CN203178474U - Intelligent electric-energy-meter fast transient pulse group test equipment - Google Patents

Intelligent electric-energy-meter fast transient pulse group test equipment Download PDF

Info

Publication number
CN203178474U
CN203178474U CN 201320149254 CN201320149254U CN203178474U CN 203178474 U CN203178474 U CN 203178474U CN 201320149254 CN201320149254 CN 201320149254 CN 201320149254 U CN201320149254 U CN 201320149254U CN 203178474 U CN203178474 U CN 203178474U
Authority
CN
China
Prior art keywords
energy meter
electric energy
coupler
fast transient
smart
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320149254
Other languages
Chinese (zh)
Inventor
关宏
朱彬若
张垠
王新刚
沈滢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Power Corp
State Grid Corp of China SGCC
Original Assignee
Shanghai Electric Power Corp
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Electric Power Corp, State Grid Corp of China SGCC filed Critical Shanghai Electric Power Corp
Priority to CN 201320149254 priority Critical patent/CN203178474U/en
Application granted granted Critical
Publication of CN203178474U publication Critical patent/CN203178474U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本实用新型涉及一种智能电能表快速瞬变脉冲群试验设备,用于检测智能电能表在快速瞬变脉冲群下的准确度,该设备包括操作台、耦合器、电压源、电流源及脉冲发生器,智能电能表设在操作台上,耦合器设在操作台上,耦合器与智能电能表通过电缆连接,电压源分别与智能电能表及耦合器连接,电流源与智能电能表连接,脉冲发生器的一端与耦合器连接,脉冲发生器的另一端连接地。与现有技术相比,本实用新型结构简单、操作方便,能够准确的检测智能电能表在快速瞬变脉冲群下的准确度。

Figure 201320149254

The utility model relates to a fast transient pulse group test equipment for an intelligent electric energy meter, which is used for testing the accuracy of the intelligent electric energy meter under the fast transient pulse group. The generator, the smart electric energy meter is set on the console, the coupler is set on the console, the coupler and the smart electric energy meter are connected by cables, the voltage source is connected with the smart electric energy meter and the coupler respectively, and the current source is connected with the smart electric energy meter. One end of the pulse generator is connected to the coupler, and the other end of the pulse generator is connected to the ground. Compared with the prior art, the utility model has simple structure and convenient operation, and can accurately detect the accuracy of the intelligent electric energy meter under the fast transient pulse group.

Figure 201320149254

Description

一种智能电能表快速瞬变脉冲群试验设备A smart electric energy meter fast transient burst test equipment

技术领域technical field

本实用新型涉及一种电能表试验设备,尤其是涉及一种智能电能表快速瞬变脉冲群试验设备。The utility model relates to an electric energy meter test equipment, in particular to an intelligent electric energy meter fast transient pulse group test equipment.

背景技术Background technique

针对目前电能表、电力用户用电信息采集系统在检定、检验体系中存在的问题,在进一步完善相关标准体系的同时,制定可操作性强的配套试验方法,明确应开展的试验项目,针对不同的试验项目提出各类试验设备的技术要求,提升试验工作能力,以满足用智能电能表大量应用和电信息采集系统大规模建设对计量中心检定、检测工作提出的要求。In view of the problems existing in the verification and inspection system of the current electric energy meter and the electricity consumption information collection system of power users, while further improving the relevant standard system, formulate a supporting test method with strong operability, clarify the test items that should be carried out, and aim at different The test project puts forward the technical requirements of various test equipment and improves the test work ability to meet the requirements for the verification and testing of the measurement center with the large-scale application of smart energy meters and the large-scale construction of electrical information collection systems.

目前电能表产品在脉冲群干扰下引起准确度变化的测试(即脉冲群影响量试验),一般试验装置复杂,试验操作繁琐,寻求一种装置简单,操作方便的智能电能表快速瞬变脉冲群试验设备就显得极为重要。At present, the test of the accuracy change caused by the electric energy meter product under the interference of the pulse group (that is, the test of the pulse group influence quantity) generally has complicated test devices and cumbersome test operations. It is necessary to seek a fast transient pulse group of smart electric energy meters with simple devices and convenient operation. Test equipment is extremely important.

