The board-like wall bushing of Medium Voltage Switchgear active catch
Technical field
The utility model relates to and is pressed into the parts that complete equipment is used in a kind of, specifically the board-like wall bushing of a kind of Medium Voltage Switchgear active catch.
Background technology
In the Medium Voltage Switchgear bus-bar room that is pressed in the complete equipment all need to install wall bushing, wall bushing of the prior art and shrouding all are fixed as one, main busbar is installed for convenience, generally the shrouding at wall bushing has bigger busbar perforation, adopt such mounting means, after main busbar is installed, does not satisfy the degree of protection requirement and do not have supporting role on the one hand; On the other hand, when change owner busbar more, after the specification of main busbar changes, busbar hole originally can not adapt to the busbar specification of replacing again, therefore whole wall bushing complete removal not only need have been wasted material but also wasted the operating time thus, made installation, maintenance cost height.
Summary of the invention
The technical problems to be solved in the utility model provides a kind of installation, the board-like wall bushing of Medium Voltage Switchgear active catch that maintenance cost is low.
In order to solve the problems of the technologies described above, the board-like wall bushing of Medium Voltage Switchgear active catch of the present utility model, comprise the wall bushing body, the end of wall bushing body connects a pair of baffle plate that cooperatively interacts by securing member, the main busbar perforation that the end of two baffle plates has a pair of cooperation to form, the specification of the size of main busbar perforation and the main busbar of required cross-under adapts.
Described two baffle plate engaged at end partly are provided with the step that cooperatively interacts.
After adopting above-mentioned structure, because the end of wall bushing body connects a pair of baffle plate that cooperatively interacts by securing member, the main busbar perforation that the end of two baffle plates has a pair of cooperation to form, arrange thus, after the main busbar of required cross-under connects, at the wall bushing body main busbar being positioned at two baffle wedges cooperates the main busbar perforation that forms to get final product, when needs more during the change owner busbar, only needing the bus size to change different baffle plates gets final product, arrange thus, installation is changed simple and convenient, has saved more conversion materials, improve replacing efficient, reduced replacing, maintenance cost.
Description of drawings
Fig. 1 is the utility model integral installation structural representation;
Fig. 2 is the planar structure schematic diagram of a wherein baffle plate of the present utility model;
Fig. 3 is two baffle plate syndeton schematic diagrames in the utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments, the board-like wall bushing of Medium Voltage Switchgear active catch of the present utility model is described in further detail.
As shown in the figure, the board-like wall bushing of Medium Voltage Switchgear active catch of the present utility model, comprise wall bushing body 1, the end of wall bushing body 1 connects a pair of baffle plate that cooperatively interacts 3 by securing member 2, the main busbar perforation 4 that the end of two baffle plates 3 has a pair of cooperation to form, as shown in Figure 2, on the end face of each piece baffle plate, all have a U-lag 7 that is used for installing main busbar, make two U-lags form a complete main busbar perforation 4 that is used for cross-under master busbar 5 after two baffle plates engage, the size of main busbar perforation 4 adapts with the specification of the required main busbar 5 that is connected in series.
Further can partly be provided with 6, two baffle plates of step that cooperatively interact two baffle plate 3 engaged at end and engage enclosed construction of back formation, play good sealing function by the hermetically-sealed construction that forms.