maximum power. When the two dual-working condition main engines are all turned on and cannot meet the end load requirements, the controller adjusts the opening of the first control valve V1 and the second control valve V2. , to melt ice and control the ice melting rate of the ice tank to ensure the needs of the end load.
以上所述的实施例仅仅是对本实用新型的优选实施方式进行描述,并非对本实用新型的范围进行限定,在不脱离本实用新型设计精神的前提下,本领域普通技术人员对本实用新型的技术方案作出的各种变形和改进,均应落入本实用新型权利要求书确定的保护范围内。The above-mentioned embodiments are only described to the preferred implementation of the utility model, and are not limited to the scope of the utility model. Various modifications and improvements made should fall within the scope of protection determined by the claims of the utility model.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320254310.7U CN203224014U (en) | 2012-11-29 | 2013-05-10 | Ice storage control system |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201220646282 | 2012-11-29 | ||
| CN201220646282.9 | 2012-11-29 | ||
| CN201320254310.7U CN203224014U (en) | 2012-11-29 | 2013-05-10 | Ice storage control system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203224014U true CN203224014U (en) | 2013-10-02 |
Family
ID=49251017
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320254310.7U Expired - Lifetime CN203224014U (en) | 2012-11-29 | 2013-05-10 | Ice storage control system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203224014U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104110782A (en) * | 2013-11-30 | 2014-10-22 | 深圳市作夏科技有限公司 | Water-cooling-storage energy-saving central air-conditioning management system |
| CN110557930A (en) * | 2019-08-08 | 2019-12-10 | 世源科技工程有限公司 | A data center cooling system and control method |
-
2013
- 2013-05-10 CN CN201320254310.7U patent/CN203224014U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104110782A (en) * | 2013-11-30 | 2014-10-22 | 深圳市作夏科技有限公司 | Water-cooling-storage energy-saving central air-conditioning management system |
| CN110557930A (en) * | 2019-08-08 | 2019-12-10 | 世源科技工程有限公司 | A data center cooling system and control method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203358863U (en) | Ship central cooling system | |
| CN201193860Y (en) | An economically operated central air-conditioning system | |
| CN201344597Y (en) | Energy storage air-conditioning system | |
| CN101225990B (en) | Hot-water air conditioner and control method | |
| CN102410597B (en) | Ground source heat pump air-conditioning system device based on peak regulation and energy storage as well as control and operation method thereof | |
| CN203586628U (en) | Cooling tower natural cooling system for chilled water system | |
| CN203010847U (en) | Ice storage cold supply control system | |
| CN208765140U (en) | A kind of refrigeration system of winter low energy consumption | |
| CN205717678U (en) | A kind of ice storage cold-hot pump system | |
| CN201885354U (en) | Energy-saving central air-conditioning system | |
| CN201093643Y (en) | New type solar energy assistant ground source heat pump air conditioning system apparatus | |
| CN103604179A (en) | Composite cooling device capable of being operated under multiple weather conditions | |
| CN203443026U (en) | Control system for ice storage refrigeration plant room | |
| CN101995071A (en) | Remote valve control method | |
| CN201935316U (en) | Automatic compensation group control system for ground source heat pump | |
| CN202304095U (en) | Heat pump three-in-one unit | |
| CN101915479A (en) | A heat source tower cooling and heating energy-saving system | |
| CN204187900U (en) | The electrical control gear of double evaporators ice storage cold-hot pump unit | |
| CN205227917U (en) | Steam condensate water and waste heat recovery utilizes system thereof | |
| CN203100031U (en) | Multi-functional air-conditioning water cold accumulation system | |
| CN203518315U (en) | Water-cooling multifunctional heat pump water chilling unit | |
| CN201611143U (en) | Air conditioner auxiliary cooling energy-saving equipment | |
| CN206055884U (en) | A kind of central air-conditioning circulates the preferred control device of pump group | |
| CN205579825U (en) | Supply system based on energy -saving solar energy air source heat pump trigeminy | |
| CN203550083U (en) | Ice-storage radiation air-conditioning system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20131002 |