实用新型内容Utility model content

本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种结构简单、试验方便、准确的智能电能表快速瞬变脉冲群试验设备。The purpose of this utility model is to provide a fast transient pulse group test equipment for intelligent electric energy meters with simple structure, convenient test and accuracy in order to overcome the above-mentioned defects in the prior art.

本实用新型的目的可以通过以下技术方案来实现:The purpose of this utility model can be achieved through the following technical solutions:

一种智能电能表快速瞬变脉冲群试验设备,用于检测智能电能表在快速瞬变脉冲群下的准确度,该设备包括操作台、耦合器、电压源、电流源及脉冲发生器,所述的智能电能表设在操作台上,所述的耦合器设在操作台上,耦合器与智能电能表通过电缆连接,所述的电压源分别与智能电能表及耦合器连接,所述的电流源与智能电能表连接,所述的脉冲发生器的一端与耦合器连接,脉冲发生器的另一端连接地。A smart electric energy meter fast transient burst test equipment, used to test the accuracy of the smart electric energy meter under the fast transient burst, the equipment includes an operating table, coupler, voltage source, current source and pulse generator The smart electric energy meter described above is set on the console, the coupler is arranged on the console, the coupler is connected to the smart electric energy meter through a cable, the voltage source is respectively connected to the smart electric energy meter and the coupler, and the described The current source is connected with the smart electric energy meter, one end of the pulse generator is connected with the coupler, and the other end of the pulse generator is connected with the ground.

所述的智能电能表与操作台之间通过铝板及绝缘底座隔开。The smart electric energy meter is separated from the operating table by an aluminum plate and an insulating base.

通过电压源及电流源为待测智能电能表电压线路、辅助线路通以参比电压,电流线路通以基本电流,分别在功率因数1.0和0.5L两点测量误差。Through the voltage source and current source, the reference voltage is passed to the voltage circuit and the auxiliary circuit of the smart energy meter to be tested, and the basic current is passed to the current circuit, and the error is measured at two points of power factor 1.0 and 0.5L respectively.

控制脉冲发生器发出干扰信号,干扰信号以共模方式分别作用在电压线路、电流线路和辅助线路上。电压线路和电流线路干扰电压4kV,参比电压超过40V的辅助线路干扰电压2kV;每一极性施加60s,在干扰情况下测量相同点误差;误差的改变应在相应标准规定的极限内。在试验时功能或性能有短暂的降低或失去是容许的。仪表准确度应在相应标准规定的极限内。The control pulse generator sends an interference signal, and the interference signal acts on the voltage line, the current line and the auxiliary line respectively in a common mode. The interference voltage of the voltage line and the current line is 4kV, and the interference voltage of the auxiliary line with a reference voltage exceeding 40V is 2kV; each polarity is applied for 60s, and the error of the same point is measured under the interference condition; the change of the error should be within the limit specified by the corresponding standard. A transient reduction or loss of function or performance during testing is acceptable. Meter accuracy should be within the limits specified by the appropriate standard.

与现有技术相比,本实用新型结构简单、操作方便,能够准确的检测智能电能表在快速瞬变脉冲群下的准确度。Compared with the prior art, the utility model has simple structure and convenient operation, and can accurately detect the accuracy of the intelligent electric energy meter under the fast transient pulse group.

附图说明Description of drawings

图1为本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.

图中,1  为操作台,2  为智能电能表,3  为耦合器,4  为脉冲发生器,5  为电压源,6  为电流源。In the figure, 1 is the console, 2 is the smart energy meter, 3 is the coupler, 4 is the pulse generator, 5 is the voltage source, and 6 is the current source.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型进行详细说明。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments.

