CN203131219U - Combined pipeline support device - Google Patents

Combined pipeline support device Download PDF

Info

Publication number
CN203131219U
CN203131219U CN 201320125295 CN201320125295U CN203131219U CN 203131219 U CN203131219 U CN 203131219U CN 201320125295 CN201320125295 CN 201320125295 CN 201320125295 U CN201320125295 U CN 201320125295U CN 203131219 U CN203131219 U CN 203131219U
Authority
CN
China
Prior art keywords
fixed
support main
supportive
fixing
combined pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320125295
Other languages
Chinese (zh)
Inventor
赵士立
Original Assignee
赵士立
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 赵士立 filed Critical 赵士立
Priority to CN 201320125295 priority Critical patent/CN203131219U/en
Application granted granted Critical
Publication of CN203131219U publication Critical patent/CN203131219U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a combined pipeline support device, which comprises a trapezoidal support main body, wherein an arc-shaped fixing groove is formed in the top of the support main body; two fixed base stations are arranged on the two sides of the fixing groove respectively; one first fixing through hole is formed in each fixed base station; two fixing bed plates are fixed on the two sides of the support main body respectively; second fixing through holes are formed in the fixing bed plates; and a guidance sliding chute is formed in the bottom of the support main body. The combined pipeline support device has the advantages that the whole support main body can be mounted on a metal cross strip by the means of the guidance sliding chute of the support main body, so that the stability and the reliability of mounting a pipeline are improved, and the pipeline is prevented from displacement; and besides, the support main body is made of hard rubber, so that the shock-absorbing performance of the device is further improved.

Description

A kind of combined pipeline support device
Technical field
The utility model relates to a kind of pipe-line equipment, or rather, is a kind of combined pipeline support device.
Background technique
In the process of arranging the workshop gas piping, for pipeline fixing and protection conveying gas, utilize special base to support usually.Existing base utilizes bolt to be fixed on the work surface, because the pulsation of gas piping vibrations are bigger, causes that pipeline is as easy as rolling off a log to be shifted, and influence the Safety performance of gas conveying.
Summary of the invention
The utility model mainly is to solve the existing in prior technology technical problem, thereby a kind of combined pipeline support device is provided.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
A kind of combined pipeline support device, described combined pipeline support device comprises a trapezoidal supportive body, the top of described supportive body is provided with an arcuate fixed groove, the both sides of described fixed groove are respectively equipped with a fixing base station, described fixedly base station is provided with first fixed via, the both sides of described supportive body are respectively equipped with a fixed base plate, and described fixed base plate is provided with second fixed via, and the bottom of described supportive body is provided with a guiding chute.
As the utility model preferred embodiment, described supportive body is that vulcanite is made.
Combined pipeline support device of the present utility model utilizes the guiding chute of supportive body, whole supportive body can be installed on the lateral metal bar, has improved pipeline mounting stability and reliability greatly, prevents its displacement.In addition, this supportive body is that vulcanite is made, and has further improved its damping performance.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technological scheme of the prior art, to do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below, apparently, accompanying drawing in describing below only is embodiments more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the perspective view of combined pipeline support device of the present utility model;
Fig. 2 is the perspective view of the combined pipeline support device among Fig. 1, and be another visual angle this moment;
Wherein,
1, combined pipeline support device; 2, supportive body; 3, fixed groove; 4, fixing base station; 41, first fixed via; 5, fixed base plate; 51, second fixed via.
Embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present utility model is described in detail, thereby so that advantage of the present utility model and feature can be easier to be it will be appreciated by those skilled in the art that protection domain of the present utility model is made more explicit defining.
Extremely shown in Figure 2 as Fig. 1, combined pipeline support device 1 of the present utility model comprises a trapezoidal supportive body 2, the top of this supportive body 2 is provided with an arcuate fixed groove 3, the both sides of this fixed groove 3 are respectively equipped with a fixing base station 4, fixedly base station 4 is provided with first fixed via 41, the both sides of this supportive body 2 are respectively equipped with a fixed base plate 5, and fixed base plate 5 is provided with second fixed via 51, and the bottom of this supportive body 2 is provided with a guiding chute 6.
This supportive body 2 is made for vulcanite.
The above only is embodiment of the present utility model, but protection domain of the present utility model is not limited thereto, and any variation or replacement of expecting without creative work all should be encompassed within the protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain that claims were limited.