实施例Example

一种智能电能表快速瞬变脉冲群试验设备,如图1所示,用于检测智能电能表2在快速瞬变脉冲群下的准确度,该设备包括操作台1、耦合器3、电压源5、电流源6及脉冲发生器4,智能电能表2通过铝板及绝缘底座设在操作台1上,耦合器3设在操作台1上,耦合器3与智能电能表2通过电缆连接,电压源5分别与智能电能表2及耦合器3连接,电流源6与智能电能表2连接,脉冲发生器4的一端与耦合器3连接,脉冲发生器4的另一端连接地。A smart electric energy meter fast transient burst test equipment, as shown in Figure 1, is used to detect the accuracy of the smart electric energy meter 2 under the fast transient burst, the device includes an operating console 1, a coupler 3, a voltage source 5. The current source 6 and the pulse generator 4, the smart energy meter 2 is set on the console 1 through an aluminum plate and an insulating base, the coupler 3 is set on the console 1, the coupler 3 and the smart energy meter 2 are connected by a cable, and the voltage The source 5 is respectively connected to the smart energy meter 2 and the coupler 3, the current source 6 is connected to the smart energy meter 2, one end of the pulse generator 4 is connected to the coupler 3, and the other end of the pulse generator 4 is connected to the ground.

通过电压源5及电流源6为待测智能电能表2电压线路、辅助线路通以参比电压,电流线路通以基本电流,分别在功率因数1.0和0.5L两点测量误差。控制脉冲发生器4发出干扰信号,干扰信号以共模方式分别作用在电压线路、电流线路和辅助线路上。Through the voltage source 5 and the current source 6, the reference voltage is passed to the voltage circuit and the auxiliary circuit of the smart energy meter 2 to be tested, and the basic current is passed to the current circuit, and the error is measured at two points of power factor 1.0 and 0.5L respectively. The control pulse generator 4 sends out interference signals, and the interference signals respectively act on the voltage line, the current line and the auxiliary line in a common mode.

电压线路和电流线路干扰电压4kV,参比电压超过40V的辅助线路干扰电压2kV;每一极性施加60s,在干扰情况下测量相同点误差;误差的改变应在相应标准规定的极限内。在试验时功能或性能有短暂的降低或失去是容许的。仪表准确度应在相应标准规定的极限内。The interference voltage of the voltage line and the current line is 4kV, and the interference voltage of the auxiliary line with a reference voltage exceeding 40V is 2kV; each polarity is applied for 60s, and the error of the same point is measured under the interference condition; the change of the error should be within the limit specified by the corresponding standard. A transient reduction or loss of function or performance during testing is acceptable. Meter accuracy should be within the limits specified by the appropriate standard.

上述的对实施例的描述是为便于该技术领域的普通技术人员能理解和应用本实用新型。熟悉本领域技术的人员显然可以容易地对这些实施例做出各种修改,并把在此说明的一般原理应用到其他实施例中而不必经过创造性的劳动。因此,本实用新型不限于这里的实施例,本领域技术人员根据本实用新型的揭示,不脱离本实用新型范畴所做出的改进和修改都应该在本实用新型的保护范围之内。The above description of the embodiments is for those of ordinary skill in the technical field to understand and apply the utility model. It is obvious that those skilled in the art can easily make various modifications to these embodiments, and apply the general principles described here to other embodiments without creative effort. Therefore, the utility model is not limited to the embodiments here, and improvements and modifications made by those skilled in the art according to the disclosure of the utility model without departing from the category of the utility model should be within the protection scope of the utility model.

Claims (2)

1.一种智能电能表快速瞬变脉冲群试验设备,用于检测智能电能表在快速瞬变脉冲群下的准确度,其特征在于,该设备包括操作台、耦合器、电压源、电流源及脉冲发生器,所述的智能电能表设在操作台上,所述的耦合器设在操作台上,耦合器与智能电能表通过电缆连接,所述的电压源分别与智能电能表及耦合器连接,所述的电流源与智能电能表连接,所述的脉冲发生器的一端与耦合器连接,脉冲发生器的另一端连接地。1. A smart electric energy meter fast transient burst test equipment is used to detect the accuracy of the smart electric energy meter under the fast transient burst, it is characterized in that the equipment includes an operating console, a coupler, a voltage source, and a current source and a pulse generator, the smart electric energy meter is arranged on the console, the coupler is arranged on the console, the coupler is connected with the intelligent electric energy meter through a cable, and the voltage source is connected with the intelligent electric energy meter and the coupled The current source is connected to the smart energy meter, one end of the pulse generator is connected to the coupler, and the other end of the pulse generator is connected to the ground. 2.根据权利要求1所述的一种智能电能表快速瞬变脉冲群试验设备,其特征在于,所述的智能电能表与操作台之间通过铝板及绝缘底座隔开。2. A smart electric energy meter fast transient burst test device according to claim 1, characterized in that, the intelligent electric energy meter is separated from the operating table by an aluminum plate and an insulating base.
CN 201320149254 2013-03-28 2013-03-28 Intelligent electric-energy-meter fast transient pulse group test equipment Expired - Lifetime CN203178474U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320149254 CN203178474U (en) 2013-03-28 2013-03-28 Intelligent electric-energy-meter fast transient pulse group test equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320149254 CN203178474U (en) 2013-03-28 2013-03-28 Intelligent electric-energy-meter fast transient pulse group test equipment