Claims (2)

1. combined pipeline support device, it is characterized in that, described combined pipeline support device (1) comprises a trapezoidal supportive body (2), the top of described supportive body (2) is provided with an arcuate fixed groove (3), the both sides of described fixed groove (3) are respectively equipped with a fixing base station (4), described fixedly base station (4) is provided with first fixed via (41), the both sides of described supportive body (2) are respectively equipped with a fixed base plate (5), described fixed base plate (5) is provided with second fixed via (51), and the bottom of described supportive body (2) is provided with a guiding chute (6).
2. combined pipeline support device according to claim 1 is characterized in that, described supportive body (2) is made for vulcanite.
CN 201320125295 2013-03-19 2013-03-19 Combined pipeline support device Expired - Fee Related CN203131219U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320125295 CN203131219U (en) 2013-03-19 2013-03-19 Combined pipeline support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320125295 CN203131219U (en) 2013-03-19 2013-03-19 Combined pipeline support device

Publications (1)

Publication Number Publication Date
CN203131219U true CN203131219U (en) 2013-08-14

Family

ID=48939198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320125295 Expired - Fee Related CN203131219U (en) 2013-03-19 2013-03-19 Combined pipeline support device

Country Status (1)

Country Link
CN (1) CN203131219U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103925460A (en) * 2014-05-06 2014-07-16 苏州市诚品精密机械有限公司 Support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103925460A (en) * 2014-05-06 2014-07-16 苏州市诚品精密机械有限公司 Support

Similar Documents

Publication Publication Date Title
CN204300619U (en) The hydraulic type Shockproof base of water turbine
CN103470861B (en) Vertical pipe vibration vibration damping pipe carrier
CN104006218A (en) Pipeline support structure
CN104061367A (en) Combined-type pipeline support device
CN104015650B (en) A kind of adjustable automobile anchor fitting
CN203131219U (en) Combined pipeline support device
CN104739055A (en) Furniture foot fixing part for intelligent furniture
CN203292747U (en) Multi-station welding test board locating device
CN204554075U (en) Petroleum pipeline supporting frame
CN203274576U (en) Shockproof base of tubular heat exchanger
CN203067541U (en) Linear guide rail
CN205013575U (en) Novel hydraulic pressure is stood for municipal works
CN205076681U (en) A supplementary guider for angle steel coaster
CN203363604U (en) Vehicle-mounted movable computer bracket
CN204609847U (en) A kind of new pumping unit positioning base
CN204180224U (en) A kind of loud speaker switching mounting support structure and vehicle
CN204541398U (en) A kind of furniture leg fixed part for intelligentized Furniture
CN204756158U (en) Fixing device of rig oil circuit pipeline
CN204818787U (en) Bore adjustment mechanism of axle housing upset anchor clamps
CN204590141U (en) A kind of power shovel buffer
CN203880239U (en) Pipeline support structure
CN103016520A (en) Linear guide rail
CN210069482U (en) Liquefied natural gas transportation damping device
CN203135641U (en) Anti-shock base of motor
CN105065784A (en) Automobile pipeline bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EE01 Entry into force of recordation of patent licensing contract

Assignee: Lianyungang Lifeng medical oxygen product Co., Ltd.

Assignor: Zhao Shili

Contract record no.: 2014320000627

Denomination of utility model: Combined-type pipeline support device

Granted publication date: 20130814

License type: Exclusive License

Record date: 20140725

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EC01 Cancellation of recordation of patent licensing contract

Assignee: Lianyungang Lifeng medical oxygen product Co., Ltd.

Assignor: Zhao Shili

Contract record no.: 2014320000627

Date of cancellation: 20140826

EXPY Termination of patent right or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130814

Termination date: 20150319