Publications (1)

Publication Number Publication Date
CN203178474U true CN203178474U (en) 2013-09-04

Family

ID=49075152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320149254 Expired - Lifetime CN203178474U (en) 2013-03-28 2013-03-28 Intelligent electric-energy-meter fast transient pulse group test equipment

Country Status (1)

Country Link
CN (1) CN203178474U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103558580A (en) * 2013-11-14 2014-02-05 国家电网公司 System and method for detecting surge immunity of electric energy meter
CN103616659A (en) * 2013-12-02 2014-03-05 国家电网公司 Automatic reliability test device and method for intelligent ammeters under circumstance of instant voltage interruption
CN105093162A (en) * 2015-08-07 2015-11-25 国家电网公司 Method and device for calibrating measurement error of electric energy meter under pulse train interference condition

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103558580A (en) * 2013-11-14 2014-02-05 国家电网公司 System and method for detecting surge immunity of electric energy meter
CN103616659A (en) * 2013-12-02 2014-03-05 国家电网公司 Automatic reliability test device and method for intelligent ammeters under circumstance of instant voltage interruption
CN103616659B (en) * 2013-12-02 2016-08-17 国家电网公司 Intelligent electric energy meter transient voltage interrupts automatic testing equipment and the method for lower reliability
CN105093162A (en) * 2015-08-07 2015-11-25 国家电网公司 Method and device for calibrating measurement error of electric energy meter under pulse train interference condition

Similar Documents

Publication Publication Date Title
CN103777079A (en) Anti-interference parameter integration testing device for ultra-high voltage line
CN103604992B (en) The method and system of nuclear phase on-load school protection that Substation secondary circuit is wireless
CN103630729A (en) One-step wiring device and method for testing 1000kV lightning arrester reference voltage and leakage current
CN203069672U (en) Loop resistance testing system
CN203178474U (en) Intelligent electric-energy-meter fast transient pulse group test equipment
CN102565608A (en) Multipoint grounding seeking instrument of voltage transformer
CN104808169A (en) Three-phase electric energy meter field detection device and detection method
CN203299284U (en) Phase detecting device for 10kv switch cabinet
CN103018525B (en) Transformer station's internal short-circuit distribution of current is carried out to the apparatus and method of synchro measure
CN203643518U (en) Three-phase phase sequence verification device
CN105652184A (en) Hardware testing equipment for battery management system
CN204287382U (en) DC system grounding searches device
CN203224571U (en) A flexible grounding resistance tester
CN204330849U (en) A kind of Multi-function experimental virtual instrument
CN202533538U (en) A multipoint earthing searcher of a potential transformer
CN202720326U (en) A system-level automatic calibration device for general test equipment
CN201974517U (en) Metering detection device for earth resistance testers
CN105891613A (en) Method for measuring phase sequence of power transmission line by using power frequency parameter tester
CN103197152A (en) Flexible earth resistance tester
CN204789763U (en) Circuit iron tower ground net impulse grounding impedance measuring apparatu
CN205139227U (en) Current conversion station earthing pole feeder cable current test device
CN203894346U (en) Cable power frequency parameter testing apparatus
CN203025236U (en) Device for synchronously measuring short circuit current distribution in transformer station
CN202119928U (en) Analog scaling device for dual laterolog equipment
CN203012053U (en) A test device for the impedance characteristics of the port of high-voltage power equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130904

CX01 Expiry of patent term